Upload
amelia-todd
View
216
Download
0
Tags:
Embed Size (px)
Citation preview
THINK DISCOVER DO
industrialpartners
INDUSTRIALPARTNERS works for many CUSTOMERS from differentranges in INDUSTRY and TRADE
Developed by industrialpartners
1 2 3 4 5
• Time schedule• Development of a specification sheet in cooperation with R&D-Department• Briefing
1. Preliminary conception phase
2. Revision phase 3. Elaboration phase • Manufacturing of a Prototype
Project schedule for e.G. Lincoln ; Germany
Development of production equipment – here: measuring systems for quality control
adapt sensors sensor testing evaluating signal quality
sensor holder
exchangeable device
test control unit
test desk
Developed by industrialpartners
Project schedule for e.G. Lincoln ; Germany
Development of production equipment – here: measuring systems for quality control
Developed by industrialpartners
Developed by industrialpartners
Project schedule for e.G. Lincoln ; Germany
Development of production equipment – here: measuring systems for quality control
Developed by industrialpartners
Developed by industrialpartners
Your Contact in Germany
industrialpartners GmbH
Jens ArendGwinnerstraße 34-3660388 Frankfurt am Main
FON: 00 49 / (0)177 / 312 60 07E-MAIL: [email protected]: www.industrialpartners.de
industrialpartners GmbH
Jens SchnurAlte Strasse 2264743 Beerfelden
FON: 00 49 / (0) 60 68 / 9 30 02 – 41E-MAIL: [email protected]: www.industrialpartners.de