Experience PJOE yard 17th May, 2016 From the start of the yard in May 2006 following projects have been realized: Client
Project Description incl weight and year
CNOOC Le Dong 15-1
and 22-1, South China Sea, China
Launch jackets, 5,630/5,520T, 107/95m wd, piles and conductors, 4,880T 2007
CNOOC Wenchang
8-3A and 19-1B, South China Sea, China
Lift jackets, 2,930/3,160T, 113/126m wd, 2007
CNOOC JZ 9-3
WHPE, Bohai Bay, China
Riser platform, suction foundation, 195T, 18m wd, 2007
APL Northeast
Gateway, GoM, USA
Suction anchors and PLEM structures, 1,524T, 2007
APL Maari, New
Zealand Suction anchors, 580T, 2007
APL Vincent,
Australia Midline Buoy Elements, 220T, 2007
PJOE
Page 2 of 22
Client
Project Description incl weight and year
ROC Oil Zhao Dong
phase 2, Bohai Bay, China
EPIC for UDP wellhead and terminal foundation incl. pile guide bridge, 1,000T, IDP for OPA flare, ODB and OPB foundation incl. pile guide bridge, 3,500T including installation scope, 2007 and 2008.
APL Reliance D6
Krishna-Godavari, India
Suction anchors and Midline Buoy Elements (MLBE), 1,895T, 2007
CNOOC Bozhong,
Bonan, Jinzhou , Jinxian, Jinzhou, LvDa and Suizhong fields, Bohai Bay, China
Fabrication of jackets, piles and conductors for 20 platforms, 63,000 Ton total, 2008 and 2009
Bluewater Talimsan
Bunga Kekwa ETMS, Malaysia
External Turret Mooring System, 1,100T, 2008
Frigstad Frigstad Oslo
SSDR bracings
Fabrication of 4 pontoon bracings for Yantai Raffles yard, 800T, 2008
Hydralift/ AmClyde
Nor Offshore M60 Offshore Crane
Offshore crane, model M60, 640T plus 980T counter weight, 2008
PJOE
Page 3 of 22
Client
Project Description incl weight and year
Awilco WilPioneer
SSDR sponsoon tanks
Fabrication of sponsoon blocks for Yantai Raffles yard, 1,200T
Aker Solutions/ Modec
Cidade de Santos FPSO, Brazil
Fabrication of the SRU module, 210T, 2009
APL Neptune
DWPP, suction anchors and subsea PLEM, USA
2 PLEM structures and 16 suction anchors, 1,160T, 2009, 186T, 2009
APL Chinook and
Cascade, suction anchors and MLBE’s, GOM USA
Fabrication of 12 mid line buoy elements and 11 suction anchors, 1,460T, 2009 740T, 2009
CNOOC Bozhong
field, Bohai Bay, China
Yoke Mooring System, refurbishment, 300T, 2008
Saipem Overhead
cranes assembly for CastorONE
Assembly and completion of cargo hold overhead cranes from Navalimpianti, 2009
PJOE
Page 4 of 22
Client
Project Description incl weight and year
GustoMSC Aramco ARB-
3 jack-up, 550 T crane, Saudi Arabia
Fabrication of tub, column and boom, 500T total with 690 material, 2009
Bluewater CALM buoys
07 and 08 CALM buoys, combined 500T, 2008
Aker Solutions/ Modec
Cidade de Santos FPSO, Brazil
Fabrication of the MEG module, 630T, 2009
Hydralift/ AmClyde
Swiber M60 Offshore Crane
Offshore crane, model M60, 640T, 2009
PJOE
Page 5 of 22
Client
Project Description incl weight and year
Hydralift/ AmClyde
Global PC-37 Offshore Mast Cranes Global 1200
Offshore crane, model PC-37, 1,400T, 2009
Hydralift/ AmClyde
GSP Bigfoot 1, KP-87 King Post crane
Offshore crane, model KP-87, 400T, 2009
CNOOC JZ25-1S LQ,
Bohai Bay, China
55 persons LQ incl helideck., 480T, 2009
Swiber LDB Swiber
Chai vessel Part engineering, fabrication of tub, counter weight, stinger, boom rest and installation of M60 AmClyde crane and engine room, 1,500T, 2009
Aker Solutions
Tupi SRU modules, Brazil
Exotic piping for Tupi modules, 150 kg, 2009.
PJOE
Page 6 of 22
Client
Project Description incl weight and year
CNOOC Bozhong BZ
34-1N WHPC deck, Bohai Bay, China
Final commissioning and completion work, 2,500T, 2009
Saipem Completion
work on Pipe joint Hatches CastorONE
Assembly and completion of pipe joint cargo holds hatches from Navalimpianti, 2009
Hyundai Moon
Heat exchangers assembly for power plant Bahrain
Providing of facilities and assistance for heat exchanger assembly, 20, 300T each, 2009
CNOOC Jin Zhou
FPSO, Bohai Bay, China
Refurbishment of yoke turret system including swivel, 2010
Hydralift AmClyde
M52 crane for Bumi Armada
Offshore crane model M52 suitable for Caspian Sea transport, 410T, 2010
Conoco Phillips
Penglai helicopter base, China
Aluminum helicopter maintenance platform, 3T, 2010
PJOE
Page 7 of 22
Client
Project Description incl weight and year
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design, bulk procurement and fabrication of a desalination plant, total weight 23,000T. Scope included: 2 x Reverse Osmosis modules, 2 x 2,645T, 2 x Pump modules, 787T and 1,013T, Pre-treatment modules 2,780T and 2,890T, pipe racks and supports, total 600T, E-Houses, 780T, 50T and 54T, control room, 185T, equipment skids, up to 1,270T total, In-take caisson 4,340T, marine harbour caissons and dolphins 2,100T, Brine Tank out fall structure 560T, 7,600T pre-cast elements, 2009/2010
CNOOC Spooling
Reels Fabrication of 2 cable reels, 35T each, 2009
Hydralift/ AmClyde
Global PC-37 Offshore Mast Cranes Global 1201
Offshore crane, model PC-37, 1,200T capacity, 1,400T, 2010
PJOE
Page 8 of 22
Client
Project Description incl weight and year
Hydralift AmClyde
PC-37 crane for Saipem FDS II
Offshore crane model PC-37 1,000T capacity for Saipem, 720T, 2010
COSL (ex Awilco)
WilPromoter lower hull semi-submersible construction
Construction and outfitting of hull, 8,500T total, Includes 8,000T steel, 410T piping, 47,000 m cables, 185 pcs of equipment, 2010
Bluewater STX FSO
project, ETMS
Fabrication of External Turret Mooring System, 750T, 2011
Hyundai Moon
Sabiya HRSG power plant, Kuwait,
Assembly and part fabrication of 92 heat exchanger modules including load-out, ~ 400T/each, 2010.
COSCO Nantong
ATP Cheviot Octobuoy floater, UK North Sea,
Fabrication and installation at shipyard of the Conductor Support structure, 2,900T, 2011
PJOE
Page 9 of 22
Client
Project Description incl weight and year
CNOOC WeiZhou 11-
1 platform extension, South China Sea, China
Fabrication of jacket frame, piles, conductors and deck, 1,200T, wd 20 m, 2011
Sofec Oil Search,
Papua New Guinea LNG
Fabrication of 380T CALM buoy and PLEM for export, 2011.
EMAS Offshore
Oil Search, Kumul terminal, Papua New Guinea
Fabrication of installation aids, 87 T plus load-out and seafastening of CALM buoy system, 2011
Sofec CCCL Edac
Energy, Nagarjuna, India
Fabrication of 387T CALM buoy and PLEM for export, 2011.
Sofec IHI for
Chevron, Erawan FSO turret, Thailand
Fabrication of External Turret Mooring System, 677T, 2011
PJOE
Page 10 of 22
Client
Project Description incl weight and year
Hyundai Moon
Power plant, Saudi Arabia
Assembly and part fabrication of 62 heat exchanger modules including load-out, ~ 300T/each, 2011
NOED Bohai Bay
offshore windmill test project, P R of China
Fabrication of 2 monopod foundations, 2011
GustoMSC Seajacks
Zaratan jack-up plfm, 800 ton crane
Fabrication of Leg Crane, 866T, 2011
GustoMSC A2SEA Sea
Installer jack-up plfm, 800 ton crane
Fabrication of Leg Crane, 866T, 2012
CNOOC Panyu 4-1 &
5-2, South China Sea, China
EPC fabrication of two 100 men living quarters, 1,175T each, 2012
PJOE
Page 11 of 22
Client
Project Description incl weight and year
Karara Mining Ltd
Karara Iron Ore Mine, EPCM Worley Parsons, West Australia
Fabrication of chute platework for inland assembly including installation of liners, 1,315T, 2012
CNOOC Hai Yang Shi
You 161 Jack-Up, P R of China
Platform modifications and leg repair of jack-up, 2012.
COSCO Nantong
ATP, Cheviot filed, Octobuoy topsides
Rolling of tubulars for deck structure, 1,255T, 2012
Sofec Tesoro
Hawaii, USA Fabrication of CALM buoy, 210T, 2012.
Sofec CNOOC,
LuFeng field, P R of China
Fabrication of spider buoy, 290T, 2012.
PJOE
Page 12 of 22
Client
Project Description incl weight and year
Heerema ExxonMobil
Arkutun-Dagi field, Sakhalin, Russia
Fabrication of spools, protection sections and miscellaneous structures, 400T total, 2012
BP BP, Jacobs
Engineering EPCM, Bulwer Refinery, Brisbane, Australia
Fabrication of Hydroisom & HF Alkylation modules, 550T, 2012
Sandvik Rio Tinto,
Hope Down, two Stackers and one reclaimer, Australia
Fabrication, final assembly and disassembly of two stackers, 590T/each and one reclaimer 1,530T, 2012
CNOOC SZ 36-1
WHPM, WHPC & WHPN, Bohai Bay, China
Fabrication of 3 jackets, piles and conductors, WHPM 6 pile 4,240T, WHPC 4 pile 1,670T, WHPN 4 pile 3,220T, 2012
Sandvik Rio Tinto,
Cape Lambert port B, Ship Loader 11, Australia
Fabrication, final assembly and disassembly of ship-loader, 1,060T, 2013
PJOE
Page 13 of 22
Client
Project Description incl weight and year
Sofec Petrobra’s,
Tanker Pacific, UOTE FSO turret, Brazil
Fabrication of turret, ~ 1,200T, 2013
BMA (BHP Billiton & Mitsubishi Alliance)
Hay Point Expansion Stage 3, Australia
Procurement, fabrication and assembly of 7 Surge Bins and Transfer Tower modules, 6,600T and fabrication of 212T chutes platework, 2012 & 2013
CNOOC Panyu 34-1,
South China Sea, China
Fabrication of 220m long jacket and piles, 23,000T jacket, 10,500T piles, 2013
BMA (BHP Billiton & Mitsubishi Alliance)
Hay Point Expansion Stage 3, Australia
Procurement, fabrication and assembly of 262 Conveyor Gallery Modules, ~ 9,500T and fabrication of 176T welded frames for conveyor galleries drives, 2012 & 2013.
PJOE
Page 14 of 22
Client
Project Description incl weight and year
SBM Offshore
FPSO Cidade de Ilhabela, Petrobra’s, Brazil
Fabrication and assembly of 24 Chain Connectors, 670T, 2013
Sofec OGX, OSX 3
FPSO, Brazil Fabrication of 515T 12 plus 1 mooring piles, 2013
CNOOC Huang Yan
WHPA, East China Sea, CanXue Oilfield, China
EPC for 4 leg jacket (3,100T) and piles (2,200T), waterdepth 108m, 2013
Sandvik, Brazil
Samarco, Brazil
Fabrication of shiploader, 1,325T, 2013
Schneider Electric
Sandvik Sacomar shiploader and reclaimer, Angola
Fabrication and part supply for 2 E-Houses, 35T, 2013
NOV APL Goliat FPSO
Project Fabrication of Goliat FPSO parts, 6.7T, 2013
PJOE
Page 15 of 22
Client
Project Description incl weight and year
Sofec Hoegh LNG
Lampung, Indonesia
Fabrication of Soft Yoke Mooring System, 2,137T, MSS 2013 and platform, 2014
CNOOC EnPing 24-2
development, China
Fabrication of jacket (8,900T) and piles (6,600T), water depth 100m, 2014
CNOOC Bao Yun Ting
Process Platform, East China Sea, HuangYan Gas Development, China
EPC for 4 leg jacket (3,160T) and piles (2,610T), water depth 77m, 2014
CNOOC Tuan Jie Ting
TJT WHP, East China Sea, Pingbei HuangYan gas field, China
Fabrication of 4 leg jacket (2,600T) and piles (2,600T), water depth 80m, 2014
PJOE
Page 16 of 22
Client
Project Description incl weight and year
Sandvik South Africa
Sacomar, Angola
Fabrication of shiploader, 1,000T, and reclaimer, 400T, 2014
Sofec Petronas,
FLNG1 turret, South China Sea, Malaysia
Fabrication of ETMS, 550T, 2014
NOV APL CNOOC
Enping STP internal turret, China
Fabrication of STP submerged internal turret, 235T, 2014
CNOOC Shao Xing
SHX 36-5 WHP, East China Sea, Pingbei HuangYan gas field, China
Fabrication of 4 leg jacket (2,690T) and piles (2,560T), waterdepth 82m, 2014
PJOE
Page 17 of 22
Client
Project Description incl weight and year
NOV APL Anadarko,
CFD-11, Bohai Bay, China
Yoke Mooring and Torque Tower fabrication, 260T, 2014
NOV AmClyde
NOV Brazil, flexible production plant, yard quay side crane, Brazil
Fabrication of crane, pedestal and boom for 380 Ton onshore yard crane, model LSB-22, 400T, delivery 2014
SBM Offshore
Petrobras Cidade de FPSOs Cidade de Maricá and Cidade de Saquarema.
Fabrication and outfitting of hawser and loading hose reels, 2 x 2, 353T, 2014
CIMC Raffles
Coastal Marine Sdn Bhd (Thaumas Marine) for Pemex Gas Compressor Jack-up, (hull H1296)
Fabrication of helideck, 200T, 2014
PJOE
Page 18 of 22
Client
Project Description incl weight and year
Hyundai Yantai
Az-Zour North IWPP Project, Kuwait
Fabrication of heat exchanger casings, 880T, 2014
NOV Kristian- sand
Frigstad SSDV Alpha and Beta for worldwide service
Fabrication of two times 1,250T capacity dual hoisting drilling tower, 1,400T, 2014 and 2015
Fluor for Exxon-Mobil Neftegaz
Odoptu stage II, Sakhalin Island, Russia
Fabrication of pile caps and well cellars, 929T, 2014
CNOOC Ping Hu
SDPP, East China Sea, Pingbei HuangYan gas field, China
EPC 4 leg jacket (3,062T) and piles (2,317T), waterdepth 80m, 2015
CIMC Raffles
Central Offshore Monaco, Jack-up drill rigs, (hulls 273&1284), CIMC Jack-up drill rig, (hull 1293)
Fabrication of 10, 5 and 28 deck box blocks, 400T, 220T and 1,800T, 2015
PJOE
Page 19 of 22
Client
Project Description incl weight and year
CIMC Raffles
Coastal Marine Sdn Bhd for Pemex, Gas Compressor Jack-up (hull H1296)
Fabrication of 4 legs and assembly in Longkou yard, total length 108 m each, ~ 650T, 2015
NOV APL for Bumi Armada and EnQuest
Kraken FPSO, UK sector North Sea
Fabrication of 12 piled anchors for STP turret. 1030T, 2015
NOV APL for Statoil
Mariner FPSO, UK sector North Sea
Fabrication of 12 piled anchors for SLT turret. 580T, 2015
Sofec for JGC
NSRP Refinery, Gulf of Tongking, Vietnam
Fabrication of CALM buoy, anchor piles and PLEM plus piles, total weight 358T, 2015
Fluor for Exxon-Mobil Neftegaz
Odoptu stage II, Sakhalin Island, Russia
Fabrication of pile caps, 20 plus 296T and 36 well cellars, 225T, delivery 2015
PJOE
Page 20 of 22
Client
Project Description incl weight and year
CNOOC Kong Queting
WHPA, East China Sea, HuangYan gas field, China
Fabrication of 4 leg launch jacket (4,920T) and 8 piles (4,070T), water depth ~80m, 2015
CNOOC Huang Yan 2-
2 WHP-A, East China Sea, Pingbei HuangYan gas field, China
Fabrication at COOEC ZhuHai yard of deck structure for wellhead platform, 1,417T, 2015
EVT for Chevron
Wheatstone LNG storage tanks modules and pipe-racks, Australia
Fabrication of manifold modules and pipe-racks including cryogenic insulation, 1,800T, plus 2 pump columns, 50 m long, SS, 79T each, s015
YamGaz (Technip/ JGC/ Chiyoda jv) for Yamal LNG (Total E&P/ Novatek/ CNPC)
Yamal LNG development, Yamal peninsula, Siberia, Russia
Delivery of train 1, PAR001, 1,500T, 2015
PJOE
Page 21 of 22
Client
Project Description incl weight and year
Huadian Heavy Industries Co., Ltd for China Power Investment Co.
Jiangsu Binhai North H1#1000MW OWF, Shandong, P.R. of China
Supply and fabrication of 6 mono-piles, 65-79m long, max 6.8m diam, total 4,000T. Delivery 2015
NOV AmClyde
ZPMC Yantai Salvage Derrick Barge
Fabrication of M78 crane boom, 700T. Delivery 2015
YamGaz (Technip/ JGC/ Chiyoda jv) for Yamal LNG (Total E&P/ Novatek/ CNPC)
Yamal LNG development, Yamal peninsula, Siberia, Russia
Delivery of train 1, PAR004, 2,600T, 2016
CNOOC
EnPing 18-1 development, China
Fabrication of jacket (8,200T) and piles (6,450T), Water depth 95m. Delivery 2016
PJOE
Page 22 of 22
NOV AmClyde
Solstad SCV for Saipem
Fabrication of MSB-264RT DWE 900T pedestal, mast and boom, 646T in total with 345T EN-10025 S690QL1 material. Scope includes outfitting of complete crane. Delivery 2016
Fluor for Exxon-Mobil Neftegaz
Odoptu stage II, Sakhalin Island, Russia
Repeat order for fabrication of 70 pile cap plates, 197T, delivery 2016.
PJOE
Page 1 of 2
Ongoing projects PJOE yard 17h May, 2016 The following projects are presently ongoing in the PJOE yard: Client
Project Description incl weight and year
CNOOC BoZhong 25
yoke mooring platform
Refurbishment of topsides, delivery expected in 2017. SOW to be advised
NOV AmClyde
ZPMC Yantai Salvage Derrick Barge
Fabrication of M78 crane deck, 2,030T in total with 865T EN-10025 S690QL1 material. Scope includes outfitting of deck. Delivery 2016
NOV AmClyde
Petrofac DLV 5000 installation vessel
Fabrication of M78 crane deck A-frame and boom, 3,240T in total with 1,426T EN 10025 S690QL1 material. Scope includes full outfitting. Delivery postponed, crane ready April 2016
YamGaz (Technip/ JGC/ Chiyoda jv) for Yamal LNG (Total E&P/ Novatek/ CNPC)
Yamal LNG development, Yamal peninsula, Siberia, Russia
Fabrication of package 3, 95,000T 33 pipe-rack modules for train 3 trains, maximum weight 5,700T, delivery up to 2017
PJOE
Page 2 of 2
Client
Project Description incl weight and year
Fjords Proces-sing /Petronas
FLNG2 LNG FPSO, Malaysia
Part procurement and fabrication of MRU module, ~ 1,000T, 2016
Fluor for Exxon-Mobil Neftegaz
Odoptu stage II, Sakhalin Island, Russia
Repeat order for fabrication of pile cap plates, 14T, delivery 2016.
Mitsubishi Heavy Industries
Caribbean Gas Chemical, Trinidad, TMD module project
Part procurement and fabrication of 58 modules including process, pipe-racks and utility modules, 12,500T, 2017
Black & Veatch
Golar Hilli for Perenco FLNG vessel, completion of 4 HRSG modules
Part procurement, completion and pre-commissioning of 4 HRSG modules, 370T/each, 2016