23/03/2020 1
The Kerala Building Rules, 2011 issuedThe Kerala Building Rules, 2011 issued under G.O. under G.O.
(Ms.) No 41/2011/LSGD. dated 14(Ms.) No 41/2011/LSGD. dated 14thth February, 2011February, 2011
GOVERNMENT OF KERALA GOVERNMENT OF KERALA
G.O.(P) No.78/2019/LSGD. G.O.(P) No.78/2019/LSGD.
NOTIFICATION Dated, NOTIFICATION Dated,
ThiruvananthapuramThiruvananthapuram, 2, 2ndnd November, 2019.November, 2019.
16th 16th ThulamThulam, 1195. , 1195.
S. R. O. No. 829/2019S. R. O. No. 829/2019
23/03/2020 2
The Kerala Building Rules, 2011The Kerala Building Rules, 2011
►► In exercise of the powers conferred by sections In exercise of the powers conferred by sections
235A, 235B, 235F, 235P, 235W read with section 235A, 235B, 235F, 235P, 235W read with section
254 of the Kerala 254 of the Kerala PanchayatPanchayat Raj Act, 1994 (13 of Raj Act, 1994 (13 of
1994) and in supersession of the Kerala 1994) and in supersession of the Kerala PanchayatPanchayat
Building Rules, 2011 issued under G.O. (Ms.) No Building Rules, 2011 issued under G.O. (Ms.) No
41/2011/LSGD. dated 14thFebruary, 2011 and 41/2011/LSGD. dated 14thFebruary, 2011 and
published as S.R.O. No. 127/2011 in Kerala published as S.R.O. No. 127/2011 in Kerala
Gazette Extraordinary No. 351 dated 14th Gazette Extraordinary No. 351 dated 14th
February,2011, the Government of Kerala hereby February,2011, the Government of Kerala hereby
make the following rules, namelymake the following rules, namely
23/03/2020 3
Modification in application for permitModification in application for permit
APPENDIXAPPENDIX-- A1A1
(See rules 5(1)(b), 75(1), 87(1) and 93(1))(See rules 5(1)(b), 75(1), 87(1) and 93(1))
APPLICATION FOR PERMIT/REGULARISATIONAPPLICATION FOR PERMIT/REGULARISATION
23/03/2020 4
Modification in application for permitModification in application for permit
►►Whether the land, if any, contiguous to this Whether the land, if any, contiguous to this
plot of the owner shown in the site plan plot of the owner shown in the site plan
(Rule 6(4)(a)(i)) : Yes /No(Rule 6(4)(a)(i)) : Yes /No
►►Usage of surrounding plots in generalUsage of surrounding plots in general
�� North :North :
�� East :East :
�� South :South :
�� West :West :
23/03/2020 5
Modification in application for permitModification in application for permit
►► Details of the ConstructionDetails of the Construction
►► Details of Proposed Details of Proposed Building(sBuilding(s))
►► Occupancy:Occupancy:
►► Height of the building in meter Height of the building in meter ––
Area provided for parking inside Area provided for parking inside
the building (the building (SqmSqm ) ) BuiltBuilt--up (up (SqmSqm ) ) Use Use Floor Floor
23/03/2020 6
Modification in application for permitModification in application for permit
►► (ii) Details of Existing (ii) Details of Existing Building(sBuilding(s))
►► Occupancy:Occupancy:
►► Height of the building in meter Height of the building in meter --
Area provided for parking Area provided for parking
inside the building (inside the building (SqmSqm ) ) BuiltBuilt--up (up (SqmSqm ) ) Use Use Floor Floor
23/03/2020 7
Modification in application for permitModification in application for permit
►►Total BuiltTotal Built--up Area :up Area :
►►Total Covered Area :Total Covered Area :
►►Total parking area provided inside the Total parking area provided inside the
building(sbuilding(s) :) :
►►Total BuiltTotal Built--up Area for F.S.I. :up Area for F.S.I. :
23/03/2020 8
Modification in application for permitModification in application for permit
►► Basic KBR Verification Basic KBR Verification w.r.tw.r.t. proposed plot. proposed plot
Coverage Coverage 2.2.
Floor Space Index Floor Space Index 3.3.
Access width to the plot Access width to the plot 1.1.
Provided Provided Required / Required /
permissible permissible Description Description Rule No. Rule No. SlnoSlno..
23/03/2020 9
Modification in application for permitModification in application for permit
►► Basic KBR Verification Basic KBR Verification w.r.tw.r.t. proposed . proposed building(sbuilding(s))
No. of Parking for VisitorsNo. of Parking for Visitors6.6.
No. of Parking for Differentiable No. of Parking for Differentiable 5.5.
No. of FourNo. of Four--wheeler parkingwheeler parking3.3.
No. of TwoNo. of Two--wheeler parking wheeler parking 4.4.
Minimum distance from the abutting road/access to other Minimum distance from the abutting road/access to other
building(sbuilding(s) (in meter) ) (in meter) 2.2.
Loading/unloading space (in sq. meter)Loading/unloading space (in sq. meter)7.7.
Access width to the building (in m) Access width to the building (in m) 1.1.
Provided Provided Required / Required /
permissible permissible Description Description Rule No. Rule No. SlnoSlno..
23/03/2020 10
Modification in application for permitModification in application for permit
►► Basic KBR Verification Basic KBR Verification w.r.tw.r.t. proposed . proposed building(sbuilding(s))
No. of Fire Escape Stair No. of Fire Escape Stair case(scase(s) ) 11.11.
No. of Stair No. of Stair case(scase(s) ) 10.10.
Exit Width (in meter) Exit Width (in meter) 9.9.
Rear Rear
Side 1 Side 1
Side 2 Side 2
Front * Set Backs (in meter) Front * Set Backs (in meter) 8.8.
Rainwater storage capacity (in Rainwater storage capacity (in litrelitre) ) 12.12.
Provided Provided Required / Required /
permissible permissible Description Description Rule No. Rule No. SlnoSlno..
23/03/2020 11
Modification in application for permitModification in application for permit
►► Provisions of Town Planning Schemes, if any, Provisions of Town Planning Schemes, if any,
applicable to the constructionapplicable to the construction
►► ZoningZoning
Permissibility of proposed Permissibility of proposed
construction as per scheme construction as per scheme Zone Zone Scheme Scheme
Stage Stage Name of the TP Name of the TP SlnoSlno..
►► Road Widening Road Widening Set back Set back
provided (in provided (in
meter) meter)
Set Back Required from Set Back Required from
Existing roadExisting road
Boundary (in meter) Boundary (in meter)
Building Building
Line (in Line (in
meter) meter)
Proposed Width Proposed Width
of road (in of road (in
meter) meter)
Existing Width Existing Width
of road (in of road (in
meter) meter)
Stage Stage
(Sanctioned/ (Sanctioned/
Published Published
Name of Name of
the TP the TP
Scheme Scheme
SlnoSlno..
23/03/2020 12
Modification in application for permitModification in application for permit
►► Permissibility with respect to Kerala Conservation of Permissibility with respect to Kerala Conservation of Paddy Land and Wet Land Act 2008 / KLU order 1967. Paddy Land and Wet Land Act 2008 / KLU order 1967.
�� (i) Type of land as per (i) Type of land as per BTRBTR ::
�� (ii) Type of land as per (ii) Type of land as per Data BankData Bank ::
►► Details of fee paid: Details of fee paid:
�� Application fee:Application fee:
�� Layout scrutiny fee:Layout scrutiny fee:
►►(i) Amount(i) Amount
►►(ii) No. and date of receipt(ii) No. and date of receipt
23/03/2020 13
Appendix in building application existing and proposedAppendix in building application existing and proposed
APPENDIX –H3
[See rule 99 (4)]
Appendix MCertificate Of Registration
APPENDIX –H2
(See rules 81(11) & 100)
Appendix LQualification And Function Of Architect, Engineer, Etc
APPENDIX –H1-A
[See rule 99(1)]
Appendix KApplication For Registration As Architect/Engineer/Town
Planner/Supervisor Etc.
APPENDIX –G2
[See rule 95 (3)]
Appendix JRegister For Regularised Constructions
APPENDIX-I
[See rule 5(4)(Note ii)] (Only in GP)
Appendix IBuilding Construction Without Permission Or Deviation From
Approved Plan-Regularisation Granted-Orders Issued
APPENDIX F2
[See rules 17(5) (f), 20 (3) and 88 (2)]
Appendix HOccupancy Certificate Or Use Certificate
APPENDIX F1
[See rules 17(5)(f)&20 (2)]
Appendix GDevelopment Certificate
APPENDIX E3
[See rule 20(1)&88(1)]
Appendix FCOMPLETION CERTIFICATE BY INSTITUTION, ARCHITECT,
ENGINEER, ETC.
APPENDIX E1
[See rules 17(5)(e),20(1)&88 (1)]
Appendix ECompletion Certificate By The Owner
APPENDIX – D
[See rule 17(5) (d)]
Appendix DNotice Regarding The Intention To Start Work
APPENDIX B2
[See rule 6(17)&9(4)]
Appendix CBuilding Permit
APPENDIX- A1
[See rules 5(1)(b), 75(1), 87(1) and 93(1)]
Appendix AApplication For Permit/Regularisation
APPENDIX B1
[See rule 6(17)]
Appendix –BDevelopment Permit
APPENDIX –A3
[See rule 5(1)(a)]
Appendix AAApplication Form For Permit for Development/
Redevelopment Of Land
ProposedExistingExisting
23/03/2020 14
Occupancy Occupancy ►► Group A1 ResidentialGroup A1 Residential
►► Group A2 Lodging Houses & Special ResidentialGroup A2 Lodging Houses & Special Residential
►► Group B EducationalGroup B Educational
►► Group C Medical/HospitalGroup C Medical/Hospital
►► Group D AssemblyGroup D Assembly
►► Group E OfficeGroup E Office
►► Group F Mercantile/CommercialGroup F Mercantile/Commercial
►► Group G1 Industrial Group G1 Industrial -- II
►► Group G2 Industrial Group G2 Industrial -- IIII
►► Group H StorageGroup H Storage
►► Group I HazardousGroup I Hazardous
►► Group J Multiplex ComplexGroup J Multiplex Complex
23/03/2020 15
Parking SpaceParking Space
2 for every dwelling unitAbove 300 sq. meters
1.5 for every dwelling unitAbove 185 sq. meters upto 300 sq. meters
1 for every dwelling unitAbove 75 sq. meters upto 185 sq. meters
1 for every 3 dwelling unitsUp to 75 sq. meters
Off-street Parking Spaces at the rate ofBuilt up Area per Dwelling Unit
OFF-STREET PARKING SPACE FOR APARTMENTS/FLATS UNDER GROUP-A1
23/03/2020 16
Parking SpaceParking Space
60 sq. meters of built-up areaGroup J Multiplex complex11
250 sq. meters of built-up areaGroup H-Storage9
250 sq. meters of built-up areaGroup G2- Industrial– II Building8
250 sq. meters of built-up areaGroup G1- Industrial-I Building7
90 sq. meters of built-up area for buildings having total built-up
area upto 1260 sq. meters and 60 sq. meters of built-up
area for the total built up area in excess of 1260 sq. meters
Group F- Mercantile/ Commercial building
exceeding 75 sq. meters built-up area6
90 sq. meters of built-up area for buildings having total built up
area upto 1260 sq. meters and 60 sq. meters of built-up
area for the total built up area in excess of 1260 sq. metersGroup E- Office Building5
(ii) In the case of library, for calculating the built-up area for the
purpose of parking, the area of the stacking space for
books shall be excluded
25 sq. meters of built-up area Note:-(i) In the case of wedding
halls and community halls, for calculating the
built-up area for the purpose of parking, the built-up area
of either the auditorium or the dining hall, whichever is
higher, alone need be taken
Group D- Assembly4
90 sq. meters of built-up areaGroup C- Medical/Hospital3
125 sq. meters of built-up area(ii) Higher educational institutions
300 sq. meters of built-up area
Group B-Educational (i) High Schools, Higher
Secondary Schools, Junior Technical
Schools,Industrial Training Institute etc.2
90 sq. meters of built-up area for buildings having total built-up
area upto 1260 sq. meters and 60 sq. meters of built-up
area for the total built-up area in excess of 1260 sq.
meters.Group A2-Lodging houses & Special Residential1
One parking space for every or fraction ofOccupancySlNo
OFF-STREET PARKING SPACE FOR OCCUPANCIES OTHER THAN GROUP-A1
23/03/2020 17
25Above 104
1.53Upto 103
1.22.4Upto 62
0.91.08Upto 31
Minimum width of Airshaft in meterArea of the airshaft in Square meterNo. of StoreySl.No.
SIZE OF AIR SHAFT
2Other un-notified roads with width less than 6 m2
3
National Highway , State Highway, District Roads, other roads notified under section 220(b) of the
Kerala Panchayat Raj Act 1994, other un-notified roads with width 6m and above1
Public roads access width in
MeterRoad TypeSlno
DISTANCE BETWEEN PLOT BOUNDARY ABUTTING THE STREET AND BUILDING
►► Access with for Public roadAccess with for Public road
Air Shaft and Access with for Public roadAir Shaft and Access with for Public road
23/03/2020 18
Access for OccupancyAccess for Occupancy
7Above 6000 upto 18000Group C20
5Above 1500 upto 6000Group C19
3.6Above 200 upto 1500Group C18
1.5Up to 200Group C17
10Above 18000Group B16
7Above 6000 upto 18000Group B15
5Above 1500 upto 6000Group B14
3.6Above 200 upto 1500Group B13
1.5Up to 200Group B12
10Above 18000Group A211
7Above 6000 upto 18000Group A210
5Above 1500 upto 6000Group A29
3.6Above 200 upto 1500Group A28
1.5Up to 200Group A27
10Above 24000Group A16
7Above 8000 upto 24000Group A15
5Above 4000 upto 8000Group A14
3.6Above 400 upto 4000Group A13
1.5Above 200 upto 400Group A12
0Up to 200Group A11
Minimum access width in MetersTotal built-up area in sq. meterOccupanciesSlno
23/03/2020 19
Access for OccupancyAccess for OccupancyMinimum access width in MetersTotal built-up area in sq. meterOccupanciesSlno
7Above 700 upto 4000Group G140
5Above 500 upto 700Group G139
3.6Above 200 upto 500Group G138
3Up to 200Group G137
10Above 18000Group F36
7Above 6000 upto 18000Group F35
5Above 1500 upto 6000Group F34
3.6Above 200 upto 1500Group F33
1.5Up to 200Group F32
10Above 18000Group E31
7Above 6000 upto 18000Group E30
5Above 1500 upto 6000Group E29
3.6Above 200 upto 1500Group E28
1.5Up to 200Group E27
10Above 4000Group D26
7Above 700 upto 4000Group D25
5Above 500 upto 700Group D24
3.6Above 200 upto 500Group D23
1.5Up to 200Group D22
10Above 18000Group C21
23/03/2020 20
Minimum access width in MetersTotal built-up area in sq. meterOccupanciesSlno
12AllGroup J51
10Above 4000Group I50
7Upto 4000Group I49
10Above 4000Group H48
7Above 700 upto 4000Group H47
5Above 500 upto 700Group H46
3.6Above 200 upto 500Group H45
1.5Up to 200Group H44
10Above 4000Group G243
7Upto 4000Group G242
10Above 4000Group G141
Access for Occupancy Access for Occupancy
23/03/2020 21
Set Set backsbacks
5510AllGroup J19
7.57.57.5AllGroup I18
236Above 200Group H17
357.5AllGroup G216
333Above 200Group G115
223Upto 200Group G114
11.53Above 200Group F13
0.612Upto 125Group F Small Plot12
11.53Upto 200Group F11
11.53Above 200Group E10
3 and 537.5Above 500Group D9
225200 upto 500Group D8
3 and 537.5Above 500Group C7
225200 upto 500Group C6
3 and 537.5Above 500Group B5
225200 upto 500Group B4
11.53AllGroup A23
0.612Upto 200Group A1 Small Plot2
11.53AllGroup A11
Side in MeterRear in MeterFront in MeterTotal built-up area in sq. meterOccupancySlno
YARDS FOR BUILDINGS UNDER DIFFERENT OCCUPANCIES
23/03/2020 22
Other Departments/AgenciesOther Departments/Agencies
Kerala State Pollution Control BoardAs per prevailing statutes of the Kerala State Pollution Control Board.10
Chief Town PlannerProposed traffic terminal stations like mobility hubs, bus stands or inter-state bus
terminals
11
State Level Environment Impact Assessment
Authority (SEIAA) / Ministry of
Environment and Forests
Any activity as specified in the schedule to the Notification No. S.O. 1533(E) dated the
14thSeptember, 2006 and as amended from time to time, issued by the Ministry of
Environment and Forests, Government of India
9
Kerala Coastal Zone Management Authority
(KCZMA)
Proposed site/buildings in any area notified by the Government of India as a coastal
regulation zone under the Environment Protection Act, 1986 (Central Act 29 of
1986) and rules made there under.
8
District CollectorProposed crematoria or burning and burial grounds including cemetery and vaults7
District CollectorProposed fuel filling stations6
District CollectorProposed buildings/places for religious purpose or worship5
District CollectorProposed buildings within any Security Zone4
The Kerala Urban Arts CommissionProposed site/buildings in areas declared, identified or advised by the Kerala Urban Arts
Commission as possessing heritage value.
3
Railway Authority concernedProposed buildings within 30m from Railway track boundary or Telecommunication
towers within 100m from Railway track boundary.
2
Officer in charge of the Defense
establishment
Proposed building is within 10m from Defense Establishment or Proposed high rise
buildings within 500m from Defense Establishment or Telecommunication towers
within 200m from Defense establishment or as per notification issued by Defense
establishment from time to time
1
Officer/authorityLocation/ Use of the site and or buildingSlno
23/03/2020 23
Officer/authorityLocation/ Use of the site and or buildingSlno
District Town Planner/ Chief Town Planner concerned, if requiredProposed site/ building forms part of any Town Planning Scheme
for the area
18
District Town Planner/ Chief Town Planner concerned, if requiredBuildings of various occupancies as mentioned in Table 11 of
these rules
17
Archaeological Survey of IndiaAny activity within 300 metre distance from any protected
monument/area notified by the Archaeological Survey of India
16
Officer authorized by him in this regardElectrical line and if clearance not available as per rule 22 (5)
Table 2 and for installation of transformers
Chief Electrical Inspector / anProposed single storeyed buildings below the15
Airport Authority of India (AAI)Proposed buildings within 20km vicinity from Airport Reference
Point (ARP) and/or as per the color coded zoning map approved
for each airport and/or all buildings having elevation more than
150m from ground level
14
A self-declaration in the form in Appendix- L from the applicant
along with a certificate from the architect/ engineer, who had
prepared the plan, to the effect that the construction of the
building conforms to the fire and safety norms specified inpart 4
Fire and Life Safety of National Building Code of India, 2016 and
subsequent amendments. Also, a copy of the self declaration form
and certificate of the architect/ engineer shall be submitted to the
nearest Fire Station.
All buildings under Group A1, A2, B, C, E, F,G1,G2 and H
occupancy exceeding 300 sqm and below 1000 sqm of built-up
area, as also in the case of buildings not exceeding 15 m height.
13
Director of Department of Fire and Rescue Services or an officer
authorized by him in this regard to the effect that the construction
of the building conforms to the fire and safety norms specified in
part 4 Fire and Life Safety of National Building Code of India, 2016
and subsequent amendments.
i. All buildings under Group A1, A2, B, C,E,F,G1,G2and H
occupancy exceeding1000sq.m of built-up area or exceeding 15
m of height ii. All buildings under Group D, I and J occupancy
irrespective of the number of storeys.
12
Other Departments/AgenciesOther Departments/Agencies
23/03/2020 24
Color Scheme & Rainwater storageColor Scheme & Rainwater storage
Green lineElectric line10
Black dot and dash lineWater supply works9
Red dotted lineDrainage sewerage work8
Red outlineBuilding (proposed)7
Yellow hatchingBuilding (proposed to be
demolished)
6
Black outlineBuilding (Existing)5
Thick black dotted linePermissible building line4
Brown dotted lineStreet (proposed)3
Brown lineStreet (existing)2
Thick black linePlot line1
Notational coloringItemSlno
25 litres/sq.metre of CoveredareaGroup J
50 litres/sq.metre of Covered areaGroup G1 & Group G2
25 litres/sq.metre of Covered areaGroup F
50 litres/sq.metre of CoveredareaGroup E
50 litres/sq.metre of CoveredareaGroup D
50 litres/sq.metre of CoveredareaGroup C
50 litres/sq.metre of CoveredareaGroup B
25 litres/sq.metre of CoveredareaGroup A2
25 litres/sq.metre of CoveredareaGroup A1
Rainwater storage
►► Data BankData Bank
�� NilamNilam
�� PurayidomPurayidom
23/03/2020 25
Land useLand use
Kaipad Land19
Institutional Land18
Industrial Land17
Hill track without road access16
Hill track with road access15
Grove14
Ground13
Government property12
Garden Land without road access11
Garden Land with road access10
Forestry land9
Fallow land8
Dry land7
Commercially important Plot6
Coastal belt5
Canyon4
Business Land3
Burial Ground2
Agricultural land1
Land useSlno Land useSlno
Wet land38
Water logged land37
Waste land36
Rocky land35
River Bank34
Residential plot with without vehicular road access33
Residential plot with private road access32
Residential plot with NH/PWD road access31
Residential plot with Corp/Muni/Panc road access30
Quarry29
Pond28
Pokkali Land27
Play Ground26
Plantation25
Park24
Marshy Land23
Marshy land22
Lake21
Kole Land20
23/03/2020 26
F.S.I Coverage & Additional feeF.S.I Coverage & Additional fee
32.550B others14
4365Multiplex complexGroup J13
01.540Extremely HazardousGroup 1(2)12
01.245HazardousGroup 1(1)11
4370StorageGroup H10
42.540Small industrialGroup G29
03.560IndustrialGroup GI8
4365Mercantile/CommercialGroup F7
4360Office/BusinessGroup E6
2.51.540AssemblyGroup D5
3.52.550Medical/HospitalGroup C4
32.535EducationalGroup B3
42.565Special ResidentialGroup A22
4365ResidentialGroup AI1
With fee of 5000per sqmWithout FeeCoverageOccupancyGroupSlno
COVERAGE AND F.S.I for KMBR and Category - I Panchayat
23/03/2020 27
PanchayatPanchayat Category IICategory II
1.751.545B others14
32.560Multiplex complexGroup J13
0240Extremely HazardousGroup 1(2)12
0240HazardousGroup 1(1)11
3.752.7565StorageGroup H10
02.550Small industrialGroup G29
02.7560IndustrialGroup GI8
3.52.7560Mercantile/CommercialGroup F7
0350Office/BusinessGroup E6
1.250.735AssemblyGroup D5
02.545Medical/HospitalGroup C4
1.751.535EducationalGroup B3
1.251.555Special ResidentialGroup A22
02.560ResidentialGroup AI1
With fee of 5000per sqmWithout FeeCoverageOccupancyGroupSlno
COVERAGE AND F.S.I for Category - II Panchayat
23/03/2020 28
FeesFees
4333Roof9
500300300300Shutter or door 8
4333Wall7
25202020Well6
75505050Hut5
3222Other than Pucca4
15101010Non Residential3
10777Residential2
1000750750750Land Development1
CorporationMunicipalityPanchayatPanchayat-IITypeSlno
►► Permit FeePermit Fee
3G1,G2, H,I3
2A2,B,C, D,E,F, J2
1A11
Rate (Rupees /sq.meters of Built up area )Occupancy GroupSlno
►► Scrutiny Fee For Layout ApprovalScrutiny Fee For Layout Approval
23/03/2020 29
Sample calculation areaSample calculation area
(FSI - FSI without fee) * Plot area * 5000in Rs.2300000.00Additional fee12
Total Buildup area * Permit fee in KBRin Rs.10000.00Permit fee11
in unit2.25FSI with fee10
in unit1.50FSI without fee9
Sum (Buildup area * FSI with fee)in sqm2250.00Total area with fee8
Sum (Buildup area * FSI without fee)in sqm1500.00Total area without fee7
Max (Covered area * Coverage in % of occupancy in KBR)in sqm625.00Max Coverage area6
Total Buildup area / Plot areain sqm2.78FSI5
(Max (Covered area) / Plot area) * 100in Percentage69.44Coverage4
Total buildup areain sqm1000.00Built-up area3
Building foot print including projectionin sqm250.00Covered area2
Total plot areain sqm360.00Plot area1