Third Party Re Pack Production Process_Manual.doc
Citation preview
Third Party Re Pack Production ProcessProcess Flow
1. CS01 Creation of Bill of Material
Put the Finished material code and plant along with BOM usage.
Press enter
Put item category as (L) and component along with the quantity required.
Lick on Item 0010
Click on Status/Lng Text
Select not Relevant to costing
Enter and save.
2. CA01- Creation of Routing for Re pack material.
Press Enter
Click on Operation Tab.
Put the work center and activity time required 3. CO01- Create production order
Put the Re Pack material code, Productio plant and select order type ZP04 (Re Packing Production Order)
Press Enter
Put the Quantity to be produce
Production Start and End date
Click on Release button & save.
4. CO11N- Production order confirmation
Put the order no. and click on Actual data
Note System will pick all Plan data from production order.Put the Actual data and save.5. MB1A- Enter Goods Issue against a Production Order.
Enter the movement type 261
Plant NJ02
Storage Location NJ20 and Click on To Order Tab.
Put the production order and click on Enter.
Enter the batch and save.
6. MB31- Enter Goods Receipt against production orders.
Enter the movement type 101
Order - 5000001
Plant NJ02Storage Location NJ20 and Press Enter
Click on Enter & Put the date of manufacturing SaveNote- For each Re pack materials goods receipt Accounting Entry will be generated, as its treated as valuated with the value of activity cost and any own packing material used in production.
7. KO88- Order Settlement
CS01
Creation of BOM
CO01
Create Production Order
CA01
Creation of Routing for Re pack material
C011N
Production Order Confirmation
MB1A
Enter Goods Issue against a Production Order
MB31
Enter Goods Receipt against production orders
KO88
Order Settlement