COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Mr. Johan Brand, Director,
African Carbon Energy
SA UCG Association Workshop
8 August 2016
Update on Africary’s
Theunissen UCG Project
Africary is proud to be a founding
member of the SA UCG Association
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
AFRICARY’s vision
“To build own and operate a
Modern Commercial UCG plant”and then grow to large scale Poly-generation
African Carbon Energy was established as a South African coal mining
company in 2009 as a 50:50 Partnership between Johan Brand and Eliphus
Monkoe
The company was founded on our expertise in mining, exploration,
gasification and specifically Underground Coal Gasification (UCG)
To utilize clean, green and efficient technologies based on UCG syngas in
Gas Engines or IGCC power systems
Future CtL Diesel opportunities
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
African Carbon Energy (“Africary”)
• 50% BEE Junior Coal Mining Company
• Focused on the growing market demand for electricity with a 20 year DoE - IPP base load off-take agreement
• From 2010 to 2012 Africary finalized the deal for a 1 billion ton coal resource from BHP Billiton SA that is ideally suited for UCG in the Free State
• We also bought 2 farms ideally placed for our first project
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
IPPProcurement Programme
Department of
Energy
(DoE)
National
Treasury
(NT)
Development
Bank of
Southern Africa
(DBSA)
IPP Procurement Programme
In 2012, the Minister of Energy directed thatnew IPP generation capacity should beprocured from hydro, coal and gas sources tosupport the South Africa’s base load energymix and added generation from gas as part ofthe medium-term risk mitigation strategy
The Determinations require that 3,126 MW ofbaseload and/or mid-merit from gas-firedpower generationThe gas will be from both imported anddomestic gas resources.
Government guaranteed 20 yearsovereign offtake by Eskom
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
18 Months ago (2 Feb 2015) the IPP Office declared:
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY 7
IPP Office Communication - Update
• IPP Procurement Program Office are coordinating the development of the Gas Utilization Master Plan (GUMP)
• Minister of Energy Tina Joemat-Pettersson at World Energy Forum states on 22 Jan 2016 said that Gas-IPP will be launched by Fiscal Q2 (July-September 2016)
• 3,126 MW allocated for gas with special allocation for UCG as domestic gas supply• Africary UCG Project expecting bid opening in H2/2016
http://www.gov.za/speeches/minister-tina-joemat-pettersson-visit-world-energy-forum-wef-davos-switzerland-january-2016
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Flow Scheme Options
8
Combined Heat and Power Generation
Methanol& Higher Alcohols
Substitute Natural Gas (SNG)
FT Syncrude
Hydrogen
GasificationSyngas
To Oxo Chemicals & Derivatives
MTBEFormaldehideDMEAcetic AcidAcetaldehydeAcetic AnhydrideChloromethanesDMTMMAMethyl Amine
Ethylene & Propylene
Gasoline &Diesel Fuel
Gasoline & Diesel FuelEthylene & Propylene
Urea (fertiliser)
To Refining Upgradingto Naphtha Steam CrackerAlpha OlifinsLube Oil Based StockSpecial Waxes
To Hydrogenation (Pet refining & Others)To HydrocrackingTo Ammonia SynthesisPossible Fuel-Cell Fuel
Possible Fuel-Cell Fuel
IGCC (Integrated
Gasification Combined
Cycle) or Gas-Engine
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Coal to 50 MWe
Coal to Gas:
Energy conversion is
75% to 85% efficient
Gas to Electricity:
Energy conversion is
38% efficient
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Carbon Energy Australia
Injection well
Production well
10
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
15
Power Generation Gas Engines can operate on Syngas
produced directly from UCG
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
EPC supported by Group Five
9
• Group Five agreed to be the EPC contractor for the Theunissen UCG Project
• Past projects includes:• Saldana Steel 35MWe gas to power• Shell VRU’s – Installation of Vapour Recovery Units• Cabinda Gas Plant (Angola)• PetroSA, • Over 10,000 employees
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Project Finance supported by Nedbank
8
• Nedbank is the 4th largest bank in South Africa
• Financed $2,6 billion of Renewable Energy IPP projects since 2013
• Nedbank agreed to project finance 70% of the Africary 50MW project
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
The TUCG Project Status
Step 1: Domestic Gas-IPP program a suitable electricity Market - from DOE
Step 2: Purchased UCG coal 2012: 1 billion ton Resource - from BHP
Step 3: Explored the resource and obtain surface rights (600 ha)
Step 4: Designed and finalized engineering for the mine & 50MW power station
Step 5: Bankable Feasibility Study + Financial assessment – PWC
Step 6: Received Environmental Approval & Emission permits in 2015
Step 7: Received Mining Right Application Approval in 2016
Step 8: Bank project support approval – Signed Nedbank
Step 9: EPC and O&M service level agreements – Signed Group5
Step 10: IPP Office indicated domestic Gas RFP by Q3/2016
PPA Offtake Agreement and Financial Close by Q3/2017
Operations planned from Q2/2019
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Africary Project Progress
Gas RFP
Bid Opening;
Q3* 2016
(Nov 2016*)
PPA Finalisation
Project
Financial Close
Q3 2017
DoE Gas RFI
Registration
May 2015
to June 2015
EIA Approval +
Air emission
licence
Nov 2015
Completion of
Bankable Feasibility
Study in Q4 2014
PROJECT READY
for
IMPLEMENTATION
Engage Nedbank
& Group 5 as
Financier + EPC
2015
Construction and
Commissioning
and first
electricity
production by
H2/2019
24 moths
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Africary’s future:120 year’s of coal under our farms
21
60 years of production in the East Farm
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Resource Classification
AreaSAMREC *
Classification
Gross CoalVolumes
(million tons)
Gross Syngas
Volumes (PJ)SPE Category**
Gross GasVolumes (tcf)
UCG Project
Measured 3.7 721P Reserve
(Proven)72 bcf
PalmietkuilFarms
Indicated+
Inferred
5.0+
21447
2P Reserve (Proven + Probable)
0.5 tcf
TheunissenResource
Inferred 1,000 16,560
3P Reserve (Proven +
Probable + Possible)
16.6 tcf
22
* SAMREC classification as signed off by a Competent person.
**SPE = Society of Petroleum Engineers category, but the values in the table are indicative only
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Advantages of UCG technology – positive
environmental impact
UCG power generation produces 25% less CO2 per MWe and in large scale
Combined Cycle mode can reach energy efficiencies of up to 55%
compared to current 35%.
UCG has no dust particulate emissions or ash handling AND little or no
leaching of trace elements from ash when operated correctly / optimally
UCG mining and power generation uses much less water
Less sulphur and heavy metals are released or emitted by the UCG
process
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
Conventional Boilers produce smog
With UCG
no
SMOG!!
UCG Electricity does not release
particulates into the atmosphere!
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
What is the future of UCG in SA?
• Coal is to South Africa what oil has been to the industrialised world
• It provides 70% of the country’s energy needs and 93% of its electricity + CTL
• However, several concerns confront coal mining and usage in SA and the major issues include: – increasing costs,
– lowering coal quality,
– water scarcity,
– carbon taxes
– discard stockpiles and ash dumps causing dust storms and AMD.
• BUT: SA have no viable short to medium term domestic baseload alternative to coal!
25
COPYRIGHT RESERVED – PROPERTY OF AFRICAN CARBON ENERGY
What is the future of UCG in SA?
IGCC = Integrated Gasification Combined Cycle
• IGCC allows for +55% efficiencies and paired with UCG’sdiminutive water requirements & mitigation of discard and ash, provides the most cost-effective clean power solution
• Coal is going to remain a part of SA’s future. But its future must be based on cleaner coal and efficient technology
• The reality is that cleaner coal technologies like UCG power generation are urgently required because syngas remains South Africa’s only large scale domestic clean coal energy supply option!
26