THECB Project Application

Texas Higher Education

Coordinating Board

Finance and Resource Planning

Roland Gilmore, Program Director

Integrated Campus Planning System (ICPS)

2

Project Approvals

Exempt Projects

Application Procedures

Tracking Report

Reapprovals

The THECB Project Approval ProcessProject Approvals

3

• New Construction (Addition) - $4 million or more

• Repair and Renovation - $4 million or more

• Auxiliary Enterprise - $4 million or more

• Intercollegiate Athletic - $4 million or more

• E&G Improved & Unimproved

Real Property Purchases - all

• E&G improved Real Property Gifts - over $300,000

• Energy Savings Performance Contracts - all

• Tuition Revenue Bond Projects (evaluation only) - all

The THECB Project Approval ProcessProjects Exempt from Approvals

4

• New Construction (Addition) -Less than $4 million

• Repair and Renovation -Less than $4 million

• Projects financed with more than 50 percent PUF or AUF

• Construction of privately owned buildings on land leased from an institution.

• Lease of property or facilities.

• Gifts, Grants, lease purchase agreements for clinical or research facilities.

• Projects pursuant to specific legislative authority.

• Gifts or lease-purchase of unimproved real property.

• Gifts or lease-purchase of improved real property with no E&G space and the value is $300,000 or less.

The THECB Project Approval Process Application Procedures

5

• ICPS Application

• Signed Board of Regents Certification

Committee on Strategic Planning and Policy or the Board Level Projects

• 80 days prior to Committee meeting

• All information and clarifications provided

• Incomplete applications or applications with unresolved issues move to the next Board meeting

The THECB Project Approval Process Application Procedures

6

Project Description Items

• Full narrative

• Name, location, and types of space

• GSF, NASF and E&G NASF amounts

• Outline of phases

• Explain cost categories that exceed thresholds

• Contingency costs over 10%

• Other costs over 5%

• Shelled Space

• Anticipated completion date

• Anticipated NASF, E&G NASF, and types of space

Integrated Campus Planning System (ICPS)Application Procedures - Project Specifics

7

Integrated Campus Planning System (ICPS)Application Procedures - Project Space

GSF, NASF and E&G NASF space (as available at submission)

Demolished or permanently removed from inventory

Total space to be added or removed from inventory

8

Room Inventory CBM011 Edits

9

• Room Inventory report (CBM011) with a total room area exceeding the building GSF or NASF will produce a hard error, that will require error correction and resubmission of the report.

• Room Inventory report with total room area exceeding divided by the building GSF and exceeds a building efficiency of 90 percent will produce review soft error.

Integrated Campus Planning System (ICPS)Application Procedures - Project Costs

10

Integrated Campus Planning System (ICPS)Application Procedures - Project Costs

11

Integrated Campus Planning System (ICPS)Application Procedures - Project Costs

12

Integrated Campus Planning System (ICPS)Application Procedures - Project Costs

13

Tracking Report Update Project Tracking

14

Uses:

• Space Projection Model – Surplus/Deficit

• Approved Not-Online E&G NASF added to actual space

• Construction Cost Standard

• New Construction Costs

• Renovation Costs

• GSF

Tracking Report Update Project Reapproval

15

Reapproval Required if:

• 10 % increase between approved and expended Total Project Cost

• 10 % change between approved and expended Gross Square Feet (plus or minus)

• Project not contracted within 18 months of approval

• Property not purchased within 24 months of approval

• Any change in Funding Source