The TRAXX Locomotive Platform

Meeting with the Croatian Railways

Janis VitinsKassel, April 2, 2007

Page 2: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

2

The EU milestones towards a “rail-liberalized” Europe,… and the Bombardier response

15. March 2003: Opening of cross-border freight on main European freight corridors • BR 185-CH, Re 482, Re 485 for D - CH

01. January 2006: Opening of international rail freight on the complete EU network • SBB Cargo 484 (on schedule Dec. 04) for CH - I

01. January 2007: Opening of all rail freight to competitors in the EU, including national services • TRAXX AC & MS for D/A, CH, I, PL, NL, B to Angel Trains Cargo and

CB Rail (total 60 MS locomotives)• TRAXX DE to LNVG and CBRail

Page 3: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

3

In the late 90‘s interoperability became important! Railion orders 400 locos BR 185 for 15 & 25 kVAC

15 kV catenary (D)

BR 101 BR 145 BR 185.1

15 kV 25 kVFrance9 Countries

BR 185.2

15 kV 25 kVFrance9 CountriesNew IGBT converter„Crash“capabilityModular brake system

2004 2005

Interoperability

2009# 200# 200# 80# 145

Page 4: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

4

IORE KirunaBlue Tiger

140 250–350 km/h200

TRAXX PlatformAVE S102

(330 km/h)

80 speed

Locomotives for Europe

* With Patentes Talgo, S.A.

AVE S130(250 km/h)

The TRAXX Platform of interoperable locomotives is the core business of Division Locomotives

> 1040 locos sold, >500 locos in service

Heavy freight

Interoperable locomotives for Cargo, InterRegio and InterCity

HighSpeed

Page 5: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

5

Corridors to Benelux, Italy,

Poland

TRAXX for cross-border

The TRAXX locomotives are available in 44 variants – for the different catenary voltages

North-Southcorridors

TRAXX AC15 + 25 kVAC

TRAXX MS15/25 kVAC & 1.5/3 kVDC

Non-electrified lines

TRAXX DEdiesel-elektrisch

Italy, Spain,Poland

TRAXX DC3 kVDC

Page 6: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

6

The TRAXX locos are standard products

140 / 160 / 200 km/hSpeed

air-conditionning & pressurizationDriver’s cab

150 kN300 kNBraking effort

270 kN300 kNTractive effort

2’200 kW diesel --4’000 kW--Power 1.5 kVDC

2’200 kW diesel 5’600 kW--Power 3 kVDC

2’200 kW diesel --5’600 kWPower 15 & 25 kVAC

1’250 / 1170 mmWheel diameter

2’600 mmWheel base

4’280 mmHeight

2’978 mmWidth

18’900 mmLength

84 t84 t85.6 – 88 t84 tMass

Diesel-electric3 kVDC15 + 25 kVAC + 1.5 + 3 kVDC

15 + 25 kVACLine voltage

TRAXX DETRAXX DCTRAXX MSTRAXX AC

Page 7: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

7

The idea of „commonality“ is taken from the airline industry. The features of a common fleet allow the operators to reduce costs.

Efficiency improvements… same as CRJ & Airbus A 319, 320, 321

Cost reductions in various areas …• Training

(loco driver, personnel of depots and workshops)

• Spare parts & logistics of procurement

• Investments in depots & workshops

• Documentation

• Engineering

• Reliability & availability

Total savings of SBB Cargo: 435 kEuro/loco• NPV over 20 years for the TRAXX MS

Bombardier CRJ 7000

50 locos: SBB Cargo Re 482

18 locos: SBB Cargo Re 484

Page 8: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

8

TRAXX passenger locomotives

LNVGelectric &

diesel

CFL, Luxembourg

Veolia (Connex)

E 464TrenitaliaCisalpino

DB Regio

Page 9: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

9

Bombardier is the largest supplier of 3 kVDC locomotives

SBB Cargo Re 484

Trenitalia E 464

TrenitaliaE 405Trenitalia

E 412

Rail Traction CompanyEU 43

Page 10: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

10

Recent new orders of Bombardier locomotives …

Angel Trains Cargo: TRAXX F140 MS for D/A-CH-I-NL (10), D/A-NL-B (15), D/A-PL (10) & TRAXX F140 DC (10) for Italy

LNVG: 11 Locos TRAXX P160 DE

CB Rail: 25 Locos TRAXX F140 MS for D/A-CH-I (10), D/A-NL-B (5) & D/A-PL (10) and 10 Loks TRAXX F140 DE

Renfe Mercancías: 100 Locos TRAXX F140 DC for Spain 3 kVDC

“Hector Rail”: 10+ Locos TRAXX F140 AC for corridor Germany –Denmark – Sweden with options D – S.

Railion: 13+ Locos TRAXX F140 AC for corridor Germany – Denmark – Sweden.

And also …

Trenitalia Regio: +150 units E 464 (total 538 units)

Renfe: 90 powerheads for multi-system (3 kVDC + 25 kVAC)

Page 11: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

11

The TRAXX F140 DC (S 253) of the Spanish Renfe Mercancías

Renfe S 253

Locomotives sold: 100 units

Catenary: 3kV DC

Speed: 140 km/h

Power: 5,4 MW

Gauge: 1668 mm (Iberian gauge)

14 years maintenance contract

Delivery: 2nd half 2008 - 2010

Page 12: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

12

Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S

Catenary: 15 kV & 25 kV AC

Speed: 140 km/h

Power: 5,6 MW

Delivery: 01/2008 – 04/2008

Page 13: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

13

Railway liberalization in Europe leads to new locomotives

Locomotives for cross-border servicesNew components, systems and international homologation

procedures are needed

High performance at lower costStandard products with large economies of scale

Lower operating costsNew technologies

Short delivery schedules and small delivery series“Off the shelf” locomotives, with a high degree of standardization

High reliability and availabilityProven products, components and systems

Service support in all countriesBombardier presence in different countries. Efficient spare parts

provision from the TRAXX Platform

Page 14: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

14

The TRAXX Platform is modular – in three dimensions

Country homologations

D CH F L A DK S N HU I.. NL B HR…

Networks

AC(15 & 25 kVAC)

DC(1.5 &

3 kVDC)

MS(AC & DC)

Diesel Inte

rCity

200

km/h

Car

go14

0 km

/hIn

terR

egio

160

km/h

Speed

Joint basis

Propulsion systems

Country packages

GSM, GPS

Additions

Catenaries Country homologations

Speed

Page 15: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

15

The four types of TRAXX locomotives match the needs of the various countries and cross-border corridors

TRAXX AC (15 + 25 kVAC)

Germany / AustriaCross-border services to CH, L, F, DK, S, N as well as Central & Eastern Europe

TRAXX MS (15 + 25 kVAC & 1.5 + 3 kVDC)Cross-border services to Poland, Benelux, Italy, France, …

TRAXX DC (1.5 + 3 kVDC)Italy, Poland, Spain

TRAXX DE (diesel-electric)All non-electrified routes

Page 16: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

16

The TRAXX locomotives are successful on western EU freight corridors, including Regio passenger services

Homologation available

Homologation planned

Homologation in existing contracts

TRAX

X-AC

TRAXX-ACTRAXX-AC/MS

TRAXX-MS/DC

TRAXX-MS

TRAXX-DC

TRAXX-MS/DC

SBB Cargo Re 482CH - D

E 186D,NL,B,A,PL,CH,I

Railion BR 185D - F

SBB Cargo Re 484CH - I

Page 17: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

17

AC and MS locos are needed for cross-border traffic between Germany and neighboring countries

Holland

Polen

Tschechien/ Slowakei

Schweiz / Italien

Belgien

Italien

MS-Locomotives+ 1.5 + 3 kVDC

Frankreich

Österreich / UngarnSchweiz

Luxemburg

Dänemark / Schweden / Norwegen

AC- Locomotives15 + 25 kV

Page 18: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

18

Lötschberg – Basistunnelab 2007

Gotthard –Basistunnelab 2015

TRAXX AC = Standard-Locomotives for D - CH

TRAXX AC are used by SBB Cargo, BLS Cargo and Private operators for traffic from Germany to the border of Italy

Page 19: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

19

The TRAX AC2 – DACH operate cross-border in three countries: Germany, Switzerland and Italy

The TRAXX AC2 – DACH operates N - S and E – W: Germany – SwitzerlandGermany – Austria (Vienna, Brenner)Switzerland – Austria

Re 482 on the Brenner Pass

Page 20: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

20

The TRAXX AC are used by Railion and Mitsui for operation between Germany and northern France

The BR 185 (20 Locos) are in revenue service since Dec. 2003 between Mannheim – Metz Mitsui has 7 locomotives which can operate on both sides of the Rhine to Basel Muttenz

Mitsui Lokomotiven

Page 21: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

21

The CFL Class 4000 locomotives can operate on 15 + 25 kVAC and in 4 countries (L, D, B, F)

The CFL Class 4000 is a TRAXX AC locomotive for 140 km/h with passenger information systemsIt is used for passenger and freight trainsThe Class 4000 can be upgraded to ETCS (ETCS L1 deployment in L)

Page 22: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

22

The TRAXX locomotives are now operating on Corridor #4, D – A – HU. Operator in Hungary is Floyd.

This opens new opportunities for freight between D and the EEU countries (HU, RO, HR, YU, BG and Turkey.These countries are „easy“ to access with 25 kVAC and IndusiPrivate operators are more innovative and have a high potential for future traffic

Page 23: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

23

With the TRAXX locos Re 482 & 484, SBB Cargo becomes a major freight operator between Germany and Italy

North-LocomotiveRe 482cross-border between D - CH

South-LocomotiveRe 484cross-border betweenCH - I

In total more than 150 TRAXX locos operate north –south between Germany and the Italian border

Main axis of SBB Cargo

Page 24: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

24

Interoperability with TRAXX locomotives on all important European corridors – examples in delivery

Total: 68 TRAXX MS ordered:Angel Trains Cargo

35 LocosCBRail

25 Locos

D-A-B-NL

NL-D-A-CH-I

Italien

D-A-PL

D-A-CH-I

Page 25: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

25

Starting mid 2007 the TRAXX locomotives will operate to the Rotterdam harbors over conventional lines as well as on the Betuweroute and the HSL Zuid with ETCS L2

Locomotives for Angel Trains Cargo and CBRail

Bombardier type TRAXX MSHomologation BombardierCountries (variant 1) D/A-NL-BCountries (variant 2) D/A-CH-I-NLBegin operations Mid 2007

Lw

Hr

Emn

Asn

Gn

Zl

Ekz

Hdr

Hn

Dv

Amr

SptnHlm

Gvc

Zvt

Gv

Amf

Ut

Ed

Gd

Rtd

Ht

TbRsdEhv

Gs BgnVs

Hm

Wt

Vl

Rm

Std

Mt

Hrl

Nm

Ah

Apd

Zp

Aml

Brn

Odz

Hgl

Es

Stv

SkHlg

Swd

Rd

Dz

Nsch

Mp

Kpn Mrb

Rhn Zv

Dtc

Ww

Dld

Tl

WdBkl

Hwd

PmrUtg

Zd

SdmHld

Br

KrdSog

Gr

Hd

Dvd

Btl

Lls

AsdAsdm

Bd

Est

Rai

Ledn

Apn

Rtkw

Hvs

Ddr

Rth

Shl

HSL Zuid160 km/h(mit ETCS L2)

Betuweroute140 km/h(mit ETCS L2)

30 MS locomotives sold for operation between Germany and the Netherlands

Page 26: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

26

The TRAXX MS locomotive Re 484 was first to operate on the Betuweroute on 25 kVAC (26. Aug. 2006)

Page 27: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

27

The new TRAXX MS (D/A-PL) locomotive hauling a 3’340 ton train load, length 570m, in Poland

Page 28: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

28

The catenary voltages and the train safety systems are critical and have a high impact on costs

Ebicab 900

ZUB 123

Indusi (PZB), LZB

SHP

EVM

Indusi, LZB

Ebicab 700

ATB-EG, ATB-NG

AWS, TPWS

TBL, RPS

TVM, KVB, RPS

Ebicab 700

ASFA, LZB,Ebicab 900

Signum, ZUB 121/262

BACC, RSDD

Ebicab 700

5 major line voltages8 different catenariesca. 25 different ATP systems4 different loading gauges

Line voltagesLine voltages

ATP systemsATP systems

Page 29: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

29

Today, the largest challenge is to fit the different national train safety systems into the locomotives and to homologate the locomotives in the various countries

DB; ÖBBSBB; PKPFS

CDSNCFSJ

NS

DSBZSMAV

Integrated solutions are necessary and a migration to ETCS must be possibleIntegrated solutions are necessary and a migration to ETCS must be possible

Page 30: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

30

The Bombardier driver’s desk allows the complete integration of national train safety systems

Page 31: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

31

Since January 2004 the TRAXX locomotives are equipped with LZB & PZB as STMs – for interoperability.

ETCS

STMLZB

STMPZB BTM

ETCS

MVB

The interface to the locomotive is via MVB (UIC, IEC norm)

The interface to the ETCS (EVC) is via MVB / Profibus

STM based ETCS systems are advantageous even if there is no initial requirement of ETCS L1 or 2!

STM for PZB 90

STM for LZB

BR 185LZB, PZBETCS L2

Redundant displays

Profibus

Page 32: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

32

Traffic is expected to increase on Corridor # 4 (Asia –Europe) TRAXX AC into Eastern Europe

The line voltage is 15 + 25 kVAC. TRAXX AC is the best fit The TRAXX F140 AC can operate in all Eastern Europe with catenaries 15 & 25 kVACThe ATP systems needed are Indusi & EVM(HU)Migration to ETCS must be possible

ETCS

STMLZB

STMPZB BTM

ETCS

EVM

MVBRedundante Bildschirme

Page 33: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

33

ETCS (EVC)

STMLZB

STMPZB BTM

ZUB(+ ETM)

ETCS

Germany, AustriaSwitzerland

STMATB-EG

Redundant displays

Vehicle data bus, MVB

I/O

SignumSCMT

Italy

#2 Cabinet #1

I/O, GW

SCMT MMI

The integration of the ATP systems based on RCS equipment (ETCS & STM) is key.

ETCS, Belgium Netherlands, incl. Betuweroute

Loco E 186 for the corridor NL-D-A-CH-ILoco E 186 for the corridor NL-D-A-CH-I

Page 34: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

34

ETCS Level 2 installations on TRAXX Locomotives

Switzerland – NBS (Rothrist-Mattstetten) and Lötschberg base tunnelBLS Cargo: 20 locomotives Re 485Railion: 10 locomotives BR 185-CHSBB Cargo: 10 locomotives Re 484 Standard: SRS 2.3.0 (with specific CH „change requests“)Deliveries: First 2 Loks in Oct. 2007 / last Loco in Feb. 2008Financing: BAV

Betuweroute (Netherlands)Angel Trains Cargo: 10 Locos D/A-CH-I-NL & 15 Locos D/A-NL-BCB Rail: 10 Locos D/A-NL-B

HSL Zuid (Netherlands and Belgium)Angel Trains Cargo: 15 Locos D/A-NL-B

In addition (Spain)High speed powerheads: AVE S 102 and AVE S 130

Page 35: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

35

The locomotive related costs (including service & maintenance) are in the range of 13 – 24% of all costs

Apart from the administrative and operating costs,the following cost elements are dominant:Energy (ca. 22%), track access (ca. 20%) and loco fix costs incl. service and maintenance (13 – 23%)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Route 1 Route 4 Route 6

Admin. & op. costsTrack access costs

Energy costsAdd. loco costs

Loco fix costs

Route 1: 1’400 t intermodal train; Rotterdam –Mannheim – Gotthard –Busto Arsizio

Route 4: 3’000t coal train; Sosnowiez – Oberhausen with double traction

Route 6: 1’800t mixed train; Munich - Hamburg

Tota

l tra

nspo

rtatio

n co

sts

Page 36: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

36

What can we do to lower total train costs?

Operations costs This is a question to the Railways• Industrialization of transportation, e.g. ski-lift

Energy costs (today measured in D, NL)• Improve locomotive efficiency, including maximum regeneration at

braking!

• Avoid “stop - and - go” operation with “good” slots.

• Driver training. 20% reduction of energy consumption can reduce total train costs by 4%!

• Lobby for direct energy measurement in all countries(?)

Locomotive fix costs• Use identical locomotives, e.g. BR 185-CH, Re 482, Re 485

• Reduce maintenance costs, e.g. “Airbus model”, consignment stock

Page 37: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

37

DuisburgWarszawa

Istanbul

Milano

Rijeka

Sopron

Constanta

Gdansk

KatowiceRoute 1Route 2

Route 3

Route 4

Route 5

Route 6

Route 7

Page 38: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

38

New locomotives pull long & heavy train loads

Sweden

Switzerland

Luxembourg

Hungary

Page 39: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

39

0

50

100

150

200

250

300

350

0 20 40 60 80 100 120 140 160

5.6 MW

a) Operation in Switzerlandb) Operation in Germany

km/h

a)

b) kN

650t on 27‰

The Flexifloat bogie has high performance and provides long wheel life and low track forces.

High tractive effort of 300 kN Surplus tractive effort for acceleration on grades

5.6 MW at the wheel

Short axle base, 2.6 m

Effective adhesion control

High secondary springs

Push/pull rod

Low track forces ⇒ long wheel life Low load transfer ⇒ high AdhesionLarge wheels, Ø 1250mm ⇒ low LCCRobust & simple frame ⇒ low LCCHigh running comfort ⇒ driver comfortLow noise ⇒ low environmental impact

Low track forces ⇒ long wheel life Low load transfer ⇒ high AdhesionLarge wheels, Ø 1250mm ⇒ low LCCRobust & simple frame ⇒ low LCCHigh running comfort ⇒ driver comfortLow noise ⇒ low environmental impact

Page 40: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

40

The Flexifloat bogie has a very good adhesion capability and permits heavy train loads

Push/pull rod with a virtual extension to track level in the middle of the bogie. Load transfer is very low.

Adhesion control system which cleans the wheels and tracks through a controlled slip. In this way the tractive effort increases from wheel 1 to wheel 4 (TE1<TE2<TE3<TE4)

Free wheelset movement which avoids lateral sliding of the wheels

Short axle base which avoids lateral sliding of the wheels in curves

wheel 1wheel 2 Vo

V2

Slip = ΔV1 = V1-Vo

V1

Traction motors

push/pull rod

carbody

TE1TE2

Wheelbase (short!)

Page 41: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

41

Test conditions:

Starting from standstill in 16 ‰ in double traction

Total train load: 3340 tons

Weather: natural wet tracks

Leading loco

The effect of “track cleaning” is verified by measurements with heavy train loads on wet tracks

The locomotive can put 300 kN consistently onto the track.The leading bogie operates at a larger slip and „cleans“ the track. Due to the cleaning the following bogie has a higher tractive effort

Page 42: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

42

The bogies are interchangeable – with the same interfaces for 140, 160 and 200 km/h

Same interfaces

140 km/h

160 km/h

200 km/h

The same loco for:- Cargo- Regio- Intercity

And services:- national- international

Page 43: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

43

Push-pull operations have been verified in extensive tests in Switzerland by SBB and DB Systemtechnik in 2003

Measurements on TRAXX locos on Gotthard and Lötschberg with curve radius of down to 250m.Measurement of wheel forces on locomotive and wagon (Sggns empty) with respect to safety. Tests with standard buffer plates and with Nylatron

Result: The TRAXX locos can push the same train loads as the SBB Re 460; no need of Nylatron

TRAXX and Re 460locomotives are certified for the same train loads

Page 44: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

44

In collaboration with DB and SBB, Bombardier has obtained a large experience in push-pull operation

SBB Re 460 with IC 2000 presently at 160 km/h

- with WTB (wire train bus) train communication

BR 101 are used primarily in push-pull for speeds of 200 km/h throughout Germany

- with German ZMS (Zeit-Multiplex Steuerung)

The BR 146 is used extensively in push-pull operation with DD coaches throughout Germany

- with German ZMS (Zeit-Multiplex Steuerung)

Page 45: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

45

The TRAXX locomotives provide much improved protection to the driver and have lower repair costs

Combined rail guard and snow plough

Anti-penetration wall

Ant-climber

Buffer and external deformation elements

Front protection

Structural deformation zones

Survival zone

Integrated mounting platform

Page 46: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

46

Crash test in Poland at CNTK

Page 47: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

47

The TRAXX fulfill the upcoming TSI, prEN 15227

Compared to conventional locomotives …much improved passive safety to the loco personnelmuch reduced repair costs

Severe damage of the carbody leads to very high repair costs

Very limited crash capability

TRAXX: Controlled deformation ofthe front part only

Controlled energy absorption

Page 48: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

48

The layout of the TRAXX Platform allows to produce electric & diesel variants. The propulsion system is variable

DE loco

E loco

The propulsion system is modular, for AC, MS, DC & DE.

Page 49: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

49

The TRAXX locomotives one carbody for all types, diesel and electric locos

Page 50: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

50

The PowerPackages of the electric and diesel TRAXX locomotives have identical interfaces into the locomotive

D-PowerPackageE-PowerPackage

Page 51: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

51

The diesel locomotive contract to LNVG

4th contract in Oct. 0511 locos TRAXX P160 DE Fleet maintenance for 15 yearsDeliveries starting Aug. 2007Begin of operations in Dec. 2007

The LNVG electric and diesel locomotives have a high

degree of commonality, e.g. the same bogies, incl. traction

motors and drive systems

Page 52: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

52

The TRAXX F 140 DE / P 160 DE performance dataMax. speed 140 / 160 km/hVersions Cargo / passengerLoading gauge UIC 505-1Power diesel engine 2200 kWPower at the wheel 1845 kWLength 18900 mmStarting tractive effort 270 kNBraking effort 150 kNMass (Passenger) 84 t Mass (Cargo) 83 tWheel diameter 1250 / 1170 mmDynamic brake 1600 kWFuel tank 4000 liters

The TRAXX DE provide the maximum possible power for a 4-axle loco with 21t axle load

Page 53: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

53

As standard products, TRAXX Locomotives have proven high reliability and availability

Railion BR 185The reliability is >> 380‘000 km (Contract)The availability is > 97% (Contract)

BR 185 Reliability *)BR 185 Availability

km

*) Gemittelte Laufleistung zwischen Ausfällen mit Bedarf einer Hilfslokomotive

Page 54: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

54

TRAXX: New technologies

Mobile MMI – Maintenance Improvement

All diagnostic data online via Wireless LAN

Interactive failure localization with „navigation“,circuit diagrams, repair instructions, reports etc.

Integration of component pictures andaction sequences possible

Oil free piston compressor

Less maintenanceno oil filter elementsno oil refill no disposal of contaminated liquids

Directly accessible in the underframe

Integrated air dryer unit

Page 55: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

55

Remote radio access lowers operating costs and improves operational logistics.

Ground station

GSM radio

The TRAXX platform is equipped with GPS & GSM remote radio diagnosis.

The TRAXX platform is equipped with GPS & GSM remote radio diagnosis.

Opertations / LogisticsOpertations / Logistics

Service StationsService StationsBombardier ServiceBombardier Service

WorkshopsWorkshops

Fleet statisticsFleet statistics

Page 56: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

56

The TRAXX Platform contributes to reducing operating costs and to increasing competitiveness

The operator has a choice of four standard locomotive types based on the same technology for the networks: AC, DC, MS, Diesel

Reduction of fleet variantsSame MMI and operating modusSame technical performanceLower investment costs

Cost reduction by means of commonality (similar to Airbus 319, 320, 321)Same spare partsLow need of training rapid fleet introductionReduced investments in depots and workshops

High reliability and availability Achieved by service proven components and systems

Short delivery schedulesObtained by standardized production processes and established sub-suppliers

Page 57: The TRAXX Locomotive Platform - zeljeznice.net Loco… · Delivery: 2nd half 2008 - 2010. 12 Bombardier sold 6 TRAXX F140 AC to Hector Rail for the corridor D-DK-S Catenary: 15 kV

57

The TRAXX Platform provides HZ with a choice of traction