Meeting On Safe and Seamless Transport Connectivity along the
Asian Highway Network
during and After the COVID-19 Pandemic
1
The Republic of the Union of Myanmar
Ministry of Construction
Department of Highways
Presented by - Kyaw Myo Htut
- Director
- Department of Highways
- Ministry of Construction
No Organization AC Concrete Bituminous Metal Gravel Earth Mule Total
1 Ministry of Construction(2018)
Department of Highways 1543.16 1840.49 25567.90 3225.48 4569.08 4844.13 259.1 41849.34
Department of Rural Road
Development
- 1572.80 3585.25 12387.09 7841.66 52566.23 11357.7389310.76
2 Ministry of Livestock,
Fisheries and Rural
Development(2015)
- 705.68 3025.89 11806.63 - 50062.91 - 65601.11
3 Ministry of Defense(2015) - 393.47 703.97 1340.95 170.59 8722.31 - 11330.29
4 Ministry of Electricity &
Energy(2015)
92.34 88.50 542.13 97.97 303.15 - 1124.10
City Development Committees(2015)
5 Yangon - 1916.27 1440.52 - - 1121.48 - 4478.27
6 Mandalay - 39.14 753.67 121.74 - 237.4 - 1151.95
7 Naypyitaw - 770.83 204.93 98.41 556.69 176.47 - 1807.33
Grand Total 1543.16 7331.02 35370.63 29522.43 13235.99 118034.1 11616.83 216653.15
Total Road Length in Myanmar (in km)
2
Designated Weight (Vehicles + Cargo) According to number of Axel and Wheels
3
Designated Weight (Vehicle+Cargo) According to number of axel and wheels
Remark : Allow According to ASEAN Standard Starting from December, 20154
RouteItinerary
Total
LengthClass I Class II Class III
Below Class
III
No (km) (km) (km) (km) (km)
AH1 Tamu-Mandalay-Meiktila-Yangon-
Bago-1553 368 638 543 4
Payagyi-Thaton-Myawaddy
AH2 Meiktila-Loilim-Kengtung-
Tachileik790 73 21 534 162
AH3 Minelar-Kengtung 88 - - 88 -
AH14 Mandalay-Hsipaw-Muse 449 193 46 210 -
Total 2880 634 705 1375 166
Current Status of ASIAN Highways
5
Sr.
No.
Route
names
Length
( Km)
Directly
Connect to
1 AH 1 1533 India , Thailand
2 AH 2 790 Thailand (Lao)
3 AH 3 88 China
4 AH 14 449 China
Total 2880
ASIAN Highways
6
(1) Tamu-Mandalay-Meiktila-Yangon-Bago-Payargyi-Thaton-Myawaddy (AH1) (1582 km)
Sr Road Segment Length
in km
Remark
1 Tamu-Kyigone-Kalay 131 Being implemented
by Indian Assistance
2 Kalay-Gangaw-Pale- 296 DOH Budget
3 Lingadaw-Chaung
Oo- Mandalay
(Myinge)
171 Upgraded by BOT
(National Private
Company)
4 Mandalay(Myinge)-
Yangon(Highway)-
Payargyi-Thaton-
Eindu
844 Upgraded by BOT
(National Private
Company)
5 Eindu-Kawkareik 66 Currently
implemented by
ADB Loan
6 Kawkareik-Myawady 45 Upgrading
complemented (by
Thailand Assistance)
Total 1553
7
(2) Meiktila-Loilem-Namsang-Kengtung-Tachileik (AH2) (790km)
Sr Road Segment Length
in km
Remark
1 Meiktila-Loilem-
Namsang
303 Upgraded by
BOT
(National
Private
Company)
2 Namsang-Kengtung 330 DOH,
Government
Budget
3 Kengtung-Tachileik 157 Upgraded by
BOT
(National
Private
Company)
Total 790
8
(3) Minelar –Kengtung (AH3) (88km)
Sr Road Segment Length in
km
Remark
1 Minelar - Kengtung 88 DOH,
Governme
nt Budget
9
(4) Mandalay-Hsipaw-Muse (AH14) (449km)
Sr Road Segment Length in
km
Remark
1 Mandalay-Hsipaw-
Muse
449 Upgraded by
BOT
(National
Private
Company)
10
11
Annual Average Daily Traffic (AADT) for AH14
0
1000
2000
3000
4000
5000
6000
7000
Jan Feb Mar Apr May
2019 (AADT)
2020(AADT)
➢ COVID-19 Case (1) patient found in 23rd March,2020
➢ Only small and Medium size vehicles (Private-Owned, Public –Owned) decreased
➢ Most of the vehicles are running along the road corridors
➢ Although the number of traffic volume decreased, the number of cargo trucks not
decreased significantly, the toll revenues are not severely affected.
COVID-19 Economic Relief Plan
Goal 2: Ease the Impact on the Private Sector through Improvement to Investment,
Trade and Banking Sectors
2.1 Ease the impact on Private Sectors Action Taken
2.1.3 Tax/Fees Deferral or
Waiver
(Fiscal Stimulus)
Waive or reduce toll fees for cargo
trucks on major road and bridgesToll Fees are reduced by
50% in (86) toll collection
points across the nation
(From June to November)
2.3 Promote Investment
2.3.1 Expedite the
Solicitation Process to
Develop Strategic PPP
Projects for Entry into the
project Bank
Expedite solicitation of Strategic
Infrastructure projectsSome projects already listed
in Project Bank
2.3.3 Prioritize Ready,
High Impact Public
Investments (Expedite
Government Spending)
Prioritize a ready and high impact
public investment pipeline for
recovery and resilience with a focus
on healthcare, key economic
infrastructure and other strategic
and ready projects listed within the
project bank
On going process
12
13