1 THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) TENDER FOR REPAIR & RENOVATION OF CENTRE OF EXCELLENCE BUILDING AT PLOT NO.10&11, FINANCIAL DISTRICT, NANAKRAMGUDA, GACHIBOWLI, HYDERABAD-500032 (Including 05 Year warranty for no leakage including Defect Liability Period) PART- I (Technical & Commercial Bid) Issued To : M/s. ___________________________ Address ___________________________ ___________________________ ___________________________ Tel. No. __________________________ Name of the Signing Person Mr.____________________ Mobile No.____________________________ E-mail ID; __________________________- Web Site; __________________________

THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

1

THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI)

TENDER

FOR

REPAIR & RENOVATION OF CENTRE OF EXCELLENCE BUILDING AT PLOT NO.10&11, FINANCIAL DISTRICT, NANAKRAMGUDA,

GACHIBOWLI, HYDERABAD-500032

(Including 05 Year warranty for no leakage including Defect Liability Period)

PART- I (Technical & Commercial Bid)

Issued To :

M/s. ___________________________

Address ___________________________

___________________________

___________________________

Tel. No. __________________________

Name of the Signing Person Mr.____________________

Mobile No.____________________________

E-mail ID; __________________________-

Web Site; __________________________

Page 2: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

2

SECTION – 5A

BILL OF QUANTITIES

Preambles : General Notes

1 Rates mentioned in BOQ shall be inclusive of all taxes, as of date i.e. Composite VAT, GST, levies, transport, octroi, labour cess , Royalities etc. or any other tax as applicable in Hyderabad is inclusive in rates.

2 Rates quoted in this BOQ shall be applicable to any height & any location even if not specified in any item including steel (H frame, Ledger system etc.) scafolding, curing, cleanning, rectification etc. complete.

3 Details/ functions/ activities mention in preambles are included in quoted rates and nothing extra shall be paid for it.

4 Watching and lighting arrangements wherever necessary whether ordered by the Employer/ Architects or otherwise is included in items.

5 This bill of quantities is to be read in conjunction with the sketches/drawings, specifications, terms & conditions etc .

6 The quanties given are approximate and can vary up to any extent. The contractor will not be entitled to claim any extra on account of this quantity variation. Billing will be on actual measurement as executed and approved.

7 Contractor has quoted the rates after visting the site and after considering all local factors

8 Rates are inclusive of Carting away debris / Cleaning / Security / statutory/ approval for disposal of debris. Nothing extra shall be paid of disposal of malva outside premises.

9 Rates are quoted for finished items, wastage factor is on contractor part and measurement will be for finished item only.

10 The rates shall remain firm till the completion of the work and the contractor shall not be entitled to claim any escalation on any account till the completion of the project, in any respect.

11 Where ever applicable all the material samples should be got approved from Architect/employer for its quality, makes, colour, pattern etc. before start of work /mass procurement of material.

12 Manufacturer test certificates/testing from lab and test results will be provided along with the sample for all the materials procured at site.

13 Curing, slurry, scaffolding, etc. wherever applicable are included in item.

14 For all concrete, Brick, stone, flooring and other works except plastering, sand used shall be coarse sand and for plastering, it would be 50% coarse + 50% fine, unless specified otherwise.

15 All surfaces to be plastered/tiled, hacking of surface is included in items.

16 All cement related works shall be cured for 7 days or more as applicable as per specifications. The rate shall be also inclusive of covering with Hassian cloth and any other form of curing as directed.

Page 3: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

3

17 Protection of all kinds of floorings with POP and polythene sheet etc. is included in item rate and nothing extra shall be paid for this. The rate is also inclusive of removing and cleaning the same after completion of work

18 Holes or pockets in the Brick work for Rain water pipes and other pipes shall be kept or the pipes shall be provided at the time of raising the masonary. These holes or Zarries should be made good after fixing of pipes and nothing extra shall be paid for the same.

19 Chiseling of brickwork, if required shall be done to flush the floor skirting with the wall. Nothing extra shall be paid on this account.

20 Grooves with cement finish up to 12 mm X 6 mm shall be formed in plaster at the junction of slab and beam and slab & brick work without any extra charge. Similar grooves shall be made in plaster at the junction of masonary and wood or steel door or steel window frames or at bottom of beams or chajja, slab projections as drip moulds without extra charge.

21 Water and electricity for all the work shall be arranged by contractor at his own cost .

22 Bailing out, pumping out or otherwise removing all water which may accumulate in the working areas from any or all causes what so ever is included in items. Nothing extra shall be paid for this...

23 Any activity not mentioned in the BOQ item description but is required for completion of that item shall be deemed to be included in the item and nothing extra shall be paid for it/on that account.

Page 4: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

4

ICAI , HYDERABAD

I ) TOILETS RENOVATION WORKS

INSTITUTIONAL / ADMIN BLOCK

S. NO

DESCRIPTION OF WORK

LOCATION

UNIT QTY RATE AMOUNT

GROUND FLOOR

1

(i)

RENOVA- TION WORK

Gents toilet near Conference - 2

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from

outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered. Breaking of existing brickbat waterproofing upto slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate & directed with necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets. disposal of malva outside the premises should be done. Safeguard of all removed and un removed fittings/fixtures would be contractor’s responsibility and if lost/damaged, shall be replaced with new at his own cost, supporting it temporarily during repairs, providing and fixing new clips, switches, pattis, wires etc. if necessary including replacing existing/above mentioned sanitary & plumbing fittings (Jaquar/Parryware/ existing makes), if damaged.

SFT 350

Page 5: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

5

(ii)

MODIFICATION AS PER REQUIREMENT ONLY FOR GENTS TOILET BLOCK

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete . After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security . Vehicle charges will be in contractor scope.

NOS 2

(iii)

For chemical waterproofing treatment , before start of work all the leakage area should be clean. Removing of plaster or tile properly to find out cracks in slab or walls. Application of waterproofing chemical should be properly with proper mixing proportion & process to ensure leakage work will be closed . Take the waterproofing test before any final work like dado / false ceiling. All above work will be carried out in ceiling & wall with dado near urinal & wash basins as require etc. complete. For above work quantity will be approx 60 sft. Specifications of Chemical Waterproofing including its method of application to be specified by contractor.

SFT 60

(iv)

Before start of tile floor or dado repairing all area should be plastered , not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 250

Page 6: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

6

(v)

After removing of existing door frame , wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish , corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc complete as per approved make. Size - 2'6'' x 7'0'' . After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be required for frame as required etc. complete. Rates to be inclusive of cleaning of removed frames, shifting and staking of same at place / location as directed.

NOS 5

(vi)

Providing & Fixing in position approved existing old urinals with consisting of waste coupling ,bottle trap , manual flush valve with making water and drain connections as required necessary fiiting etc. complete as per approved make. All the existing urinal will be used with proper care . Manual operated flush valve used to avoid maintenance in sensor system . Water inlet & drain outlet line should be connected in proper way to assure any leakage. Rate shall be inclusive of chipping, cutting, curing, and finishing the same. Complete as per the direction of Project incharge/Engineer.

NOS 5

(vii)

Providing and fixing granite counter with kadappa with half or full round moulding, including cutting of kadappa slab & granite slab to receive drain cutout for existing wash basin. Wash basin counter should be carried out with necessary plumbing / drainage arrangement. The rate should be inclusive of providing and laying necessary backing material and joint filling compound of the same shade of the granite. All the joints between granite & wall will be plaster finish.

Rate shall be inclusive of chipping, cutting, curing, and finishing the same with proper support. Complete as per

RFT 6

Page 7: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

7

the direction of Project incharge/Engineer.

(viii)

Repairing damaged false ceiling with gypsum board including cutting and removing the damaged sheet, providing and fixing new sheet, replacing damaged channels/battens, section joiners/connecting clips, suspension rods/angles, suspension clips/fixtures, soffit cleats, expansion fasteners, galvanized screws, bolts, nuts and washers etc. complete. The rate shall be inclusive of covering the joints with perforated jointing paper tape as per manufacturer’s specification/recommendations, the beveled joints shall be filled with jointing compound and surface finished with two coats of paint matching with adjacent. Suitable openings shall be provided and framed in the false ceiling for fitting in light fixtures, air-conditioning grills, smoke/ heat detectors, sprinkler heads, public address speakers etc., wherever required.

SFT 350

(ix)

Providing & fixing of mirror with necessary plywood backing or s.s. finish studs as per existing size with lipping etc. complete. Mirror glass as per approved make. Ply to be Marine/waterproof ply. It’s thickness including lipping material etc. to be specified. With complete

polishing.

SFT 18

Page 8: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

8

(x)

Providing and fixing solid door shutter of sizes as per toilet openings. The door shutter shall consist of 30 mm thick...flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or prelaminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0'' Door edges should be provided with minimum 12 mm thick teak wood lipping. Material, type, size and Nos. of locking system, hinges, tower bolts, latch, stopper etc. needs to be specified. Rate shall include fixing of removed/existing door closer.

NOS 2

(xi)

Providing and fixing solid door shutter of sizes as per toilet openings. The door shutter shall consist of 40 mm thick...flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or prelaminated shutter.

The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for main door of block. SIZE 3'3'' X 7'0'' -Do- as mentioned in Item No. 1 (x).

NOS 1

(xii)

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete.

Item shall be operative for other areas as well, if required/necessitated.

SFT 400

Page 9: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

9

Item shall be inclusive 100% removing old loose paint, surface preparation, filling pot holes & depressions by “Palati” as per manufacturer’s specifications, priming coat, scaffolding, curing, forming grooves, patties, patta, grooves treatment & filling between walls and RCC members etc. complete. Rate shall be inclusive of proper covering and protection of windows, doors, pipes, floors, walls, plumbing and sanitary fittings and other areas. Splashes, if any, should be removed by the contractor at the end of day’s work.

GENTS TOILET NEAR CONFERENCE - 2 TOTAL

2 RENOVATION WORK

Ladies toilet near Conference - 2

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light

fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered. Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly.

Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate & directed with necessary carting away of debris at ground level near

building with all leads, lifts etc. complete in toilets

SFT 400

MODIFI-CATION AS PER REQUIRE-MENT ONLY FOR GENTS

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete. After shifting of debris all the area should be clean properly

NOS 2

Page 10: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

10

TOILET BLOCK

to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security .

For chemical waterproofing treatment, before start of work all the leakage area should be clean. Removing of plaster or tile properly to find out cracks in slab or walls. Application of waterproofing chemical should be properly with proper mixing proportion & process to ensure leakage work will be closed. Take the waterproofing test before any final work like dado / false ceiling. All above work will be carried out in ceiling & wall with dado near urinal & wash basins as require etc.

complete. For above work quantity will be approx. 60 sft.

LUMSUM

1

Before start of tile floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly.

Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 250

After removing of existing door frame, wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champers edge polish, corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7'0''. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be required for frame as require etc. complete.

NOS 5

Page 11: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

11

Providing and fixing granite counter with kadappa with half or full round moulding, including cutting of kadappa slab & granite slab to receive drain cutout for existing wash basin. Wash basin counter should be carried out with necessary plumbing / drainage arrangement. The rate should be inclusive of providing and laying necessary backing material and joint filling compound of the same shade of the granite. All the joints between granite & wall will be plaster finish. Rate shall be inclusive of chipping, cutting, curing, and finishing the same with proper support. Complete as per the direction of Project incharge/Engineer.

RFT 6

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as require.

SFT 400

Providing & fixing of mirror with necessary plywood backing or s.s. finish studs as per existing size with lipping etc. complete. Mirror glass as per approved make.

SFT 18

Providing and fixing solid door shutter of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or prelaminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

NOS 3

Page 12: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

12

Providing and fixing solid door shutter of sizes as per toilet openings. The door shutter shall consist of 40 mm thick...flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or prelaminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch , stopper as required etc. complete for main door of block. SIZE 3'3'' X 7'0''

NOS 1

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete

SFT 450

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Labour charges for repair & modification of existing exhaust system as require etc. complete in toilet block ( LUMSUM BASIS )

NOS 1

Providing & jointing of previous wire if require for light fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. (LUMSUM BASIS )

NOS 1

LADIES TOILET NEAR CONFERENCE - 2 TOTAL

FIRST FLOOR

Page 13: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

13

3

RENOVATION WORK

Gents toilet near Library / Conference - 3

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered. Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate & directed with necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets

SFT 2000

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete. After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security.

NOS 5

For Brick bat waterproofing treatment, before start of work all the leakage area should be clean. Removing of plaster or tile properly to find out cracks in slab or walls. Application of waterproofing chemical or cement base coat should be properly with proper mixing proportion & process to ensure leakage work will be closed. After base coat brickbat fitting with cement mortar & after final coba finishing will be applicable. Take the waterproofing test before any final work like dado / false ceiling. All above work will be carried out in w.c. unit / urinal area / wash basin area as require etc. complete .

SFT 480

Page 14: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

14

Before start of tile floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 1500

After removing of existing door frame , wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish, corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7'0''. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be require for frame as require etc. complete.

NOS 5

Providing and fixing urinal granite partitions of size 1200 x600 with both side polish granite and full round edge moulding including cutting and shape as per design ,instruction etc. complete. After fixing of granite partitions side wall gaps should be plaster in finish. Proper curing will be require for partitions as require etc. complete

NOS 5

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4'' drain pipe , 32 mm & 15 mm water line with fotiings / fixtures life elbow, sockets, bends, adoptor , pvc solvent , adhesive tape , all plumbing work etc. as required etc. complete . All plumbing work in proper joints & laying to avoid leakage. The entire previous plumbing requirement should

NOS 2

Page 15: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

15

be completed. Material will be used as per approved make list.

Providing & Fixing in position approved existing old urinals with consisting of waste coupling ,bottle trap , manual flush valve with making water and drain connections as required necessary fitting etc. complete as per approved make. All the existing urinal will be used with proper care. Manual operated flush valve used to avoid maintenance in sensor system .Water inlet & drain outlet line should be connected in proper way to assure any leakage.

NOS 5

Providing and fixing in position existing wash basin, to be fixed in appropriate size on granite counter with proper

inlet including pillar cock, waste pipe , waste coupling , angle cock as require necessary fittings & fixtures etc. complete. (Existing wash basin will be use.) Water inlet & drain outlet line should be connected in proper way to assure any leakage.

NOS 2

Providing and fixing granite counter with kadappa with half or full round moulding, including cutting of kadappa slab & granite slab to receive drain cutout for existing wash basin. Wash basin counter should be carried out with necessary

plumbing / drainage arrangement. The rate should be inclusive of providing and laying necessary backing material and joint filling compound of the same shade of the granite. All the joints between granite & wall will be plaster finish .

RFT 6

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as require .

SFT 500

Page 16: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

16

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Providing & fixing of mirror with necessary plywood backing or s.s. finish studs as per existing size with lipping etc. complete. Mirror glass as per approved make.

SFT 18

Providing and fixing solid doors of sizes as per toilet openings . The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles , tower bolts or latch , stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

NOS 4

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 40 mm thick. Flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for main door of block. SIZE 3'3'' X 7'0''

NOS 1

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete

SFT 400

Page 17: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

17

Labour charges for repair & modification of existing exhaust system as require etc. complete in toilet block (LUMSUM BASIS )

NOS 1

Providing & jointing of previous wire if require for light fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. ( LUMSUM BASIS )

NOS 1

GENTS TOILET NEAR LIBRARY / CONFERENCE - 3 TOTAL

4

RENOVATION WORK

Ladies toilet near Library / conference - 3

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered. Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work . Above work will be done as indicate & directed with necessary carting away of debris at ground level near

building with all leads , lifts etc. complete in toilets

SFT 1600

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. Complete. After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security .

NOS 4

Page 18: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

18

For Brick bat waterproofing treatment, before start of work all the leakage area should be clean . Removing of plaster or tile properly to find out cracks in slab or walls. Application of waterproofing chemical or cement base coat should be properly with proper mixing proportion & process to ensure leakage work will be closed. After base coat brickbat fitting with cement mortar & after final coba finishing will be applicable. Take the waterproofing test before any final work like dado / false ceiling. All above work will be carried out in w.c. unit / wash basin area as require etc. complete.

SFT 360

Before start of tile floor or dado repairing all area should be plastered , not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 1200

After removing of existing door frame, wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish , corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7’0’’. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be require for frame as require etc. complete.

NOS 5

Page 19: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

19

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4'' drain pipe , 32 mm & 15 mm water line with fotiings / fixtures life elbow, sockets, bends ,adoptor , pvc solvent , adhesive tape , all plumbing work etc. as require etc. complete . All plumbing work in proper joints & laying to avoid leakage. All the previous plumbing requirement should be completed. Material will be used as per approved make list.

NOS 3

Providing and fixing in position existing wash basin, to be fixed in appropriate size on granite counter with proper inlet including pillar cock, waste pipe , waste coupling , angle cock as require necessary fittings & fixtures etc. complete. (Existing wash basin will be use.) Water inlet & drain outlet line should be connected in proper way to assure any leakage.

NOS 2

Providing and fixing granite counter with kadappa with half or full round moulding, including cutting of kadappa slab & granite slab to receive drain cutout for existing wash basin. Wash basin counter should be carried out with necessary plumbing / drainage arrangement. The rate should be inclusive of providing and laying necessary backing material and joint filling compound of the same shade of the granite. All the joints between granite & wall will be plaster finish . Rate shall be inclusive of chipping, cutting, curing, and finishing the same with proper support. Complete as per the direction of Project incharge/Engineer.

RFT 6

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with

SFT 500

Page 20: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

20

nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as required.

Providing & fixing of mirror with necessary plywood backing or s.s. finish studs as per existing size with lipping etc. complete. Mirror glass as per approved make.

SFT 18

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or prelaminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

NOS 4

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 40 mm thick. Flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or prelaminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for main door of block. SIZE 3'3'' X 7'0''

NOS 1

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete

SFT 400

Page 21: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

21

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Labour charges for repair & modification of existing exhaust system as require etc. complete in toilet block ( LUMSUM BASIS )

NOS 1

Providing & jointing of previous wire if require for light fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. ( LUMSUM BASIS )

NOS 1

LADIES TOILET NEAR LIBRARY / CONFERENCE - 3 TOTAL

TOTAL AMOUNT

RESIDENTIAL BLOCK

RENOVATION WORKS AT GROUND FLOOR

Toilets near Members lounge Gents & Ladies toilet block

Removing of existing Gypsum ceiling in toilet with

necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered. Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work.

Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate &

SFT 800

Page 22: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

22

directed with necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets

Gents toilet wc unit -1

nos. Ladies toilet wc unit - 1 nos.

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be

taken for local trip / carting etc. complete. After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security.

NOS 4

Providing and applying Brick bat type water proofing with chemical over the slab surface. Cost of the water proofing shall include cleaning of the surface of all dirt and grit before the application. The screed coat will be applied with necessary slope. After brick bat with cement mortar fittings with compete

laying & curing. Final finishing cost will be applied by cement with w/p chemical by brush finish. The waterproofing application shall be carried for at least 350mm on the vertical surface on all sides of the area to be water proofed. The water proofed area shall be ponded and tested for a

SFT 150

Page 23: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

23

minimum 3 days etc. complete.

Before start of GRANITE floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing GRANITE shade / size matching for dado & flooring repair including preparation of surface, fixing of GRANITE in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as

per approved make. Rate shall be inclusive of chipping, cutting, curing, and finishing the same with proper support. Complete as per the direction of Project incharge/Engineer.

SFT 700

After removing of existing door frame, wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish, corner joints in proper line & plumb.

For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7'0''. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be require for frame as require etc. complete.

NOS 5

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4''

drain pipe , 32 mm & 15 mm water line with fotiings / fixtures life elbow, sockets, bends ,adoptor , pvc solvent , adhesive tape , all plumbing work etc. as require etc. complete . All plumbing work in proper joints & laying to avoid leakage. The entire previous plumbing requirement should be

NOS 2

Page 24: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

24

completed. Material will be used as per approved make list.

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws.

Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as require.

SFT 500

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or prelaminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

NOS 4

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 40 mm thick. Flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for main door of block. SIZE 3'3'' X 7'0''

NOS 1

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc.

SFT 1250

Page 25: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

25

complete

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Labour charges for refitting of existing exhaust fan only in gents & ladies toilet unit as require etc. complete in toilet block

NOS 2

Providing & jointing of previous wire if require for light fittings at ceiling . Previous wire & light fittings , switch boards used for complete the work. (LUMSUM BASIS)

NOS 1

TOILETS NEAR MEMBERS LOUNGE NOS 1 TOTAL

2

RENOVATION WORKS AT FIRST FLOOR

TOILETS OF ROOM NOS.

101 TO 113

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered.

Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate & directed with necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets

SFT 275

Page 26: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

26

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete. After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security.

NOS 1

Providing and applying Brick bat type water proofing with chemical over the slab surface. Cost of the water proofing shall include cleaning of the surface of all dirt and grit before the application. The screed coat will be applied with necessary slope. After brick bat with cement mortar fittings with compete laying & curing. Final finishing cost will be apply by cement with w/p chemical by brush finish. The waterproofing application shall be carried for at least 350mm on the vertical surface on all sides of the area to be water proofed. The water proofed area shall be ponded and tested for a minimum 3 days etc. complete.

SFT 66

Before start of tile floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 220

Page 27: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

27

After removing of existing door frame, wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish, corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7'0''. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be require for frame as require etc. complete.

NOS 1

Providing & fixing of steel grey granite ledge / sill top with cutting, champer edge polish, corner joints on ledge wall as require in toilet block etc. complete as per approved make.

RFT 6

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , bath shower mixer , wash basin, nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4'' drain pipe , 32 mm & 15 mm water line with fittings / fixtures life elbow, sockets,

bends, adoptor, pvc solvent , adhesive tape , all plumbing work etc. as require etc. complete . All plumbing work in proper joints & laying to avoid leakage. The entire previous plumbing requirement should be completed. Material will be used as per approved make list.

NOS 1

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall /

partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as required.

SFT 40

Page 28: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

28

Providing & fixing of mirror with necessary S.S. finish studs / bracket as per existing size with etc. complete. Mirror glass as per approved make.

SFT 5

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

NOS 1

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete

SFT 50

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Labour charges for refitting of existing exhaust fan only toilet unit as require etc. complete in toilet block

NOS 1

Page 29: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

29

Providing & jointing of previous wire if require for light

fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. Existing geyser unit will be used. (LUMPSUM BASIS )

NOS 1

TOTAL TOILET QTY. ON FIRST FLOOR NOS 13 TOTAL

3

RENOVATION WORKS AT SECOND FLOOR

TOILETS OF ROOM NOS.

201 TO 213

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered.

Breaking of existing brickbat waterproofing upto slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate & directed with necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets

SFT 275

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as

dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete . After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security .

NOS 1

Page 30: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

30

Providing and applying Brick bat type water proofing with chemical over the slab surface. Cost of the water proofing shall include cleaning of the surface of all dirt and grit before the application. The screed coat will be applied with necessary slope . After brick bat with cement mortar fittings with compete laying & curing . Final finishing cost will be apply by cement with w/p chemical by brush finish. The waterproofing application shall be carried for at least 350mm on the vertical surface on all sides of the area to be water proofed. The water proofed area shall be ponded and tested for a minimum 3 days etc. complete.

SFT 66

Before start of tile floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 220

After removing of existing door frame , wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish , corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc complete as per approved make. Size - 2'6'' x 7’0’’. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be require for frame as require etc.

complete.

NOS 1

Page 31: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

31

Providing & fixing of steel grey granite ledge / sill top with cutting, champer edge polish, corner joints on ledge wall as require in toilet block etc. complete as per approved make.

RFT 6

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , bath shower mixer , wash basin , nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4'' drain pipe , 32 mm & 15 mm water line with fittings / fixtures life elbow, sockets, bends ,adoptor , PVC solvent , adhesive tape , all plumbing work etc. as require etc. complete . All plumbing work in proper joints & laying to avoid leakage. All the previous plumbing requirement should be completed . Material will be used as per approved make list.

NOS 1

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as required .

SFT 40

Providing & fixing of mirror with necessary s.s. finish studs / bracket as per existing size with etc. complete. Mirror glass as per approved make.

SFT 5

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc.

NOS 1

Page 32: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

32

complete for toilet shutter. SIZE 2'6'' X 7'0''

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc.

complete

SFT 50

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Labour charges for refitting of existing exhaust fan only toilet unit as require etc. complete in toilet block

NOS 1

Providing & jointing of previous wire if require for light fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. Existing geyser unit will

be used. ( LUMSUM BASIS )

NOS 1

TOTAL TOILET QTY. ON SECOND FLOOR NOS 13 TOTAL

4

RENOVATION WORKS AT THIRD FLOOR

TOILETS OF ROOM NOS. 301 TO 313

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe

properly without disturbing of water inlet pipe from outside to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or structure should not be hampered. Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work.

SFT 275

Page 33: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

33

Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate & directed with necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as

dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete. After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security.

NOS 1

Providing and applying Brick bat type water proofing with chemical over the slab surface. Cost of the water proofing shall include cleaning of the surface of all dirt and grit before the application.

The screed coat will be applied with necessary slope. After brick bat with cement mortar fittings with compete laying & curing. Final finishing cost will be applied by cement with w/p chemical by brush finish. The waterproofing application shall be carried for at least 350mm on the vertical surface on all sides of the area to be water proofed. The water proofed area shall be ponded and tested for a minimum 3 days etc. complete.

SFT 66

Page 34: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

34

Before start of tile floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 220

After removing of existing door frame, wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champers edge polish, corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7’0’’. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be required for frame as require etc. complete.

NOS 1

Providing & fixing of steel grey granite ledge / sill top with cutting, champer edge polish, corner joints on ledge wall as require in toilet block etc. complete as per approved make.

RFT 6

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , bath shower mixer , wash basin , nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4'' drain pipe , 32 mm & 15 mm water line with fittings / fixtures life elbow, sockets, bends ,adaptor , pvc solvent , adhesive tape , all plumbing work etc. as require etc. complete . All plumbing work in proper joints & laying to avoid leakage. The entire previous plumbing requirement should be completed. Material will be used as per approved make list.

NOS 1

Page 35: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

35

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as required .

SFT 40

Providing & fixing of mirror with necessary s.s. finish studs / bracket as per existing size with etc. complete . Mirror glass as per approved make.

SFT 5

Providing and fixing solid doors of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch , stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

NOS 1

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete

SFT 50

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Page 36: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

36

Labour charges for refitting of existing exhaust fan only toilet unit as require etc. complete in toilet block

NOS 1

Providing & jointing of previous wire if require for light fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. Existing geyser unit will be used. ( LUMSUM BASIS )

NOS 1

TOTAL TOILET QTY. ON THIRD FLOOR NOS 13 TOTAL

5

RENOVATION WORKS AT FOURTH FLOOR

TOILETS OF

ROOM NOS. 4011 , 4012 , 4013 ( OUT SIDE ) 4021 , 4022 , 4023 ( OUT SIDE )

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside

to avoid additional work. Breaking of existing dado & floor tile by breaker or manually properly . At the time of breaking brickwork or structure should not be hampered. Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work . Above work will be done as indicate & directed with

necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets

SFT 275

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete. After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security.

NOS 1

Page 37: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

37

Providing and applying Brick bat type water proofing with chemical over the slab surface. Cost of the water proofing shall include cleaning of the surface of all dirt and grit before the application. The screed coat will be applied with necessary slope. After brick bat with cement mortar fittings with compete laying & curing. Final finishing cost will be apply by cement with w/p chemical by brush finish. The waterproofing application shall be carried for at least 350mm on the vertical surface on all sides of the area to be water proofed. The water proofed area shall be ponded and tested for a minimum 3 days etc. complete.

SFT 66

Before start of tile floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

SFT 220

After removing of existing door frame, wall area will be plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish, corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7’0’’. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be require for frame as require etc.

complete.

NOS 1

Page 38: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

38

Providing & fixing of steel grey granite ledge / sill top with cutting, champer edge polish, corner joints on ledge wall as require in toilet block etc. complete as per approved make.

RFT 6

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , bath shower mixer , wash basin , nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4'' drain pipe , 32 mm & 15 mm water line with fittings / fixtures life elbow, sockets, bends ,adaptor , pvc solvent , adhesive tape , all plumbing work etc. as require etc. complete . All plumbing work in proper joints & laying to avoid leakage. The entire previous plumbing requirement should be completed. Material will be used as per approved make list. Existing wash basin & wall hung commode will be use for above work.

NOS 1

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as required.

SFT 40

Providing & fixing of mirror with necessary s.s. finish studs / bracket as per existing size with etc. complete. Mirror glass as per approved make.

SFT 5

Providing and fixing solid door shutters of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick

NOS 1

Page 39: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

39

laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles, tower bolts or latch, stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

Providing & Applying Plastic emulsion paint in 2 coats of

approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete

SFT 50

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Labour charges for refitting of existing exhaust fan only toilet unit as require etc. complete in toilet block

NOS 1

Providing & jointing of previous wire if require for light fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. Existing geyser unit will be used. ( LUMSUM BASIS )

NOS 1

TOTAL TOILET QTY. ON FOURTH FLOOR NOS 6 TOTAL

6

RENOVATION WORKS AT FIFTH FLOOR

TOILETS OF ROOM NOS. 5011 , 5012 , 5013 ( OUT SIDE ) 5021 , 5022 ,

5023 ( OUT SIDE )

Removing of existing Gypsum ceiling in toilet with necessary arrangement of removing of electrical light fittings with not wastage of existing wires. Removing of existing toilet fitting & fixtures & conceal pipe properly without disturbing of water inlet pipe from outside to avoid additional work.

Breaking of existing dado & floor tile by breaker or manually properly. At the time of breaking brickwork or

SFT 275

Page 40: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

40

structure should not be hampered. Breaking of existing brickbat waterproofing up to slab level with clean surface of slab for new waterproofing work. Removing of drain pipe from waterproofing properly. Breaking of ledge wall & granite top if require for further plumbing work. Above work will be done as indicate & directed with necessary carting away of debris at ground level near building with all leads , lifts etc. complete in toilets

Dismantling & breaking of above debris Shifting from ground level near building to outside premises of ICAI as dumping location given by ICAI officers. Prior inspection & approval from ICAI officers should be taken for local trip / carting etc. complete. After shifting of debris all the area should be clean properly to avoid any extra work as require etc. complete. The local trip vehicle will be checked from security.

NOS 1

Providing and applying Brick bat type water proofing with chemical over the slab surface. Cost of the water proofing shall include cleaning of the surface of all dirt and grit before the application. The screed coat will be applied with necessary slope . After brick bat with cement mortar fittings with compete laying & curing. Final finishing cost will be applied by cement with w/p chemical by brush finish. The waterproofing application shall be carried for atleast 350mm on the vertical surface on all sides of the area to be water proofed. The water proofed area shall be ponded and tested for a minimum 3 days etc. complete.

SFT 66

Before start of tile floor or dado repairing all area should be plastered, not any bricks / RCC will be exposed. Proper curing of wall require before work. Providing & fixing of existing tile shade / size matching for dado & flooring repair including preparation of surface, fixing of tile in cement mortar, filling of joints with cement slurry to bind adhesive of the tiles. All the tile joints to be filled by tile grout with matching

SFT 220

Page 41: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

41

shade properly. Curing as per requirement in toilet blocks etc. complete as per approved make.

After removing of existing door frame, wall area will be

plastered or cementing work as require to giving finish surface. Providing & fixing of steel grey granite door frame with cutting, champer edge polish, corner joints in proper line & plumb. For fitting of door frame araldite & grit should be used for bonding in toilet block door frame etc. complete as per approved make. Size - 2'6'' x 7’0’’. After fixing of granite frame side wall gaps should be plaster in finish. Proper curing will be required for frame as require etc. complete.

NOS 1

Providing & fixing of steel grey granite ledge / sill top with cutting, champer edge polish, corner joints on ledge wall as

require in toilet block etc. complete as per approved make.

RFT 6

Providing & fixing of wall hung commode unit ( wc unit ) with wc fittings , bath shower mixer , wash basin , nahani trap , conceal flush valve , two way bib cock , health faucet , connector pipe , 3'' drain pipe , 4'' drain pipe , 32 mm & 15 mm water line with fittings / fixtures life elbow, sockets, bends ,adaptor , pvc solvent , adhesive tape , all plumbing work etc. as require etc. complete . All plumbing work in proper joints & laying to avoid leakage.

The entire previous plumbing requirement should be completed. Material will be used as per approved make list. Existing wash basin & wall hung commode will be used for above work.

NOS 1

Page 42: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

42

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as required.

SFT 40

Providing & fixing of mirror with necessary s.s. finish studs / bracket as per existing size with etc. complete. Mirror glass as per approved make.

SFT 5

Providing and fixing solid door shutters of sizes as per toilet openings. The door shutter shall consist of 30 mm thick. Flush door in case of WC door it should be marine flush door. All edges of the door should be provided with 6mm thick C.P. teak wood lipping. The door shall be finished on both sides with 1mm thick laminate or pre-laminated shutter. The rate shall include locking systems necessary hinges, handles , tower bolts or latch , stopper as required etc. complete for toilet shutter. SIZE 2'6'' X 7'0''

NOS 1

Providing & Applying Plastic emulsion paint in 2 coats of approved shade of Dulux / Asian Paints Co. Ltd., including scrapping, opening of existing cracks, filling up of "V" cracks with epoxy expandable putty to required depths making smooth finish as required in toilet ceiling etc. complete

SFT 50

Labour charges for internal plumbing with necessary pipe & fittings with conceal piping work with water & drain connection & fitting of C.P. fittings all required plumbing labour work etc. complete in toilet block. All plumbing labour work should be with proper pipe joints & alignment to avoid leakage. Plumbing labour work should be with no wastage of material.

NOS 1

Page 43: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

43

Labour charges for refitting of existing exhaust fan only toilet unit as require etc. complete in toilet block

NOS 1

Providing & jointing of previous wire if require for light fittings at ceiling. Previous wire & light fittings, switch boards used for complete the work. Existing geyser unit will be used. ( LUMSUM BASIS )

NOS 1

TOTAL TOILET QTY. ON FIFTH FLOOR NOS 6 TOTAL

7

(i)

RENOVATION WORKS AT ALL PLUMBIMG DUCT

OUTSIDE OF BUILDING

Providing single coat sand faced plaster externally in cement mortar using Kharsalia/Kasaba or similar type of sand, in all positions including scaffolding , curing etc. single coat of 15mm thick C.M. 1:4 finishing the surface by taking out grains and curing for seven days etc. complete. For repair works.

rate should be inclusive of removing old loose plaster in proper shape and repairing base surfaces etc. complete. Rate shall be inclusive of making grooves, wherever called for/required etc. complete.

SFT 2000

(ii)

Providing, fixing, testing and commissioning UPVC Pipe Type B for soil, waste, rain water, vent including structural supports, clamps & injection molded fittings e.g. tees, bends, Y junctions, reducers, coupling, adapters, door bend and terminal cowl etc. With solvent as required and

making good the walls and floors as required at site. Scaffolding included for completion of work. For underground piping, rates shall be inclusive of excavation, refilling, finishing of surface as per existing adjacent finish with all materials, labours etc. complete required for completion of job. (Make: Supreme/Prince/Astral)

Page 44: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

44

(a) 110 MM ( 4'' Dia ) Rectification & Replacement as required RFT 850

(b)

75 MM (3'' Dia ) Rectification & Replacement as required RFT 850

(c)

1.5'' Dia water line Rectification & Replacement RFT 1300

(d)

3/4'' OR 1/2'' Dia water line Rectification & Replacement RFT 1300

(iii)

Shifting of existing drain & water connection line from duct having service duct in room like room no. 113 / 101 / store room in vertical . Existing drain line divert from 4th floor slab core cutting from external face of building covered by false ceiling .Scaffolding included for completion of work. ( LUMSUM BASIS ) Details including works/ activities associated under item needs to be specified. Closing of existing duct opening in the room along with its waterproofing complete. Rate shall include core cutting, fixing of sleeve of required size, its closing and finishing matching with adjacent finish,

concreting, curing, cleaning, disposal of debris, cutting of reinforcement, welding of bars, providing fresh reinforcement, welding, shuttering, de-shuttering, chipping of concrete up to required depth, etc. Rate shall also include all associates work of shifting and creating new duct shaft for future maintenance with protection from all possible leakages etc. complete. Rate shall also include preparation of As-built sketch/drawing of executed work for future reference & records.

Job 1

Page 45: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

45

(iv)

Making of service openable type grill louvers for plumbing service duct include breaking or making cut out 4'0'' for maintenance. Scaffolding included for completion of work . Size of opening will be approachable to maintenance person for work. External face of plumbing duct opening will be making . If MS/steel works are involved, then its priming and painting should be included. Proper detailed sketch/ drawing is needed for work.

SFT 225

(v)

Providing & fixing of MS ladder floor to floor for maintenance of plumbing duct & breaking of slab cut out for ladder etc. complete. Approx. size of ladder - 2'0'' x 10'0''. Slab cutting will be only for one person approach for maintenance in duct. M.S . Ladder will be fixed in position on duct inside of wall.

Kg 15

PLUMBING DUCT OUTSIDE OF BUILDING

TOTAL

8

(i)

RENOVATION WORKS AT

FOURTH FLOOR & FIFTH FLOOR

STORE ROOM

Repair of existing storage racks like laminate touch up work , shutter alignment , Hinges , handles etc. change if require

etc. complete. Above repair work only carried out for store room storage system. Laminate shade variation will be closer for any damage / breakage of laminate. Shutter hinges will be heavy quality to avoid maintenance.

SFT 1000

(ii)

Providing and fixing Gypsum False Ceiling of India Gypsum / Saint Gobain which includes G.I. Perimeter Channels along with perimeter of ceiling, screw fixed to brick wall /

partition with the help of Nylon sleeves and screws. Then suspending intermediate channels & suspending G.I. intermediate fixed to soffit with G.I. cleat and steel expansion fasteners fixing with 12 mm gypsum sheet with nylon joint strip for smooth finish of ceiling as required etc. complete in toilet block. All gypsum ceiling work in proper finish & levels as required.

SFT 1500

Page 46: THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) · ICAI , HYDERABAD I ) TOILETS RENOVATION WORKS INSTITUTIONAL / ADMIN BLOCK S. NO DESCRIPTION OF WORK LOCATION UNIT QTY RATE

46

(iii)

Providing & fixing of plywood boxing unit with laminate finish as per previous design for plumbing duct in lobby / store room as require with complete finish etc. complete. Laminate will be in line & plumb location as require etc. complete.

SFT 100

STORE ROOM RENOVATION ON FOURTH / FIFTH FLOOR

TOTAL