The Republic of the Union of MyanmarMinistry of Electric Power
Electricity Supply EnterpriseKayah State Office
Priorities and Detailed Description of Electrification Plan
For Kayah State
Dated -21.Oct.2015
As Per DE Idea after discussion with Local government
As the whole Kayah State , we must perform for only submitted village in
demoso township with NEP project that a village locate in the distribution
line within two miles.Nowaday there is only five village ( wich are situated
within two miles ) left according to NEP plan.In currently time, we are
distributing the electricity to the quarters fo hpruso and 12Villages
neighboruing hpruso with 33/11kV ,1.25MVA transformer but we have been
Improving to fulfill the demand of electricity for 14villages neighbouring
hpruso in 2014-2015 fiscal year and 44villages neighbouring hpruso in
2015-2016 fiscal year with regional government budget.So, we would like to
submit that to change the currently 33/11kV, 1.25MVA transformer as a
33/11kV , 5MVA transformer.
At that time, we are ferforming the distribution line and substation .
The distribution for 33kV 36.5miles,the substation for 33/0.4kV transformer
7Nos,the distribution line for 11kV 48.5miles, the substation for 11/0.4kV
transformer 8Nos and the distribution line for 400V 6.3miles so as to get
electricith for 15 village of neighbouring Hoyar in hpruso township with
regional government budget. As a matter of fact, we would like to submit
to improve 33/11kV ,5MVA transformer hpruso township and then to build
for 33/11kV 1.25MVA substation surplus transformer of hpruso township for
hoyar. We would like to subit that we alreay negotiated with regional
grovrnment that the relevant proposal plans and the condition of tasks.
2
Priority Electrification Project List for Kayah State
No District Township Nos of Village Remark
1 Loikaw Demoso 5 Within 2 miles Distance from existing grid Line
Hpruso 57 Upgrad 33/11kV 1.25MVA to 5MVA33kV Outgoing Switch Bay 1No
Hpruso ( hoyar ) 8 33/11kV , 1.25 MVA 1No
Total 70
3
No
District
No of Village To be
Electrified
No of
House
House
hold
Popula tion
To be constructed
Estimated cost (Mil
Kyates)
Task by regional
400 V
Lines
(Miles)
Estimated cost (Mil
Kyates)
Cost for 11 kV Line 11/0.4 kV Transformer
Mile
Materi al
Cost
Transpor
t Cost
Construc tion Cost
Total
KVA No
Material
Cost
Transpor
t Cost
Construc tion Cost
Total
1 Loikaw Distrit 5 169 185 1118 2
47.816 4.7 9.2 61.7
16 250 4 36.762 1.8 8.612 47.174 108.89 2.3 103.5
2 Bawlakhe - - - - - - - - - - - - - - - - - -
Total 5 169 185 1118 2 47.81
6 4.7 9.2 61.716 250 4 36.76
2 1.8 8.61247.174
108.89 2.3 103.5
Detailed Electrification Plan for Kayah State(Within 2 miles from Existing 11 kV Distribution Line)
4
Electrification Plan for Villages of Kayah State (Within 2 miles from Existing 11 kV Distribution Line)
To be Constructed 33/11kV Transformer 2 Nos 33kV Outgoing Switch Bay 1 No 11kV Distribution Line 2 miles 400V Distribution Line 2 .3 mile 11/0.4 kV Distribution
Transformer 4 Nos
Kayah State No. of Villages - 70Nos Household - 3362 Estimated Cost -1000.79 (mil kyats)
Loikaw District No. of Villages - 70Nos Household - 3362Estimated Cost -1000.79(mil kyats) 5
Detailed Electrification Plan for Loikaw District(Within 2 miles from Existing 11 kV Distribution Line)
No Town ship
No of
Village To be
Electrifie
d
No of
House
House
hold
Popula tion
To be constructed
Estimated cost (Mil
Kyates)
Task by regional
Cost for 11 kV Line 11/0.4 kV Transformer
400 V
Lines
(Miles)
Estimated cost (Mil
Kyates)
Mile
Materi al
Cost
Transpor
t Cost
Constr uc tion Cost
Total KVA No
Material Cost
Transpor
t Cost
Construc tion Cost
Total
1 Demoso 5 169 185 1118 2
47.816 4.7 9.2 61.71
6 250 4 36.762 1.8 8.612 47.1
74 108.89 2.3 103.5
Total 5 169 185 1118 2 47.8
16 4.7 9.2 61.716 250 4 36.7
62 1.8 8.612 47.174
108.89 2.3 103.5
6
33/11kV ( 5 MVA) Ngwetaung Substation ( Existintg)
33/11kV ( 1.25MVA)
Hpruso Substation ( Existing )
Dawsoshae Village
11/0.4 kV(50 kVA)
Dawlawkhuthit & Dawlawkhu houng
Village11/0.4 kV(50 kVA)
Dawsophya Village11/0.4 kV(100
kVA)
Legend
33/11kV Sub station ( Existing)
11kV Line ( Existing)
11kV Line 2Mile ( Proposal)
Village( Proposal)
Location Map of Electrification Plan for Loikaw District(Within 2 miles from Existing 11 kV Distribution Line)
Soungduywarthit Village
11/0.4 kV(50 kVA)
Loikaw District No. of Villages - 5Nos Household - 185Estimated Cost - 108.89(mil kyats)
7
Detailed Electrification Plan for Loikaw District(Within 2 miles from Existing 11 kV Distribution Line)
NoTownship
Name of
Village To be Electrif
ied
No of
House
House
hold
Popu
lation
To be constructed Estimate
d cost (Mil Kyates)
Task by regional
Cost for 11 kV Line 11/0.4 kV Transformer 400 V
Lines
(Miles)
Estimated Cost(Mil
Kyats)
mile
Material
Cost
Transport
Cost
Constructio
n Cost
Total
KVA
No
MaterialCost
TransportCos
t
Construction
Cost
Total
1. Demo
soSoungdu-ywarthit 30 35 205 - - - - - 50 1 8.803 0.45
2.153
11.406
11.406 0.5 22.5
2.Demo
so Dawsoshe 22 25 153 - - - - - 50 1 8.803 0.45
2.153
11.406
11.406 0.5 22.5
3.Demo
soDawsopha 80 85 512 - - - - - 100 1
10.353
0.452.15
312.956
12.956 0.5 22.5
4.Demo
soDawlawkhu 18 20 120
2.0 47.816 4.7 9.261.716 50 1 8.803 0.45
2.153
11.406
73.122 0.8 36.0
5. Demoso
Dawlawkhuthit
19 20 128
Total 169 185 1118 2.0 47.816 4.7 9.2 61.7
16 250 4 36.762 1.8 8.61
247.174
108.89 2.3 103.5
8
33/11kV ( 5 MVA) Ngwetaung Substation ( Existintg)
33/11kV ( 1.25MVA)
Hpruso Substation( Existing )
Soungduywarthit Village11/0.4 kV(50
kVA) Dawsoshae Village11/0.4
kV(50 kVA)
Dawlawkhuthit & Dawlawkhu houng
Village11/0.4 kV(50 kVA)
Dawsophya Village
11/0.4 kV(100 kVA)
Legend
33/11kV Sub station ( Existing)
11kV Line ( Existing)
11kV Line 2Mile ( Proposal)
Village( Proposal)
Location Map of Electrification Plan for Demoso Township
(Within 2 miles from Existing 11 kV Distribution Line)
9
Serial
Township
To be Constructed The effective areaEstimated Cost ( Mil
Kyates )
Substatio n66 kVLine(mile)
33 kVLine (mile)
TotallVillag
es
TotalHouseHold
Total Population
Materials
Cost
Construction Cost
Total
1 Hpruso
33/11kV upgrad 1.25 to 5 MVAWith 33kV utgoing Switch Bay 1No
- - 57 2774 14414 380.0 24.9 404.9
2Hpruso ( Hoya )
33/11kV1.25 MVA
- - 8 403 1791 375.0 112.0 487.0
Total 2 - - 65 3177 16205 755.0 136.9 891.9
The additional electrification statement due to newly and upgrading 66/33/11kV substation and related
power Line for Kayah State
Remark 33/11kV , 1..25MVA transformer ( Hpruso )is going to promate as 33/11kV 5MVA transformer and the surplus
1.25MVA transformer is going to build in Hoyar. 10
Location Map for 33/11kV Substation 2Nos & 33kV Outgoing Switch bay at Hpruso Township
Upgrad 33/11kV 1.25MVA (Existing)
to 5MVA and33kV Outgoing Switch Bay 1No
33/11KV , 1.25MVASubstation 1No
11
No
Fiscal Year
Staet Capital Budget for ESE ( mil Kyats )
Staet Capital Budget
for DRD (mil
Kyats )
Electrified Connection
Total Cost for
11kV Line
& 11/0.4 TR
Total Cost for
400V Line
TotalOff
Grid
ON Grid Off Grid
Village
( Nos )
Consumer
( Nos )
Village
( Nos )
Consumer
( Nos )
12014 -2015 Estimate ( BE + RE )
5901.266 702.49 6603.7
56 441.42 95 6923 120 4418
22015 -2016 Estimate ( BE + RE )
9401.537 2697.6 12099.
137 247.25 114 6948 44 1210
32016 -2017 Budget Estimate( BE) 456.38 2104.9
62561.3
4 801.3 25 1625 80 2671
Grand Total15759.1
835505.
0521264.233
1489.97 234 15496 244 8299
The Statement Fiscal Yearly Budget and Electrified Connection for Kayah State
12
Sr No Description Quantiti
es Transported Site
1 33/11 kV ,5 MVA Transformer 1 No Loikaw District , PMO Office
2 33kV Outgoing Switch Bay Accessories 1 Set Loikaw District , PMO Office
3
33kV Incoming Switch Bay , 33kV Control pannel and 11kV 1 incoming 2 outgoing cubical for 1.25MVA And Accessories
1 Set Loikaw District , PMO Office
4 11/0.4kV , distribution transformer 4 No Loikaw District , PMO Office
5 10 meter Concrete Pole 100 Nos Loikaw District , PMO Office
6 A C S R 95 mm2 4.2 Tons Loikaw District , PMO Office
7 11kV Pin Insulator with Spindle 230 Nos Loikaw District , PMO Office
8 11kV Disc Insulator with fittinggunset 72 Set Loikaw District , PMO Office
9 Other Materials 1 Lot Loikaw District , PMO Office
Main Materials List Transported to Loikaw District Office
13
THANK YOU