The Rail Safety Summit 2015

SIMON FRENCHDeputy Chief Inspector, RAIB

Page 2: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

2

Rail Accident Investigation Branch

Lessons learnt from investigations (2014-15)

Rail Safety Summit 2015Simon FrenchDeputy Chief Inspector

Page 3: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Introduction

SF-4.1.8.1 v2 13.11.09

• In the last year the RAIB has:

o published 22 reports and 2 bulletinso made a total of 84 recommendations for the

improvement of railway safety

• So what are the big themes?

Page 4: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Track worker safety (1)

SF-4.1.8.1 v2 13.11.09

• how is this best achieved, particularly for those who are experienced and familiar with the task?

• there is a need for continued focus on promoting safe behaviours; how can this best be achieved?

• do managers know how their teams are working?

[Fatal accident involving look-out near Newark North Gate station (report 01/2015)]

High levels of discipline and vigilance are vital if safety is to be maintained on site

Page 5: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Track worker safety (2)

SF-4.1.8.1 v2 13.11.09

Good advanced planning is essential to enable the selection of the safest system of work

The need for safe system of work documents to be accurate and clearly presented

 

[Passenger train collision with trolley at Bridgeway, near Shrewsbury (report 25/2014)]

Page 6: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Managing the vehicle/track system interface

Industry needs to research and risk assess the uneven loading of container wagons, and then to promote adoption of reasonable practicable mitigation measures

[Freight train derailment at Primrose Hill (report 21/2014)]

Page 7: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

8

Residual risk at the VTI

Managing the vehicle/track system interface

Page 8: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

SF-4.1.8.1 v2 13.11.09

Structure fa

ilure; 1

Condition of rolling stock; 5

Driver error; 3

Earthworks failure; 4

Overspeeding; 1

Interaction of uneven wagon loading and poor track condition; 5

Interaction of deficient rolling stock and poor track condition; 8

S&C condition; 2

Signaller error; 2

Track condition; 4

Train preparation; 3

Total = 38

Managing the vehicle/track system interface (2)

Page 9: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Track quality

SF-4.1.8.1 v2 13.11.09

There is a need to identify high risk assets and put in place effective management systems, implemented by staff with the necessary competencies [Derailment of passenger train at Liverpool Street (report 27/2014)]

Page 10: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Track quality

SF-4.1.8.1 v2 13.11.09

Staff and local managers need to be helped to manage recurrent track faults more effectively, particularly in the case of cyclic top faults [Freight train derailment near Gloucester (report 20/2014)]

Page 11: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Managing platform/train interface risk

SF-4.1.8.1 v2 13.11.09

 [Passenger dragged by LUL train at Holborn (report 22/2014)]

Page 12: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Managing platform/train interface risk

SF-4.1.8.1 v2 13.11.09

Areas of potential safety improvement; eg• dispatch equipment and procedures• reducing platform edge gaps• design and testing of train door obstruction detection systems• promoting passenger awareness of the risk• managing risk of platforms that slope towards the track

The RAIB is pleased to note that the ORR has worked with the railway industry to establish a cross-industry group to develop a strategy for the management of the platform train interface (the ‘Platform Train Interface Strategy Group’).

 

Page 13: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Managing platform/train interface risk

SF-4.1.8.1 v2 13.11.09

Is there more we can do to manage the risk of platforms that slope towards the track? [Wheelchairs rolling onto the track at Southend Central and Whyteleafe (report 17/2014)]

 

Page 14: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Driver management

SF-4.1.8.1 v2 13.11.09

There is a need to better manage the non-technical skills of drivers and other operational staff; eg• How best should operators assess such factors?• How best should operators respond when drivers are exhibiting signs that

they are deficient in an area (eg lapses in concentration)?[Train collision at Norwich (report 9/2014)]

 

Page 15: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Safety at user worked crossings

SF-4.1.8.1 v2 13.11.09

There is a need for the railway industry to better understand how road vehicle drivers behave at user worked crossings and to optimise sighting, signage and layout accordingly. [Collision at Jetty Avenue level crossing (report 28/2014)]

 

Page 16: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Safety at user worked crossings (2)

SF-4.1.8.1 v2 13.11.09

What more should be done to manage risk at times of peak demand (eg harvesting)?[Collision at Buttington Hall user worked crossing (report 6/2014 v.2)]

 

Page 17: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Signalling design

SF-4.1.8.1 v2 13.11.09

Exploiting reasonable opportunities to improve safety when undertaking upgrade projects.

The continued need for engineered safeguards to protect against a single human error.[Near miss at Llandovery level crossing (report 11/2014)]

 

Page 18: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Signalling design

SF-4.1.8.1 v2 13.11.09

Exploiting low cost information and communications technology (eg to provide fault data from locally monitored automatic crossings to maintainers). [Near miss at Butterswood level crossing (report 12/2014)]

 

Page 19: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Low adhesion

SF-4.1.8.1 v2 13.11.09

What can our trains tell us about low adhesion conditions?

[Buffer stop collision at Chester station (report 26/2014)]

 

Page 20: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Engineering safety management in design and modifications of plant

SF-4.1.8.1 v2 13.11.09

Quality assurance within suppliers, to ensure plant is fit for purpose[Runaway of RRV at Queen Street, Glasgow (report 15/2014)][Runaway of on-track machine at Bryn (ongoing)]

 

Page 21: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Risk management during rolling stock’s life cycle

SF-4.1.8.1 v2 13.11.09

Ensuring that operators and maintainers understand and manage the risks that were identified by designers[Passenger trapped in train door and dragged at Newcastle Central (report 19/2014)]

 

Page 22: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Risk management during rolling stock’s life cycle

SF-4.1.8.1 v2 13.11.09

The need to correctly translate design intent into effective maintenance procedures[Derailment of Heathrow Express train at Paddington (ongoing)]

Page 23: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Train protection systems

SF-4.1.8.1 v2 13.11.09

Train protection systems (AWS, TPWS, ATP etc) • must be understood by drivers• must not be isolated, or rendered ineffective, inappropriately• must not be reset without authority

[Double SPAD at Greenford (report 29/2014)][SPAD at Wootton Bassett (investigation is ongoing)]

 

Page 24: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

Train management systems

SF-4.1.8.1 v2 13.11.09

Do our train management systems enable crews to manage emergencies effectively, and are they trained and competent to do so? [Uncontrolled evacuation of an LUL train at Holland Park (report 16/2014)]

 

Page 25: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

26

Ongoing investigations

Page 26: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

27

Fire on Eurotunnel freight shuttle in Channel Tunnel. Currently subject of joint RAIB/BEA-TT investigation

RAIB web entry update on 05 March

• Fire caused by electrical arcing event near UK portal

• Fire first detected on the approach to the French SAFE station – but too late to stop within it

• Investigation will consider the modification of carrier wagons (removal of roofs) and the response to previous arcing events (eg fire in Nov 2012)

Ongoing investigations- Lorry fire on Mission 7340 (Jan 2015)

Page 27: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

28

Bridge parapet pushed onto the Berks and Hants by lorry reversing on the bridge having taken a wrong turning

Investigation will consider the time elapsed between the first 999 call and notification of the signalling centre

Ongoing investigations- Froxfield (Feb 2015)

Page 28: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

29

Brake application automatically activated following a late response to an AWS warning

Driver and fireman instead took an action which cancelled the effect of the AWS braking demand - the action taken also had the effect of making subsequent AWS or TPWS brake demands ineffective

Subsequent signal passed at danger

Train came to a stand across a high speed junction less than 1 minute after the passage of a previous express train

Ongoing investigations- Wootton Basset (April 2015)

Page 29: The Rail Safety Summit  2015 SIMON FRENCH Deputy Chief Inspector, RAIB

30

Urgent Safety Advice issued by RAIB concerning:

• the need to review operating restrictions for wagons with spigots that do not comply with the UIC standard; and

• the need for modifications to the wagons concerned to remove the possibility of containers being blown off moving trains

Container blown off trains - Scout Green (March 2015) and Deeping St Nicholas (April 2015)