1PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
ThePenProjectAfullydocumentedsamplePRINCE2®project
By: Frank Turley, Nader K. RadDate: 22/1/2018Version: PT0080 01 FREE EditionPlease send feedback to: [email protected]
ISBN: 9789082114706
2PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
• Most common question in our PRINCE2 Training classes“Is there a documented sample PRINCE2 project?”
• I asked the same question when I did my PRINCE2 training • Otherwise, it is just theory and no practice • What do most people do today after a PRINCE2 Training?
• Put the slides in a cabinet – never to be seen again :-( • Update their LinkedIn profile • And go back to their existing way of working
WhydidwecreatethisSampleProject?
3PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
By: Frank Turley, Nader K. RadDate: 22/2/2018Version: 01 Premium EditionPlease send feedback to: [email protected]
ISBN: 9789082114706
Copyright © 2018 PTCoEAll rights reserved. With the exception of brief passages and quotes for reviewing or commenting purposes, no part of this publication may be reproduced or transmitted in any form or by any means without prior consent of PTCoE (Professional Training Center of Excellence)
PRINCE2® is a registered trade mark of AXELOS Limited. The Swirl logo™ is a trade mark of AXELOS Limited.
4PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
About the authorsFrank Turley has been a Project Manager for more than 15 years and a PRINCE2® Practitioner. He is also a PRINCE2, Scrum and Project Management trainer and coach and has written a number of PRINCE2® and Project Management related books. Frank is best known in the PRINCE2 world for his work in creating the most popular PRINCE2 Self Study training including:• The PRINCE2 Foundation Training Manual and video course • The PRINCE2 Practitioner Training Manual • The Scrum Master Training Manual Website: LinkedIn Profile: http://linkedin.com/in/frankturley
Nader K. Rad is a project management consultant, author, and trainer at Management Plaza. His career started in 1997 and he has been involved in many projects in different industries. He has designed a number of project management courses, prepared a number of e-learning materials, and written more than 40 books and plenty of practical articles on project management concepts and standards, planning software, scheduling, etc. He is certified as PMP®, PRINCE2® Practitioner, AgilePM® Foundation, CSM®, and PSM I.
Website: http://nader.pm/LinkedIn Profile: http://www.linkedin.com/in/naderkhorramirad
5PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Who is this sample PRINCE2 project for? Document:
• BrowseoverthemainPRINCE2documents,thiswillhelpyourunderstandingofPRINCE2.• Lookat:1)Projectmandate,2)ProjectBrief,3)InitiationStagePlan,4)ProductDescription,5)PID,6)RegisterFiles,7)Logfiles
1) PRINCE2 Foundation Students
• YouneedtobefamilarwithallPRINCE2managementdocumentsandtheirstructure(typicalcontents)• ItisthereforebesttobecomefamilarwiththescenariousedinthissampleprojectandthenbecomefamilarwitheachPRINCE2managementdocument
• ThisisperhapsthebestwaytoprepareforthePractitionerExamastheexamusesagivenprojectscenarioandyouareexpectedtoknowhowtoapplyPRINCE2.
2) PRINCE2 Practitioner Students
• ManycompaniesarenowconsideringimplementingaPMObutarenotsurewheretostart• Wesuggestthatyouidentifyastandardprojectfromyourorganizationanddocumentitlikethissampleproject• Startofassimpleaspossiblesoyoucandeliverafirstinternalsampleproject(areferenceproject)• ThePMOcanthengraduallyupdatethisreferencesampleprojecttointroducenewtechniquesandlessons
4) Implementing a PMO
• ManypeoplenevergetachancetoworkinaPRINCE2environmentanddon’tunderstandhowtoapplyPRINCE2.• Wesuggesttore-createthissampleprojectbasedonanotherscenario(e.g.aprojectyouhavedone)• ThisisperhapsthebestwaytopracticePRINCE2(WeatMPLAZAwillbehappytogiveyoufeedbackifyoudothis)
3) Gaining PRINCE2 experience
WhoisthissamplePRINCE2projectfor?
6PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
PRINCE2 Foundation Students • YoujustneedtohaveanoverviewofPRINCE2• BrowseoverthemainPRINCE2documents– helpyourunderstanding• Weadvisetolookat:
• Projectmandate• ProjectBrief• InitiationStagePlan• ProductDescription
• PID• RegisterFiles• Logfiles
• YoucanuseourFREEversionofthesamplePRINCE2project
WhoisthissamplePRINCE2projectfor?
7PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
WhoisthisSamplePRINCE2projectfor?
PRINCE2 Practitioner Students • Typicalpractitionercourse:Youspend66%ofyourtimepracticingquestionsL
• Result:It’saexampreparationcourse(notaPRINCE2course)• Result:LittlepracticalknowledgeofhowPRINCE2works
• WhatyouneedtoknowforthePractitionerExam?• FamiliarwithallPRINCE2managementproducts• Awareoftheirstructureandtypicalcontents• Understandthedocumentdescriptionsinthemanaul appendix• Howtoreadandinterprettheprojectscenarioprovidedintheexam
8PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
TheProject Scenario
WehavecreatedaneasytounderstandprojectscenarioasthefocusisonhowtousethePRINCE2managementdocuments
9PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Scenario: CopyWorld365Document:
Company: CopyWorld365CopyWorld365 is a company that sells printing / photo copying machines. They have 15 employees (including 4 sales people) and they would like to start a project to give their clients a high quality promotional pen to help improve the relationship with clients and to reduce client turnover (client loss).
The Sales Manager chaired a meeting and the outcome of the meeting was as follows: • We will give a quality pen/pencil to all clients to help reduce client turnover and improve relationship• The majority of pens will be given out by the sales people• The pen must be of good quality so people will be happy to use it (not be embarrassed to use it) • Budget: €6 to €8 each • Presentation of pen is important • Company logo must appear on pen
Project Scope • Define quality requirements • Choose & test Pens/Pencils • Order Pens with logo • Choose clients to give pen to
Out of Scope • Giving out the pens is not part of the project • Designing the logo (will be supplied my marketing person) • Original list of clients (will be supplied by accounts)
Project Scenario
10PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-ProjectStarting up a Project
11PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Project mandate
Projectmandate
Theprojectmandateisthetriggerfortheproject
Otherdocumentswillbegraduallyaddedtothisdiagram.Theywillbepresentedinoneofthefollowingcolors:Blue:CreatedonceintheprojectGreen:CreatedonceineverystageOrange:Created/updatedmultipletimesineverystageDarkRed:Created/updatedforeachWorkPackage
12PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project mandate Date: Document: Project: Pen Project Author: Corporate
Theprojectwillchooseahighqualitypenandgiveoutabout400penstoourexistingclients.ProjectObjectives• Chooseapenthatmeetsspecifications• ChooseapenthatuserswillperceiveasaqualitypenProjectScope:
1. Project Definition
Buildbetterrelationshipswithclientsandreducethelossintherenewalofmaintenancecontractsby50%.• CopyWorld365has4,200maintenancecontracts• Profitof€200percontract=€840k• 5%losseachyearcosts€42,000
2. Reasons
Tobecreated3. Project Product Description
3.Clientlist4.Pensordered
1. Evaluationofpensordered2. Penevaluated TheExecutiveshallbetheCEO
5. Project Management Team
Dotheprojectinternally4. Approach
Theprojectmandatedoesnothavetocontainmuchinformation
Normallyjustthereasons andthenameoftheExecutive.
Project mandate
13PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Lessons Log
Projectmandate
TheProjectManagerwillfacilitatethegatheringoflessons.Allprojectstakeholdersareinvitedto
providelessonsThisisaPRINCE2principle
14PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Lessons Log Date: Document: Project: Pen Project Author: Project Manager
ID +- Recommendations Seenbefore
DateLogged
Loggedby Priority Stage
1 J Weusedthe businessgiftcompany“BizGifts”lastyearandtheyofferedagoodservice
Yes 12/1 PM 3 2
2 L The timetodelivergiftsalwaysseemstotakelongerthanagreedbymostcompanies(soaddtimebuffer)
Yes 12/1 PM 2 1
3 L Thebusiness giftcompany“Gifts4All”providedapoorserviceforourneighboringcompany.
No 13/1 PM 2 2
4 J ThereisaISOstandardforpens:ISO12757-2 No 13/1 PM 2 SU
5
…
Lessonseenbefore?
+-:(J)Positiveeffectontheproject,(L)negativeeffect,Riskbefore: Hastheriskbeenseenbefore(ifyes,howdidtheprojectdealwithit?)Priority: Importanceforproject– ThePMwillwanttomakesure,theyareusingtheimportantlessonsStage: ThePMcanseewhichlessonshavevalueforthenextstage
ThePMwillfacilitatethegatheringoflessons.Lessonscancomefromusers,TeamManagers,pastprojectLessonsReports,consultants,…
Lessons Log
15PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Daily Log Date: Document: Project: Pen Project Author: Project Manager
ID DateofEntry Description Responsible Target
Date Result
01 06-17 Whenwewerepreparingthelistofpotentialsuppliers, Irealizedthatoneofthemisownedbyanoldfriendofmine(conflictofinterest) ProjectManager 06-17
IbelieveI’mcapable ofevaluatingthesuppliershonestly.I’vealsoinformedtheprojectboardaboutthisconflictofinterest.
02 06-18Asalesmanfrom oneofthepotentialsupplierscametoourofficetodaytomeetme,whileIwasinameeting.HeleftmeagiftandleftthebuildingbeforeIcouldmeethim.Thiscanbeconsideredabribery.
ProjectManager 06-18 Ireturnedthegift andputthesupplierinthecompany’sblacklist.
03 06-22 DanielRoss, who’sresponsibleforthelogo,isaskedtoprepareitsvectorversion,buthedoesn’tseemtoknowhow. ProjectManager 06-23
He’sreplacedbyJulieGates,who’smoreexpertongraphicdesign.We’velosttwodays, buttheactivityhasalotoffloatandwewon’tgetintoanyproblems.
04 06-25ThecommunicationbetweenJulieGatesandthesupplier neededforthedesignofthelogoisnoteffectiveenough.Ittakesalotoftimeforeachversiontobereviewedandthenewversionisreleased.
ProjectManager 06-25JulieGatesisasked tomeetwiththeresponsiblepersoninthesuppliercompanytodiscusstherequirementsofthelogoandtoprepareittogether.
Note: the content of this sample Daily Log belongs to next stages of the project
TheDailyLogisusedtocaptureissuesandrisksintheStartingupaProjectprocessAfterthat,itisusedasa(private)dailyjournalbytheProjectManager
Daily Log
16PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Project Product Description (part of Project Brief)
Projectmandate
TheProjectProductDescription(highlevelmainproductdescription)defineswhattheprojectmustdeliverinordertogainacceptance.It
usuallydefinesthescope,requirements,qualityexpectations,acceptancecriteria,acceptancemethod,andacceptanceresponsibilities.
17PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Product Descriptions Requirements (MoSCoW)
• USB memory stick in pen 3. Could have requirements
Document:
Project Product Description (Workshop)
The Project Manager hosted a workshop to create the Project Product Description. The main workshop goals: 1. Get buy-in from the necessary stakeholders 2. Identify the most important requirements for the pen and prioritize them3. Complete the Project Product Description during the workshop
Requirements Exercise • The PM gave each person post-its and reminded them about the project goals• The PM asked each person to list 10 pen requirements • After this exercise, the PM categorized each requirement and identified the top requirements • The requirements are listed below using the MoSCoW technique
• Write upside down 4. Other (Won’t have for now)
• Quality looking pen• 5 year guarantee • Logo display correctly• Pen easy to write with
• Easy to find refills for the pen• Guarantee no leak pen
Anumberofrequirementshavebeengroupedunder“5yearguarantee”(allpartsworking,colorfading....)
TheacceptancecriteriaandacceptancemethodforeachmusthavewillbedetailedintheProjectProductDescription
1. Must Have Requirements
2. Should have requirements
18PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Product Description
Priority
The purpose of the pens will be to provide a constant reminder of our company to most of our clients and reduce the loss of maintenance contracts renewals by 50% in the next 12 months.
1. Pens to evaluate2. Chosen Pen
1. Business Gift Catalogs2. Client list
1. Purpose 3. Derivation
Date: Document: Project: Pen Project Author: Project Manager
PurchasingskillsAccount(Client)management
4. Development skills required
3. Reviewed client list 4. Distributed Pens
QualityExpectationAcceptanceCriteria
ToleranceAcceptancemethod
Responsibilities
MQualitylookingpen1:Lookslikeitcost>€102:LooklikeaprofessionalpenNone1:Confirmthat8of10seevalue>€102:Confirmthat9of10seepenasprofessional1:SusanKelly,2:SusanKelly
PriorityQualityExpectationAcceptanceCriteriaToleranceAcceptancemethodResponsibilities
M5yearguarantee1:5yearguaranteefromsupplier1:± 10%1:Guaranteecertification1:SalesManagerwillacceptguarantee
PriorityQualityExpectationAcceptanceCriteria
ToleranceAcceptancemethod
Responsibilities
MLogodisplaycorrectlyonpen1:Correctsizeonpen2:Logowillnoterasein5yearsofnormaluse1:Size± 10%,2)Logoerase:+100%1:Measurelogoonpenwithruler2:Logo:AskforLogoguarantee1:SusanKelly,AC2:SusanKelly
PriorityQualityExpectationAcceptanceCriteriaToleranceAcceptancemethodResponsibilities
MPeneasytowritewith1:9of10peoplefindpeneasytowritewith1:± 10%1:Providesurveyreport1:SusanKelly
Thisexamplehasoutlinedfourmainrequirementsanddefinedthequalitylevelforeachrequirement.Seethenextslideformoreinformation.
Project Product Description (part of Project Brief)ThisisagoodexampleoftheProjectProductDescription(Main productdescription).Itdoes
nothavetobealargedocument..
2. Composition
Quality
19PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Qualityheading Description
QualityExpectations Whatfeature/requirementdoesthecustomers want(listoneatatime)e.g.Quicksearch
Priority MoSCoW:(Must,Should,Could,Won’t)or1,2,3
AcceptanceCriteria(AC)
AcceptancecriteriastateswhattheCustomeragreestoaccept(mustbemeasurable)AskQuestion:Howcanweprovethatwehavemeetyourexpectations?AskQuestion: Whattestsshouldbedone&whataretheexpectedresults?Note:TheremaybeanumberoftestsforeachQualityexpectation1:E.g.Expectedspeedresultforasimplesearch:<1.5seconds2:E.g.Expectedspeedresultforacombinedsearch:<2seconds
Tolerance Whatisthetolerance(s)foreachAcceptanceCriteria1:± 15%;2:± 10%
Acceptance MethodHowwilleachqualitycriteriabechecked?1:Manualtesting2:Unittestingwithloadtesting
AcceptanceResponsibleListthepersonsnameforeachqualitycriteriaorcomplete qualityexpectation1:FrankKlein2:FrankKlein
ThisslideprovidesinformationaboutthequalitydatarequiredintheProjectProductDescriptionMostProjectManagersfinditverydifficulttounderstandthisfromtheofficialPRINCE2Manual
Introduction to the quality information
20PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure(PMT)
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Project Management Team Structure (part of Project Brief)
Projectmandate
OneofthePRINCE2Principlesis“DefinedRolesandResponsibilities”.ThisPMTdocumentisoneofthetoolsusedtorealizethisprinciple,andconsistsof
definedandagreedrolesandresponsibilities.
21PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Management Team Structure Date: Document: Project: Pen Project Author: Project Manager
Del
iver
yM
anag
emen
tD
irect
ion
Cor
p..
Senior User Executive Senior Supplier
CorporateorProgrammeManagement
Susan Kelly John King Terry Clinton
Project ManagerRose Carr
CopyWorld365 Employees & Job titles John King: Susan Kelly: Terry Clinton: Rose Carr:
CEO Sales Manager Purchasing & AccountsClient Project Manager
Tailoring comments for the Project Management Team: • The Project Manager will have the roles and responsibilities of Team Manager and Project Support. • The Project Board will have the role of Project Assurance. • The Project Manager, Executive, Senior User, and Senior Supplier will have the change authority role. • The management (Project Manager) and delivery (Team Manager) levels have been merged
TailoringcommentsforthePMT
Project Assurance
Project SupportRose Carr
Thesearetheirnormaljobfunctions
ThesearethePMTrolesfortheproject
Change Authority
Project Management Team Structure (part of Project Brief)
22PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
outline Business Case (part of Project Brief)
outlineBusinessCase
Projectmandate
TheoutlineBusinessCaseispreparedintheStartingUpaProjectprocess,Itisusedtodetermineifthere’sabusinessjustificationforinitiatingtheproject.ThisdocumentwillbeexpandedintheInitiationStage(asmoreinformationbecomesavailable)to
become BusinessCase.
23PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Outline Business Case
Buildbetterrelationshipwithclientsandreducethelossintherenewalofmaintenancecontractsby50%.CopyWorld365had4,200maintenancecontractswithaprofitof€200percontract=€840,000A5%lossinsteadofa10%losswouldbeagainof€42,000
1. Reasons
• Reducelossofmaintenancecontractsby50%:value€42,000/year• Increasenewmachineordersby5%±1%:16,000/year
2. Expected Benefits
12weeks(3months)4. Timescale
Date: Document: Project: Pen Project Author: Executive
SeeBusinessCase(Initiationstage)6. Investment appraisal
• Pencosts:€9by400pens=€3,600• Otherprojectcosts:€600
5. Costs
ClientsmaynotkeepusingthepeneachdayandthereforewillnotberemindedofCopyWorld365.
7. Major risks
None3. Expected dis-benefits
Outline Business Case (part of Project Brief)
TheoutlineBusinessCasedoesnothavetocontainmuchdataThisinformationwillbeexpandedlaterintotheBusinessCasedocumentin
theInitiationstage.
ItiswrittenbytheExecutivewithnormallysomeassistancefromtheProjectManager
24PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Project Brief
outlineBusinessCase
Projectmandate
TheProjectBriefisusuallyacollectionofalltheinformationgatheredduringtheSUprocess.ThisinformationbeexpandedtobecometheProjectInitiation
Documentation(PID)intheInitiationStage.
25PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Brief
Theprojectwillchooseaqualitypenandgiveout±400penstoourclients.ProjectObjectives• Chooseaqualitythatmeetsspecifications• ChooseapenthatuserswillperceiveasaqualitypenProjectScope:
1. Project DefinitionReasons:Buildabetterrelationshipwithclientsandreducethelossintherenewalofmaintenancecontractsby50%.CopyWorld365had4,200maintenancecontractswithaprofitof€200percontract=€840k5%losseachyearcosts€42,000ExpectedBenefits• Reducelossofmaintenancecontractsby50%:€42,000(eachyear)• Increasenewmachineordersby2%:€16,200(eachyear)Risks• Clientsmaynotkeepusingthepeneachday.Costs• Pencosts:€9by400pens=€3,600• Otherprojectcosts:€600
2. Outline Business Case
Attached:ProjectProductDescription(PPD)3. Project Product Description
Date: Document: Project: Pen Project Author: Project Manager
Constraintsandassumptions• PossibletofindapeninthecataloguesprovidedProjectTolerances1. Time: 3months+30%2. Cost:€9forapen:Estimate€4,200fortheproject+- 10%3. Quality:Pensmustmeetqualityrequirements
Attached:ProjectManagementTeam(PMT)5. Project Management Team
Thecompanywillchooseapenthatmeetstherequirementsfromanexistingbusinessgiftcompany.Projectwillberuninternally.
4. Approach ThisprojectusestherolesdescriptionasdefinedbyPRINCE2- Link totheRolesDescriptionsdocument
6. Role Descriptions
Project Brief
TheProjectProductDescriptionandthePMT arenotdisplayedhere(attached)butarepartofProjectBriefThisisagoodexampleoftheProjectBrief.Itdoesnothaveto
bealargedocument.
TheoutlineBusinessCasehasbeenslightlyupdated.
3.Clientlist4.Pensordered
1. Evaluationpensordered2. Penevaluated
26PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Initiation Stage Plan
OutlineBusinessCase
InitiationStagePlan
Projectmandate
Thisplan- IsthefirstplantobecreatedinaPRINCE2project- isusedbytheProjectManagertoexecutetheInitiationStage.- showswhatwillbeproducedandwhen- documentsthecostoftheInitiationStage
27PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Initiation Stage Plan
ThisistheplanfortheInitiationStageofthePenProject1. Plan description
SalesManagerisavailablefortheprojectTenpersonswillbeavailabletoevaluatethepensAbusinessgiftcompanywillprovidethepenstoevaluate.Internalresourceswillnotbechargedtotheproject
2. Assumptions - Dependencies Attached:ProjectProductDescription7. Products Description(s)
Date: Document: Project: Pen Project Author: Project Manager
Allowbuffertimefordeliveryofpens(LessonsLog)InvestigatetheISOstandardforpens:ISO12757-2
3. Lessons incorporated
ThePMwillusethestandardPRINCE2documentsAhighlightreportwillbesentattheendofweektotheProjectBoardAnExceptionreportwillbeusedifastageforecastedtogooutoftolerance
4. Monitoring & Control
Initiationstagebudget:€200(internalpeopletimeisnotcharged)RiskBudget:€0,ChangeBudget:€0
5. Budgets
Time:± 50%:Cost:± 50%:Scope:0%6. Tolerances
8. Schedule
4th 5th 6th 7th 8th 11th 12th 13th 14th 15thDeliverables- March
Approachdocuments
PBS(WBS)
Product Descriptions
Risk&Issues
Project Plan
BenefitsMgmtApproach
BusinessCase
PID
Next StagePlan
6 hrs
8 hrs
1 hrs
4 hrs
2 hrs
2 hrs
4 hrs
3 hrs
2 hrs
Initiation Stage Plan
Thisexamplehasmergedassumptionsanddependencies
Thisisasimpleexampleoftheschedule.Note:thefocusisontheproductscreatedandnottheactivities
28PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Stage 1Initiation (Planning)
Thepre-projectactivitiesarenowcompleteandtheProjectBoardmaygivepermissionfortheInitiationStagetobegin
Approx.80%oftheworkinthisstageisfocusedonplanning(productbreakdown,requirements,productdescriptions,estimating,scheduling)
29PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Communication Management Approach (part of PID)
OutlineBusinessCase
InitiationStagePlan
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
Projectmandate
TheCommunicationManagementApproachdocument:- providesaguidelineonhowcommunicationshouldbedone
ThissampleprojectjustgivesanexampleoftheCommunicationManagementApproachastheothersdonotchangeverymuchfromthetemplatesprovided.
Therearefourapproachdocuments,theseareguidelinesfortheproject.NormallytheProjectManagerwilljustcopyintheseapproachdocumentsfromastheyarestandardineachcompany.Thereare1) TheCommunicationManagementApproach2) TheRiskManagementApproach3) TheQualityManagementApproach4) TheChangeControlApproach
30PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Communication Management Approach
ThePMandProjectBoardwillmeeteachtwoweeksThePMandProjectBoardwillmeetattheendofeachstage
5. Timing of communication activities
Date: Document: Project: Pen Project Author: Project Manager
7. Roles & Responsibilities
8. Scales: Priority & Severity
Thefollowingdocumentswillbeusedforinternalcommunication- HighlightReport,EndStageReport,EndProjectReport,IssueReports,LessonsReport,ProjectDescriptionsandregisters
4. Records
6. Reports / Stakeholder Matrix
HighlightReportReportName Timing Recipients
Weekly ProjectBoardEndStageReport Endofstage ProjectBoardEndProjectReport Endofproject ProjectBoardIssueReport Anytime PM/ProjectBoardElectronicNewsletter Once Clients
ProjectBoard InformtherestofthemanagementteamProjectManager Allinternalcommunication(projectteam)
CreatetherequiredPRINCE2documentsSeniorUser Communicatewithclients
Priority UseMoSCoW(Must,Should,Could,Wont..)Severitylevels 1=ProjectManager,2=ProjectBoard
9. Stakeholder Analysis
Mostoftheeffortwillgointorecognizingthestakeholders,decidingthedesiredrelationshipandhowtocommunicateduringtheproject.
Communication Management Approach (part of PID)
ThePMisresponsibleforallinternalprojectcommunicationandwillreporteachweektotheProjectBoardusingaHighlightReport.OtherPRINCE2documentsandreportswillalsobeusedasexpected.TheSalesManagerisresponsibleforallexternalcommunication
Thisdocumentdescribeshowcommunicationwillbedoneduringtheproject:Itisbasedonthestandardapproachdocument.
1. Introduction
ThePMisresponsibleforallinternalprojectcommunicationandwillreporteachweektotheProjectBoardusingaHighlightReport.OtherPRINCE2documentsandreportswillalsobeusedasexpected.TheSalesManagerisresponsibleforallexternalcommunication
2. Communication Procedure
• ThePMwillusetheintranetportalsiteforallinternalcommunicationandprojectdocumentation.
• TheSalesManagerwilluseanelectronicnewsletterandsitevisitstocommunicatewithclients.
3. Tools and techniques
31PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Risk Management Approach
Thisdocumentdescribeshowriskmanagementwillbedoneduringtheproject:Itisbasedonthestandardapproachdocument.
1. Introduction
Theprocedureshouldcoveractivitiessuchas:Identify,Assess,Plan,ImplementandCommunicate.ThePMwillberesponsibleforcarryingoutthisriskmanagementprocedureandforkeepingtheriskdocumentsuptodateandwilltakecorporatepolicyintoaccount.
2. Risk Management Procedure
Date: Document: Project: Pen Project Author: Project Manager
6. Risk Categories Used: PESTLE
• ThePMwillusethestandardriskregistertotrackallrisksandthisriskregisterisbasedonthecorporatelayout.
• ThePMwillalsocommunicatehighlevelrisksinthebusinesscaseandthehighlightreporttotheprojectboard.
3. Tools and techniques
Communicatewithclients
10. Risk Tolerances
Risk Management Approach (part of PID)
Risksshouldbeescalatedifanyriskputmorethan30%oftheexpectedbenefitsoftheprojectinquestion.ThePMwillspendabout1to2hourseachweekonriskmanagement
Theexecutivemustreviewrisksforeachstagedecisionandhighlightreport.
5. Timing of risk management activities
Thefollowingdocumentswillbeusedforriskmanagement:- Riskregister,businesscase,highlightreport
4. Records
8. Roles & Responsibilities
7. Scales
ProjectBoard InformaboutnewandexistingrisksProjectManager Gatherriskinformationfortheproject
RiskmanagementprocedureExecutive
Verylow <€50Low <€100Medium <€250High <€500Veryhigh >€500
Thefollowingscalewillbeused:
11. Risk Budget: A risk budget will be established
9. Risk response categoriesThreat:Avoid,reduce,transfer,share,accept,contingentplansOpportunity:Exploit,enhance,transfer,share,accept,contingentplans
12. Proximity: Not used
32PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Product Breakdown Structure (part of the next Stage Plan)
OutlineBusinessCase
InitiationStagePlan
RiskRegister,QualityRegister,IssueRegister
NextStagePlanPBS
Projectmandate
ProductBreakdownStructure(PBS)Normally,thefirststepaftertheapproachdocumentsistobreakdownthe
mainproductintosub-products,togetabetterideaofwhatneedstobedone.
TheProjectManagerwillfacilitatethisprocessandtheycanuseabreakdowndiagram,indentedlistormind-maptodothis.
ProjectInitiationDocumentationFourApproachDocs
33PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
PBS for Stage 2 (hierarchy chart)
1. Hierarchy presentation of PBS
Date: Document: Project: Pen Project Author: Project Manager
PenProject
Supplier EvaluationPens InternalEvaluation Distribution FinalPens
Listofpotentialsuppliers
Shortlistofpotentialsuppliers
Selectedsupplier
Catalogofpens
Shortlistofpenstobeevaluated
Purchaseorderforevaluationpens
Samplepensforevaluation
Listofevaluators
Evaluationforms
Evaluationandfilledinforms
Evaluationreport
Listofclients
Listofsalespeople
Salespeopledelivered
requirements
logo
Purchaseorderforthefinalizedpen
Receivedpens
GroupofproductsProductsExternalproducts
Legend:
Product Breakdown Structure (part of the next Stage Plan)
ThisisanexampleofanPBS hierarchydiagram.Level1:PenProjectLevel2:5groupsofproductsLevel3:Listalltheproductsineachgroup
TheProjectManagercancreatethiskindadiagramusingPost-ItswithhelpfromTeamMembers,
34PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Inthismind-map,therearethesame5groupsofproductse.g.Supplier
- Supplierisagroupofproducts- Supplierhasthreesub-products- Eachsub-productcanbedescribedusingaProductDescription
PBS for Stage 2 (Mindmap)
1. Mindmap presentation of PBS
Date: Document: Project: Pen Project Author: Project Manager
Legend
Product Breakdown Structure (part of the next Stage Plan)
1
2
3
4
5
SomeProjectManagersprefertouseMind-Maps.ThisisthesameinformationatthelastslidebutinMind-Mapformat.
35PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Product Description(s) (part of PID)
OutlineBusinessCase
InitiationStagePlan
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
Projectmandate
AProductDescriptioncanbecreatedforeachproductidentifiedintheProductBreakdownStructure(PBS)
NextStagePlanPBS
36PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Product Description: List of Clients
Listofallexistingclientsthatwillreceiveapen
Customerknowledge
1. Identifier: PEN03.2
3. Purpose
6. Development skills required
1. Contractvaluemustbethecurrentcontractvalue2. Contactnamemustbethedecisionmakerormaininfluencer
7. Quality Criteria
Date: Document: Project: Pen Project Author: Project Manager
2. Title: Client List
• Contactpersonandcompanynames• Currentcontractvalueforeachcompany• ContactpersonatCopyWorld365
4. Composition
• Existingclientlist• Clientcontract
5. Derivation (Source)
1 Contractknowledge2
Criteria SkillsRequiredMethodReviewReview
ToleranceNoneNone Contractknowledge
Gerry Malone Sales Manager
TheProductDescriptionalsoincludesthequalitycriteria,howtheproductwillbetested(method),tolerance,skillsfortesterand
qualityreviewer.
ThisisanexampleofaProductDescriptionandtheobjectiveistodescribetheexpecteddeliveredproduct.
Product Description: Client List
Identifythecomponentsthatmakeuptheproduct
Whatisusedtocreatethisproduct(source)?
Producer: Reviewer ApproverCFO
37PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Risk Register
OutlineBusinessCase
InitiationStagePlan
RiskRegister,QualityRegister,IssueRegisterProjectmandate
NextStagePlanPBS
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
TheProjectManagerwillfacilitatethegatheringofrisks- Runworkshopsandinviteusersandsuppliers- Reviewoldlessonreports,RiskRegistersandIssueRegisters
RiskscanalsobeidentifiedforeachproductlistedinthePBS
38PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Risk Register Date: Document: Project: Pen Project Author: Project Manager
ID RiskAuthor
DateRegister
RiskCategory RiskDescription Probability
xImpact Proximity ResponseCategory Status Risk
OwnerRisk
Actionee
1 PSmith 6/3/13 OrderingAriskthatpens willbedelivered2-4weekslaterwhichwillimpactthetimeoftheproject €550 Stage2 Reduce Active PSmith JBell
2 S. Kelly 7/3/13 ProductUsers maynotlikethepensandthereforenotkeepusingthemwhichresultin90%- 100%reductioninbenefits
€8,760 Year1 Reduce Active S. Kelly RClark
3 S. Kelly 9/3/13 ProductSomesalespeople maynotdistributethepensasintended,thereforethebenefitswillnotberealizedfortheseusers
€5,600 Year1 Reduce Active S. Kelly S.Kelly
ProjectName PenProject Risk/Impact
ProjectNo 008 HighRisk>€7,500
ProjectManager RoseCarr Medium>€1000
ProjectExecutive JohnKing LowRisk< €1000
The response text is not included in this example The likelihood that majority of users will not like pen: 15%The Impact if almost all users don’t like pen: €58,400The Probability * Impact = 20% * €58,400 = €8,760
Example: How to calculate Probability * Impact
Risk Register
Amountsarerelatedtothevalueoftheexpectedbenefits(SeetheBenefitsManagementApproach)Theexpectedgainis:€58,400
Thisisarathersimpleproject,sotherearenotmanyrisks.
Newriskswillcontinuetobeidentifiedasweplanandexecutetheproject
39PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Benefits Management Approach
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
Projectmandate
TheBenefitsManagementApproachisa plantoreview theexpectedbenefits.Benefitscanbereviewedineachstageboundaryandafter
theprojecthasbeencompleted.
NextStagePlanPBS
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
40PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Benefits Management Approach
Thisdocumentdescribeswhatbenefitsaretobemeasured,howandwhentheywillbemeasured,andthepersonsneededtocarryoutthosemeasurements.Thisplanliststheactivitiestocheckifthebenefitshavebeenrealized
1. Introduction
Accountable Benefit1. SusanKelly:Reducelossofmaintenancecontractsby50%2. SusanKelly:Increasenewmachineordersby5%
4. Accountable for Benefits
Date: Document: Project: Pen Project Author: Project Manager
6months:afterprojectiscomplete- Checkiflossofordersisreducedby50%forprevious6months- Checkifincreaseinmachineordersis5%forprevious6months
1year:afterprojectiscomplete- Checkiflossofordersisreducedby50%forprevious12months- Checkifincreaseinmachineordersis5%forprevious12months
6. Plan to Review after project
1. Reducelossofmaintenancecontractsby50%:€42,0002. Increasenewmachineordersby5%eachyear:€16,200
2. Benefits
1. Showproofthatthelossofmaintenancecontractsarereducedby50%2. Showproofthatmachineordershaveincreasedby5%
5. What to Review
1. Currentlossofmaintenancecontractsis10%(420contracts)• Valueof10%lossis:€84,000
2. Newmachineorderstodaywillhaveaprofitvalueof€320,000
3. Baseline measurements
Benefits Management Approach
ThePMwillasktheSeniorUser(SusanKelly)1. Whataretheexpectedbenefits?2. Whendoyouexpecttogetthesebenefits?3. Howtomeasurethesebenefits?
41PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Project Controls (part of PID)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
Projectmandate
NextStagePlanPBS
ThisProjectControlsdocumentdefinesthelevelandtypesofcontrolbytheProjectBoardandtheProjectManager
42PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Controls
Costisassessedforthewholeprojectandeachstage.Cost =PlannedCostvForecastedcost.Thiscostparameterwillbecomparedtothetolerancessetforthewholeprojectorastage.Timeisassessedforthewholeprojectandeachstage:Time=Forecastedduration/Plannedduration.Thistimeparameterwillbecomparedtothetolerancesforthewholeprojectorastage.
Theprojectwillbemanagedinthreestages:• Stage1– Initiatingtheproject(Planning)• Stage2– Preparingeverythingtostartevaluatingsamplepens,including
preparingrequirements,selectingthesupplier,selectingandbuyingsamplepens,preparingevaluationforms,andselectingevaluators
• Stage3– Preparingthefinalpens,includingtheevaluationofsamplepens,selecting,buying,receivingfromsupplier,andpreparingthelistofthesalespeopletodistributethem,andclientswhoaresupposedtoreceivethem.
1. Management Stages
Communicationswillbeconductedbasedonthecommunicationsmanagementapproach.
2. Communications
IssuesandriskswillbesubmittedintheIssueRegisterandRiskRegisterbytheProjectManager,andwillbehandledasdescribedintheRiskManagementApproachandChangeControlApproach
3. Controlling Issues and Risks
Date: Document: Project: Pen Project Author: Project Manager
• Time:15% Escalateifforecastedtimeincreasesmorethan15%• Cost:20% Escalateifforecastedcostincreasesmorethan20%• Quality: Qualitydefinedinprojectproductdescription• Scope: EachproductisprioritizedusingMoSCoW• Benefits:20% Escalateifexpectedbenefitsdropby20%ormore• Risk:>€7000 Escalateittheriskhasanimpactof€7000ormore
Theaboveprojectmanagementtolerancesaresetforissues,projectplan,andstageplans.TheProjectBoardwillbenotifiedwhenanyofthetolerancesareforecastedtobeexceeded.
RiskandIssuereportswilldocumenthowissuesandriskseffecttheprojectandtheimpactofthesixprojectvariables.
5. Escalation and delegation
4. Assessments
Thisshowshowwe’regoingtomanagebyexception.
We’vehavedefinedsomecustomizedassessmentstobeusedthroughouttheproject.SomecompaniescalltheseKPI’s
Project Controls (part of PID)
43PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Project Plan (part of PID)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
Projectmandate
NextStagePlanPBS
TheProjectPlanisahigh-levelplanforthewholeproject.Itisthebasisforthemeasurementofthewholeproject
andthesourceforcreatingdetailedstageplans.
44PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Plan (Part 1)
Thisisthehigh-levelplanforthewholeproject.1. Plan description
Attached:ProjectProductDescription7. Products Description(s)
Date: Document: Project: Pen Project Author: Project Manager
Time:±30%|Cost:±40%|Scope:MoSCoW6. Tolerances
8. ScheduleAttached:Scheduleforstageplan1
9. Product Breakdown StructureAschedulesisapartofaplan
Thisisonlyahigh-levelPBSintheProjectPlan,therewillbemoredetailintheStagePlans.
Project Plan (part of PID)
SalesManagerandCEOwillprovidethenecessarytimefortheproject.Resourcesareavailablefortheevaluation.Pensshouldarriveontime.Evaluatorswillfillintheformsintimeandprecisely.Thesupplierwillpreparethepensinanappropriatetime.Internalresourceswillnotbechargetotheproject.
2. Prerequisites, Assumptions, and external dependencies
Allowbuffertimefordeliveryofpens3. Lessons incorporated
ThePMwillusethestandardPRINCE2documentsforreportingAHighlightReportwillbesenteachweektotheProjectBoardAnExceptionReportwillbeusedifforecastedtogooutoftolerance
4. Monitoring & Control
Projectbudget:€3,840(internalpeopletimeisnotcharged)RiskBudget:€0,0days|ChangeBudget:€480.TimeBudget:45days(duration)
5. Budgets
Howmuchtimeandmoneydowehaveforthewholeproject?Howmuchtoleranceisacceptable?
45PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Plan (part 2) Schedule
1. Activity bar chart
2. Resources
Date: Document: Project: Pen Project Author: Project Manager
Thisisthehigh-levelscheduleforthewholeproject;partoftheProjectPlan.Thiscanbeusedtocreatetimephasedinformationsuchasresourceallocationsandcashflows.
Wecanalsopreparealistoftheresourcesneededfortheplan.It’sbesttoprepareitasatimephasedtable,extractedfromtheschedule.
Project Plan (part of PID)
46PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Business Case (part of PID)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
Projectmandate
NextStagePlanPBS
Nowthatwehaveallthedetailedinformationontimeandcosts,it’stimetocreatetheBusinessCase.NormallytimeandcostsestimateswillchangefromwhatwasforecastedintheoutlineBusinessCase.
47PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Business Case
GiveoutaqualitypentoclientstoincreasecontractsrenewalsMainBenefits• Reducelossofmaintenancecontractsby50%:value€42,000• Increasenewmachineordersby5%:€16,000ReturnonInvestment:Cost=€4,800vsGain=€42,200
1. Executive summary
Option1:Donothing:Continuelosingcontracts:loose€84,000Option2:Offeracalendar:
• Value:notperceivedasaqualityitemOption3:Offerpenthatclientswillcontinuetouse:
• Value:Contactswillkeepusingthepens• Believethiswillhavetheeffecttoreducelossincontracts
3. Business options
• Reducelossofmaintenancecontractsby50%±15%:€42,000/year• Increasenewmachineordersby5%±1%:€16,000/year
4. Expected benefits
Date: Document: Project: Pen Project Author: Project Manager
• Projectstart:March5th,ProjectEnd:May31st (12weeks)• Measurebenefitson28/12/2016and31/05/2017
6. Timescales
• Thereisriskthatwecanchoosethewrongpenwhichthemajorityclientswillnotkeepusing.
9. Major risks
Buildabetterrelationshipwithclientsandreducethelossintherenewalofmaintenancecontractsfrom10%to5%.CopyWorld365has4,200maintenancecontractswithanaverageprofitof€200percontract=€840,000.A10%lossincontractsisalossof€84,000
2. Reasons
• None5. Expected dis-benefits
• Pencosts:€10by400pens=€4,000• Otherprojectcosts:€800
7. Costs
• Projectcost: €4,800• Expectedgain:€42,000• Time: 1year• ROI: 875%
8. Investment appraisal
We’reundertakingthisprojectbecauseitsexpectedbenefitsarehigherthanitscosts.
Business Case (part of PID)
TheBusinessCaseisanupdated(refined)versionofoutlineBusinessCase(withalotmoredetails)
48PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Tailoring of PRINCE2 (part of PID)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
Tailoring
Projectmandate
NextStagePlanPBS
TheseventhPRINCE2principleis:Tailortosuittheprojectenvironment.Onegoodruletofollowistojustdoenoughtoruntheprojectcorrectly.Soyoudon’tneedtocreateeachmanagementdocumentindetail.
Asthisisasampleproject,wewanttoshoweachPRINCE2managementdocumentwithasmuchdetailaspossible.
49PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Tailoring of PRINCE2 Date: Document: Project: Pen Project Author: Project Manager
Ourobjectivehereistoapplythesimplestpossible- yetfull- formofPRINCE2soyoucanviewthemajorityof
PRINCE2documentsandgetabetterideaofhowatypicalmidsizeprojectworksandseethatallthePRINCE2
principlesareapplied.
Tailoring of PRINCE2 (part of PID)
Asmallprojectlikethiswouldusuallybetailoreddifferently,itwouldcontainabout80%lessofthe
documentationshown.
AllPRINCE2principleswillbefullyappliedintheproject.1. Adapting the Principles
ThedefaultPRINCE2terminologywillbeusedintheproject,exceptfortheProjectBrief,whichmayalsobecalled“projectcharter”insomedocumentsorverbalcommunications;theywillbothaddressthesamemanagementproduct.
3. Adapting the Terms
Themanagementproductswillbekeptseparated(eachinasingledocument).WewouldnotuseformalanddocumentedWorkPackages.CheckpointReportswillbeverbal(notwritten).
4. Adapting the Management Products
Theruletofollowistokeepitassimpleaspossible.Risk:Askyourself“WhatistheminimumthatIcandomanageRisk?”Plans:Askyourself“WhatistheminimumthatIcandotoplantheproject?”Askthesamequestionforallthemes.
2. Adapting the Themes
AllPRINCE2processeswillbekeptseparatedandwillbehandledformally.5. Adapting the Processes
• TheProjectAssuranceandChangeAuthorityroleswillbemergedintotheProjectBoard.
• TheProjectSupportrolewillbehandledbytheProjectManager.• TheProjectManagerwillalsohavetheroleofProjectSupport.• TheProjectManagerwillcommunicatedirectlywiththeteammembers,so
thereisnoneedforaTeamManager.
6. Adapting the Roles
It’scommonforsmallprojectstohandletheSUprocessinformally,ortocombineitwithIPprocess;
50PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Project Initiation Documentation (PID)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
Tailoring
Projectmandate
NextStagePlanPBS
ThePID isacollectionofanumberofdocuments,itdefinesthewholeprojectandprovidesabasisforitsmanagement(itactsasacontractbetweentheProjectBoardandtheProjectManager)
51PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Project Initiation Documentation Date: Document: Project: Pen Project Author: Project Manager
Theprojectwillchooseaqualitypenandgiveoutabout400penstoourclients.ProjectObjectives:• Chooseaqualitythatmeetsspecifications• Chooseapenthatuserswillperceiveasaqualitypen
ProjectScope:1.Chooseapen3.Promotionalpencatalogues2.Salespeoplelist4.Listofclientsthatwillreceiveapen
Constraintsandassumptions:• Possibletofindapeninthecataloguesprovided
ProjectTolerances:1. Time:3months+30%2. Cost:€7forapen:Estimate€3400fortheproject+- 10%3. Quality:Pensmustmeetqualityrequirements
1. Project Definition
Thecompanywillchooseapenthatmeetstherequirementsfromanexistingbusinessgiftcompany.Projectwillberuninternally.
2. Project Approach
Attached:BusinessCasedocument3. Business Case
Attached:ProjectManagementTeamStructuredocument4. Project Management Team Structure
ThisprojectusestherolesdescriptionasdefinedbyPRINCE2- Link totheRolesDescriptionsdocument
5. Role Descriptions
Attached:QualityManagementApproachdocument6. Quality Management Approach
Attached:ChangeControlApproachdoc7. Change Control Approach
Attached:RiskManagementApproachdocument8. Risk Management Approach
Attached:CommunicationManagementApproach document9. Communication Management Approach
Attached:ProjectPlandocument10. Project Plan
Attached:ProjectControlsdocument11. Project Controls
Attached:TailoringofPRINCE2document12. Tailoring of PRINCE2
Thisismostlyanassemblyofotherdocuments,soweonlyhavereferencestootherdocumentsratherthanembeddingtheinformationhere.
Project Initiation Documentation (PID)
52PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Stage BoundaryThisistheStageBoundaryprocessanditstartstowardstheendof
thecurrentstage.
53PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Dependencies Diagram (part of the next Stage Plan)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Projectmandate
NextStagePlan:
Thisprovidesthedependenciesbetweenprojectelementswhichwilllaterturnintoaschedule.InPRINCE2,thedependencydiagramiscalledtheProductFlowDiagram.
54PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Dependencies Diagram
1. Dependencies Diagram
Date: Document: Project: Pen Project Author: Project Manager
Listofpotentialsuppliers
Shortlistofqualifiedsuppliers
SelectedSupplier
Catalogofpens
Shortlistofpenstobeevaluated
Purchaseorderofpenstobeevaluated
Samplepensforevaluation
Listofevaluators
Evaluationform
Evaluationandfilledinforms Evaluationreport
Listofclients
Listofsalespeople
Salespeopledelivered
Requirements Logo
Purchaseorderofthefinalizedpen Receivedpens
Stage1 Stage2
Legend:
Dependenciescanbeprovidedwithanetworkdiagram(suchasthis),atable,etc.
Dependencies Diagram (part of the next Stage Plan)
Product Flow Diagram
Authornote:IprefertouseanormalGanttcharttodothis.Youcanlistalltheproducts(oneineachrow)andthenshowthedependenciesbetweenthem.
55PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Schedule (part of the next Stage Plan)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
Projectmandate
Nowit’stimetoschedulethenextstageindetail(comparedtotheProjectplan)
56PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Schedule for Stage 2 Plan1. Product Schedule
Date: Document: Project: Pen Project Author: Project Manager
Note: durations shown for the groups of products are based on a rollup of products on all stages, rather than this specific stage.
Wecanuseaprojectplanningsoftwareforschedulingtheproject.
Schedule (part of the next Stage Plan)
57PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Next Stage Plan
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
Projectmandate
The“schedule”isjustpartoftheplan.WealsoneedmoreinformationforanextStagePlan.
58PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Plan for Stage 2 (description) Date: Document: Project: Pen Project Author: Project Manager
Next Stage Plan
Thisistheplanforstage2,duringwhichwewillprepareeverythingforandconductevaluationofthesamplepens.
1. Plan description
Resourcesneededforevaluationareavailable,potentialsellerswillrespondquicklyandsamplepensaredeliveredontime.Internalrecourseswillnotbechargedtotheproject.
Attached:ProjectProductDescription7. Products Description(s)
BizGiftscompanyoffersagoodserviceGifts4Allprovidesapoorservice
3. Lessons incorporated
ThePMwillusethestandardPRINCE2documentsAHighlightReportwillbesenteachweektotheProjectBoardAnExceptionReportwillbeusedifforecastedtogooutoftolerance
4. Monitoring & Control
Stagebudget:€640(internalpeople’stimeisnotcharged)Time:10daysRiskBudget:€0,0days|ChangeBudget:€80
5. Budgets
Time:±20%|Cost:±40%|Scope:±0%6. Tolerances
8. ScheduleAttached:ScheduleforStagePlan2
9. Resources
2. Prerequisites, Assumptions, and external dependencies
Budgets(timeandmoney)andtolerancesofeachstagearedeterminedseparately;however,theyshouldalwaysbeconsistentwiththebudgetand
tolerancesofthewholeproject(ProjectPlan).
TheEndStageReportandtheLessonsReportcanalsobesubmittedwiththenextStagePlan
59PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Stage 2ThefirststagetheInitiatingStage (mainfocusisonplanning).Inthisproject,projectexecutionstartsfromthesecondstagecontinuestothethird(last)stage.
Fromnowon,we’llexecutetheproject,monitorandcontrolit,revisetheplans,andpreparenewplansinthestageboundaries.
60PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Work Package
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
Projectmandate
AWorkPackagecontainsoneormoreproductdescriptionsfromtheStagePlan andotherinformation(e.g.tolerances,frequencyofreports)
61PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Work Package #1
2016-06-291. Date
ITDepartment2. Authorized body
Theprojectwillnotpayforinternalresources,includingtheresourcesworkingonthisWP.TheoriginaldurationforthisWPistwodays;however,wearebehindscheduleandwouldbeabletorecoverifit’sdoneinoneday.
5. Joint agreement
Date: Document: Project: Pen Project Author: Project Manager
Ansimpleevaluationformshouldbedesignedthatcoverseverythingmentionedintherequirementsdocumentandeasyfortheevaluatorstofillin.
3. Description
Sincethedataistobecollectedinaspreadsheet,theevaluationformsshouldbemadeeasytouse.
4. Techniques
TheSeniorUserwillansweranswerquestionsabouttherequirements.5. Interfaces
Time:0%|Cost:0%|Scope:0%|6. Tolerances
None7. Constraints
AllreportsonthisWPwillbeverbalandnone-official,atleasttwiceaday.8. Reporting arrangement
AnyproblemwhichhasaneffectonthetimeshouldbeimmediatelyescalatedtotheProjectManager.
9. Problem handling and escalation
TheSeniorUserwillapprovethisform,basedonhowwellitcoversthefactorsstatedintherequirementsdocument.
Acleardefinitionofthedeliverabletobedelivered.
ToaccepttheWorkPackage
Thewaywe’regoingtomanagebyexception.
Work Package (WP)
10. Approval method
62PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Issue Register
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
Projectmandate
Weshoulddocumentandfollowuponimportantissuesduringthecompleteproject.
ManyProjectManagersdon’tmaketimeforthiswhichisabigmistake.
63PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Issue Register Date: Document: Project: Pen Project Author: Project Manager
ID Description Type DateRaised
RaisedBy
ReportAuthor Priority Severity Status Closure
Date
01 Selected suppliersentthenewcatalogthreedayslaterthanexpected
Problem/concern
Jun29,2016 RoseCarr Rose
Carr High Level 2Open
(last updatedJun30,2016)
Data Date: Jun 30, 2016
Wehaveonlyoneissueuptonow.Duringtheproject,newissueswillarise,beclosed,escalated,….LessimportantissuewillbedocumentedintheDailyLog
Weshouldalwaystrytocloseanyopenissuesassoonaspossibleandifpossible.
Issue Register
64PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Issue Report
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
Projectmandate
IssueReports areonlycreatedwhenweneedtohandleanissueformally.EachlineintheIssueRegistermayhaveit’sownIssueReportoranIssueReportcanalsodocumentanumberofrelatedissues
65PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Issue Report for ID-01 Date: Document: Project: Pen Project Author: Project Manager
ID Description Type DateRaised
RaisedBy
ReportAuthor Priority Severity
01 Selected suppliersentthenewcatalogthreedayslaterthanexpected
Problem/concern Jun29,2016 RoseCarr RoseCarr High Level 2
Date: Jun 30, 2016
Time:Thethreedaydelayonreceivingthenewcatalogfromthesuppliermakesthewholeprojectlate.Risk:Giventhatwehadsomeproblemsarrangingtohaveaccesstoresourcesforthefutureactivities,thisdelaymightcauseproblemsinresourceavailabilitiesinfuturetoo.It’simportanttorecoverthistimeassoonaspossibleandgetbackontrack.Benefits:Thebenefitsfromtheprojectwillbedelayediftheprojectisdelayed.
1. Impact Analysis
Twofutureactivitiesforpreparingtheevaluationformsandpreparingthelistofevaluatorscanbedonebyusingmoreresources.ThebestoptionforextraresourcesistheITDepartment;theyarecapableofhelpingusexecutingthesetwoactivitiesfaster.
1. Recommendation
Accept1. Decision
SeniorSupplier,TerryClinton1. Approved by
Jul1,20161. Decision date
Jul1,20161. Closure date
ThisinstanceoftheIssueReportshowstheissueafteritsclosure.TheIssueReportmighthavebeeninitiallycreatedassoonastheissueiscaptured.
Issue Report
Lookattheimpactontheproject,soconsidertheimpactonTime,Cost,Quality,Scope,BenefitandRisk.
Approved,sotheissuecanbeclosed.
66PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Issue Register
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
Projectmandate
Allregisters,includingtheIssueRegister,aremaintainedcontinuously.Itiscreatedduringtheinitiationstage.
67PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Issue Register Date: Document: Project: Pen Project Author: Project Manager
ID Description Type DateRaised
RaisedBy
ReportAuthor Priority Severity Status Closure
Date
01 Selected suppliersentthecatalogthreedayslaterthanexpected
Problem/concern Jun29,2016 RoseCarr RoseCarr High Level 2 Closed Jul 1,
2016
02 Fiveevaluatorsdidnotreturntheformsintime
Problem/concern Jul18,2016 RoseCarr RoseCarr High Level2
Open(last updatedJun30,2016)
03 Evaluationformsoffourevaluatorsdonotseemprecise
Off-specification Jul18,2016 RoseCarr RoseCarr High Level0
Open(last updatedJun30,2016)
Data Date: Jul 19, 2016
Thefirstissueisnowclosedandtwonewissueshavebeencaptured.
Issue Register
68PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Highlight Report
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport
Projectmandate
TheProjectManagerusesaHighlightReporttoinformtheProjectBoard(andpossiblyotherstakeholders)oftheperformanceoftheStageatpredefinedintervals.
69PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Highlight report # 4
Time:+5%,thisisinsidethetolerancessetfortheStageCost:±0%
EndofthesecondweekofStage2,foraperiodofoneweek.1. Date and period of the report
Time:+5%|Cost:±0|TheProjectisgoingwellsofar.2. Status summary
• Selectedsupplier: Completed• Catalogsofpens: Completed(behindschedule)• Pensshortlisttobeevaluated: Completed(behindschedule)• Evaluationpenspurchaseorder:Notfinished(behindschedule)• Sampleevaluationpensarrived:Notstarted(behindschedule)• Logo: Completed
Ittookthreeextradaysforthesuppliertosendusthecatalogs.
3. Work Packages in this period
Date: Document: Project: Pen Project Author: Project Manager
Wefellbehindschedulebecausethesuppliersentuscatalogsthreedayslaterthanweexpected.WedesignedacorrectiveactiontogethelpfromtheITdepartmentfortwoofourfutureWorkPackages.Wewillrecovertimebythis.(approvedbyProjectManager)
6. Change requests
5. Stage tolerances
• Purchaseorderofpenstobeevaluated(movedfromthisperiod)• Samplepensforevaluation(movedfromthisperiod)• Listofevaluatorsû• Evaluationformû• Nextstageplan
ûWearegoingtogethelpfromITdepartmenttoconductthesetwopackagesfasterandcatchupontheplannedschedule.
4. Work Packages for the next period
Wemighthavemoredelaysinreceivingevaluationpensandthefinalpensfromthesupplier.
7. Key issues and risks
Noexceptionyet.
Highlight Report
70PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Stage 2 Stage Boundary
Towardstheendofastage(aftermostoftheworkhasbeendone),theProjectManagercanstartthinkingaboutthenextstage
71PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Product Breakdown Structure (part of the next Stage Plan)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Projectmandate
MostITprojectscannotdefinethewholeprojectindetailatthestartastherearelotsofunknowns.DuringtheSBprocess,newproductscanbe
identifiedandexistingProductDescriptionscanbeupdated.
72PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
PBS for Stage 2 (Mindmap)
1. Mindmap presentation of PBS
Date: Document: Project: Pen Project Author: Project Manager
Legend
Thedeliverablesthataresupposedtobedeliveredinnextstagewillbebrokendownintomoredetailsnow.
Product Breakdown Structure (part of the next Stage Plan)
73PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Dependencies Diagram
1. Dependencies Diagram
Date: Document: Project: Pen Project Author: Project Manager
Listofpotentialsuppliers
Shortlistofqualifiedsuppliers
SelectedSupplier
Catalogofpens
Shortlistofpenstobeevaluated
Purchaseorderofpenstobeevaluated
Samplepensforevaluation
Listofevaluators
Evaluationform
Evaluationandfilledinforms Evaluationreport
Listofclients
Listofsalespeople
Salespeopledelivered
Requirements Logo
Purchaseorderofthefinalizedpen Receivedpens
Stage1 Stage2
Legend:
Usuallythedependenciesofthenextstagearenotdefineduptonow.
Dependencies Diagram (part of the next Stage Plan)
ManycompaniesuseanormalGanttcharttolistalltheproductsandshowthedependencieswhichiseasierthanusinga
ProductFlowDiagram
74PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Schedule (part of the next Stage Plan)
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Dependencies
Schedule
Projectmandate
Andnowit’spossibletocreatethescheduleforthenextstage.
75PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Schedule for Stage 3 Plan
1. Activity bar chart
Date: Document: Project: Pen Project Author: Project Manager
2. ResourcesAttached:ProductBreakdownStructure2. Product Breakdown Structure
Note: durations shown for the groups of products are based on a rollup of products on all stages, rather than this specific stage.
ThisscheduleiscompatiblewiththeoneintheProjectPlan;however,wecanupdatetheProjectPlanschedulebasedonthedetailedinformationproducedhere.
Schedule (part of the next Stage Plan)
76PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Next Stage Plan
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Dependencies
Schedule
Projectmandate
Nowweassembleandaddmoreinformationtothepreviousdocuments
tocompletetheStagePlan.
77PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Next Stage Plan (for Stage 3) Date: Document: Project: Pen Project Author: Project Manager
ThisistheStagePlanforthenextstage(stage3)andthescheduleisattached.
Next Stage Plan
Thisistheplanforstage3,duringwhichwewillpreparethepensfordistribution,byselectingthesupplierandthetypeofpenbasedonevaluationsinthelaststageandplacetheorder.
1. Plan description
Evaluatorswillfillintheformsintimeandprecisely,supplierwillpreparethepensinanappropriatetime,Internalrecourseswillnotbechargeoftheproject.
Attached:ProjectProductDescription7. Products Description(s)
AllowbuffertimefordeliveryofpensInvestigatetheISOstandardforpens:ISO12757-2
3. Lessons incorporated
ThePMwillusethestandardPRINCE2documentsAHighlightReportwillbesent(endofweekone)totheProjectBoardAnExceptionReportwillbeusedifforecastedtogooutoftolerance
4. Monitoring & Control
Stagebudget:€3,200(internalpeopletimeisnotcharged),25daysRiskBudget:€0,0days|ChangeBudget:€400,3days
5. Budgets
Time:±50%|Cost:±30%|Scope:MoSCoW6. Tolerances
Attached:Scheduleforstage38. Schedule
2. Prerequisites, Assumptions, External Dependencies
78PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Configuration Management
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Dependencies
Schedule
Projectmandate
ConfigurationManagement
ConfigurationManagementisusedthroughouttheprojecttotrack
changesandstatesofallproductsanddocuments.ManyPMsdonothaveasystemoraprocessforconfigurationmanagement.Tip:useaspreadsheet.
RiskRegister,QualityRegister,IssueRegister
79PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Date: 2016-07-20
Configuration Management Date: Document: Project: Pen Project Author: Project Manager
ID ProductTitle/Name CurrentVersion
Dateoflastupdate
MgmtStage ProductGroup Status Source Owner Succe-
ssors Issues Risks
01 Listofpotentialsuppliers v1 2016-06-21 2 Supplier Approved Int. Purchasingdep. 02
02 Shortlistofqualifiedsuppliers v1 2016-06-21 2 Supplier Approved Int. Purchasingdep. 03
03 Selectedsupplier v1 2016-06-25 2 Supplier Approved Int. Purchasingdep. 04
04 Catalogofpens v1 2016-06-28 2 Supplier Received Ext. Purchasingdep. 05 01
05 Shortlistofpenstobeevaluated v1 2016-06-29 2 Evaluationpens Approved Int. Purchasingdep. 06
06 Purchaseorderofpenstobeevaluated v1 2016-06-29 2 Evaluationpens Approved Int. Purchasingdep. 09
07 Listofevaluators v1 2016-07-03 2 InternalEvaluation Approved Int. Purchasingdep. 09
08 Evaluationform v2 2016-07-03 2 InternalEvaluation Approved Int. Purchasingdep. 09
09 Evaluationresults v1 2016-07-19 3 InternalEvaluation Approved Int. Purchasingdep. 10 02,03
10 Evaluationreport 3 InternalEvaluation Indevelop. Int. Purchasingdep. 15
11 Listofclients 3 Distribution Pending Ext. Salesdep.
12 Listofsalespeople 3 Distribution Pending Ext. Salesdep.
13 Requirements v2 2016-06-20 2 FinalPens Approved Int. Purchasingdep. 05
14 Logo v4 2016-06-27 2 FinalPens Approved Int. Purchasingdep. 15
15 Purchaseorderofthefinalized pens 3 FinalPens Pending Int. Purchasingdep.
Configuration ManagementProductID
Noticethateachrowcontainsdatathatdescribestheproduct.Soeachrowisarecord thatprovidesconfigurationinformationforeachitem (product),hencethenameCIR.Thisisalistofalldeliverablesandstatusinformation. ThePMupdatesthislistregularlytotrackallproductsandensurethatproductsarecorrectlycontrolled.Thisisgoodhouse
keeping.ThislistissetupintheInitiationStageandisupdated/revisedthroughtherestoftheproject.
80PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Configuration Item Record
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Dependencies
ScheduleConfigurationItemRecord
Projectmandate
ConfigurationManagement
81PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Configuration Item Record #14 Date: Document: Project: Pen Project Author: Project Manager
Date: 2016-07-20
Configuration Item Record
ItemID 14
ItemName Logo
Currentversion 4
Dateoflastupdate 2012-06-27
Managementstage 2
Item Type Marketing
Status Approved(ready foruse)
Source Internal(MarketingDepartment)
Owner PurchasingDepartment
Users All(Public)
Location MarketingPack
Related Marketing GuidelinesDoc(MKT045)MarketingPack
Cross Reference NA
LookattheLogodatainthelastslide“ConfigurationManagement”Thisisthesameinformationbutpresentedinthisformat.
SomeotherexamplesofConfigurationItemRecordsaretheMP3TagsinyourSmartPhoneoralibraryindexcardthatprovidesbookinformation.
Forbiggerprojects,itcantakealotofefforttokeepthisdatauptodateandthePMwillneedneedtimeorassistance.
82PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
DailyLog,LessonsLogTowardstheendoftheSB
process,theEndStageReportiscreated.ItprovidestheProjectBoardwithasummaryoftheperformanceofthestageand
overallprojectstatus.
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
End Stage Report and Lessons Report
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Dependencies
ScheduleConfigurationItemRecord
EndStageReport
EndStageReport
LessonsReport
Projectmandate
ConfigurationManagement
WewillalsoaddaLessonsReport
83PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
End Stage Report #2
• Supplier:Potentialsupplierswerereviewed,andthebestoptionselectedfortheproject.
• Evaluationpens:Fourofthepenswereselectedtobeevaluatedinthenextstage.
• InternalEvaluation:Evaluatorsareselectedtoevaluatethesamplepensinthenextstage.
• Logo:Thelogowaspreparedtobeprintedonthepens.
Thisstagewentwell,andwewereonscheduleandonbudget.Wehadsomeminordelaysinthemiddleofthestage,whichwecouldrecoverwiththehelpoftheITDepartment.
1. Project Manager’s report
TheBusinessCasestaysviableandunchanged.We’verealizedthatweareactuallyabletobuyqualitypensin6to8Eurosrange.Allfourselectedpensmeetalltherequirements.
2. Review of the business case
• Time: 10days,onschedule• Cost: €560,onbudget• Scope: asdefined• Quality: asdefined• Risks: asdefined• Benefits: asdefined
3. Review of the objectives
Date: Document: Project: Pen Project Author: Project Manager
Time:0%| Weforecastthecompleteprojectwillbeontime.Cost:-17%|Weforecasttheprojecttobefinishedwithacost17%lessthantheplannedcost.
6. Forecasts
5. Review of the products
Allteammembersspentenoughtimeontheproject,andperformedasplanned.
4. Review of the team performance
Issue:Supplierprovideduswiththecatalogs(threedaysdelay)Risk: Thesuppliermayhavemoredelaysinpreparingthefinalpens.
7. Issues and risks
Attached:LessonsReport#28. Lessons learned
NoexceptionyetHowwe’veperformedsofar(sixprojectvariables)
End Stage Report
84PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Lessons report #2
Wehadasuccessfulstageandlearnedalesson,whichhelpsusavoidproblemsinfuture.
1. Executive summary
Thelessonfromthesecondstageoftheproject2. Scope of the report
Whatwentwell:• Wecouldeasilychoosethesupplier,becausetheteamprovideduswith
neededinformationintimeandhadgoodcommunications.• Wecouldeasilychoosetheevaluators.• ThehelpofITDepartmentwasreallyuseful,andwecouldn’trecoverthe
delaywithouttheirhelp.Whatdidn’twentwell:• Thereweredelaysinreceivingcatalogsandthisdelayedallitsdepending
activities.Inretrospective,werealizedthatwecouldhaveaskedthemforthecatalogssooner.Wewillincreaseourbuffertimewhenorderingfromsuppliersinthefuture.
3. Lessons
Date: Document: Project: Pen Project Author: Project Manager
Whatwe’velearnedthroughthestage.
Lessons Report (part of End Stage Report)
85PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Stage 3Final Stage
Thisisthelaststageoftheproject.ThisstagecanproceedoncetheProjectBoardhavereviewedtheEndStageReport(fromStage2)andthe
nextStagePlanforStage3
TheClosingaProjectprocessattheendofthisstage.
86PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Quality Register
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport
ConfigurationItemRecord
EndStageReport
LessonsReport
Projectmandate
ConfigurationManagement
EndStageReport
NextStagePlan
Dependencies
SchedulePBS
DailyLog,LessonsLogTheQualityRegisterdocumentsthequalitymanagementactivitiesthatareplannedorhavetakenplace
throughouttheproject.
Theresultsofthequalitytestsareaddedtothe QualityRegister
87PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Quality Register Date: Document: Project: Pen Project Author: Project Manager
QualityID
Prod
uctID(s)
Prod
uctN
ame
QualityMetho
d
Prod
ucer
Quality
Review
er
Approver
Prod
uctio
ndate
TargetQuality
Review
Date
ActualQuality
Review
Date
TargetApp
roval
Date
ActualApp
roval
Date
Result
Records
01 01 Listofpotentialsuppliers Inspection John Bob Frank 6-21 6-20 6-21 6-20 6-21 Pass Link
02 02 Shortlistofqualifiedsuppliers Inspection John Bob Frank 6-21 6-21 6-21 6-21 6-21 Pass Link
03 03 Selectedsupplier Inspection John Bob Frank 6-25 6-25 6-26 6-25 6-27 Fail Link
04 05 Shortlistofpenstobeevaluated Inspection John Bob Frank 6-29 6-30 6-30 6-30 7-1 Pass Link
05 06 Purchaseorderofpenstobeevaluated Inspection Robin Stephan Frank 6-29 6-30 6-30 6-30 7-2 Pass Link
06 07,08,09,10 Evaluationofpens Inspection Robert Stephan Frank 7-28 7-29
07 11,12 Listofclientsandsalespeople Inspection Mary Bob Frank 7-30 7-30
08 13 Requirements Inspection Tom Stephan, Bob Frank 6-20 6-20 6-22
09 14 Logo Inspection Daniel Mary Frank 6-27 6-27 6-27
Date: 2016-07-20
¢ DataistakenfromtheProject,Stage,TeamPlan(Schedule)¢ DataistakenfromtheProductDescriptions(ProjectPlan)¢ (bluetext)Addedlater:Dates,Qualityresults,Links
Quality Register
88PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
Product Status Account
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Dependencies
ScheduleConfigurationItemRecord
EndStageReport
EndStageReport
LessonsReport
ProductStatusAccount
Projectmandate
ConfigurationManagement
AProductStatusAccountshouldbecalledaProductStatusReportasitisareport aboutoneormoreproducts
89PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
End Project Report and Lessons Report
OutlineBusinessCase
InitiationStagePlan
BenefitsManagementApproach
RiskRegister,QualityRegister,IssueRegister
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls
ProjectPlan
BusinessCase
TailoringTailoring
NextStagePlanPBS
Dependencies
Schedule
WorkPackage
IssueReport
HighlightReport NextStagePlanPBS
Dependencies
ScheduleConfigurationItemRecord
EndStageReport
EndStageReport
LessonsReport
ProductStatusAccount
EndProjectReport
LessonsReport
Projectmandate
ConfigurationManagement
WeshouldprepareaEndProjectReport attheendoftheprojecttoreviewhowtheprojectperformedagainsttheinitialPID.ThismayalsoincludeaLessonsReport,which
reviewsallthelessonslearnedthroughtheproject.
90PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Lessons Report - Final
Theprojectwassuccessful;however,welearnedthatweshouldbemorecarefulwithevaluators,andtimingofthetasksofthesupplier.Thereweresomepositivepointsintheprojectwhichweshouldtrytokeepinourfutureprojects.
1. Executive summary
Theendoftheproject2. Scope of the report
Whatcouldhavegonebetter?• Thereweredelaysinreceivingthecatalogsandthisimpactedallfuture
tasksanddeliverables.Inretrospective,werealizethatwecouldhaveaskedforthecatalogsalotsooner
• 9outof20evaluatorsdidnotdotheirtasksproperly.Weshouldhavehostedashortmeeting(<15mins)wheretheCEOpresentedthevalueoftheprojectandhowthistaskwillhelpus.
3. Lessons (continue)
Date: Document: Project: Pen Project Author: Project Manager
Whatwentwell?• Itwaseasytochoosethesupplier,becausetheteamprovideduswith
neededinformationintimeandwehadgoodcommunication.Weshouldalwaystakehelpfromsuchpeopleinourprojects.
• ItwasalsoeasytochoosetheevaluatorsduetothesupportoftheSalesManager.
• ThehelpofITDepartmentwasreallyhelpfulandhelpedustorecoverthedelay.
3. Lessons
ALessonsReportnormallycovers:- Whatwe’velearnedthroughthisproject.- Tipsthatwouldbeusefulforfutureprojects.
Lessons Report (part of End Project Report)
91PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
End Project Report
Finalproduct:400qualitypenswithintherangeof€6to€8,readytobedistributedamongtheclients
ProductgroupsinProductBreakdownStructure:• Supplier:Weweresatisfiedwiththeselectedsupplier.• EvaluationPens:Fourtypesofpenswereselected• InternalEvaluation:Evaluatorstestedthefoursamplepens,andfilled-inthe
formswhichwereanalyzedtofindthebestpens.• Distribution:Thelistoftheclientstoreceivethepensandthesalespeople
responsiblefordistributingthemwasprepared.• FinalPens:Requirementsdefined,logoredesigned,400pensordered.• Thepenswerereceivedontimefromthesupplierandaccepted.
Penswerepreparedaccordingtotherequirements,intime(withinthetoleranceoftheproject),andwithinbudget.Wefacedminorissuesinthesecondandthirdstages,whichwereresolved.
1. Project Manager’s report
Thefinalproductoftheprojectisdeliveredaccordingtotheplans,andalignedwiththeBusinessCase.Weforecastthatthebenefitswillbeachieved;however,wecanonlybesureafterthe6monthand12monthreview.
2. Review of the Business Case
• Targets:• Time: 49days,withintolerance• Cost: €3760,onbudget• Scope: 100%,asdefined• Quality: asdefined• Risks: asdefined• Benefits: asdefined
• Strategies:• Communications: veryeffective• Risk: alittleineffectiveinriskassessment• Configuration: effective• Quality: effective
3. Review of the objectives
Date: Document: Project: Pen Project Author: Project Manager
4. Review of the products
Mostteammembersspentenoughtimeontheproject,andperformedasplanned.Theonlyexceptionwastheevaluatorsofthepens;9outof20evaluatorsdidnotreturntheirformsontime,orseemedliketheyhavenottrulytestedthepens.Theirresultswereomitted,inordertokeeptheevaluationhigh-quality,andtostayonschedule.
5. Review of the team performance
Attached:LessonsReport- Final6. Lessons learned
End Project Report
Howdidweperformthewholeproject?
92PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Summary
93PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
• Pre-Project• Project mandate• Daily Log• Lessons Log• Project Brief• Project Product Description• Project Management Team Structure• Outline Business Case• Initiation Stage Plan
• Stage 1• Benefits Management Approach• Risk Register• Project Initiation Documentation• Communication Management Approach• Product Description(s)• Project Controls• Tailoring of PRINCE2• Business Case• Project Plan• Next Stage Plan• End Stage Report
What we practiced in this sample project:• Stage 2
• Work Package• Issue Register• Issue Report• Lessons Report• Highlight Report• Configuration Management• Configuration Item Record• Next Stage Plan• End Stage Report
• Stage 3• Product Status Account• Lessons Report• End Project Report
Summary
94PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Projectmandate
Pre-Project Stage 1 (initiation) Stage 2 Stage 3 (Final)
StartingupaProject InitiatingaProject ControllingaStage ControllingaStage
ManagingaStageBoundary ClosingaProjectManagingaStageBoundary
Processes ò
Management Products ò
DailyLog,LessonsLog
ProjectBrief
ProjectProductDescription
ProjectManagementTeamStructure
OutlineBusinessCase
InitiationStagePlan
ProjectInitiationDocumentationFourApproachDocs
ProductDescriptions(s)
ProjectControls BusinessCase
Tailoring
BenefitsManagementApproach
RiskRegister,QualityRegister,Issue,Register
ConfigurationManagement
NextStagePlanPBS
Dependencies
Schedule
EndStageReport
NextStagePlanPBS
Dependencies
ScheduleHighlightReport
EndStageReportIssueReport
WorkPackage
EndProjectReport
ConfigurationItemRecord
Note: this diagram only contains the sample documents of this training course, rather than all the necessary documents in each stage.
ProjectPlan
LessonsReport
LessonsReportProductStatus
Account
Summary
95PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
How this sample project helps you and your company:
• Helps you to better understand PRINCE2 in practice
• Helps you document a standard project
• Can be shared with other team members and even external stakeholders of your
projects
• Can be used as a reference in your projects
• Can be updated and tailored based on the feedback
in your projects (continuous improvement)
Summary
96PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Notes Page Notes
Thanksforleaving acommentonLinkedIn,Facebook,Twitter,etc…
97PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Notes Page Notes
98PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Notes Page Notes
99PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Notes Page Notes
100PRINCE2® is a Registered Trade Mark of the AXELOS. The Swirl logo™ is a Trade Mark of the AXELOS.© Professional Training Center of Excellence (PTCoE) P2P-SampleProject-EN Version V01 – Premium Edition
Notes Page Notes