The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE, James Houle, CPSWQ University of New Hampshire Stormwater Center University of New Hampshire Philadelphia Low Impact Development Symposium: Greening the Urban Environment 25-28 September 2011 1

The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Embed Size (px)

Citation preview

Page 1: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

The Porous PavementCurve Number

Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe,Robert Roseen, PE, PhD, D.WRE, James Houle, CPSWQ

University of New Hampshire Stormwater CenterUniversity of New Hampshire

Philadelphia Low Impact Development Symposium: Greening the Urban Environment25-28 September 2011

1

Page 2: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

What is the Curve Number For Porous Pavement?

Who wants to know?!?

(What is your OBJECTIVE?)

2

Page 3: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

The SCS (NRCS) Curve NumberOriginally conceived to translate rainfall depth into runoff depth on agricultural watersheds…method worked best for large storms

This was then translated into a runoff hydrograph

3

Page 4: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Definition Sketch of SCS Runoff Hydrograph Characteristics

4

Page 5: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

5

Page 6: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

UNHSC Porous Pavement Sites

6

Page 7: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

UNHSC Porous Asphalt Lot UNHSC Porous Concrete Lot7

Permeable Pavement Sites

Page 8: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

8

Typical Cross‐Section Construction

SUBGRADE

NATIVE MATERIALS

BANK RUN GRAVEL FILTER COURSE

PERVIOUS PAVEMENT 3-6”

1-1/4” CRUSHED STONE CHOKER COURSE

14”

3/8” PEA-GRAVEL RESERVOIR COURSE 6”4”

Sub-base design matches that of the UNHSC Porous Asphalt Parking Lot

4”

Page 9: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

UNHSC Porous Pavement Monitoring

Compound weir Pressure transducer Datalogger

9

Page 10: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

10

REFERENCE LOT

POROUS ASPHALT

Tree Filter

Page 11: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

UNHSC Porous Pavement Hydrologic Data

11

“Real time” flow monitoring…5‐minute time step “Real time” rainfall monitoring…5‐minute time step

Page 12: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

0

200

400

600

800

1000

1200

1400

1/1/08

1/8/08

1/15/0

8

1/22/0

8

1/29/0

8

2/5/08

2/12/0

8

2/19/0

8

2/26/0

8

3/4/08

3/11/0

8

3/18/0

8

3/25/0

8

Volu

me

(gal

.)

Influent

Effluent

12

0

200

400

600

800

1000

1200

1400

1600

Volu

me

(gal

.)

Influent

Effluent

PC Flow Attenuation1/1/08 - 3/31/08

Influent Effluent

Total Volume (liters) 446,034 78,192

# of Flow Events 16 8

4/1/08 - 6/30/08

Influent Effluent

Total Volume (liters) 446,034 25,585

# of Flow Events 15 5

Page 13: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

13

PC Pollutant Removal

82% RE94% RE

Page 14: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Methods of Teasing CN from the Data

Measure P and Q, invert basic SCS equation Measure P and outflow hydrograph (q), measure lag, 

estimate CN from lag equations Measure Q and qp, estimate CN from peak discharge 

equations

14

Page 15: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Q P Ia 2

P Ia SEq. 1.

S 1000CN

10 Eq. 4.

Ia 0.2S Eq. 2.

.3.8.02.0

8.0

22

EqSPSP

SPIPQ a

Q: Total Runoff Depth (in)P: Total Precipitation Depth (in)Ia: Initial Abstraction (in)S: Storage Parameter (in)

Method 1 ‐ Depth of Runoff (Q)MethodMethod 1 ‐ Depth of Runoff (Q)Method

15

Page 16: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

16

Page 17: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Study how the timing of the “runoff” is transformed

Time of concentration Lag time Time base Peak time

17

Method 2 ‐Lag MethodsMethod 2 ‐Lag Methods

Page 18: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

18

Page 19: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Tlag: Lag Time (hr)Tc: Concentration Time (hr)Y: Surface Slope (%)S: Storage Parameter (in)

Tlag L0.8 S 1 0.7

1900Y 0.5 Eq. 5.

Tc 53

Tlag Eq. 6.

S 1000CN

10 Eq. 7.

Method 2 ‐LagMethods

Method 2 ‐LagMethods

19

Page 20: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

0

1

2

3

4

5

6

0

0.01

0.02

0.03

0.04

0.05

0.06

0 50 100 150 200 250 300 350 400 450 500 550 600

Run

off

[gpm

]

Rai

nfal

l [in

]

Lag MethodsLag Methods

1. T base (Sánchez San Román [2009])

T base = T precip + T conc

T conc = T base – T precip

LAG METHOD (A) – lag measured from precip peak and runoff peak

3 APPROACHES

T baseT 

precip

 

Using Eq. 5 and Eq. 6 used into Eq.7., solve for CN

In. Abs.

Recession curveRecession curve

20

Page 21: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

0

1

2

3

4

5

6

0

0.01

0.02

0.03

0.04

0.05

0.06

0 50 100 150 200 250 300 350 400 450 500 550 600

Run

off

[gpm

]

Rai

nfal

l [in

]

2. T peak (Sánchez San Román [2009], Folmar, Miller and Woodward [2007])

T peak = T lag + T precip/2

T lag = T peak– T precip/2

LAG METHOD (B) – measure lag from duration of excessprecipitation

T peak

T precip

Insert Eq. 1 into Eq.3 and solve for CN:

In. Abs.

T lag

CN 1000

1900 TLAG Y 0.5

L0.8

1.423

9

21

Lag MethodsLag Methods

Page 22: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

0

1

2

3

4

5

6

0

0.01

0.02

0.03

0.04

0.05

0.06

0 50 100 150 200 250 300 350 400 450 500 550 600

Run

off

[gpm

]

Rai

nfal

l [in

]

3. T centroid (NRCS [2009], Folmar, Miller and Woodward [2009])

T lag:  time from the centroid of excess precipitation to the peak of the hydrograph. 

LAG METHOD (C) – Measure Lag from when ½ Q occurs

In. Abs.

T lag

CN 1000

1900 TLAG Y 0.5

L0.8

1.423

9

22

Lag MethodsLag Methods

Page 23: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

qp: Peak Discharge (cfs)qu: Unit Peak Discharge (csm/in) Am: Drainage area (mi2) Q: Runoff (in)

Method 3GRAPHICAL PEAK DISCHARGE METHOD

Method 3GRAPHICAL PEAK DISCHARGE METHOD

0

1

2

3

4

5

6

0 50 100 150 200 250 300 350 400 450 500 550 600

Run

off [

gpm

]

qp qu Am Q

23

Page 24: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

qp qu Am Q Eq. 8.

GRAPHICAL PEAK DISCHARGE METHODGRAPHICAL PEAK DISCHARGE METHOD

0

1

2

3

4

5

6

0 50 100 150 200 250 300 350 400 450 500 550 600

Run

off [

gpm

]

qu qp

Q Am

Eq. 9.

Area = 0.000201 mi2(5200 ft2)

24

Page 25: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Method 3 – GraphicalPeak Discharge

Method 3 – GraphicalPeak Discharge

Tc estimated with Lag Method and qufound with Eq. 9., find Ia/P from the Unit Peak discharge for NRCS type III 

rainfall distribution chart.

If Ia/P < 0.1 then Ia/P=0.1If Ia/P > 0.5 then Ia/P=0.5

25

Page 26: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Method 3 – GraphicalPeak Discharge

Method 3 – GraphicalPeak Discharge

Knowing Ia/P and P, compute Ia. Then with Eq. 2 and Eq. 7, 

obtain CN

S 1000CN

10 Eq. 7.

CN 1000

5 Ia 10

Ia 0.2S Eq. 2.

26

Page 27: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

27

Page 28: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

CNMethod 1

CNMethod 2Method A

CNMethod 2Method B

CNMethod 2Method C

CNMethod 3

Average 74 11 6 6 51Median 75 8 2 3 13

28

RESULTSRESULTS

Natural state for Hinckley-Charlton soil (HSG – B/C)= 60 - 72

Page 29: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

29

Page 30: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

30

Page 31: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

31

Page 32: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

So….Which to Use? Events

Peak Outflow from Underdrain Peak flow method

No net increase in benchmark storms Lag method (median)

Long Term Simulation Lag methods Runoff depth method (~native soil)

Watershed Simulation Seasonal CN Lag methods

32

Page 33: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Philosophically Speaking….. What is the CN for a detention pond?

33

time

flowwatershed hydrograph

pond hydrograph

Page 34: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

REFERENCESREFERENCES

FOLMAR,N.D; MILLER, A.C.; AND WOODWARD, W.E; 2007. “HISTORY AND DEVELOPMENT OF THE NRSC LAG TIME EQUATION”. JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION. VOL. 43(3): 829‐838. 

LEMAY, G; 2008. DETERMINING THE CURVE NUMBER (CN) FOR POROUS ASPHALT SYSTEMS –INDIVIDUAL STORM VOLUMES. HONORS THESIS INDEPENDENT

SANCHEZ SAN ROMAN, F.J. 2009. “HIDROLOGIA SUPERFICIAL III”. ONLINE HTTP://WEB.USAL.ES/JAVISAN/HIDRO

UNITED STATES DEPARTMENT OF AGRICULTURE. NATIONAL RESOURCES CONVERSATION SERVICE. 1986. “URBAN HYDROLOGY FOR SMALL WATERSHEDS TR‐55”. ONLINE HTTP://WWW.WSI.NRCS.USDA.GOV/PRODUCTS/W2Q/H&H/TOOLS_MODELS/OTHER/TR55.HTML

34

Page 35: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

35

AcknowledgementsFunding Source:

Page 36: The Porous Pavement Curve Number - Villanova University · The Porous Pavement Curve Number Thomas Ballestero, PE, PhD, PH, CGWP, PG, Federico Uribe, Robert Roseen, PE, PhD, D.WRE,

Questions?

36

http://www.unh.edu/erg/cstev/

or Simply Search for “UNHSC”