The National Construction Code Bringing Building and Plumbing Together. The purpose of regulations: “To keep out the fools and rascals” - Hardy Cross (author of Engineers and Ivory Towers ). National Construction Code. Background to the National Construction Code. - PowerPoint PPT Presentation

Citation preview

Page 1: The National Construction Code  Bringing Building and Plumbing Together

The National Construction Code

Bringing Building and Plumbing Together

Page 2: The National Construction Code  Bringing Building and Plumbing Together

The purpose of regulations:“To keep out the fools and rascals”

- Hardy Cross (author of Engineers and Ivory Towers)

Page 3: The National Construction Code  Bringing Building and Plumbing Together

National Construction Code

Page 4: The National Construction Code  Bringing Building and Plumbing Together

Background to theNational Construction Code

• Council of Australian Governments (COAG) initiative

• First step – building and plumbing

• All States/Territories have agreed to adopt by October 2012

Page 5: The National Construction Code  Bringing Building and Plumbing Together

Plumbing Code of Australia• First published in 2004 by the National Plumbing

Regulators Forum (NPRF)• Not universally adopted by States and Territories• 2010 review by NPRF/ABCB working group

Page 6: The National Construction Code  Bringing Building and Plumbing Together

National Construction Code Series

Building Code Plumbing Code Guide toVolume One

Volume One S&T Appendices

Page 7: The National Construction Code  Bringing Building and Plumbing Together

Why PCA?

Training (2004)

PCA (2011)

Licencing (2013?)

Page 8: The National Construction Code  Bringing Building and Plumbing Together

Regulatory FrameworkState/Territory Act

NCC (incl. Plumbing Code of Australia)

Referenced documents(incl. Australian Standards)

State/Territory Regulations

Page 9: The National Construction Code  Bringing Building and Plumbing Together

PCA Operating Structure

Page 10: The National Construction Code  Bringing Building and Plumbing Together

Performance Requirements• Set the level of performance that a

plumbing or drainage solution must meet, e.g.-– A cold water service for human

consumption must comply with drinking water guidelines etc…; or

– A sanitary plumbing system must be installed to minimise noise, blockages, stormwater ingress etc…

Page 11: The National Construction Code  Bringing Building and Plumbing Together

Deemed-to-Satisfy• Solutions that are ‘deemed-

to-satisfy’ a requirement – i.e. an accepted solution

• Referenced standards and other documents

• AS/NZS 3500 series of standards

Page 12: The National Construction Code  Bringing Building and Plumbing Together

Alternative Solutions• Alternative means of compliance• Assessed through ‘Assessment Methods’

– Part A2.2 of PCA– Verification Methods– Expert Judgement– Comparison to DTS

Page 13: The National Construction Code  Bringing Building and Plumbing Together

What does it mean for you?• PCA is now the primary

regulatory code• Opportunity for innovation

through Alternative Solutions• AS/NZS 3500 series still provides

the bulk of technical detail• Still need to use WaterMarked

products

Page 14: The National Construction Code  Bringing Building and Plumbing Together

Have a say in future NCC development

• Proposal for Change submissions

• Public comment

Page 15: The National Construction Code  Bringing Building and Plumbing Together

Plumbing Code Committee

• Assess technical proposals to change the Plumbing Code of Australia and provide technical advice to the Board

Page 16: The National Construction Code  Bringing Building and Plumbing Together

Plumbing Code CommitteeBuilding Ministers Forum

ABCB Board

Building Codes Committee

ABCB Office

Plumbing Code Committee

Page 17: The National Construction Code  Bringing Building and Plumbing Together

What the future holds• Heated water deadwater draw-off• Waterless urinals• Review of AS/NZS 3500 suite• Solar hot water review• Scoping study for gasfitting in

NCC

Page 18: The National Construction Code  Bringing Building and Plumbing Together

Heated Water Dead Water Draw-off

• Wasted water and energy?• Project will establish-

– ‘Typical’ water losses– Energy losses incl. by water

cooling in pipework– Options and impact analysis

Page 19: The National Construction Code  Bringing Building and Plumbing Together

Waterless Urinals• Project will establish

– Extent of problem– Potential solutions if

necessary– Impact analysis

12 months after installationPhoto from NPRF Advisory Note 2009

Page 20: The National Construction Code  Bringing Building and Plumbing Together

AS/NZS 3500 Suite Review• Review for regulatory use in PCA• Compliance with ABCB Protocol

– Public policy, regulatory statements and administrative matters

– PCA duplication and compatibility– Manufacturer’s or supplier’s

instructions

Page 21: The National Construction Code  Bringing Building and Plumbing Together

Solar Hot Water Review• AS/NZS 3500 Part 4 Section 6

– Lacks installation requirements– Relies on “manufacturer’s

instructions”– Specific orientation and inclination

provisions required

Page 22: The National Construction Code  Bringing Building and Plumbing Together

Gasfitting

• Scoping study to determine whether gasfitting should also be included in NCC

Page 23: The National Construction Code  Bringing Building and Plumbing Together

Plumbing Resource Kit• One of a series ABCB

produces• Designed for trainers• Includes lecture notes,

group exercises and frequently asked questions

Page 24: The National Construction Code  Bringing Building and Plumbing Together

Plumbing Resource Kit

Role of Regulator

NCC

Role of PCA

Why PCA?

Using the PCA

Recent Changes Materials / Products

Performance Req’ts

Deemed-to-Satisfy

Alternative Solutions

Variations & Additions

More about ABCB

Page 25: The National Construction Code  Bringing Building and Plumbing Together

Plumbing Resource Kit

Page 26: The National Construction Code  Bringing Building and Plumbing Together

Tailor to Different AudiencesAll Slides

1st Year Apprentices

3rd Year Apprentices

Cert IV Students

Contractors (60-90 min.)

Contractors (20 min.)

Page 27: The National Construction Code  Bringing Building and Plumbing Together

Annual NCC seminars

Page 28: The National Construction Code  Bringing Building and Plumbing Together

Biennial Building Australia’s Future Conference

Page 29: The National Construction Code  Bringing Building and Plumbing Together

Postal Address:GPO Box 9839Canberra ACT 2601

www.abcb.gov.au Phone: 1300 134 631

Australian Building Codes Board