19
Distribution Statement A Distribution Statement A : Approved for Public Release; Distribution Unlimited. ( : Approved for Public Release; Distribution Unlimited. ( 11/14/2007 11/14/2007 ). ). This Brief is provided for Information Only and does not constit This Brief is provided for Information Only and does not constit ute a commitment on behalf of ute a commitment on behalf of the U.S. government to provide additional information and / or s the U.S. government to provide additional information and / or s ale of the system. ale of the system. Updated . (11/14/2007). Updated . (11/14/2007). The Ship Acquisition Process: Status and Opportunities NDIA Expeditionary Warfare Conference 24 October 07 RDML Chuck Goddard Program Executive Officer, Ships

The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

Distribution Statement ADistribution Statement A: Approved for Public Release; Distribution Unlimited. (: Approved for Public Release; Distribution Unlimited. (11/14/200711/14/2007). ). This Brief is provided for Information Only and does not constitThis Brief is provided for Information Only and does not constitute a commitment on behalf of ute a commitment on behalf of the U.S. government to provide additional information and / or sthe U.S. government to provide additional information and / or sale of the system.ale of the system. Updated. (11/14/2007). Updated. (11/14/2007).

The Ship Acquisition Process:Status and Opportunities

NDIA Expeditionary Warfare Conference

24 October 07

RDML Chuck Goddard Program Executive Officer, Ships

Page 2: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

2

Program Executive Office, Ships

2

Tomorrow’s Navy in design and constructionTomorrow’s Navy in design and construction

Concept Refinement

Technology Development

System Development & Demonstration

Production& Deployment

Operations& Support

MPF(F)

JHSV

LHA 6

LCS

DDG 1000

LPD 17

T-AKE

LHD 8

Small Boats

CG 47

DDG 51

JHSS

JMAC

FFG 7

LCAC SLEPCG(X)

JCC(X)

Page 3: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

3

Program Executive Office, Ships

3

ZUMWALT (DDG 1000) Class TodayZUMWALT (DDG 1000) Class Today

• Designated DDG 1000 ZUMWALT Class Apr 06

• Detail design contracts awarded in Aug 06 to NGSS and BIW

• Construction contracts to be awarded 2008 to NGSS and BIW

• Mission System Equipment contacts awarded to Raytheon (Jan 07) and BAE (Jun 07)

• Navy is planning to re-sequence first ship set of Mission Systems Equipment to BIW

Page 4: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

4

Program Executive Office, Ships

4

FREEDOM (LCS 1) Class TodayFREEDOM (LCS 1) Class Today

FREEDOM (LCS 1)

INDEPENDENCE (LCS 2)

• Navy Program Review– Both design approaches satisfy

validated need– For a 55-ship class, the critical

issue is cost of production– Need to converge to one

configuration to maximize efficiencies in production and minimize operation and maintenance costs

• Way Ahead– Deliver LCS 1 and 2– Contain cost growth the budget– Keep the momentum

Continue Flight 0 in FY 08 and 09– Build to the future – Flight 1

Page 5: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

5

Program Executive Office, Ships

5

ARLEIGH BURKE (DDG 51) Class TodayARLEIGH BURKE (DDG 51) Class Today

All DDG 51 Class Ships Have Been Awarded

85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05DDG 51 1 2 5 5 4 5 4 3 3 2 4 4 3 3 3 3 2 3 3

51 52 54 59 64 68 7373 7777 80 83 85 89 93 96 99 102 105 107 11053 55 60 65 69 7474 7878 81 84 86 90 94 97 100 103 106 108 111

56 61 66 70 7575 79 82 AP 87 91 95 98 101 104 109 11257 62 67 71 7676 88 92 AP58 63 7272

Acquisition StrategiesCompetition For Work 26Negotiated Allocation 6Competition for Profit (PRO) 6Multi-Year (PRO) 24

62Ships

FY02-05 MYP

11 Under Contract

51 Delivered to Fleet

Flight I21 Ships

Flight II7 Ships

Flight IIA34 Ships

Delivered Under Contract TotalBIW 27 7 34NGSS 24 4 28

Delivered Under Contract TotalBIW 27 7 34NGSS 24 4 28

MS 02/80

ACAT IC ACAT ID ACAT IC

MS I6/81

MS II12/83

MS IIIA10/86

MS IV10/93

BIW 1 1 3 2 2 3 3 2 1 1 2 2 1 1 2 2 1 2 2NGSS 1 2 3 2 2 1 1 2 1 2 2 2 2 1 1 1 1 1

FY98-01 MYP

All DDG 51 Class Ships Have Been Awarded

85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05DDG 51 1 2 5 5 4 5 4 3 3 2 4 4 3 3 3 3 2 3 3

51 52 54 59 64 68 7373 7777 80 83 85 89 93 96 99 102 105 107 11053 55 60 65 69 7474 7878 81 84 86 90 94 97 100 103 106 108 111

56 61 66 70 7575 79 82 AP 87 91 95 98 101 104 109 11257 62 67 71 7676 88 92 AP58 63 7272

Acquisition StrategiesCompetition For Work 26Negotiated Allocation 6Competition for Profit (PRO) 6Multi-Year (PRO) 24

62Ships

FY02-05 MYP

11 Under Contract

51 Delivered to Fleet

Flight I21 Ships

Flight II7 Ships

Flight IIA34 Ships

Delivered Under Contract TotalBIW 27 7 34NGSS 24 4 28

Delivered Under Contract TotalBIW 27 7 34NGSS 24 4 28

MS 02/80

ACAT IC ACAT ID ACAT IC

MS I6/81

MS II12/83

MS IIIA10/86

MS IV10/93

BIW 1 1 3 2 2 3 3 2 1 1 2 2 1 1 2 2 1 2 2NGSS 1 2 3 2 2 1 1 2 1 2 2 2 2 1 1 1 1 1

FY98-01 MYP

28 6

Page 6: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

6

Program Executive Office, Ships

6

SAN ANTONIO (LPD 17) Class TodaySAN ANTONIO (LPD 17) Class Today

• USS SAN ANTONIO (LPD 17)– Delivered Jul 06– Commissioned Jan 06

• NEW ORLEANS (LPD 18) – Delivered Dec 06– Commissioned Mar 07

• MESA VERDE (LPD 19)– Delivered Sept 07– Commissioning scheduled for Dec 07

in Panama City• GREEN BAY (LPD 20)

– 84% complete– Delivery in 2008

• NEW YORK (LPD 21)– 61% complete– Launch in late 2007

• SAN DIEGO (LPD 22) – Keel laid May 07• ANCHORAGE (LPD 23) – Keel laid Sept 07• ARLINGTON (LPD 24) – Started fab. Aug 07• SOMERSET (LPD 25) – Start fab. 08

Page 7: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

7

Program Executive Office, Ships

7

LHD 8 / LHA 6 TodayLHD 8 / LHA 6 Today

• LHD 8 under construction

– Delivers Nov 08

• LHA 6 $2.4B construction contract awarded 1 Jun 07

Page 8: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

8

Program Executive Office, Ships

8

LEWIS AND CLARK (T-AKE 1) Class TodayLEWIS AND CLARK (T-AKE 1) Class Today

• T-AKE 1 USNS LEWIS AND CLARK– Delivered 20 Jun 06– Very successful OPEVAL

• T-AKE 2 USNS SACAGAWEA– Delivered 27 Feb 07

• T-AKE 3 USNS ALAN SHEPARD– Delivered Jul 07

• T-AKE 4 USNS RICHARD E. BYRD– Delivers Nov 07

• T-AKE 5 USNS ROBERT E. PEARY– Ship is 41% complete– Delivers Jun 08

• T-AKE 6 USNS AMELIA EARHART– Delivers Nov 08

• T-AKE 7– Keel laying 7 Nov

• T-AKE 8-10– Material ordered

Page 9: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

9

Program Executive Office, Ships

9

Maritime Prepositioning Force (Future) MPF(F)Maritime Prepositioning Force (Future) MPF(F)

• Program Capability– To provide Combatant/Joint Force

Commanders a highly flexible operational and logistics support capability

– Meet widely varied expeditionary missions ranging from delivering combat ready personnel ashore in support of an Expeditionary Strike Force (ESF)

– Conduct independent operations in a permissive environment for Humanitarian Assistance, Global War on Terrorism (GWOT) or other smaller scale contingency ops.

• Way Ahead– Issue RFP to accomplish Phase One

preliminary design in FY 08

Page 10: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

10

Program Executive Office, Ships

10

Joint High Speed Vessel (JHSV) TodayJoint High Speed Vessel (JHSV) Today

• Program Capability– High speed lift ship capable of

transporting cargo and personnel across intratheater distances

– Can transport combat ready personnel and equipment

– Can offload in austere ports without reliance on infrastructure

• Way Ahead– Award Phase One preliminary

design contracts in early FY 08, and detail design and construction contract in late FY 08

Page 11: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

11

Program Executive Office, Ships

11

The question is not who is right or wrong…

…the question is how will the Navy and industry change historical cost behavior.

Navy: $14.4B CBO: $19.5BAverage 2006-2035

FY2007$

The CNO and CBO plans both state the need to control costs

313-Ship Navy: Navy estimate vs. CBO estimate313-Ship Navy: Navy estimate vs. CBO estimate

Page 12: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

12

Program Executive Office, Ships

12

Potential to neck down to 9 ship models

*Note: Types excludes support and MPF(F)

21

19

6

29

27

9

0

5

10

15

20

25

30

35

2007 2020 AFFS Fleet

Num

ber

of S

hip

Type

s or

Mod

els

Number of Types* Number of Models*

Alternative Fleet

Vision – Fewer Ship Types and ModelsVision – Fewer Ship Types and Models

Page 13: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

13

Program Executive Office, Ships

13

L (X)

Today’s Fleet

Next Fleet

LSD 41

LSD 49

LHD

LPD 4

LPD 17

LHA 1

LPD 17

LHD 8

LHA 6

Future Fleet

We can reduce to one ship type

Potential Amphibious StrategyPotential Amphibious Strategy

Page 14: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

14

Program Executive Office, Ships

14

Future FleetNext Fleet

Today’s Fleet

FFG 7DDG-72

DDG-72

We can maximize reuse

DDG-1000

CG(X)

DDG-1000

LCS-A

LCS-B

Potential Surface Combatant StrategyPotential Surface Combatant Strategy

Page 15: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

15

Program Executive Office, Ships

15

• Masts & Kingposts - 47

• Diesel Engine - 187

• Gas Turbine Engine - 30

• Reduction Gear - 641

• Clutches & Couplings – 1,113

• Shaftings - 141

• Bearings - 383

• Propulsors - 125

• Rudder - 34

• Motors – 7,125

• Ship Service Generators - 57

• Emergency Generators - 53

• Frequency Converters - 52

• Pumps – 4,171

• Valves – 37,709

• A/C units - 123

• Distilling Plants - 82

• Air Compressors - 203

We need more commonality to reduce total cost

Unique HM&E Varieties in the FleetUnique HM&E Varieties in the Fleet

Page 16: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

16

Program Executive Office, Ships

16

Material cost offers most cost reduction opportunity

SCN

FY0

7$B

Second Tier = 10% ($7B)

Material = 57% ($38B)

Labor = 33% ($21B)

$0

$2

$4

$6

$8

$10

$12

$14

$16

$18

$20

FY07 FY08 FY09 FY10 FY11

Second Tier (LCS)

GFE

CFE

Overhead

Direct Labor

Already competitive.

Opportunities exist toreduce cost.

Opportunities exist toreduce cost, but Congressional desire tomaintain Big Six Shipyardsconstrains opportunities.

SCN Labor and Material Cost BreakoutSCN Labor and Material Cost Breakout

Page 17: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

17

Program Executive Office, Ships

17

Develop “A-Teams” for ship negotiation

Emphasize contract clauses for cost visibility

Separate risk-laden work packages from ship construction scope

Adopt corporate procurement practices

Encourage industry to operate as a joint venture

Realign Navy to maximize leverage as one buyer

And more…

Incr

easi

ng C

ompl

exity

Achievable

Increasingly Difficult

Change the Status Quo

Alternative Contracting StrategiesAlternative Contracting Strategies

Page 18: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

18

Program Executive Office, Ships

18

• We can reduce the types/models of ships and warfare systems baselines resulting in much lower costs

Program Level AoA guidance should emphasize re-use

• The majority of the shipbuilding costs over FYDP is material we procure on a program basis with each contractor

Change our contracting strategy to a “portfolio basis”Reduce number of components and standardize

• Modularity offers the ability to reconfigure our ships and potential to reduce integration and modernization costs

Focus our systems engineering on cross platform modularity

Summary of FindingsSummary of Findings

Page 19: The Ship Acquisition Process: Status and …...Portfolio Management Title Slide 1 Created Date 11/14/2007 2:22:43 PM

19

Program Executive Office, Ships

19

Building Tomorrow’s Fleet Building Tomorrow’s Fleet

• Relative stability key to OUR future

• Affordability is paramount

– Commonality

– Minimal Changes

– Portfolio Management