The impact of BIM: An Architect’s Perspective

Page 2: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

About Stride Treglown

Formed in 1953

10th largest practice in the UK

76th largest practice in the world

£14m turnover (2012)

80% retained clients

Secured over 50 frameworks throughout the UK

245 members of staff

Quality Assured to ISO 9001 / ISO 14001 Environmental Management and BS OHSAS 1800 accredited

Investors in People and CHAS accredited

We are a ‘Building Top 300’ company

South

ampt

on

Page 3: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

What is BIM?

Page 4: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

BIM is ‘Building Information Modelling’

• A collaborative process of virtual design, construction and management of buildings

• The use of BIM unites design phase; construction phase and post construction phases including facility management.

• It means understanding and controlling the data flow through these phases, ensuring leanness in its handling and therefore driving efficiency.

• If we make the construction process more efficient and eliminate uncertainties before construction, we can drive down cost

Page 5: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world
Page 6: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

4D Time (Phasing/Sequencing)

5D Cost. (Measuring/Estimating)

6D Life Cycle. (Building Owner / FM)

And the list goes on...

11D?

More dimensions

Page 7: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Levels of BIM Collaboration

Level 1•Lonely BIM

Level 2•Shared BIM

Level 3• Integrated BIM

Contractor

Architect

Structure M+E

Architect

Contractor

Structure M+E

Structure

M+EArchitect

Contractor

Page 8: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Why BIM?

Page 9: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Reduce Operation Costs

Most of a buildings cost is in it’s operation

Design Construct Operate

£1=£10=£100

Page 10: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Why from the Government?

Digital Leaders

Inefficient Industry

UK construction costs 20% more than Europe

Singapore takes ½ hour to register a planning application

All US projects have to be delivered in BIM

Zero Change contracts now possible

2016 All Government projects to be Level 2 Shared BIM

Page 11: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

• A shared knowledge resource to support decision-making

• Improved coordination

• Increased efficiency

• Better decisions

“A model should provide access to all graphic and non graphic information about a building, as an integrated resource”

Access to Information

Page 12: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

The Design Process

3D Virtual Design

2D Formation

Use

Construction

Page 13: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

More Output for Less Input

Page 14: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

BIM forces collaboration

"BIM is a 21st Century campfire - it gathers people together."

David Philp, Cabinet Office

Page 15: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

What are the challenges?

Page 16: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

A whole new world

Page 17: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

The process of change

denial

resistance

commitment

exploration

Page 18: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

New www.ribaplanofwork.com

Page 19: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Sub-Structure

Page 20: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Super-Structure

Page 21: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Mechanical & Electrical

Page 22: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Fit-out

Page 23: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Shell

Page 24: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

We have this…

Page 25: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

… and hope for this…

Page 26: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

… to produce this

Page 27: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

But we get this…

Page 28: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

… and this…

Page 29: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

… and have to produce this.

Page 30: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Twin tracking

traditional bim

bim

Page 31: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Exemplar industry response?

Page 32: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Furniture’s Light Bulb Moment

Page 33: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

Embedded data

Page 34: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

…driving 100 hits a day

Page 35: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

When are you having yours?

Page 36: The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in 1953 10th largest practice in the UK 76th largest practice in the world

stridetreglown.co.uk