The STC Process
Presented by:Olympic Aero Services Inc.
www.faastc.com
7/28/2019 The STC Process
2/27
Introduction
The FAA and Your Company
Does Your Company have to make a safe or an
airworthy product? Airworthiness/FARs
The path to airworthiness. The STC process.
7/28/2019 The STC Process
3/27
The FAA and Your Company
Your Company could
manufacture a variety of items.
Fortunately/Unfortunately themajority of these are installed in
aircraft.
7/28/2019 The STC Process
4/27
The FAA and Your
Company(cont) If you modify an
aircraft...the FAA must
approve every aspect: The design
Electrical, Structural
Manufacturing
Does the product matchthe design?
Others?
7/28/2019 The STC Process
5/27
Question?
Does Your Company have
to make a product that is
safe when installed orairworthy when installed?
7/28/2019 The STC Process
6/27
Answer
The answer is both.
Safe - When installed will not cause harm to
the aircraft or the operator.
Airworthy - When installed the entire
aircraft complies with the Federal Aviation
Regulations (FAR). Several portions of theFARs address safety--if airworthy, it is safe.
7/28/2019 The STC Process
7/27
Federal Aviation Regulations
(FARs) Describes how an aircraft
should be designed,
manufactured andmaintained.
Engineering=Design
Production=Manufacturing
Maintain=Customer
7/28/2019 The STC Process
8/27
Parts 23,25,27,29
Part 21 (see the PMA Manual)
Part 23 small aircraft (172, 182)
Part 25 Transport Category ( 747, GV)
Part 27 small helicopters (Astar, Bell 206)
Part 29 Transport Category (Bell 412)
7/28/2019 The STC Process
9/27
FARs (cont)
Within each part are
broad categories:
Flight loads Flammability
Electrical Equipment
Mechanical
Interiors
Flight
Loads
Flammability.
Structure
Interiors Electrical
7/28/2019 The STC Process
10/27
FARs (cont)
The FAA wants to know how you are going
to show that the aircraft is in an airworthy
(meets the FARs) condition after you install
your system.
7/28/2019 The STC Process
11/27
The STC Process
Type Certificate - Data that describes the
aircraft, the limitations, and the FAR
revision level.
STC - Supplemental Type Certificate is
essentially a change to the TC. A change
by Your Company must comply with theinformation in the TC and result in an
airworthy aircraft.
7/28/2019 The STC Process
12/27
The STC Process
Step 1: Sales sells a new
product or an old product in a
new aircraft (new to YourCompany)
7/28/2019 The STC Process
13/27
The STC Process (cont)
Step 2: Engineering creates a certification
plan (this tells the FAA Your Companys
plan of how you are going to make theaircraft airworthy after you change it).
7/28/2019 The STC Process
14/27
The STC Process (cont)
Step 3: Submit the certification plan to the
FAA for approval. The FAA has X number
of days to approve/change your plan.
Step 4: Engineering creates all the reports,
drawings and tests to demonstrate
compliance with each section of the FARsidentified in the certification plan.
7/28/2019 The STC Process
15/27
The STC Process (cont)
Examples:
25.561 (Emergency Landing Conditions)
Pull Test-Build Prototype and pull test
Comparison-This is the same as....
Analysis-Stress Engineers model and calculate.
25.609 (Protection of Structure) You might add finish instructions to drawings(anodize or powder coat)
7/28/2019 The STC Process
16/27
The STC Process (cont)
Examples:
25.785 (e)(f) (Seats, Berths...)
Analysis or test for a 170 lb person
By the way (Part 23 is 215 lbs)
25.853 Compartment Interiors (Flammability)
Create samples and send out for testing
7/28/2019 The STC Process
17/27
The STC Process (cont)
Examples:
25.1309(b)(1): Create a
failures modes andeffect analysis (FMEA)
25.1353(a): Perform an
Electro-Magnetic
Interference (EMI) test.
7/28/2019 The STC Process
18/27
The STC Process (cont)
Step 4: Engineering
creates reports...
Who says that thereport, drawing or test
actually demonstrates
compliance with that
particular FARsection?
7/28/2019 The STC Process
19/27
The STC Process (cont)
Step 5: Design data approval. The FAA is
the only person that can say yes your
test, report, comparison demonstratescompliance with that FAR section.
Remember, you have to show that Your
Companys product meets therequirements of each FAR section so the
aircraft will be Airworthy.
7/28/2019 The STC Process
20/27
The STC Process (cont)
Step 5 (cont): Design data approval. The
FAA can only handle about 5% of their
requests for approval of design data. So theFAA then created the designee system.
A Designated Engineering Representative
(DER) is a person designated by the FAA toact on their behalf to approve design data.
DERs have specialty areas.
7/28/2019 The STC Process
21/27
The STC Process (cont)
Step 5 (cont): Design data approval. A
DER uses an 8110-3 form to communicate
to the FAA that a report, drawing or testmeets the requirements of a particular FAR
section. This is not approval of the entire
installation.
7/28/2019 The STC Process
22/27
The STC Process (cont)
Step 5 (cont): Design data approval. A
DER cannot approve the physical
installation--thats a designatedmanufacturing inspection representative
(DMIR) see PMA manual.
7/28/2019 The STC Process
23/27
The STC Process (cont)
Step 6: After all the design data is
approved by a DER you submit the package
to the FAA. If they approve the data--thenthey give you permission to install a
prototype in an aircraft.
7/28/2019 The STC Process
24/27
The STC Process (cont)
Step 7: Conformity Inspection: After
installation, the DMIR/DAR conforms the
installation. Verifies that the installationmatches the drawings.
Step 8: Conduct any tests (EMI, Functional)
Step 9: Interior Compliance (Normally bythe FAA.) Do you block exits, head strike,
aisle width, placards?
7/28/2019 The STC Process
25/27
The STC Process (cont)
Step 10: Update the paperwork and then do
a final submittal to the FAA.
7/28/2019 The STC Process
26/27
The STC Process (cont)
The FAA issues you
an STC for a particular
model aircraft. YourCompany can now
install this STC on any
aircraft of this type!
7/28/2019 The STC Process
27/27
Other Comments
Olympic Aero Services considers the FAA as avaluable partner and we strive to continually foster our
relationship with the FAA based on trust, integrity,
and excellence.
Olympic Aero Services can provide all the help andsupport you need to get your idea STCd. Please call