F. Baguelin & Seng Y Ung (FONDASOL) F. Gaillard & J.P. Commun (RAZEL) Journée franco-britannique CFMS-BGA, Paris, le 2 décembre 2011 The foundation of the new sewage plant at le Havre An alternative solution with a preloading embankment Titre

The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

F. Baguelin & Seng Y Ung (FONDASOL)F. Gaillard & J.P. Commun (RAZEL)

Journée franco-britannique CFMS-BGA,Paris, le 2 décembre 2011

The foundation of the new sewage plant at le Havre

An alternative solution with a preloadingembankment

Titre

Page 2: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

L’ouvrage – vue perspective

THE PLANT

2 superimposed tanks

each : ~ square 100m x 100m

6,6m of water

Page 3: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Les 4 cyclors : vue en plan

The 4 units : cyclors A, B, C, D

101 m

90 m

Page 4: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Bond &Harris UU London clay

pl* et la solution pieux

PILES = the initial foundation concept

360 piles mesh : 5,6mx5,6mL=40m Ø=1.4m QELS = 800 t

net limit pressure pl*

0

5

10

15

20

25

30

35

40

45

-1 0 1 2 3 4 5pl* (MPa)

dept

h z

PR1

PR2

PR3

PR4

design

1. fill

2. sand

3. sand

4. clay & peat

5. sand & gravel

Page 5: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Bond &Harris UU London clay

pl* et la solution préchargement

The alternative solution : preloading

360 piles mesh : 5,6mx5,6mL=40m Ø=1.4m QELS = 800 t

net limit pressure pl*

0

5

10

15

20

25

30

35

40

45

-1 0 1 2 3 4 5pl* (MPa)

dept

h z

PR1

PR2

PR3

PR4

design

1. fill

2. sand

3. sand

4. clay & peat

5. sand & gravel

160 to 250 kPa

Page 6: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

T2

Plan du remblai de préchargement

THE PRELOADING EMBANKMENT

110m

125m

T1

H fill = 8m

H fill = 12.5 m

Page 7: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Plan du remblai d’essai

THE TRIAL EMBANKMENT

H = 8 m

Page 8: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Remblai d’essai : résultats et conclusion

THE TRIAL EMBANKMENTH= 8 m

Results

� no instability during fill construction

� in 4 months

- pore pressures dissipated

- settlements stabilised and magnitude as predicted

Conclusion : preloading possible without vertical drains in all alluvial deposits

Page 9: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Remblai de préchargement : rés & conclusions

THE PRELOADING EMBANKMENT

Measurements

� inclinometers

� pore pressures

� multipoint tassometers

T1 & T2

� settlement profiles

Results

� no instability confirmed

� confirms quick rate of consolidation

and establishes

� time of fill removal

� degree of creep attained

� residual settlement at service

� checks settlement model

& provides settlement pattern for

structural design

Page 10: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

T1 – résultats à diverses périodes

MULTIPOINT TASSOMETER T1

-30.00

-25.00

-20.00

-15.00

-10.00

-5.00

0.00

5.00

10.00

-10 0 10 20 30 40 50 60 tassement s (cm)

cote

NG

F (

m)

24/04/2008

21/05/2008

09/07/2008

02/09/2008

Page 11: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

-30.00

-25.00

-20.00

-15.00

-10.00

-5.00

0.00

5.00

10.00

-10 0 10 20 30 40 50 60 tassement (cm)

cote

NG

F (

m)

16/04/2008

21/05/2008

09/07/2008

02/09/2008

T2 – résultats à diverses périodes

MULTIPOINT TASSOMETER T2

Page 12: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

T1 & T2 – valeurs finales

MULTIPOINT TASSOMETERS T1 & T2 – Final values

-30.00

-25.00

-20.00

-15.00

-10.00

-5.00

0.00

5.00

10.00

-10 0 10 20 30 40 50 60 tassement s (cm)

cote

NG

F (

m)

T1 (02/09/2008)

T2 (02/09/2008)

Page 13: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

-35

-30

-25

-20

-15

-10

-5

0

5

10

0 100 200 300 400 500 600 700

sigma ' v

altit

ude

sigma ' vosigma ' psigma ' v T1sigma ' v T2

Calage du POP sur T1 & T2

∆σ∆σ∆σ∆σ’p = σσσσ’p - σσσσ’v0

∆σ∆σ∆σ∆σ’p ≈ 80 kPa

CALIBRATE OVERCONSOLIDATION MARGIN ∆σ∆σ∆σ∆σ’p (POP)

Page 14: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Calage du POP sur T1 & T2

MULTIPOINT TASSOMETERS T1 & T2 : measured & calculated settlements

-35

-30

-25

-20

-15

-10

-5

0

5

10

0 100 200 300 400 500 600 700

sigma ' v

sigma ' vosigma ' psigma ' v T1sigma ' v T2

-30

-25

-20

-15

-10

-5

0

5

10

0 100 200 300 400 500 600 700

tassement (mm)

cote

NG

F

mesure T1mesure T2calage T1calage T2

overconsolidation margin fit for settlements

Page 15: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

TASSUNI : une charge

SETTLEMENT MODEL : TASSUNI (FONDASOL software)

n rectangles i with load qi

m soil layers j with σ’p and :

- either : moduli (E, Er)

- or : compression indexes CC, CS

z

O

y

x

M Load qi on rectangle i

layer 1

layer j

layer m

Settlement si

σz(i,j) εz(i,j)

Page 16: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

TASSUNI : formules de tassement avec sig’p

EEpvz

r

vpz

'''' 00 σσσσσε

−++

−=

SETTLEMENT MODEL : TASSUNI (FONDASOL software)

n rectangles i with load qi

m soil layers j with σσσσ’pand :

- or : compression indexes CC, CS

p

zvC

v

pSZ e

C

e

C

'

'log

1'

'log

10

0 σσσ

σσ

ε ++

++

=

For example : E = EM/α & Er = 3 to 10 EM/α

- either : moduli (E, Er)

Page 17: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

TASSUNI : 13 couches de sol

TASSUNI : 13 LAYERS

Page 18: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

TASSUNI : les 13 charges et les 62 charges

TASSUNI : 13 LOADS FOR PRELOADING

Page 19: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Les 62 charges de l’ELS q-permanentTASSUNI : 62 LOADS FOR PERMANENT STATE

Page 20: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Profilomètre 3 : prévision et mesures

PROFILOMETER 3

Comparison between measured and calculated settlements

before fill removal

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

-20 0 20 40 60 80 100

x(m)

s(m

)

measures 3A measures 3B calculated measure T1 calculated T1

T1

60 cm

Page 21: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Profilomètre 1 : prévision et mesures

OTHER PROFILOMETERS

Page 22: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Profilomètre 2 : prévision et mesures

OTHER PROFILOMETERS

Page 23: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Profilomètre 4 : prévision et mesures

OTHER PROFILOMETERS

Page 24: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Profilomètre 5 : prévision et mesures

OTHER PROFILOMETERS

Page 25: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Fluage : modèle de Bjerrum

SOIL CONSOLIDATION & CREEP

Bjerrum creep model - parameter tF for creep lines

Unloading from 1 to 2 :

m

FF tt

=

2

112 '

'

σσ

αCe

CCm SC

)1( +−=with :

Page 26: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Lois de consolidation et de fluage

SOIL CONSOLIDATION & CREEP

Page 27: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Asaoka sur T1 & T2

SOIL CONSOLIDATION : ASAOKA

T1 T2

Page 28: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Consolidation : courbe ajustée sur T1

SOIL CONSOLIDATION : CURVE FITTING

T1

Page 29: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Consolidation : courbe ajustée sur T2

T2

SOIL CONSOLIDATION : CURVE FITTING

Page 30: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Consolidation & fluage sur T1

SOIL CONSOLIDATION & CREEP

T1

Creep parameter

CONSOLIDATION ONLY

CONSOLIDATION + CREEPCONNECTING POINT

LAST MEASUREMENT

layers subjected to creep at 25m depth : peaty clay , cumulated thickness = 3m

Page 31: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Tassements à 10 ans (ch. perm.) : courbes

SETTLEMENT PREDICTED at 10 years under permanent loads

85 mm

Page 32: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Tassements à 10 ans (ch. perm.) : carte

SETTLEMENT PREDICTED at 10 years under permanent loads

Page 33: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Tassements sous charge d’eau dans CZC

SETTLEMENT PREDICTED under water load in cell CZC

6,6 mm

Page 34: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Tassements sous charge d’eau max

SETTLEMENT PREDICTED under maximum variable load

18 mm

Page 35: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Modèle de la structure

SOIL-STRUCTURE INTERACTION

Model 1 : structure (3D) + subgrade springs for soil

=> initial reinforcement in the structure

Model 2 : 2D a slice of the structure, 5.6m thick : walls or porticos + elastic layer (28m thick) for soil

=> additional reinforcement (+10%)

Page 36: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Modèle 1 : avec ressorts

SOIL-STRUCTURE INTERACTION Model 1 : structure on springs

Page 37: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Modèle 2 : sol élastique

SOIL-STRUCTURE INTERACTION Model 2 (2D) : structure on elastic soil

Page 38: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Modèle 2 : Valeurs de E

SOIL-STRUCTURE INTERACTION Model 2 (2D) : E values for soil

15.3m 29.55m90 m

Gravel 199

Fill 49

272 272

Sands 1 143 174 180

Sands 2 58 65 68

Clay 1 69Clay 2 30

7532

7934

E (MPa)

Soil in natural state Soils consolidated

Page 39: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Modèle 2 : tassement file 17

SOIL-STRUCTURE INTERACTION Model 2 (2D)

Settlement at row 17 (columns)

Water in the 4 tanks

6,50 cm 4,11 cm

Page 40: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Modèle 2 : tassement file 17

SOIL-STRUCTURE INTERACTION Model 2 (2D)

Settlement at row 17 (columns)

Water in 2 tanks on left, 1 on right

5,65 cm 2,60 cm

Page 41: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Modèle 2 : tassement files 1 & 20

SOIL-STRUCTURE INTERACTION Model 2 (2D)

Settlement at rows 1 & 20 (walls)

Water in the 4 tanks

2,50 cm 1,76 cm

Page 42: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Tassements mesurés en service (1 an) : carte

SETTLEMENTS MEASURED IN SERVICE

-16

CELL CZA

(mm)

Settlements under water levelfluctuation of 1,1m in one tank

Page 43: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

Avantages inconvénients

THE OPINION OF THE CONSTRUCTION WORKS DIRECTOROn the preloading solution

PROS

Lower cost

Simple technique (standard earthworks)

hence : allows to prepare easily thestructure works

CONS

Fill material management atacceptable cost (supply, disposal)

Impact of road transportation (400 trucks / day in the city)

Lack of schedule visibility

Difficulty to obtain approval by thesupervisor on the method and on the time for fill removal

Page 44: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m

FIN FONDASOL

Fin - FONDASOL

THANK YOU FOR YOUR ATTENTION !