31
Riko Wichmann, XPO Joint ILC-XFEL Meeting, 24. Aug. 2007 The European X-Ray Laser Project XFEL X-Ray Free-Electron Laser Summary: Configuration Management Conference July 3 rd & 4 th , 2007, AIRBUS, Hamburg July, 2 nd : Pre-Conference: Tutorial about the CMII Model Organizers: AIRBUS CIMPA Gesellschaft für Konfigurations Management (GfKM) Institute for Configuration Management (ICM) DESY Participants: Frank Lehner (ILC) Riko Wichmann (XFEL)

The European X-Ray Laser Project XFEL X-Ray Free-Electron

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The European X-Ray Laser Project XFEL X-Ray Free-Electron

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

Summary: Configuration Management Conference

July 3rd & 4th, 2007, AIRBUS, Hamburg

July, 2nd: Pre-Conference: Tutorial about the CMII Model

Organizers: AIRBUS CIMPA

Gesellschaft für Konfigurations Management (GfKM)

Institute for Configuration Management (ICM)

DESY Participants:

Frank Lehner (ILC)

Riko Wichmann (XFEL)

Page 2: The European X-Ray Laser Project XFEL X-Ray Free-Electron

2

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMII Tutorial

given by Steve Easterbrook, ICM Vice-PresidentSummary of the CMII Certification Course42 Participants with up to 15 (!) years of experience in CM

CMII Timeline:1977-1985: Development of basic CMII principles as Best Practice1986: Start Training and Certification Program1986-today: Continuous Improvement

“CMII provides a business process infrastructure that enables all activities to perform their tasks reliably and efficiently”

Page 3: The European X-Ray Laser Project XFEL X-Ray Free-Electron

3

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMII Tutorial: “A requirement is not a requirement unless it's documented, validated and released”

Page 4: The European X-Ray Laser Project XFEL X-Ray Free-Electron

4

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMII Tutorial: Corrective Actions

Corrective Action: extra effort to correct something, which should not have happened in the 1st place

primary cause: inadequate requirements and/or conformance to specification

most organizations spent 40-60% of their resources on interventionsIntervention Resources are spent on Corrective Actions

reduce corrective actions: clear, concise, valid requirements CM: accommodate change and stay clear concise and valid

Page 5: The European X-Ray Laser Project XFEL X-Ray Free-Electron

5

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMII: Ingredients 1 – Properly Structured Baseline

CM

II:

very

doc

umen

tatio

n ce

ntric

Physical item hierarchies are used as a framework for end item products, facilities and their associated requirementsEach item has its set of supporting documents/data

Documentation:

Clear Concise Valid

XFEL

Buildings

Underground Buildings

XTL

Construction

Page 6: The European X-Ray Laser Project XFEL X-Ray Free-Electron

6

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMII: Ingredients 2 – Closed Loop Change Process

Rules of the ultimate solution:

(1) Documents must be validated prior to release.(2) Documents must be released prior to use.(3) Any detected deficiencies must be corrected prior to reuse(4) Results must conform to require- ments in every case

Feedback about the execution of the change must reach the initiator

applies to process themselves (e.g. CM) !

Page 7: The European X-Ray Laser Project XFEL X-Ray Free-Electron

7

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMII: Not all changes require full treatment!

75% - 85% of changes can be handled in a Fast-Track Process

Page 8: The European X-Ray Laser Project XFEL X-Ray Free-Electron

8

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMII: Ingredients 2 – Closed Loop Change Process with Fast Track

Page 9: The European X-Ray Laser Project XFEL X-Ray Free-Electron

9

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

CMC 2007 Main Conference: Company Reports on CMII Related Experience

142 ParticipantsPresentations by (non-selling) Organizations

NHIndustries (Eurocopter)EmbraerNASA ISSEADS Astrium SatellitesDelphi Automotive SystemsAirbusEADS Defence ElectronicMicrosoft

Dominated by Aviation and Space Industry

Page 10: The European X-Ray Laser Project XFEL X-Ray Free-Electron

10

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NHIndustries: Multi-national Cooperation

Christine-Anne Chevry, Senior Manager Configuration Management, NHIndustries

Page 11: The European X-Ray Laser Project XFEL X-Ray Free-Electron

11

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NHIndustries: Eurocopter international project

Page 12: The European X-Ray Laser Project XFEL X-Ray Free-Electron

12

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NHIndustries: Configuration Management Plan

defined in 2001 (?)requirementsconfiguration identificationchange processproduction CM documents

Dec 2006: CM II training started for 20 employeesFeb 2007: Program Change Board established

long lead time for changes: 3 CB discussing costs, technical and business issues

Page 13: The European X-Ray Laser Project XFEL X-Ray Free-Electron

13

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NHIndustries: Closed Loop Process w. Baseline

Closed Loop

Page 14: The European X-Ray Laser Project XFEL X-Ray Free-Electron

14

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NHIndustries: Process => Key Performance Indicators => Tools

Page 15: The European X-Ray Laser Project XFEL X-Ray Free-Electron

15

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NASA: International Space Station

Ginny Stephenson, Change Management Lead, NASA Johnson Space Center

Dec

emb

er 2

006

con

fig

ura

tio

n

Page 16: The European X-Ray Laser Project XFEL X-Ray Free-Electron

16

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NASA: International Space Station

Partners from 15 countries participate in ISS the program

Page 17: The European X-Ray Laser Project XFEL X-Ray Free-Electron

17

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NASA: CM Process Improvement

Starting situation:well defined CM process in place since yearsstrong CM group

Improvementsgap analysis by ICM in September 2004 (3 days)implementation of recommendationsCM II briefing sessions with all departmentsfollow-up assessment August 2006

Page 18: The European X-Ray Laser Project XFEL X-Ray Free-Electron

18

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NASA: ICM findings/recommendations

fragmented baseline managementimplement closed-loop change management and couple to baselinefind automated tool:

workflow, online change creation, distribution, disposition, task identification, scheduling & tracking

formal CMII training for ISSP CM groupCMII overview for ISSP personnelavoid “redline” documents and drawingsdefine metric reporting for managementcontractors to conform to NASA CM processcontinuously improve CM process (committee)

Page 19: The European X-Ray Laser Project XFEL X-Ray Free-Electron

19

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NASA: implementing CM improvements

within ~2 years

closed-loop in updated change request process with new/updated forms

CMII certification and CMII briefings

updated metrics => regular meetings with senior managers

CMII also for new space vehicle !!

Page 20: The European X-Ray Laser Project XFEL X-Ray Free-Electron

20

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

NASA: Next Steps

integrate software tools

improve baseline databases

continuously improve process

reduce amount of signatures

Page 21: The European X-Ray Laser Project XFEL X-Ray Free-Electron

21

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

EADS Astrium Satellites

Jochen Hagenkötter, Senior Advisor Configuration Management, EADS Astrium

Page 22: The European X-Ray Laser Project XFEL X-Ray Free-Electron

22

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

Astrium: Project Structure (similar to XFEL)

will be transferred into a product structure as the project progresses

Page 23: The European X-Ray Laser Project XFEL X-Ray Free-Electron

23

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

Astrium: ESA CM Standards ECSS

Very similar to CMII standardsconfiguration baseline for approved statusbaseline: all documentation that describe the characteristics of the productevolution only by formal change procedure involving all disciplineschange disposition via Change Control Board (CCB)

Change Boards on all levels:ESA <-> EADSEADS <-> sub-contractorsub-contractor <-> vendor

Page 24: The European X-Ray Laser Project XFEL X-Ray Free-Electron

24

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

Astrium: ECSS on the way to CMII

bring all CM related activities under one umbrellacurrently ECSS is 85% CMII

standardized baselines, adapt CMII processes, harmonize forms, templates, etc for all space companies

ECSS CMII

Page 25: The European X-Ray Laser Project XFEL X-Ray Free-Electron

25

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

Embraer: Process Improvement in Aerospace

Manoel de Queiroz C. Santos, Configuration Engineer, Embraer

Page 26: The European X-Ray Laser Project XFEL X-Ray Free-Electron

26

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

Embraer: Advices

get upper management to buy-in (ICM advice)

be visible (ICM advice)

implement CMII principles step-by-step

understand culture in your organization and identify what is necessary to change that

think process first, tools should follow!!

Page 27: The European X-Ray Laser Project XFEL X-Ray Free-Electron

27

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

“Commercial To-Sell” Presentations

Airbus CIMPA, HHconsulting for product lifecycle management in aviation industry

PTCsoftware for product lifecycle management (PLM)CMII certified

Page 28: The European X-Ray Laser Project XFEL X-Ray Free-Electron

28

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

Siemens UGS: Product Lifecycle Management SW

Page 29: The European X-Ray Laser Project XFEL X-Ray Free-Electron

29

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

UGS: Product Lifecycle Management SW

Most of this we have to do, too !

Page 30: The European X-Ray Laser Project XFEL X-Ray Free-Electron

30

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

“Commercial To-Sell” Presentations

Airbus CIMPA, HHconsulting for product lifecycle management in aviation industry

PTCsoftware for product lifecycle managementCMII certified

Siemens UGS PLM SoftwareCMII conformsupply 90 % of the world PLM software (in aviation) Teamcenter !

Think process first – Tools should follow!

Page 31: The European X-Ray Laser Project XFEL X-Ray Free-Electron

31

Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

The EuropeanX-Ray Laser Project XFEL

X-Ray Free-Electron Laser

“Commercial To-Sell” Presentations

Airbus CIMPA, HHconsulting for product lifecycle management in aviation industry

PTCsoftware for product lifecycle managementCMII certified

Siemens UGS PLM SoftwareCMII conformsupply 90 % of the world PLM software (in aviation) Teamcenter !

Think process first – Tools should follow!