6
Global  TPI Services We Pr ovi de Pr e-Shi pment Inspect ion, V endor Inspectio n and Com mo dity Ins pect ion Services. Click Here for More Information Home About Services Contact What's New! Privacy Policy Third Party Inspection for Control Panel The Third Party Inspec tion for Contro l Panel article provide s you informati on about control panel test and control pane inspection in manufacturing shop. You may need to review this article in conjunctions of following article: Inspection and Test Plan for Control Panel This content gui des you abo ut all necess ar y stages in the producti on of the Control Pane ls from the examination of raw material to the final inspecti on, preservation and packing to despatch to site. You need to take this point in account this article is written for a typical Control Panel and might not be complete for special cases. This content may be use ful for second party ins pec tors, Co ntr ol Panel manufacture quality control personnel, engineering companies and purchasers as well. All Control Panel inspections and tests are carried out against the approved drawings, purchase order specifications, purchasers or company standards, and wi thi n the pract ices and rules of the co untry, st at e or pro vinc e and any government decrees, laws, ordinance or regulation as may apply. The applicable codes and spec ifi cat ions for the contro l panel which is under constr uction process are: Design code Purchase order sp ecification Purchaser's standards Approved drawings The applicable codes and standard may be based any int er nat ional standards. This content is general and can be use ful for all recognized standards. Required Documents for Third Party Inspector Review: The list of documents normally is agreed in the Pre Inspection meeting which is hold several weeks before actual commencement of inspection work. The parties which are participated in this meeting are manufacture, purchaser and third party inspection agency representatives. Select Languag e  Please Click the Facebook Like and g +1 Recommend Buttons If You Feel our Articles are Useful. Home General Articles Third Party Inspection Pre-Shipment Inspection Goods Inspection Vendor Inspection Inspection and Test Plan Shop Inspection Factory Acceptance Test Comm odity Inspection Industrial Quality Control Industrial Inspection Approved Vendor List Plant Inspection Fix Equipment Articles Pressure Vessel Heat Exchanger Steam Boiler Storage Tank Piping System Industrial Valve Process Heater Rotary Equipment Articles Centrifugal Pump Centrifugal Compressor Reciprocating Compressor Gas Turbine Steam Turbine Custom Search Follow Us on Follow Us on TPI Blog Search This Website Global TPI Services Approved Vendor Lists We wi ll be up dat ing and grow ing this s ite with more an d more of in dustr ial inspection related articles. Please subscribe to ou r monthly newsletter so you don't miss a thing. Enter Your E-mail Address Enter Your First Name (optional) Like 207 Like 207 Th ird Part y I nspection for Con trol Panel ht tp://www.inspection-f or-indust ry.com /third-part y-inspect ion-f or-control... 1 of 6 10/29/2012 17:03

Third Party Inspection for Control Panel

Embed Size (px)

Citation preview

Page 1: Third Party Inspection for Control Panel

7/27/2019 Third Party Inspection for Control Panel

http://slidepdf.com/reader/full/third-party-inspection-for-control-panel 1/6

Global TPI Services

We Provide Pre-Shipment

Inspection, Vendor Inspection

and Commodity Inspection

Services. Click Here for More

Information

Home About Services Contact What's New! Privacy Policy

Third Party Inspection for Control Panel

The Third Party Inspection for Control Panel article provides you information

about control panel test and control pane inspection in manufacturing shop.

You may need to review this article in conjunctions of following article:

Inspection and Test Plan for Control Panel

This content guides you about all necessary

stages in the production of the Control Panels

from the examination of raw material to the final

inspection, preservation and packing to despatch

to site.

You need to take this point in account this article

is written for a typical Control Panel and might not be complete for special cases.

This content may be useful for second party inspectors, Control Panel

manufacture quality control personnel, engineering companies and purchasers

as well.

All Control Panel inspections and tests are carried out against the approved

drawings, purchase order specifications, purchasers or company standards, and

within the practices and rules of the country, state or province and any

government decrees, laws, ordinance or regulation as may apply.

The applicable codes and specifications for the

control panel which is under construction process

are:

Design code

Purchase order specification

Purchaser's standards

Approved drawings

The applicable codes and standard may be based

any international standards. This content is

general and can be useful for all recognized

standards.

Required Documents for Third Party Inspector Review:

The list of documents normally is agreed in the Pre Inspection meeting which is

hold several weeks before actual commencement of inspection work. The parties

which are participated in this meeting are manufacture, purchaser and third party

inspection agency representatives.

Select Language   ▼

Please Click the Facebook Like

and g +1 Recommend Buttons If

You Feel our Articles are Useful.

Home

General Articles

Third Party Inspection

Pre-Shipment Inspection

Goods Inspection

Vendor Inspection

Inspection and Test Plan

Shop Inspection

Factory Acceptance Test

Commodity Inspection

Industrial Quality Control

Industrial Inspection

Approved Vendor List

Plant Inspection

Fix Equipment Articles

Pressure Vessel

Heat Exchanger

Steam Boiler

Storage Tank

Piping System

Industrial Valve

Process Heater

Rotary Equipment Articles

Centrifugal Pump

Centrifugal Compressor

Reciprocating Compressor

Gas Turbine

Steam Turbine

Custom Search

Follow Us on

Follow Us on TPI Blog

Search This Website

Global TPI Services

Approved Vendor Lists

We will be updating and

growing this s ite with more

and more of industrial

inspection related articles.

Please subscribe to ourmonthly newsletter so you

don't miss a thing.

Enter Your E-mail

Address

Enter Your First Name

(optional)

Like 207

Like 207

Party Inspection for Control Panel http://www.inspection-for-industry.com/third-party-inspection-for

10/29/20

Page 2: Third Party Inspection for Control Panel

7/27/2019 Third Party Inspection for Control Panel

http://slidepdf.com/reader/full/third-party-inspection-for-control-panel 2/6

This already explained in the Inspection and Test Plan for Control Panel article.

These are the list of documents which are normally agreed to be presented to

the inspector:

Control Panel Purchase Order or Contract

Control Panel Manufacture Quality Control Plan

Control Panel Inspection and test plan

Control Panel Data Sheet

Control Panel Approved drawings, (arrangements, schematics, wiring,

single line)

Control Panel Material Test Reports

Control Panel Welding Specification Procedures (WPS) and Procedure

Qualification Records(PQR)

Control Panel Welders Qualifications Reports

Control Panel Calibration Certificates for Test Equipment

Control Panel Special procedures

Control Panel Special qualifications

Control Panel Preparation and Painting Procedure

Control Panel Preservation, Packing and Shipping Procedure

Control Panel Packing List

Third Party Inspection for Control Panel-Material Inspection

The first actual inspection work in the Control Panel is raw materials inspection.

The original or authenticated copies of mill certificates of material normally are

available at manufacturer's premises.

The third party inspector examines these certificates for compliance with

specifications and where appropriate, drawings.

The review includes checks on:

Certificate No.

Heat or cast No.

Chemical composition.

Mechanical properties.

Heat treated condition.

NDE applied and results.

Surface finish

Then inspector witnesses the materials identification on the certificates against

materials marking. It is also necessary to check with Control Panel drawing

datasheet, material list and other specification as appropriate.

We Provide TPI Inspection Services in most Industrial Areas in the

Globe. Click Here for More Information

Visual inspection for surface finish and probable defects is done and

dimensional compliance with specification need also to be controlled.

When the third party inspector carried out the material inspection, then provides

inspection visit report (IVR), the report contains following items:

Confirmation of satisfactory document review

Record of the endorsement of certification reviewed/witnessed

Record of all non-conformities

Record of any tests witnessed and the result

Fan and Blower

Electrical Equipment

Articles

Induction Motor

Generator

Power Transformer

Switchgear

Gas Circuit Breaker

UPS Storage Battery

Power Cable

Control Panel

Electrical Insulator

Editor

About

Services

Contact

TPI Inspection Blog

Privacy Policy

[?]Subscribe To This Site

Then

Don't worry — your e-mail

address is totally secure.

I promise to use it only to

send you Inspection for

Industry Newsletter .

Party Inspection for Control Panel http://www.inspection-for-industry.com/third-party-inspection-for

10/29/20

Page 3: Third Party Inspection for Control Panel

7/27/2019 Third Party Inspection for Control Panel

http://slidepdf.com/reader/full/third-party-inspection-for-control-panel 3/6

Third Party Inspection for Control Panel Construction

When Control Panel raw material inspection carried out and results was

satisfactory or non-conformities closed by remedial action, then Control Panel

manufacture will start fabrication.

The third party Inspector checks following points on control panel based on the

inspection and test plan (ITP) which is already agreed between purchaser and

control panel manufacture.

The inspection scope is determined in the ITP, some purchasers prefer to have

stringent control and assign the TPI inspector in more “hold or witness points” for

inspection and test activities and some others prefer lesser “hold or witness

points” and assign TPI much more in the “review document”.

This depend to the inspection budget which purchasers assign for inspection,

much more inspection will have much more costs and less risks and conversely

less more inspection will have less costs but more risks.

For more detail review Inspection and Test Plan for Control Panel article. There is

draft ITP in this article which I believe it is the best practice for Control Panel

inspection.

The third party inspector checks following items in Control Panel construction

process:

Paint using specified colour swatch, thickness measurement, if specified

Name plate control

Outline dimensions, interface dimensions, bus bar dimensions and

Clearances and other specified dimensions

Tightness/torque of terminals

Degree of protection

It is necessary the results to meet drawings and applicable standards.

Third Party Inspection for Control Panel General Arrangement Check

The third party inspector checks that all instruments, compartments, control

switches etc. are correctly rated and are correctly located, with specified labelling

in accordance of approved drawings.

If the third party inspector is not in hold or witness point in the project ITP for this

stage, then will review control panel manufacture quality control report in his/her

coming visit or in the final inspection day.

Third Party Inspection for Control Panel Insulation Resistance Test

Insulation resistance is measured between control circuits and earth (with

sensitive devises excluded) with a 500V Megger.

Similarly insulation resistance is measured in all applicable permutations for any

power circuits, if these are included within the control system, with a Megger

selected to the voltage calculated appropriate to the applicable specification.

The test result depends to the circuit but would not be acceptable if it is less

than 2 Megohms.

If the third party inspector is not in hold or witness point in the project ITP for this

stage, then will review control panel manufacture quality control report in his/her

coming visit or in the final inspection day.

Party Inspection for Control Panel http://www.inspection-for-industry.com/third-party-inspection-for

10/29/20

Page 4: Third Party Inspection for Control Panel

7/27/2019 Third Party Inspection for Control Panel

http://slidepdf.com/reader/full/third-party-inspection-for-control-panel 4/6

Control Panel Withstand Voltage Test (Dialectric Test)

Power frequency voltage of 1.5 kV is applied between control circuits and earth

for 1 minute.

Similarly power frequency voltage, calculated appropriate to the applicable

specification, is applied to all applicable permutations for power circuits for 1

minute.

The test would be acceptable if no flashover and puncture occurs during thetest.

Similarly if the third party inspector is not in hold or witness point in the project

ITP for this stage, then will review control panel manufacture quality control

report in his/her coming visit or in the final inspection day.

Third Party Inspection for Control Panel Sequence Test

Control circuitry is functionally tested and circuits proven by appropriate tests.

The test result would be acceptable if meet approved schematic diagrams

(including appropriate, recorded, “as built” alterations) and project philosophy

Similarly if the third party inspector is not in hold or witness point in the project

ITP for this stage, then will review control panel manufacture quality control

report in his/her coming visit or in the final inspection day.

Third Party Inspection for Control Panel Mechanical Operation Test

The following mechanisms are checked for operation:

Locking

Interlocking systems

Drawing mechanisms

Opening and shutting mechanisms

Interchangeability.

The test would be acceptable if all mechanisms work correctly.

Similarly if the third party inspector is not in hold or witness point in the project

ITP for this stage, then will review control panel manufacture quality control

report in his/her coming visit or in the final inspection day.

Third Party Inspection for Control Panel Painting and Coating Inspection

Surface preparation for painting is checked for the following points, according to

specification by third party inspector:

Cleaning method (Blast or scraping and wire brushing)

Preparation grades

Freedom from weld spatter, blow-holes and other defects

Dry film thickness is checked according to specification

It is necessary surface condition to be free from pin-holes, runs damage and

other discontinuity.

We Provide TPI Inspection Services in most Industrial Areas in the

Globe. Click Here for More Information

Similarly if the third party inspector is not in hold or witness point in the project

ITP for this stage, then will review control panel manufacture quality control

Party Inspection for Control Panel http://www.inspection-for-industry.com/third-party-inspection-for

10/29/20

Page 5: Third Party Inspection for Control Panel

7/27/2019 Third Party Inspection for Control Panel

http://slidepdf.com/reader/full/third-party-inspection-for-control-panel 5/6

report in his/her coming visit or in the final inspection day.

Third Party Inspection for Control Panel Reporting:

Third party inspector provides Inspection Visit Report (IVR) after each visit as well

as a final report summarising the activities carried out during the Control Panel

production in accordance with the contract requirements and circulated within

the time limits specified in the contract.

The report is in the format required by the client and clearly indicates final

acceptance or rejection of the Control Panel.

Third Party Inspection for Control Panel Release Note:

When required by the contract or purchase order a release note is issued by

third party agency and given to the manufacturer when the Control Panel have

been finally accepted.

Third Party Inspection for Control Panel Packing, Marking and Shipping:

The following points are checked by the third party inspector:

Verify that the packing materials conform to specifications and accepted

practice for the mode of transport.

Verify protection against humidity, abrasion, distortion and other damage.

Verify shipping marks to marking instructions and record.

Verify handling marks.

Recommend this on Google

Related Articles:

Third Party Inspection for Generator, Third Party Inspection for Bus Duct, Third Party

Inspection for Power Transformer, Third Party Inspection for Power Cable, Third Party

Inspection for Induction Motor, Third Party Inspection for Insulator, Third Party

Inspection for Gas Circuit Breaker, Third Party Inspection for Battery Charger, ThirdParty Inspection for UPS Storage Battery, Third Party Inspection for Switchgear, Third

Party Independent Inspection, Third Party Quality Inspection, Third Party Inspection

Services, Third Party Inspection agency

Other Related Articles:

Industrial Inspection, Shop Inspection, Pre-Shipment Inspection, Factory Acceptance

Test, Goods Inspection, Commodity Inspection, Vendor Inspection, Vendor Inspection

Services,  Goods Inspection Services,  Commodity Inspection Services, Preshipment

Inspection Services, 3rd Party Shop Inspection,  Third Party Inspection for Material

Stamp, Quality Control Plan, Quality Control Manuals for Contractors, Quality Control

Manual, Contractor Quality Control Plan, Third Party Inspection Expediting, Industrial

Quality Control, Quality Control Forms, Approved Vendor List

Return from Third Party Inspection for Control Panel to Third Party Inspection

Return from Third Party Inspection to Inspection for Industry Home

Recommend this on Google

New! Comments

Have your say about what you just read! Leave me a comment in the box below.

Like Send 207 people like this.

Like Send 207 people like this.

Party Inspection for Control Panel http://www.inspection-for-industry.com/third-party-inspection-for

10/29/20

Page 6: Third Party Inspection for Control Panel

7/27/2019 Third Party Inspection for Control Panel

http://slidepdf.com/reader/full/third-party-inspection-for-control-panel 6/6

Share this page:What's This?

Enjoy this page? Please pay it forward. Here's how...

Inspection 4 Industry LLC

Tel International: 0037257536267

Tel USA: 0013106518570

Facebook soc ial plugin

Add a comment...

Comment using... 

Party Inspection for Control Panel http://www.inspection-for-industry.com/third-party-inspection-for