FLEXISTAIR is a permanent, lightweight galvanized steel shuttering system for forming an in-situ stair. For use on reinforced concrete and steel buildings.
The FLEXISTAIR System
We offer:
• AComprehensiveDesignService - ensuring the finest attention to detail from the outset, specifically for your project.
• BespokeManufacture- crafted by our highly experienced and skilled tradesmen to your specification.
• DeliverytoSite- together with a generic method statement and lifting plan for the installation.
www.flexistair.comwww.flexistair.com
Bespoke Design
FLEXISTAIR offer a full range of permanent or sacrificial balustrading, manufactured from mild steel to stainless steel, with various balustrade options such as toughened glass, structural glass and polyester powder coated perforated sheet.
Specification
The finish of stairs can be basic or advanced to suit any design requirements. External surfaces can simply be painted to provide a smooth background, ready for final decoration. FLEXISTAIR can provide polyester powder coated soffit panels with integral lighting. Alternatively, plasterboard or any other finish can be used.
FLEXISTAIR will assist in the design at the very initial stages, working with engineers/architects to provide a fully bespoke service, ensuring the final product suits your specification perfectly.
www.flexistair.comwww.flexistair.com
STRINGERS
• Galvanized steel• Painted finish • Can be clad in powder
coated aluminium
SOFFIT
• Powder coated aluminium panel
• Feature groove in soffit allows for LED lighting
BALUSTRADES
• Pre-installed sacrificial balustrade
• Painted steel balustrade• Stainless steel balustrade • Glass infill• Perforated Panels infill
The FLEXISTAIR System
Once delivered to site the composite sections of flights/landings can be simply hoisted into position, leaving the final task of completing the rebar connections and pouring of the concrete.
FLEXISTAIR comes with the half landing and rebar fully installed as standard which speeds up the build programme and safety constraints. A temporary or permanent balustrade is included, dependent on individual project
requirements, which negates the cost of erecting temporary scaffold and provides operative protection from day one.
There are lifting points on each section of the stair. Simply connect a 4 leg chain, and hoist into position. FLEXISTAIR will provide a generic method statement and hoisting plan on request.
www.flexistair.com
FLEXISTAIR installation.
FLEXISTAIR installation. FLEXISTAIR manufacture.
• Improved Health and Safety• Quick and simple installation• Direct cost saving• No need for temporary scaffold rails
www.flexistair.com
Advantages in using FLEXISTAIR
A key design advantage of the FLEXISTAIR system is the permanent galvanised steel shuttering, with no need to install timber shuttering or the need to strike once the concrete is cured, as opposed to traditional shuttering methods.
The FLEXISTAIR system is installed as the concrete frame progresses, enabling you to walk on the staircase the following day. The half landing is integral to this system, with no need to install shuttering or rebar, simply crane the unit into position.
A pre-attached balustrade (no leading edge at any point of installation) is included, this can be a sacrificial balustrade or permanent to suit the projects needs.
A typical level takes less than 1 day to install, just add final rebar connections and the concrete pour, and that’s one floor complete, no striking of shuttering, just back prop the half landing and the stair can be in full use the following day.
FLEXISTAIR is adaptable to suit design requirements, tailor-made for each project and is safe and easy to install.
www.flexistair.com
VERSATILEANDCOSTEFFECTIVE
www.flexistair.com
Installation Procedure
From the engineers/architects drawings FLEXISTAIR will produce a detailed drawing for approval/comment.
Stairs will be manufactured to suit an agreed programme of works and delivered to site, ready for installation by your appointed site contractors.
Once construction has reached the point where the stairs are ready to be installed. A section of the stair can be hoisted into place, the rebar connected, the stairs lined and levelled. Then the concrete can be poured. The stairs will be ready to be walked on 24 hours later.
1.
2.
3.
READYTOUSEIN JUST 24 HOURS
Index Date Description AuthorP1 02/08/2012 First Issue For Approval DtmA 19/12/2012 Construction Issue Dtm
1. This drawing must not be scaled.General Notes
REVISIONS
[G] -
advancesteelF Unit 5, Zone C, Chelmsford Road Ind. Est.
Great Dunmow, Essex, CM6 1HDTel: +44 01371 878600 Fax: +44 01371 878608
e-mail: [email protected]: www.alloyfabweld.com
ALLOY FABWELDA
C62-3672
As Noted
A
Dtm 06/08/2012
Flexi Stair
01J1392
Berkeley Homes
Cambridge College Brunswick
FPL1
FPL1
FPL1
Elevation 1:25
B1
B3
B2
B2
B1
B1
Plan 1:25
Elevation Concrete Only 1:25
1904 154
1904 154
1405.6
1904
2925
2925
2925
+19.175
+16.250
+13.325
+10.400
+17.712
+14.787
+11.862
2925
2925
2925
1462
.529
2529
2514
62.5
+19.175
+16.250
+13.325
+10.400
FFL
FFL
FFL
FFL FFL
FFL
FFL
FFL+19.050
+16.125
+13.200
+10.250
SSL
SSL
SSL
SSL
AA
Section A-A 1:33.3 Section B-B 1:33.3
200 5000.1 200
1904
200 5000.1 200
1904 154
1082
1282
Section C-C 1:33.3
200 5000.1 200
1135.6
1904 115
1082
200
1082
BB
BB
CC
Edg
e of
Sla
b an
d S
cree
d
Edg
e of
Sla
b
Edg
e of
Sla
b
Edg
e of
Scr
eed
4
E
F
E
F
E
F
4 4 4
162.
5
250
3096.1
15 1081
15
15
1081
1081
1889 15
1889 15
1904
1889 15
3D View
750 750
75 75
125 125
FLEXISTAIR production stages.
www.flexistair.com