NEW YORK STATE DEPARTMENT OF TRANSPORTATION
Sunrise Highway CorridorSustainable Transportation Study
NY Route 27, Medford Avenue (NY 112) to Wading River RoadTown of Brookhaven, Suffolk County
Project ID. No. 0059.08
NYS DOTRegion 10, Long Island
Governor: David A. PatersonActing Commissioner: Stanley GeeRegional Director: Subimal Chakraborti
PROJECT ADVISORY COMMITTEE MEETING #2
WELCOME!
TODAY’S GOALNYSDOT Study Team is here to:
Review study progress to dateIntroduce Measures Of Effectiveness (MOEs)Introduce transportation improvement ideasListen and gather input
PAC Members are here to provide: Information and adviceWritten and oral commentsGuidance on study area needs and goals
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
STUDY LOCATION MAP
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.083A
STUDY LOCATION MAPN
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.083B
PurposeDevelop a plan for smart, affordable, workable and sustainable transportation solutions for the Route 27 corridor.
AccomplishmentsConducted data collection and analysisHosted two public involvement sessions (April ‘09)Developed, calibrated computer models of existing travel, socio-economic conditionsIdentified problem areasPrepared possible solutions
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
STUDY PURPOSE & ACCOMPLISHMENTS
4
Informal EffortSmall group meetingsWritten correspondencePhone lineSurvey
Public MeetingsTwo locations for maximum attendance~150 attendees~100 completed questionnaires
PUBLIC INVOLVEMENT
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.085
Website Survey:Went live 1-25-10 at noon
Feb 17, 2010: 874 respondents
Question 4: Rank importance of following, distribute 100 points so that more points reflects higher priority
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
PUBLIC INVOLVEMENT
70 10 20 30 40
Expand Road
Bike-Ped
Public Transit
Character
Carpools
Environment
Safety
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.087
STUDY DEVELOPMENT & EVALUATION PROCESS
Project Goals Defined Input provided at first PAC meeting
Challenges IdentifiedPublic meetings, study surveys & analyses
Ideas & Concepts Developed, RefinedStudy team, public suggestions, PAC workshop
Performance Measures DevelopedMeasures of Effectiveness (MOEs) sent to PAC for review today
Compare Transportation Improvement ConceptsQualitative Description of PAC-expectations of study recommendation based on PAC-approved goals
MOEs to be used by PAC to help reach consensus on whether and degree that proposed transportation solutions achieve study goalsData will be provided to help PAC make an informed decisionTransportation solution that PAC determines achieves the most MOEs will be considered the “better option”, will be recommended in final study report
MEASURES OF EFFECTIVENESS (MOEs)
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.088
PAC-Approved Study Goals as Starting Point:
MEASURES OF EFFECTIVENESS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.089
Study Team Broke Goals into “Mini-Goals”:
Models Provide Data to Inform Rating Process:
MEASURES OF EFFECTIVENESS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.089
MOEs will PAC reach consensus on whether proposed transportation alternatives achieve goalsPAC will determine which proposed solution attains the most MOEsThis option will be recommended in final reportData will be provided by study team wherever possible to help PAC make informed decision
CONVERSATION
MEASURES OF EFFECTIVENESS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.0810
(Refer to handout)
Utilized Information From:Public meetings, written correspondence, surveyTraffic counts and SkyComp photosProject Advisory Committee (PAC)Other studies, notably Roadway Evacuation Study
Computer forecasting and simulation models
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
IDENTIFIED TRANSPORTATION CHALLENGES, ALTERNATIVE SOLUTIONS
11
ExistingSafety concerns, non-standard featuresIncomplete bicycle and pedestrian networkIntermittent service roadsWFP interchange backs up onto NY 27 Main roadwayCongestion on NY 27 between NY 112 and CR 101Hospital Rd interchange
2035Existing problems exacerbatedCongestion at Wading River Rd Interchange
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
IDENTIFIED TRANSPORTATION CHALLENGES
12
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
COMMUNITY CHARACTER
13
NON-MOTORIZED
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Connects existing and proposed north-south routesAccess to MTA LIRR stations, other destinationsNYSDOT & Brookhaven Bicycle Advisory Council, LINMTS 14
TRANSPORTATION SYSTEM DEMAND AND PERFORMANCE MANAGEMENT
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Travel DemandEncourage travel choice change through marketing, education and incentivesManage number of vehicles to help reduce congestion
17
Transportation System Performance
Facility management strategiesAddress congestion, safety
TRANSIT IMPROVEMENTS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Suffolk County Bus Route Analysis and Comprehensive Service Development Plan
Improve frequency and span of serviceRoute modifications
Clipper Express BusMastic to Patchogue to HauppaugePark & Rides, Patchogue and Mastic
16
MTA LIRRImproved non-motorized access to stationsNo anticipated service changes
HOV SYSTEM CONNECTION
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Facilitate South-Shore Carpools and BusesWilliam Floyd Parkway to Nicolls Rd to Existing LIE HOVCarpooling reduces congestion, conserves fuel, and protects air qualityPotential for future expansion
17
Existing LIE HOV
Proposed HOV Lane
Long Island Expressway
Sunrise Hwy
Nicolls Rd
Medford Ave
William
Floyd Parkw
ay
REDUCE CONFLICT POINTS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Reconfigure Weave Zones:Existing: configuration has entering and exiting traffic conflicting at high speed in short distancePotential Alteration: move weave-zone to lower-speed service or collector-distributor roads
18a
REDUCE CONFLICT POINTS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Reconfigure Weave Zones:Existing: configuration has entering and exiting traffic conflicting at high speed in short distancePotential Alteration: move weave-zone to lower-speed service or collector-distributor roads
18b
REDUCE CONFLICT POINTS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Reconfigure Weave Zones:Existing: configuration has entering and exiting traffic conflicting at high speed in short distancePotential Alteration: move weave-zone to lower-speed service or collector-distributor roads
18c
Possible Roundabout
INTERCHANGE UPGRADES
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
“Button Hook”/”J Ramp” EliminationExisting: Short ramps ending in intersections that require rapid decelerationPotential Alteration: Replace intersections with merges, does not change access
19a
Main Roadway
Service Road
Possible Roundabout
INTERCHANGE UPGRADES
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
“Button Hook”/”J Ramp” EliminationExisting: Short ramps ending in intersections that require rapid decelerationPotential Alteration: Replace intersections with merges, does not change access
19b
INTERCHANGE UPGRADES
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Modernized Design Improves Safety, FlowEliminate full “clover-leaf” interchangesUpgrade storage capacityPotential modern roundabouts
20a
Possible roundabout
↓
INTERCHANGE UPGRADES
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Modernized Design Improves Safety, FlowEliminate full “clover-leaf” interchangesUpgrade storage capacityPotential modern roundabouts
20b
Possible roundabout
↓
INTERCHANGES
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Hospital Rd Bridge WideningTown of Brookhaven
Presented by Town of Brookhaven to public on Nov 19, 2009Not currently fundedNot related to Wal-Mart proposal
21
New Access to Sunrise Hwy WB via Barnes or Titmus Rds
Recommended by Brookhaven Roadway Evacuation StudyReduce circuitous movements (non-direct travel)May relieve pressure on existing interchangesMixed feedback from public meetings
22NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
HOSPITAL RD: 2035 AM PEAK HOUR
Connect on- and off-ramps with auxiliary laneProvides safer acceleration/deceleration
LOCAL COMMUNITY CONCERNS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Site-Specific UpgradesPublic meetings provided wealth of local knowledgeGeneral concerns: congestion, connectivity, traffic volume and speed on local roads, & safetyLocal concerns: property-specific, by land-owners
23
Jerusalem Hollow Rd
SERVICE ROADS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
One-Way Service Roads:Enables local trips to remain on local roadsMay avoid negative impacts to specific localitiesImproves land-access
24a
SERVICE ROADS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
One-Way Service Roads:Enables local trips to remain on local roadsMay avoid negative impacts to specific localitiesImproves land-access
24b
COLLECTOR-DISTRIBUTOR ROADS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Improves safe access to and from Sunrise HwyLess traffic impact on local neighborhoods
25a
Possible roundabout
COLLECTOR-DISTRIBUTOR ROADS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Improves safe access to and from Sunrise HwyLess traffic impact on local neighborhoods
25b
Possible roundabout
MAIN ROADWAY IMPROVEMENT
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Existing 3-lane section ends east of NY 112Future congestion between NY 112 and CR 101
26
YOUR IDEAS?
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.0827
We’ve Shown You Ideas Regarding:Transit and non-motorized travelTransportation demand and system management strategiesSafety improvements including ramp and interchange modificationsService road and collector-distributor conceptsMain roadway widening (HOV or general use-lane)
SUMMARY
NEXT STEPS
NYS DOT SUNRISE HIGHWAY CORRIDOR SUSTAINABLE TRANSPORTATION STUDY, PIN 0059.08
Further explore ideas discussed todayPresent ideas to PAC at March workshopPublic meeting will follow, tentatively May, 2010Fall 2010: return to PAC with model results, public input for rating alternativesProduce draft report, present to PAC and then public
28
Telephone: 631-952-6234
E-mail: [email protected]
Website: www.nysdot.gov/ny27
NY 27 Study Team