The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative properties of the entire system:
operability assurance of the JINR basic facilities;
supply of energy resources;
safety protection of vitally important and potentially dangerous elements of the JINR infrastructure
communication service;
DEVELOPMENT OF THE JINR ENGINEERING INFRASTRUCTURE
7-Year Plan (2010-2016)(First approach)
BASIC FACILITIES
G.Shirkov, JINR Scientific Council, 19.02.2009
Development of the JINR engineering infrastructure is the necessary condition for the operation of basic facilities and the basement for new facility creation according to the 7-Year Plan (2010-2016).
The programme of basic facilities development and creation is the subject of the 7-Year scientific programmes of JINR Laboratories.
NICA-MPD
DRIBs
IBR-2M
IREN
G.Shirkov, JINR Scientific Council, 19.02.2009
ENGINEERINGINFRASTRUCTURE
Electric power
Heat supply
Liquid nitrogen production
Water supply
Cooling systems
Communication service
SAFETY POLICY
Radiation and nuclear safety
Physical protection
Industrial safety
Labour protection
Fire safety
ELECTRIC POWER
G.Shirkov, JINR Scientific Council, 19.02.2009
At present Plans Goals
Main step-down
station 1 (GPP-1)P=19 MW
2 transformers
+ 15 MW
+ 1 transformer
LHEP (NICA)
Main step-down
station 2 (GPP-2)P=25 MW
2 transformers
+ 19 MW
+ 2 transformers
DRIBs, IBR-2,
Phasotron
Other independent sources of electric
power
+ 4 MW (Moscow Channel Company);
+12 MW (autonomic power station)
To release the load of the main
step-down stations 1 and 2
Approx. cost (2010-2016): ~ 4.3 M$ including budget: ~ 0.1 M$
• to increase the total power;• to improve reliability;• to provide independent power supply of the basic facilities.
Objectives:
HEAT AND WATER SUPPLY
G.Shirkov, JINR Scientific Council, 19.02.2009
Boiler-houses and heat network:• Automation of boiler-houses.• Replacement of the steam- boiler in the East boiler-house.• Reconstruction and replacement of the heat network.• Heat control and accounting systems.
Plan: Replacement of the outdated equipment Goal: Reliability, modern equipment, economy
Water supply:• Enlargement and reconstruction of the pumping-filtering station.• Automation of the drinking water preparation.• Reconstruction and replacement of the water pipes.• Water accounting.
Approx. cost (2010-2016): ~14.1 M$ including budget: ~ 2.5 M$
Activities to be continued:
RADIATION SAFETY
G.Shirkov, JINR Scientific Council, 19.02.2009
Objectives:
• Purchasing of devices and the equipment for the radiation control.• Purchasing of a mobile radiological laboratory.• (*) Reconstruction and development of new systems of the radiation control (e.g. IBR-2M, NICA, IREN).• (*) Disposal of the used radioactive sources.• Handling with the radioactive wastes.• Metrological maintenance of the radiation control.• Accreditation of the radiation control laboratory.
(*) - financial means of JINR Laboratories
Approx. cost (2010-2016): ~ 0.5 M$
LABOUR PROTECTION AND INDUSTRIAL SAFETY
G.Shirkov, JINR Scientific Council, 19.02.2009
Main Goals: •Providing safe and healthy working conditions for personnel.•Ensuring prescribed benefits and compensation for appropriate category of workers .•Realization of preventive actions to avoid traumatism, industrial- caused diseases, and also emergencies and failures.
Activities to be continued:• Certification of workplaces in regard to working conditions to validate, in particular, available benefits and compensation for work in harmful and/or dangerous working conditions.• Scheduled replacement of morally and physically outdated equipment and technical devices.• Re-equipment of the JINR Industrial and Sanitary Lab with modern instrumentation to take more precisely measurements and online processing of parameters and levels of the harmful and dangerous production factors.• Technical upgrade of workplaces of the specialists on labour protection in the JINR departments.• Advanced training in the fields of labour and industrial safety for the JINR experts and department heads. The JINR University Center can be involved in this activity.
FIRE SAFETY
G.Shirkov, JINR Scientific Council, 19.02.2009
FIRE STATIONcontrol panel
GOALS:• Re-equipment of the fire station with fire engineering.• Modern control panel (GSM, large covering area, etc.). • Gradual replacement of the RID-1 annunciators• Persistent activities to maintain the JINR infrastructure in accordance with the fire safety requirements.
JINR
15000 annunciators
including ~3500 RID-1which have to be replaced
7 automatic gasfire-fighting systems
Approx. cost (2010-2016): ~ 2 M$
TELEPHONYG.Shirkov, JINR Scientific Council, 19.02.2009
At Present:• Analog station (1975-1985).• 5500 users (~3800 at JINR).• Old network (copper wires).• High energy consumption.• Space requirement is around 950 m2.• No additional services (IP-telephony, etc.).• Does not meet the modern requirements of Russian Federal regulations.
In the Future:• Digital electronic station.• Scalability.• Optical connection.• Low cost of international and long distance calls.• Floor space and electricity saving.
Approx. cost: ~ 0.5 M$
G.Shirkov, JINR Scientific Council, 19.02.2009
SUMMARYPreliminary estimate of the financing for the
programme of JINR engineering infrastructuredevelopement in 2010-2016
Budget, M$ Off-budget, M$ TOTAL, M$
Electric power 0.1 4.3 4.4
Heat and water supply 2.5 11.6 14.1
Telephony 0.5 - 0.5
Radiation and nuclear safety 0.5 - 0.5
Industrial safety and labour protection
2.0 - 2.0
Fire safety 2.0 - 2.0
TOTAL, M$ 7.6 15.9 23.5
G.Shirkov, JINR Scientific Council, 19.02.2009
PROGRAMME OF DEVELOPMENT OF THE
JINR ENGINEERING INFRASTRUCTURE 7-Year Plan (2010-2016)
(First approach)
The development of the engineering infrastructure is the basis, which has to
provide effective realization of the research programme to achieve
significant scientific results.