33
© 2017 HDR, Inc., all rights reserved. The EchoWater Project Leveraging Technology to Enhance Project Delivery Christina Romano, PE, PMP, Brown and Caldwell Ron Perkins, PE, CCM, HDR Engineering, Inc.

The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

© 2017 HDR, Inc., all rights reserved.

The EchoWater

Project

Leveraging Technology to Enhance Project DeliveryChristina Romano, PE, PMP, Brown and Caldwell

Ron Perkins, PE, CCM, HDR Engineering, Inc.

Page 2: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

What is the EchoWater Project

Implementing 3D/4D/5D

Benefit: Issue Visualization

Benefit: Project/Operations Coordination

Benefit: Asset Data Transfer

Summary - Results

Benefit: Schedule Analysis

Page 3: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

What is the EchoWater Project

Page 4: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Service Area

Page 5: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Regional San is California’s Largest Inland Discharger

It serves approximately

1.4 million residents

in the greater

Sacramento Region

SRWTP began operating in 1982; it replaced 22 separate treatment systems

The plant discharges to the Sacramento River, which flows to the Delta and the San Francisco Bay

It is responsible for major interceptors

and the Sacramento Regional

Wastewater Treatment Plant

(SRWTP)

Page 6: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

• Required significantly higher treatment to remove ammonia, nitrates, and

further reduce pathogens in the treated water

• Ammonia removal MUST be completed and operational by May 2021;

filtration/disinfection by May 2023

• 2011 – 2012 – Initial Studies, Design, and Build 0.5-mgd Pilot Plant

• February 2012 – Commissioned Program Management Office

• Late 2014 – Environmental Document Complete

2010 Discharge Permit (NPDES)

Page 7: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

EchoWater Project Stats

• Original Program cost estimate: $2.1 billion

• Current Program cost estimate:$1.735 billion

• Number of discrete projects: 24

• Peak month spending: $35 million

• Estimated daily workers at site: 500 at peak

Page 8: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

8

Page 9: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Return Activated Sludge

Tertiary Treatment Facilities

Flow Equalization

BNR/PEPS

Miscellaneous

Site Buildings

Main Electrical Substation Expansion

Nitrifying Sidestream Treatment

Miscellaneous Site Buildings

Bufferlands Building

Disinfection Chemical Storage

Page 10: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Implementing 3D/4D/5D

Page 11: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

3D 4D 5DVISUALIZATION SCHEDULING ESTIMATING

• Existing Conditions

• Animations

• Renderings

• Walkthroughs

• Project Phasing

• Visual Validation

• Interproject

Coordination

• Cost Phasing

• Quantity

Extractions

• Funding

Projections

Page 12: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

• Established

CAD/BIM

standards for all

designers

• Established

processes for

updating files

from design

through

construction

Establish BIM Standards

Step ADesigner BIM modeler places

file sets into a DropBox folder

under their project

Step BBIM modeler copies link to

shared folder into existing

PMWeb deliverable record

Step CBIM modeler sends

PMWeb notification to

PMO, designers, and

schedulers as new files

are posted. Include

a description of changes

DropBox notifies PMO and

designers of new files posted

Step EBIM administrator posts clash

detection results on comments page in

a) PMWed deliverables record if formal or

b) PMWeb Document Manager if informal

Step DBIM administrator copies DWG,

NWD, RVT files to Z drive and

merges into master model

for analysis

BIM Modeler (Designer)

BIM Administrator (PMO)

BIM

Model

(Designer)

PMWeb

BIM

Model

(Master)

Page 13: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

• Established

scheduling

standards for all

designers and

contractors

• Established

processes for

updating schedules

design through

construction

Establish Scheduling/4D/5D Standards

Page 14: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Benefit: Issue Visualization

Page 15: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Pre-Construction Use of BIM

Effective Project Planning

Visualization of design

options/studies

Site utilization planning

Page 16: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Primary Effluent Pumps 3D Rendering

Page 17: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

BIM-Clash Detection

Page 18: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Inter-Project Connections

Page 19: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Benefit: Schedule Analysis

Page 20: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

4D and 5D BIM

• Synchro Model, P6 Schedule,

and Cost Integration

Page 21: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler
Page 22: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Baseline Schedule Scope Gap

Page 23: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Visual Schedule Variance Analysis (VSVA)

Page 24: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Benefit: Project/Operations Coordination

Page 25: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Brown and Caldwell 25

Page 26: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

• Inter-Project ConflictsConstruction Use of BIM

Page 27: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Brown and Caldwell 27

Page 28: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Benefit: Asset Data Transfer

Page 29: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Leveraging Smart P&ID and BIM Data Transition to Operations:

Page 30: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

• Asset Management Design Database (AMDD) serves as the hub for design and construction data capture

• AMDD interfaces with design models and construction phase inputs for assets, spare parts, warrantees, and maintenance requirements for export to CMMS

• AMDD includes tracking and controls tools for quality and completeness of data being transferred to CMMS

Timely data is always a challenge. CM and Designer review of BIM as-built data keeps pressure on contractor and aids commissioning processes.

Capturing Asset Data for Migration to Plant CMMS

Page 31: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Summary - Results

Page 32: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

• No unplanned operational impacts to date

• Program is on schedule for meeting discharge permit deadlines

• Program total cost $1.7B versus initial $2.1B estimate

• Future recycled water project in planning phase

EchoWater Project Progress and Results

Page 33: The EchoWater Project Leveraging Technology to Enhance ... … · 05/06/2019  · BIM modeler copies link to shared folder into existing PMWeb deliverable record Step C BIM modeler

Presenter Contact Information

• Christina Romano, PE, PMP [email protected]

• Ron Perkins, PE, CCM [email protected]

Questions