The Physical Research Section – Research Coordination Unit of the Illinois Department of Transportation(IDOT) is responsible for directing and administering a research program consistent with the department’sneeds. Our comprehensive research programs feature a diverse range of projects in the following focus areas: Construction; Environment; Pavement Design, Management and Materials; Planning; Public and Multi-Modal Transportation; Safety; Structures, Hydraulics and Geotechnical; and Traffic Operations and Roadside Maintenance.

This research is funded primarily through federal State, Planning, and Research (SPR) Part 2 dollars, which are limited to research, development, and technology transfer activities. These federal dollars are focused onefforts to obtain the most benefit to IDOT and to Illinois’ taxpayers.

We carry out this research by utilizing a contract research program administered by the Illinois Center forTransportation (ICT) and through participation in the Federal Highway Administration’s (FHWA) TransportationPooled Fund (TPF) Program with State and Federal partners.

Our research with ICT is governed by a cooperative inter-governmental agreement with the University of Illinoisat Urbana-Champaign. ICT and their subcontractors provide a 25 percent match for IDOT’s federal SPR fundsto cover the federal matching requirements for research and planning activities. A small amount of state fundsare used to pay the administrative costs of this contract research program since federal SPR funds may notbe used for this purpose. A visual representation of all the FY2012 active projects underway through ICT isprovided, showing project details and a graphical timeline for each project. Projects are grouped by focus area.

Participation in the TPF Program enables IDOT to pool limited resources with other federal, state, and localagencies having similar research goals in an efficient and cost-effective manner. IDOT has participated in numerous pooled fund studies led by FHWA or state DOTs with research conducted by universities, privatecompanies, and foundations. A table is provided which shows the pooled fund studies, grouped by focusarea, in which IDOT participated in FY2012. IDOT’s contribution as a function of the total project cost is shown.

This report also includes pie charts detailing FY2012 Contract Research by Focus Area, FY2012 TPF Participation by Focus Area, and FY2012 SPR Part 2 Funding Distribution, representing all areas of our research program.

The projects highlighted in this report show the diversity and depth of research done at ICT and through our participation in the TPF Program. Together, they help IDOT provide safe, cost-effective transportation for Illinois, while enhancing quality of life, promoting economic prosperity, and demonstrating respect for our environment.

For more information on IDOT’s research program, please contact the Research Coordination Unit [email protected] or at (217) 782-7200. Additional information on the ICT, including project status and published reports for IDOT projects, can be found at http://ict.illinois.edu/index.aspx.

Page 3: The Physical Research Section – Research Coordination Unit ......The Physical Research Section – Research Coordination Unit of the Illinois Department of Transportation (IDOT)

6/30

/201

2TA

GPr

ojec

t #Ti

tlePe

rfor

min

g O

rgan

iza o

nPr

inci

pal I

nves

gat

orTR

P Ch

air

Curr

ent C

ost

% C

ompl

eted

Ope

ra o

nsR2

7-09

6Pe

dest

rian/

Bicy

clist

War

ning

Dev

ices

and

Sig

ns a

t Hig

hway

and

Pat

hway

-Rai

l Gra

de C

ross

ings

Uni

vers

ity o

f Illi

nois

at C

hica

goP.

Met

axat

os, P

.S. S

riraj

Tim

Kel

l

Ope

ra o

nsR2

7-09

5Fi

eld

Eval

ua o

n of

Sm

art S

enso

r Veh

icle

Det

ecto

rs a

t Int

erse

c on

s and

RR

Cros

sings

*U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nR.

Ben

ekoh

alYo

gi G

auta

m, S

tan

Mile

wsk

i (IC

C)

Ope

ra o

nsR2

7-11

8De

velo

pmen

t of a

Hig

hway

Inci

dent

Man

agem

ent O

pera

ona

l and

Tra

inin

g Gu

ide

- Pha

se II

Sout

hern

Illin

ois U

nive

rsity

at E

dwar

dsvi

lleH.

Zho

u, R

. Frie

sGe

no K

oehl

er

33%

Stev

e Ly

nch,

John

Be

nda

(ITHA

)16

7,06

6.00

$

75%

Kyle

Arm

stro

ng20

0,89

8.00

$

50%

Ope

ra o

nsR2

7-09

4Pe

rfor

man

ce E

valu

a on

of S

now

and

Ice

Plow

sBr

adle

y U

nive

rsity

S. E

lhou

r, E.

Mah

mou

d

Ope

ra o

nsR2

7-10

9Eff

ects

of F

lagg

ers a

nd S

po"e

rs in

Dire

c ng

Wor

k Zo

ne T

raffi

c for

Illin

ois F

reew

ays a

nd E

xpre

ssw

ays

(Ope

ra o

ns, S

afet

y)U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nK.

El-R

ayes

, L. L

iu, N

. El-

Goha

ry

106,

668.

00$

O

pera

ons

R27-

108

Impr

ovin

g th

e Eff

ec v

enes

s of N

igh'

me

Tem

pora

ry T

raffi

c Con

trol

War

ning

Dev

ices

(Ope

ra o

ns,

Cons

truc

on,

Saf

ety)

Appl

ied

Rese

arch

Ass

ocia

tes,

Inc.

D. S

teel

e, W

. Vav

rik

42%

Tim

Pet

ers

250,

000.

00$

94%

Past

Due

Mar

k Se

ppel

t30

2,60

0.00

$

Past

Due

99,9

38.0

0$

O

pera

ons

R27-

091

Eval

ua o

n of

Tra

ffic F

low

Mon

itorin

g Te

chno

logi

es: C

icer

o-M

idw

ay S

mar

t Cor

ridor

Cas

e St

udy

Uni

vers

ity o

f Illi

nois

at C

hica

goJ.

Erik

sson

Jeff

Gala

s

100%

Geno

Koe

hler

136,

400.

00$

Past

Due

Ope

ra o

nsR2

7-07

6LE

D Ro

adw

ay Li

gh n

g Ev

alua

on

and

Fiel

d Te

s ng

*U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nR.

Ben

ekoh

al

230,

000.

00$

O

pera

ons

R27-

075

Clea

rvie

w F

ont i

n Tr

affic S

igns

: Ass

essin

g ID

OT

Expe

rienc

e an

d N

eeds

*N

orth

wes

tern

Uni

vers

ityH.

Mah

mas

sani

Julia

Fox

Todd

Hill

, Cha

rles

Wie

nran

k30

,000

.00

$

100%

16%

Ope

ra o

nsR2

7-06

4De

velo

pmen

t of a

Hig

hway

Inci

dent

Man

agem

ent O

pera

ona

l Gui

deSo

uthe

rn Il

linoi

s Uni

vers

ity a

t Edw

ards

ville

H. Z

hou,

R. F

ries

25,5

24.0

0$

En

viro

nmen

tR2

7-SP

2120

12 U

pdat

e to

Illin

ois C

arbo

n M

onox

ide

Scre

en fo

r Int

erse

c on

Mod

elin

gU

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nS.

Pet

ers

Wal

t Zyz

nieu

ski

Envi

ronm

ent

R27-

SP18

Deve

lopi

ng B

est P

rac

ces f

or B

icyc

le T

rail

Cons

truc

on

and

Mai

nten

ance

in Il

linoi

sU

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nB.

Dem

psey

, B. B

u"la

r

250,

000.

00$

En

viro

nmen

tR2

7-12

6Te

mpo

rary

Sta

biliz

a on

Impr

ovem

ent I

nves

ga

on^

Sout

hern

Illin

ois U

nive

rsity

at E

dwar

dsvi

lleM

. Grin

ter,

P. M

inch

in, S

. M

orga

n, W

. Ret

zlaff

Ma"

Sun

derla

nd

Envi

ronm

ent

R27-

114

Rest

ora

on P

rogr

ess a

nd F

lood

Dist

urba

nce

at ID

OT

Wet

land

Mi

ga o

n Si

tes

Illin

ois S

tate

Geo

logi

cal S

urve

y / I

llino

is N

atur

al H

istor

y Su

rvey

G. P

ocia

sk /

J. M

a"he

ws

245,

086.

00$

Cons

truc

on

An E

xper

t Sys

tem

s App

roac

h to

Hig

hway

Con

stru

c on

Sch

edul

ing

Miss

ouri

Stat

e U

nive

rsity

D. S

la"e

ry, K

. Sla

"ery

, R.

Bruc

eR2

7-08

6

192,

091.

00$

En

viro

nmen

tR2

7-10

4N

a ve

Veg

eta

on E

stab

lishm

ent f

or ID

OT

Eros

ion

Cont

rol B

est M

anag

emen

t Pra

c ce

sU

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

n / U

S Ar

my

Corp

s of

Engi

neer

s Con

stru

c on

Eng

inee

ring

and

Rese

arch

Labo

rato

ryP.

Kal

ita /

H. H

owar

d, R

. Bu

sby

Sco"

Mar

low

Thom

as B

rook

s81

,214

.00

$

2011

2008

2009

2010

100%

R27-

102

Inst

alla

on

and

Per

form

ance

Tes

ng

of D

itch

Chec

ks a

nd In

let P

rote

c on

Str

uctu

res

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

/ US

Arm

y Co

rps o

f En

gine

ers C

onst

ruc

on E

ngin

eerin

g an

d Re

sear

ch La

bora

tory

P. K

alita

, M. G

arci

a / H

. Ho

war

d, N

. Sve

ndse

nJo

e Ve

spa

Mik

e Ri

pka

89,1

12.6

8$

87%

R27-

093

Tran

spor

ta o

n Co

nfor

mity

Par

cul

ate

Ma"

er H

ot-S

pot A

ir Q

uaity

Mod

elin

gU

nive

rsity

of I

llino

is at

Chi

cago

J. Li

n

300,

001.

00$

Ope

ra o

nsR2

7-11

0Tr

aini

ng a

nd Im

plem

en n

g Fi

ndin

gs o

f Que

ue a

nd U

sers

' Cos

ts in

Hig

hway

Wor

k Zo

nes -

Pha

se II

(O

pera

ons

, Saf

ety)

Stev

e Ly

nch

80,0

00.0

0$

U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nR.

Ben

ekoh

al

20%

18%

17%

75%

0% 0%

Ope

ra o

nsR2

7-SP

20Sa

fety

Ben

efits

of I

mpl

emen

ng

Adap

ve

Sign

al C

ontr

ol T

echn

olog

ies

Ope

ra o

nsR2

7-12

3St

reet

Ligh

ng

Tech

nolo

gies

- Ph

ase

II of

LED

Stre

et Li

gh n

g Ev

alua

on

(Ope

ra o

ns, E

nviro

nmen

t)U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nR.

Ben

ekoh

alM

ark

Sepp

elt

282,

000.

00$

44%

Ope

ra o

nsR2

7-12

0Ev

alua

ng

All-W

eath

er P

avem

ent M

arki

ngs a

nd La

b M

etho

ds to

Sim

ulat

e Fi

eld

Expo

sure

Iow

a St

ate

Uni

vers

ity /

Cent

er fo

r Tra

nspo

rta

on R

esea

rch

and

Educ

a on

at I

owa

Stat

e U

nive

rsity

/ Tex

as T

rans

port

a on

Ins

tute

N. H

awki

ns /

O. S

mad

i /

Paul

Car

lson

Kelly

Mor

se-

$

0%

Ope

ra o

nsR2

7-12

7Sa

fety

and

Effi

cien

cy B

enefi

ts o

f Im

plem

en n

g Ad

ap v

e Si

gnal

Con

trol

Tec

hnol

ogy

in Il

linoi

s^TB

DTB

DKy

le A

rmst

rong

400,

000.

00$

Pave

men

tR2

7-03

7Im

pact

of H

igh

Recl

aim

ed A

spha

lt Pa

vem

ent C

onte

nt o

n Pa

vem

ent S

truc

tura

l Per

form

ance

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

I. Al

-Qad

i, S.

Car

pent

erJim

Tre

pani

er32

0,93

7.00

$

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

R. B

enek

ohal

Kyle

Arm

stro

ng30

,000

.00

$

50%

100%

2012

2013

2014

2015

2016

Envi

ronm

ent

Envi

ronm

ent

Wal

t Zyz

nieu

ski

84,4

32.0

0$

Pa

st D

ue

Envi

ronm

ent

300,

001.

00$

R27-

054

Stor

m W

ater

Pol

lu o

n, E

rosio

n an

d Se

dim

ent C

ontr

ol P

rodu

cts T

es n

g an

d Tr

aini

ng C

ente

rU

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nP.

Kal

ita, R

. Coo

keJo

e Ve

spa

499,

229.

00$

29%

Envi

ronm

ent

R27-

103

"Gre

en F

riend

ly" B

est M

anag

emen

t Pra

c ce

s for

Inte

rsta

te R

est A

reas

- Ph

ase

II (E

nviro

nmen

t, O

pera

ons

)U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nK.

El-R

ayes

, L. L

iuM

ark

Sepp

elt,

Ma"

Su

nder

land

220,

000.

00$

73

%

CO

NT

RA

CT

RE

SE

AR

CH

PR

OJE

CT

S U

ND

ER

WAY

IN

FY

2012

Page 4: The Physical Research Section – Research Coordination Unit ......The Physical Research Section – Research Coordination Unit of the Illinois Department of Transportation (IDOT)

6/30

/201

2TA

GPr

ojec

t #Ti

tlePe

rfor

min

g O

rgan

iza o

nPr

inci

pal I

nves

gat

orTR

P Ch

air

Curr

ent C

ost

% C

ompl

eted

2011

2008

2009

2010

2012

2013

2014

2015

2016

100%

Pave

men

tR2

7-04

2Th

in, Q

uiet

, Lon

g-La

s ng

Hig

h Fr

ic o

n Su

rfac

e La

yer

Pave

men

tR2

7-03

8Hi

gh P

las

c Con

cret

e Te

mpe

ratu

res S

peci

fica

on fo

r Pav

ing

Mix

ture

sU

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nJ.

Popo

vics

, J. R

oesle

rDe

rek

C. P

arish

168,

740.

00$

Pave

men

tR2

7-06

0M

echa

nis

c-Em

piric

al D

esig

n Im

plem

enta

on

and

Mon

itorin

g fo

r Fle

xibl

e Pa

vem

ents

U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nM

. Tho

mps

on, I

. Al-Q

adi

Char

les W

ienr

ank

484,

158.

00$

64%

Pave

men

tR2

7-07

7Ev

alua

ng

the

Com

pa b

ility

of D

urab

le P

avem

ent M

arki

ngs o

n Pa

vem

ents

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

I. Al

-Qad

i, S.

Car

pent

erTo

m Z

ehr

569,

805.

00$

84

%

67%

Pave

men

tR2

7-06

1M

echa

nis

c-Em

piric

al D

esig

n Im

plem

enta

on

and

Mon

itorin

g fo

r Rig

id P

avem

ents

U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nJ.

Roes

ler

Char

les W

ienr

ank

488,

674.

00$

Pave

men

tR2

7-07

8Ev

alua

ng

the

Effec

ts o

f Var

ious

Asp

halt

Bind

er A

ddi

ves/

Mod

ifier

s on

Moi

stur

e Se

nsi

vity

in H

ot M

ix

Asph

alt

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

I. Al

-Qad

iJim

Tre

pani

er54

6,07

7.00

$

85%

Pave

men

tR2

7-10

0Be

st P

rac

ces f

or Im

plem

enta

on

of T

ack

Coat

TRP

Rec

omm

enda

ons

Appl

ied

Rese

arch

Ass

ocia

tes,

Inc

C. D

wye

r, W

. Vav

rikKe

lly M

orse

300,

000.

00$

86

%

60%

Pave

men

tR2

7-07

9De

signi

ng, P

rodu

cing

, and

Con

stru

c ng

Fin

e-Gr

aded

Hot

Mix

Asp

halt

on Il

linoi

s Roa

dway

sU

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

n / M

urph

y Pa

vem

ent

Tech

nolo

gy /

Herit

age

Rese

arch

Gro

up a

nd E

mul

sicoa

t, In

c.W

. Bu"

lar /

T. M

urph

y /

W. P

ine

Ma"

Mue

ller,

Laur

a Sh

anle

y64

4,57

8.00

$

Pave

men

tR2

7-11

2Te

s ng

of P

ortla

nd C

emen

t (Cu

rren

t AST

M C

150

) with

Lim

esto

ne a

nd P

roce

ss A

ddi

on (A

STM

C 4

65)

Uni

vers

ity o

f Illi

nois

at C

hica

goM

. Iss

aJo

hn H

uang

399,

987.

00$

0%

Pave

men

tR2

7-12

5Su

stai

nabl

e Ag

greg

ates

Pro

duc

on -

Gree

n Ap

plic

a on

s for

Agg

rega

te B

y-Pr

oduc

ts^

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

/ Bra

dley

Uni

vers

ity /

Herit

age

Rese

arch

Gro

up a

nd E

mul

sicoa

t, In

c.

I. Al

-Qad

i / E

. Mah

mou

d /

W. P

ine

Dere

k Pa

rish

549,

954.

00$

72

%

44%

Pave

men

tR2

7-12

4Ev

alua

on

of P

orou

s Gra

nula

r Em

bank

men

t Mat

eria

ls U

sed

as P

avem

ent S

ubgr

ade

/ Gra

nula

r Sub

base

^U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nE.

Tut

umlu

erSh

eila

Bes

hear

s46

0,00

0.00

$

Pave

men

tR2

7-12

8Te

s ng

Pro

toco

ls to

Insu

re P

erfo

rman

ce o

f Hig

h As

phal

t Bin

der R

epla

cem

ent M

ixes

Usin

g Re

clai

med

As

phal

t Pav

emen

t and

Rec

laim

ed A

spha

lt Sh

ingl

es^

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

I. Al

-Qad

iDa

vid

Lipp

ert

585,

000.

00$

0%

Pave

men

tR2

7-13

0De

velo

pmen

t of I

mpr

oved

Ove

rlay

Thic

knes

s Des

ign

Alte

rna

ves f

or Lo

cal R

oads

^

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

E. T

utum

luer

, H. O

zer

Davi

d Li

pper

tTB

D0% 0%

Pave

men

tR2

7-12

9Im

plem

en o

n of

Agg

rega

te Im

agin

g Sy

stem

in M

easu

ring

Aggr

egat

e Re

sista

nce

to P

olish

ing,

Abr

asio

n,

Brea

kage

^TB

DTB

DSh

eila

Bes

hear

s12

5,00

0.00

$

Pave

men

tR2

7-SP

19Ev

alua

on

of R

ecyc

led

Asph

alt S

hing

le E

ffect

on

Som

e M

echa

nica

l Pro

per

es o

f an

IDO

T As

phal

t M

ixtu

re*

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

H. O

zer

Davi

d Li

pper

t30

,000

.00

$

100%

Plan

ning

R27-

083

Good

s Mov

emen

t Stu

dy in

IL: A

pplic

a on

s to

Frei

ght T

rans

port

a on

and

Logi

s cs

*(Pl

anni

ng, P

ublic

Tr

ans)

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

E. T

utum

luer

Kevi

n Bu

rke

180,

000.

00$

0%

Past

Due

Plan

ning

R27-

048

Trav

el D

eman

d M

odel

ing

for S

mal

l and

Med

ium

Size

Met

ropo

litan

Pla

nnin

g O

rgan

iza o

ns in

Illin

ois

Cham

paig

n Co

untr

y Re

gion

al P

lann

ing

Com

miss

ion

/ Uni

vers

ity

of Il

linoi

s at C

hica

goR.

Mor

ocoi

ma-

Blac

k / P

. M

etax

atos

Susa

n S

"14

1,76

0.00

$

Plan

ning

R27-

084

Deve

lop

Trav

el R

elia

bilit

y In

vent

ory

for H

ighw

ay N

etw

orks

Nor

thw

este

rn U

nive

rsity

/ U

nive

rsity

of I

llino

is at

Chi

cago

M. N

ie /

P. N

elso

n, J.

Di

llenb

urg

Jeff

Gala

s12

5,40

7.00

$

100%

Plan

ning

R27-

131

Leve

ragi

ng T

raffi

c and

Sur

veill

ance

Vid

eo C

amer

as fo

r Urb

an T

raffi

c^

Uni

vers

ity o

f Illi

nois

at C

hica

goK.

Moh

amm

adia

nM

ike

Garc

ia21

1,36

5.00

$

Past

Due

Past

Due

Plan

ning

R27-

087

Impl

emen

ng

Pave

men

t Man

agem

ent S

yste

ms f

or Lo

cal A

genc

ies

Appl

ied

Pave

men

t Tec

hnol

ogy

/ Bra

dley

Uni

veris

tyA.

Wol

ters

/ K.

Sch

a"le

rKe

vin

Burk

e99

,851

.00

$

Plan

ning

R27-

132

Inco

pora

ng

the

Na

onal

Env

ironm

enta

l Pol

icy

Act i

nto

the

Illin

ois D

epar

tmen

t of T

rans

port

a on

and

M

etro

polit

an P

lann

ing

Org

aniza

on

Plan

ning

Pro

cess

^U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nN

. El-G

ohar

ySu

san

S ",

Cha

rles

Perin

o17

9,70

3.00

$

100%

Publ

ic T

rans

R27-

051

Guid

elin

es, S

ite S

elec

on,

and

Des

ign

for I

mpl

emen

ng

Truc

k Pa

rkin

g/Re

st F

acili

es i

n Ch

icag

o's S

outh

Su

burb

s*

Uni

vers

ity o

f Illi

nois

at C

hica

goJ.

Erik

sson

Rob

Robi

nson

100,

000.

00$

0% 0%

Publ

ic T

rans

R27-

050

Trip

Cha

inin

g Be

havi

or o

f Sen

ior C

i ze

ns a

nd A

pplic

a on

s to

Publ

ic T

rans

port

a on

Pla

nnin

gU

nive

rsity

of I

llino

is at

Chi

cago

K. M

oham

mad

ian

Char

les A

brah

am11

0,88

7.00

$

Publ

ic T

rans

R27-

113

Mod

elin

g Se

nior

s Ac

vity

- Tr

avel

Dat

a - P

hase

IIU

nive

rsity

of I

llino

is at

Chi

cago

K. M

oham

mad

ian

Amy

Wel

k12

5,06

2.00

$

Past

Due

Safe

tyR2

7-06

6Eff

ec v

enes

s of I

nnov

a ve

Spe

ed E

nfor

cem

ent T

echn

ique

s in

Illin

ois

Illin

ois I

ns t

ute

of T

echn

olog

yP.

Bel

tem

achi

, L. R

ohte

rCh

arle

s Abr

aham

80,5

36.0

0$

Pa

st D

ue

66%

Safe

tyR2

7-05

2St

udyi

ng a

nd M

inim

izing

Tra

ffic-

Rela

ted

Wor

k Zo

ne C

rash

es in

Illin

ois*

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

K. E

l-Ray

es,

L. Li

uM

arsh

all M

etca

lf21

0,00

1.00

$

Safe

tyR2

7-08

9Ill

inoi

s Hig

hway

Saf

ety

Man

ual W

orks

hop*

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

Y. O

uyan

g, S

. Cha

krab

orty

Prisc

illa

Tobi

as17

5,67

6.00

$

Nor

thw

este

rn U

nive

rsity

H. M

ahm

assa

ni, R

. Che

nPr

iscill

a To

bias

, Sco

" Ab

bo"

(ISP)

225,

000.

00$

89

%

Past

Due

Page 5: The Physical Research Section – Research Coordination Unit ......The Physical Research Section – Research Coordination Unit of the Illinois Department of Transportation (IDOT)

6/30

/201

2TA

GPr

ojec

t #Ti

tlePe

rfor

min

g O

rgan

iza o

nPr

inci

pal I

nves

gat

orTR

P Ch

air

Curr

ent C

ost

% C

ompl

eted

2011

2008

2009

2010

2012

2013

2014

2015

2016

^ Fu

ndin

g is

appr

oved

, pro

ject

is u

pcom

ing

* Re

sear

ch P

roje

ct su

bsta

n al

ly co

mpl

ete,

Fin

al R

epor

t pen

ding

app

rova

l and

pub

lica

onO

rigin

al

Jim K

lein

350,

000.

00$

0%

Oth

erR2

7-07

3Di

stan

ce T

echn

olog

y Tr

ansf

er C

ours

e Co

nten

t Dev

elop

men

tU

nive

rsity

of I

llino

is at

Spr

ingfi

eld

/ Uni

vers

ity o

f Illi

nois

at

Urb

ana-

Cham

paig

nJ.

Hall

/ W. B

u!la

rKe

vin

Burk

e30

0,00

2.00

$

Past

Due

Past

Due

Safe

tyR2

7-09

7Ev

alua

on

of F

lash

ing

Yello

w A

rrow

s for

Pro

tect

ed/P

erm

issiv

e Le

" Tu

rn C

ontr

ol (S

afet

y, O

pera

ons

)

Safe

tyR2

7-09

0In

ves

ga o

n of

Con

trib

u ng

Fac

tors

Reg

ardi

ng W

rong

-Way

Driv

ing

on F

reew

ays*

Sout

hern

Illin

ois U

nive

rsity

at E

dwar

dsvi

lleH.

Zho

u, R

. Frie

s, B.

Va

ughn

, C. L

inPr

iscill

a To

bias

230,

986.

00$

Safe

tyR2

7-11

1Eff

ects

of I

nter

sec

on R

ight

-Tur

n La

ne D

esig

n an

d Sk

ew o

n Sa

fety

and

Ope

ra o

ns (S

afet

y, O

pera

ons

)Br

adle

y U

nive

rsity

K. S

cha!

ler,

M. Y

amin

Sean

Coy

le11

5,80

0.00

$

14%

Safe

tyR2

7-11

7N

a on

al S

tate

Saf

ety

and

Engi

neer

s and

Tra

ffic E

ngin

eers

Pee

r to

Peer

Wor

ksho

p (S

afet

y, O

pera

ons

)

Brad

ley

Uni

vers

ityK.

Sch

a!le

rRa

ndal

l Lan

inga

355,

000.

00$

33

%

42%

Safe

tyR2

7-11

6In

ves

ga o

n of

Met

hods

and

App

roac

hes f

or C

olle

c ng

and

Rec

ordi

ng H

ighw

ay In

vent

ory

Data

Sout

hern

Illin

ois U

nive

rsity

at E

dwar

dsvi

lleH.

Zho

u, S

. Hu,

J. G

ong,

M

. Grin

ter

Rob

Robi

nson

, Kim

Ko

lody

215,

000.

00$

Stru

ctur

esR2

7-02

6Fr

ee-C

u+ng

Bra

ss B

reak

away

Cou

plin

gsU

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nD.

Kuc

hma

Chris

Hah

in52

,500

.00

$

Past

Due

Stru

ctur

esR2

7-05

6Tr

ansf

er &

Dev

elop

men

t Len

gths

in P

rese

tres

sed

Self-

Cons

olid

a ng

Con

cret

e Br

idge

Box

and

I-Gi

rder

s

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

Y. O

uyan

gPr

iscill

a To

bias

, Aar

on

Wea

ther

holt

150,

000.

00$

0% 10

0%

Stru

ctur

esR2

7-05

5In

stru

men

ta o

n an

d M

onito

ring

of "E

xtre

me"

Inte

gral

Abu

tmen

t Brid

ges i

n Ill

inoi

s*U

nive

rsity

of I

llino

is at

Chi

cago

S. O

lson,

J. Lo

ngW

illia

m K

ram

er, G

ary

Kow

alsk

i36

3,00

0.00

$

Stru

ctur

esR2

7-05

7Su

perio

rity

and

Cons

truc

tabi

lity

of F

ibro

us A

ddi

ves f

or B

ridge

Dec

k O

verla

ysIn

dian

a-Pu

rdue

For

t Way

neM

. Alh

assa

n, S

. Ash

urGa

ry K

owal

ski

160,

000.

00$

Past

Due

Stru

ctur

esR2

7-07

0Ca

libra

on

and

Refin

men

t of I

llino

is' E

arth

quak

e Re

sis n

g Sy

stem

Brid

ge D

esig

n M

etho

dolo

gy

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

B. A

ndra

wes

, A. P

ozol

oTo

m D

omag

alsk

i19

0,00

0.00

$

100%

100%

Stru

ctur

esR2

7-06

9Im

prov

ed D

esig

n fo

r Driv

en P

iles B

ased

on

a Pi

le Lo

ad T

est P

rogr

am in

Illin

ois*

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

J. Lo

ngW

illia

m K

ram

er

Stru

ctur

esR2

7-08

1Fi

eld

Perf

orm

ance

Eva

lua

ons o

f IL A

ggre

gate

s for

Sub

grad

e Re

plac

emen

t and

Sub

base

- Ph

ase

II*U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nE.

Tut

umlu

erGr

eg H

ecke

l

441,

883.

00$

Stru

ctur

esR2

7-08

0Fa

gue

Tes

ng

of B

rass

Bre

akaw

ay C

oupl

ings

*U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nI.

Al-Q

adi,

G. B

anas

Chris

Hah

in85

,000

.00

$

Dani

el T

obia

s75

0,08

1.00

$

87%

Past

Due

Stru

ctur

esR2

7-08

8Br

idge

Dec

ks: M

i ga

on

of C

rack

ing

and

Incr

ease

d Du

rabi

lity

(Str

uctu

res,

Pave

men

t)U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

n / S

t. Lo

uis U

nive

rsity

P. M

onda

l, D.

Fou

tch

/ R.

Hind

iDa

n To

bias

334,

372.

00$

Dan

Tobi

as20

0,00

0.00

$

Stru

ctur

esR2

7-08

2St

reng

then

ing

of B

ridge

Woo

d Pi

lings

Ret

rofit

s for

Mom

ent R

esist

ance

0%

230,

000.

00$

58%

Doug

Dirk

s

62%

335,

017.

00$

Pa

st D

ue

Stru

ctur

esR2

7-10

5Im

prov

emen

t of I

DOT

Brid

ge S

cour

Es

ma

on M

etho

d at

Site

s with

Coh

esiv

e So

ils U

sing

SRIC

OS

Zmax

- Ph

ase

IIU

S Ge

olog

ical

Sur

vey

A. Is

hii,

T. S

trau

bN

eil V

anbe

bber

204,

000.

00$

Past

Due

Stru

ctur

esR2

7-09

9Im

prov

emen

t for

Det

erm

inin

g th

e Ax

ial C

apac

it of

Dril

led

Sha"

s in

Shal

e in

Illin

ois

Stru

ctur

esR2

7-09

8Ev

alua

on

of C

oncr

ete

Cylin

der M

atch

Cur

ing

and

Eval

ua o

n of

4"X

8" C

ylin

ders

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

J. Po

povi

cs

R27-

107

Load

Tes

ng

of R

apid

Dep

loym

ent P

late

and

Tub

e Sh

ort-S

pan

Brid

ge fo

r Cou

nty

Road

s^TB

DTB

DCh

ris H

ahin

, Tom

W

inke

lman

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

T. S

tark

, J. L

ong

Riya

d W

ahab

, Will

iam

Kr

amer

172,

500.

00$

145,

000.

00$

Stru

ctur

es12

%

Stru

ctur

esR2

7-10

6Fo

rmab

ility

of N

ew H

igh

Perf

orm

ance

Gra

de 5

0 St

ruct

ural

Ste

elN

orth

wes

tern

Uni

vers

ityS.

Vay

nman

, M. F

ine,

Y-

W. C

hung

Chris

Hah

in90

,000

.00

$

Stru

ctur

es

44%

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

B. A

ndra

wes

96%

71%

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

J. La

Fave

, J. H

ajja

r, L.

Fa

hnes

tock

, D. F

outc

h

Dan

Tobi

as, M

ark

Shaff

er30

0,00

0.00

$

0%

R27-

115

Anal

ysis

of S

uper

stru

ctur

es o

f Int

egra

l Abu

tmen

t Brid

ges

Uni

vers

ity o

f Illi

nois

at U

rban

a-Ch

ampa

ign

J. La

Fave

, L. F

ahne

stoc

kM

ark

Shaff

er30

0,00

0.00

$

Will

iam

Kra

mer

304,

792.

00$

0%

Stru

ctur

esR2

7-13

3Ca

libra

on

and

Refin

emen

t of I

llino

is Ea

rthq

uake

Res

is ng

Syt

em B

ridge

Des

ign

Met

hodo

logy

- Ph

ase

II^U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nJ.

LaFa

ve

Stru

ctur

esR2

7-13

4St

reng

then

ing

of B

ridge

Woo

d Pi

lings

Ret

rofit

s for

Mom

ent R

esist

ance

- Ph

ase

II^U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nB.

And

raw

es

Stru

ctur

esR2

7-12

2Im

prov

emen

t of D

riven

Pile

Inst

alla

on

and

Desig

n in

Illin

ois:

Pha

se II

^U

nive

rsity

of I

llino

is at

Urb

ana-

Cham

paig

nJ.

Long

Proj

ects

in g

reen

wer

e co

mpl

eted

in F

Y201

2Pr

ojec

ts in

red

wer

e pa

st d

ue a

s of J

une

30, 2

012

All D

ata

as o

f Jun

e 30

, 201

2

Curr

ent

Rem

aini

ngPa

st D

ue

Page 6: The Physical Research Section – Research Coordination Unit ......The Physical Research Section – Research Coordination Unit of the Illinois Department of Transportation (IDOT)

POOLED FUND INVESTMENTS

Page 7: The Physical Research Section – Research Coordination Unit ......The Physical Research Section – Research Coordination Unit of the Illinois Department of Transportation (IDOT)

FY20

12 C

ontr

act

Rese

arch

by

Focu

s A

rea

Envi

ron

men

t -

9 P

roje

cts

(11.

9%

)

Traf

fic

Op

erat

ion

s &

Ro

adsi

de

Mai

nte

nan

ce -

15

Pro

ject

s (1

9.7

%)

Oth

er -

1 P

roje

ct (

1.3

%)

Pav

emen

t D

esig

n &

Man

agem

ent/

Mat

eria

ls -

15

Pro

ject

s (1

9.7

%)

Pla

nn

ing

- 6

Pro

ject

s (7

.9%

)

Pu

bli

c Tr

ansp

ort

atio

n/M

ult

i-M

od

al -

3 P

roje

cts

(3.9

%)

Safe

ty E

ng

inee

rin

g -

8 P

roje

cts

(10

.5%

)

Stru

ctu

res/

Hyd

rau

lics

/Geo

tech

nic

al -

18

Pro

ject

s (2

3.8

%)

Co

nst

ruct

ion

- 1

Pro

ject

(1.

3%

)

FY20

12 T

PF P

arti

cip

atio

nb

y Fo

cus

Are

a

Envi

ron

men

t –

1 P

roje

ct (

3.1

%)

Traf

fic

Op

erat

ion

s an

d R

oad

sid

e M

ain

ten

ance

– 7

pro

ject

s (2

1.9

%)

Oth

er –

3 p

roje

cts

(9.4

%)

Pav

emen

t D

esig

n &

Man

agem

ent/

Mat

eria

ls –

12

pro

ject

s (3

7.5

%)

Pla

nn

ing

– 3

pro

ject

s (9

.4%

)

Safe

ty E

ng

inee

rin

g –

3 p

roje

cts

(9.4

%)

Stru

ctu

res/

Hyd

rau

lic/

Geo

tech

nic

al –

3 p

roje

cts

(9.4

%)

FY20

12 S

PR P

art

2 Fu

nd

ing

Dis

trib

uti

on

Co

ntr

act

Res

earc

h -

$2

.31

Mil

lio

n

Tran

spo

rtat

ion

Po

ole

d F

un

ds

- $

0.4

6 M

illi

on

Tran

spo

rtat

ion

Res

earc

h B

oar

d (

TRB

) -

$0

.23

Mil

lio

n

Nat

ion

al C

oo

per

ativ

e H

igh

way

Res

earc

h P

rog

ram

(N

CH

RP

) -

$1.

48

Mil

lio

n

Page 8: The Physical Research Section – Research Coordination Unit ......The Physical Research Section – Research Coordination Unit of the Illinois Department of Transportation (IDOT)

Illinois Department of TransportationBureau of Materials & Physical Research

Physical Research Section126 East Ash St., Springfield, Illinois 62704-4766

(217)782-7200

State of IllinoisIllinois Department of Transportation