The Experience of the Russian Federation State Research Center OJSC “ORPE “Technologiya” in the International Cooperation on the Development and Production of Polymer Composite Structures and Special Optics for Aerospace Equipment Speaker: Oleg Komissar, General Director of OJSC “ORPE “TECHNOLOGIYARiga, Latvia «Avia-invest 2014» april 10-11

The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

The Experience of the Russian Federation State Research Center OJSC “ORPE “Technologiya” in the International Cooperation on the Development and Production of

Polymer Composite Structures and Special Optics for Aerospace Equipment

Speaker: Oleg Komissar, General Director of OJSC “ORPE “TECHNOLOGIYA”

Riga, Latvia «Avia-invest 2014» april 10-11

Page 2: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

LOCATION OF OJSC “ORPE “TECHNOLOGIYA”

Ermolino

Domodedovo

Vnukovo

Sheremetyevo

Moscow

Science city Obninsk

“ORPE “TECHNOLOGIYA”

Our Address:

15 Kiev Str., 249035 Obninsk, Kaluga Region, Russia

Year of Foundation: 1959

Number of Employees: 2300

Nearest big cities:

Moscow, Kaluga, Tula, Bryansk

Motor roads:

Kiev high road (М3), Kaluga high road (А101)

There is a Moscow bigger ring line(A108) 5 km

off Obninsk Railroad “Moscow-Bryansk-Kiev”

Nearby airports:

Vnukovo, Sheremetyevo, Domodevo,

Ermolino (freight airport)

Page 3: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Space Shuttle "Buran"

high-strength heat and radiation resistant cockpit windshields

payload bay flaps from polymer composite materials

superlight heat-insulating tiles for casing

Page 4: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Areas of Activity

Design and analysis of structures UniGraphics,

MSC/NASTRAN, MSC/PATRAN, FiberSim

Research and development of materials

Development of technologies for structure

manufacturing

Design and fabrication of non-metallic tooling

Testing of materials and structures

NDE of structure quality

Serial production of materials and structures

Page 5: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

ORGANIZATION STRUCTURE OF THE STATE RESEARCH CENTRE

OF THE RUSSIAN FEDERATION OJSC ORPE “TECHNOLOGIYA”

General Director

Enterprise Administration

Research and Development Base

Production Base (Pilot and Production)

Page 6: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

STAGES OF DEVELOPING QUALITY MANAGEMENT SYSTEM AT ORPE “TECHNOLOGIYA”

System of Manufaturing Products

without Defects was used

System of Enhancing Efficiency

and Quality of Work was used

Integrated Quality Control System for Product

was used

Quality System

was used

Quality Management

System was used

1967 – 1975

1975 – 1983

1983 -1994

Certificate of Conformity

2000 - 2003 ISO 9002:1994

2002 - 2005 ISO 9001:1994

2005 - 2008 ISО 9001:2001

2008 - 2011 ISО 9001:2001

2011 - 2013 ISО 9001:2008

EN 9100

Page 7: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

TECHNOLOGIYA’S PRODUCTS FOR AVIATION

Sport aircrafts: Sukhoi-26, Sukhoi-29, Sukhoi-31, Sukhoi-49

Passenger aircrafts: Tupolev-154, Tupolev-204, Tupolev-334,

Ilyushin-86, Ilyushin-96, Ilyushin-114, Yakovlev-40, Yakovlev-42

Blimps Helicopters:

Kamov-52, Kamov-60, Mil-8 and “ANSAT”

ORPE “Technologiya”

Passenger aircrafts: MS-21

Ultralight solar aircrafts

Page 8: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Development for LVs

Proton-М, Rokot, Angara PL fairing casing

PL fairing

1 stage & booster

2 stage

Fairings of 3 stage Local fairings of 2 and 3

stages

3 stage

2 stage

1 stage

Booster

Page 9: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Structures for launching vehicles

Biconic shells

«Proton-М»

Cylindrical shells

«Proton-М»

Integral shells

«Angara»

Component fairing

«Proton», «Angara»

Airframe fairing

«Proton-М», «Аngаrа»

Equipment bay

components «Rockot»

Page 10: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

DEVELOPMENT IMPLEMENTATION IN SPACE

VEHICLES

“Kondor” SV:

dimensionally stable

tubes

“RAMOS” SV:

dimensionally

stable integral platform

“Spektr-UF” SV:

dimensionally stable

structures

“Spektr-R” SV : dimensionally stable

antenna structures for the radio telescope

Perspective SV: dimensionally stable

structures

“Kupon” SV: dimensionally stable honeycomb platform

Page 11: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Quality Control of Support Structures for the Atlas ID Project of CERN

Page 12: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”
Page 13: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

POLYMER COMPOSITE GATE FOR SEVEROMUYSK RAILWAY TUNNEL

Page 14: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Structural optics

Page 15: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Application of nano-sized multifunctional coatings to the products made of organic and silicate glass

Resulting effect : - abrasion resistance; - protection against electromagnatic and thermal radiation; - electrical conductivity; - lack of glare on the surface;

Page 16: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

High-strength heated glazing for diesel and electric locomotive

cabins

Page 17: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Project # 1

SOUND-SUPPRESSING PANELS

FOR THE SAM-146 ENGINE (Snecma)

Page 18: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

STRUCTURES FOR THE PD-14 ENGINE

• Sound-absorbing

panels

• Lapping paste

• Reverser buckets

• Gas generator

panels

Page 19: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Project # 2

Aircraft by solar energy

19

Высота полета: 22 000 м

Скорость: 40 м/с

Длительность: 72 часа

Масса: 400 кг

Размах: 30 м

Двигатели: 4х3=12 квт

Площадь крыла: 75 м²

Helios Zephir

Page 20: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Синтез инноваций для проекта «Космос - Крыло»

20

Фотогенерирующая часть КА массой

1,2 кг/м2

Углепластиковый ультралегкий каркас КА массой 0,5 кг/м2

Page 21: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Project # 3

Components of fin and stabilizer torsion boxes

for the MS-21 aircraft

Page 22: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Automated lay up of polymer composite

structures

Page 23: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

МС-21 & A-320/321 PRODUCTION

Production facilities should be calculated for rate of 250 units per year.

3

12 1521

26

43

5766

71 7479

84

75

130

87

138

151156

173

187196

201 204209

214

0

25

50

75

100

125

150

175

200

225

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

Qu

an

tity

, p

cs.

Years

A-320/321

MC-21

Total

Page 24: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Project # 4 OJSC “ORPE “Technologiya” proposal for the delivery of cockpit and passenger compartment glazing and nose radomes to repair Airbus airliners being used in Russia

Page 25: The Experience of the Russian Federation State Research ... · Stages of project # 4 realization 2015 – implementation of auditing and approval of OJSC “ORPE “Technologiya”

Stages of project # 4 realization

2015 – implementation of auditing and approval of OJSC “ORPE

“Technologiya” production by Airbus company. Including in the list of the

official Airbus suppliers.

2016 – receipt of regulatory Airbus documentation on the materials and

structures of passenger aircrafts А-320 and А-321: glazing and radioparent

fairing.

2017 – OJSC “ORPE “Technologiya” develops the technology of structures

production

2018 – certification of structures production in accordance with standards.

Start of the components production.