20
The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax: +46 8 735 20 30 e-mail: [email protected], web: www.Transek.se

The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

Embed Size (px)

Citation preview

Page 1: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

The SAMPERS project- an over view

By Gunnar Johansson Sveder

Transek AB

Postal address: Solna Torg 3, S-171 45 Solna, Sweden

Tel: +46 8 735 24 49, Fax: +46 8 735 20 30

e-mail: [email protected], web: www.Transek.se

Page 2: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 2

Background

• Long tradition of cost-benefit analysis of investment projects

• Long tradition of modelling - from 4-step to disaggregate systems

• SAMPLAN, extensive co-operation between agencies responsible for – road, rail, air, sea

• National transportation plan, investment plan, transportation policy:– maintenance, taxation, road

pricing, technical development, regulations

• Evaluation of alternative scenarios the society– efficiency, environment, safety,

regional balance

• Detailed cost-benefit analysis

Page 3: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 3

The old national traffic forecast system

National road network data bank

Public transport(train, bus, air ) Maps

EMME/2 GIS

FREDRIKregional trips

Socio-economic data

IC/3long distance

Car owner ship

EVACBA - assessment

Page 4: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 4

The project

• Contract April 1998

• New traffic demand models– Current data

• National travel survey (1994-1997)

• SP-survey (time of day)

• Fehmarn Belt, Öresund

– All trips• Regional

• National long distance

• International

– Time of day modelling• Long distance public transport trips

– Secondary destination• Regional trips

• Computer System– EMME/2

– Plenty of forecast parameters

– Integrated into one single user-friendly system

• Car ownership

• Demand models

• Impact calculation

• Cost benefit analysis

• Accessibility calculation

– Flexibility to output data

• Validation

• Delivery, spring and autumn 1999

Page 5: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 5

Data assembling

Quality control

Trips construction

Estimation

Client approval

Model implementation

Validation (Survey, Elasticity)

Validation (Traffic counts)

The project process

Page 6: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 6

Train Pedesr. BikeCar dr. Car pas. Bus

Dest1…n

Trip No trip

Bf Bp B T G C

Dest1…n

Bf Bp B T G C

Dest1…n

Bf Bp B T G C

Dest1…n

Home based Secondary destination Working place based

……. ……. …….

Trip No trip

Befolkningsutveckling 1993 - 2010

2 100

1 050

210

-210

-1 050

-2 100

Demand models - Regional trips

• Nested logit models– Secondary destinations

• Trip purposes– Home-work trip

– Recreation

– Personal visits

– School trips

– Business

– and other

• Sweden divided into five regions

• Total 8000 zones

Page 7: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 7

Demand models - National long distance trips

• Nested logit models– Time table assignment

– Time of day models

• Trip purposes– Business

• Duration 0 days

• Duration 1+days

– Private• Duration 1 day

• Duration 2-5 days

• Duration 5+ days

• Total 670 zonesCar

Trip No trip

Bus IC train

X2000train

Air

Destinations

Trip frequency

Destination

Mode

Time of day

Type of ticket

98-10-16 10:45MODULE: 6.26TRANSEK5.. .Chr

EMME/2 PROJECT: SAMPERS-modellSCENARIO : 9731 Period 3, Dag 1 (tisdag)

TRANSIT LINES: 33 LINES

3900 3906

3907 3902

3805

3813 3863 3861 3800 3853 3811 3821 3801 3865

3810

3721

3728

3942 3700

3703

3704

3502

3503

3500

0

50

100

150

200

km

16h00 16h30 17h00 17h30 18h00 18h30 19h00 19h30 20h00 20h30 21h00 21h30 22h00 22h30

Page 8: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 8

Impact & Cost benefit analysis

• Energy consumption– Petrol, Diesel

– Costs

• Exhaust emissions– NOx, HC, Particulate, CO2,

SO2

– Costs

• Traffic safety– Number of killed

– Number of severely injured

– Number of slightly injured

– Wildlife accidents

• Costs– Maintenance costs

– Consumer surplus

– CBA

Page 9: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 9

Computer system

• Technology– Windows NT

– Database• Access (ODBC)

– Software• Visual Basic 5

• PowerPlay

– Object oriented approach

• Multiprocessing

• Export file format– EMME/2

• Data bas

• Filter matrices

– Excel• Standard report

– GIS• MapInfo/ArcView

– Micro simulation system• Contram

• ...

Page 10: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 10

Computer system

Long dist.trip

Data base

SAMPERS Scenario handler system

Regional trip

Emme/2 PowerPlay

ImpactCBA

Internat.trip

Page 11: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 11

Model validation

• No “Base matrix”

• Model estimation– Value of time

– Elasticity

• After implementation– Elasticity

– Model vs Survey • Trip frequency by mode and trip

propose

• Trip length

• Traffic production (mileage)

• Assigned traffic – Counts

• Roads

• Trains

• Airports

• Ferries

Page 12: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 12

Mälar lake region, number of trips, model divided by survey

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Hom

e-work

Oth

er pers

onel

Lesiu

re

Private

vis

its

School

Busin

ess

Total

Page 13: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 13

Mälar lake region, number of trips, model divided by survey

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

Bike

Bus

Train

Car d

r.

Car p

ass

Pedest

rian

Page 14: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 14

South region, number of home-work trips by travel distance in km

0

10000

20000

30000

40000

50000

60000

70000

80000

0-2,52,5-5

5-10

10-1515-20

20-2525-30

30-3535-40

40-4545-50 50-

Survey

Model

Page 15: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 15

Traffic production, km per day

02000000400000060000008000000

1000000012000000140000001600000018000000

Bike

Bus

Train

Car d

r.

Car p

ass

Pedest

rian

Survey

Model

Page 16: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 16

Road traffic south of Malmö city

Page 17: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 17

Road traffic west regionLINK SCATTERGRAM

99-05-02 10:39MODULE: 2.43TRANSEK5.. ..ks

EMME/2 PROJECT: VAST fr 3000 zonerSCENARIO : 1000 Bilnt 1997 Vst-Tass

LINKS: !ul1=0

391 LINKS

REGR: Y=A+BXA= -242.416B= .884073R2= .94368STD= 1177.299

2500 5000 7500 10000 12500 15000 17500 20000 22500 25000 27500 30000

0

2500

5000

7500

10000

12500

15000

17500

20000

22500

25000

UL1

UL2

Page 18: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 18

Road traffic around the city of Jönköping

LNKFLDEN, BIL

99-04-30 09:58MODULE: 2.13TRANSEK5.. .Chr

EMME/2 PROJECT: SYDOST fr 3000 zonerSCENARIO : 2000 Bil 1997

WINDOW:1375.8/ 6375.81429.1/6415.73

LINKS: mod=c

langv privlangv tjreg arbetereg vrigt

LAYERS:

SCALE: 651.5

Page 19: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 19

Passenger in the Stockholm underground system

Page 20: The SAMPERS project - an over view By Gunnar Johansson Sveder Transek AB Postal address: Solna Torg 3, S-171 45 Solna, Sweden Tel: +46 8 735 24 49, Fax:

28 April 1999 20

Future possibilities

• Options– Integration of a new car owner

ship model, liked by logsum variables to the demand model

– Integration of land use model