16
CITY OF KIRKLAND Planning and Building Department 123 Fifth Avenue, Kirkland, WA 98033 425.587.3600 www.kirklandwa.gov MEMORANDUM To: Design Review Board From: Jon Regala, Planning Supervisor Date: September 12, 2016 File No.: DRV16-00914 Subject: VILLAGE AT TOTEM LAKE PHASE II DESIGN RESPONSE CONFERENCE Continued from August 15, 2016 I. MEETING GOALS At the September 19, 2016 Design Review Board (DRB) meeting, the DRB should continue their review from August 15, 2016 of the Village at Totem Lake project (Phase II) and provide feedback to the applicant regarding their design response materials. The DRB’s feedback should be based on consistency with the design guidelines and conditions found in the Totem Lake Mall Amended Conceptual Master Plan (CMP). II. BACKGROUND The subject property is located at 12560 - 12632 120 th Avenue NE, the ‘upper Mall’ of the Village at Totem Lake project. The applicant is proposing to demolish the existing buildings and construct a new mixed-used development as the second (and final) phase of the Village at Totem Lake project. This phase of the redevelopment project will consist of approximately: 44,197 sq. ft. of retail and restaurant uses 35,000 sq. ft. movie theater 650 residential units 1,393 parking stalls within a parking garage III. DESIGN RESPONSE CONFERENCE At the August 15 th DRB meeting, the DRB requested that the applicant respond to the items/topics listed below. The applicant has provided a design response based on the DRB’s feedback (see Attachment 1). GENERAL SITE & BUILDING DESIGN DRB Direction: Provide additional information as described below. Residential Building Design Enlarged building elevations at major building areas with corresponding wall section drawings (typical floors may be skipped) and associated material boards. Floor plans that better correlate with building elevations. Create architectural interest at upper story courtyard facades (concern was expressed regarding large amount of hardie board being used). 1

The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

CITY OF KIRKLAND Planning and Building Department 123 Fifth Avenue, Kirkland, WA 98033 425.587.3600 www.kirklandwa.gov

MEMORANDUM

To: Design Review Board

From: Jon Regala, Planning Supervisor

Date: September 12, 2016

File No.: DRV16-00914 Subject: VILLAGE AT TOTEM LAKE PHASE II DESIGN RESPONSE CONFERENCE – Continued from August 15, 2016

I. MEETING GOALS

At the September 19, 2016 Design Review Board (DRB) meeting, the DRB should continue their review from August 15, 2016 of the Village at Totem Lake project (Phase II) and provide feedback to the applicant regarding their design response materials. The DRB’s feedback should be based on consistency with the design guidelines and conditions found in the Totem Lake Mall Amended Conceptual Master Plan (CMP).

II. BACKGROUND

The subject property is located at 12560 - 12632 120th Avenue NE, the ‘upper Mall’ of the Village at Totem Lake project. The applicant is proposing to demolish the existing buildings and construct a new mixed-used development as the second (and final) phase of the Village at Totem Lake project. This phase of the redevelopment project will consist of approximately:

44,197 sq. ft. of retail and restaurant uses 35,000 sq. ft. movie theater 650 residential units 1,393 parking stalls within a parking garage

III. DESIGN RESPONSE CONFERENCE

At the August 15th DRB meeting, the DRB requested that the applicant respond to the items/topics listed below. The applicant has provided a design response based on the DRB’s feedback (see Attachment 1).

GENERAL SITE & BUILDING DESIGN

DRB Direction: Provide additional information as described below.

Residential Building Design

Enlarged building elevations at major building areas with corresponding wall section drawings (typical floors may be skipped) and associated material boards.

Floor plans that better correlate with building elevations. Create architectural interest at upper story courtyard facades (concern was

expressed regarding large amount of hardie board being used).

1

Page 2: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

Village at Totem Lake File No. DRV16-00914

Page 2

Movie Theater

Final design details of the movie theater façade. Information on how the movie theater façade is integrated with the adjoining

buildings.

Building Details

Color of vinyl window mullions and casing. Overhead weather protection plan. Developed roof plan and screening for rooftop appurtenances. Exterior lighting information.

PUBLIC PLAZA DESIGN

DRB Direction: The DRB requested additional details regarding the central public plaza including the proposed pedestrian amenity spaces. The DRB was concerned with the previous compartmentalized design. The design response should include:

Revised plaza plan that addresses concerns regarding the separated nature of the plaza and lack of public gathering space(s).

Details on the stand-alone building. Further development of the proposed water feature.

ACCESS & PEDESTRIAN CONNECTIONS

DRB Direction: Explore design options to the current 48’ wide driveway along Totem Lake Way. In addition, provide detailed plans information regarding the EvergreenHealth and Madison House pedestrian connections to include:

Cross section drawing Landscaping Paving finishes Lighting

LANDSCAPING

DRB Direction: The DRB requested a creative landscape plan that considers a variety of colors, species, and long term viability given the purpose of the landscaping.

IV. PUBLIC COMMENT

Prior to the finalization and distribution of this staff memo, no public comment was received.

V. ATTACHMENTS

1. Applicant’s Design Response Packet

2

Page 3: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

0 5 . 0 5 . 2 0 1 6

F A I R F I E L DR E S I D E N T I A L

T H E V I L L A G E A T

TOTEM LAKED E S I G N R E S P O N S E C O N F E R E N C E

0 9 . 1 2 . 2 0 1 6

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

3

Page 4: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

T0.1PROJECT LOCATION/DATA. DRAWING INDEX.content

T0.1 PROJECT LOCATION, DATA SUMMARY

T0.2 DEVELOPMENT SUMMARY LOT 1

TO.3 DEVELOPMENT SUMMARY LOT 2

T0.4 VICINITY MAP-SURROUNDING PARCELS

T0.5 TOPOGRAPHIC SURVEY

A1.0 SITE PLAN

A2.0 LEVEL 1

A2.1 LEVEL 2

A2.2 LEVEL 3

A2.3 LEVEL 4

A2.4 LEVEL 5

A2.5 LEVEL 6

A2.6 LEVEL 7

A6.1 NORTH PROJECT ELEVATION

A6.2 EAST PROJECT ELEVATION

A6.01 ENLARGED NORTHWEST

A6.02 ENLARGED SOUTHWEST 1

A6.03 ENLARGED SOUTHWEST 2

A6.04 ENLARGED SOUTHWEST 3

A6.05 ENLARGED SOUTHWEST 4

A6.06 ENLARGED SOUTHEAST 1

A6.07 ENLARGED SOUTHEAST 2

A6.08 ENLARGED SOUTHEAST 3

A7.1 BUILDING SECTION 1 + SECTION 2

A7.2 BUILDING SECTION 3 + SECTION 4

A7.3 SECTION LOCATION SITE PLAN

A7.4 WALL SECTION 1

A7.5 WALL SECTION 2

A7.6 WALL SECTION 3

OWNER

CENTERCAL PROPERTIES, LLC

1600 East Franklin Avenue

El Segundo, CA 90245

Tel: 310.563.6900

E: [email protected]

Contact: Rick Beason

DEVELOPER

FAIRFIELD RESIDENTIAL

5510 Morehouse Drive, Suite 200

San Diego, CA 92121

Tel: 619.787.6100

E: [email protected]

Contact: Brendan Hayes

ARCHITECT

CARRIER JOHNSON + CULTURE

1301 Third Ave.

San Diego, CA 92101

Tel: 619.239.2353

Fax: 619.239.6227

E: [email protected]

Contact: Claudia Escala

CIVIL ENGINEER

BARGHAUSEN CONSULTING

ENGINEERS, INC

18215 72nd Avenue South

Kent, WA 98032

Tel: 425.251.6222

Contact: James Pullicino

LANDSCAPE ARCHITECT

ANIL VERMA ASSOCIATES, INC

444 South Flower Street, Suite 1688

Los Angeles, CA 90071

Tel: 213.624.6908

Contact: Jim Keenan

DRAWING INDEXPROJECT TEAMPROJECT LOCATION

A7.7 WALL SECTION 4

A7.8 WALL SECTION 5

A7.9 WALL SECTION 6

A7.10 WALL SECTION 7

A7.11 WALL SECTION 8

A8.1 PERSPECTIVE 1

A8.2 PERSPECTIVE 2

A8.3 PERSPECTIVE 3

A8.4 PERSPECTIVE 4

A8.5 PERSPECTIVE 5

A8.6 PERSPECTIVE 6

A8.7 PERSPECTIVE 7

A9.0 COLORS & MATERIALS PALETTE

A9.1 PROJECT MATERIAL BOARD

A9.2 MATERIAL BOARD 1

A9.3 MATERIAL BOARD 2

A9.4 DESIGN/DETAIL CONCEPTS

A10.1 COURTYARD INSPIRATION

A10.2 COURTYARD LANDSCAPE LOT 1

A10.3 COURTYARD LANDSCAPE LOT 2

A10.4 LANDSCAPE OVERALL SITE PLAN

A10.5 LANDSCAPE MATERIALS

A10.6 TREE LEGEND

A10.7 CONNECTIONS LOCATION

A10.8 CONNECTIONS PLANS

A10.9 CONNECTIONS TREE PLAN

A10.10 OVERHEAD STRUCTURE PLAN

A10.11 PLAZA SEATING PLAN

A10.12 PLAZA MATERIALS

A10.13 TREE LEGEND

A10.14 PLAZA AREA USE DIAGRAM

A10.15 PLAZA CIRCULATION DIAGRAM

A10.16 TREE IMAGES

A10.17 SHRUB LIST AND IMAGES

A10.18 SHRUB LIST AND IMAGES

A10.19 SITE MATERIALS

A11.1 DRB RESPONSE #1

A11.2 DRB RESPONSE #2

A11.3 DRB RESPONSE #3

A11.4 DRB RESPONSE #4

A11.5 DRB RESPONSE #5

A11.6a DRB RESPONSE #6

A11.6b DRB RESPONSE #6

A11.7 DRB RESPONSE #7

A11.8 DRB RESPONSE #8

A11.9 CENTERCAL PLACEMAKING

A11.10 CENTERCAL PLACEMAKING

A11.11 CENTERCAL PLACEMAKING

A11.12 CENTERCAL PLACEMAKING

A11.13 OVERHEAD PROTECTION PLAN

A11.14 LEVEL HEIGHT CALCULATION

A11.15 SITE AREA CALCULATION

A11.16 TREE RETENTION PLAN

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

4

Page 5: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

DEVELOPMENT SUMMARY LOT 1

T0.2DEVELOPMENT SUMMARY LOT 1content

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

5

Page 6: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

DEVELOPMENT SUMMARY LOT 2

T0.3DEVELOPMENT SUMMARY LOT 2content

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

6

Page 7: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

T0.4VICINITY MAPcontent

T O T E ML A K E

L O W E R M A L L

N O R T H

N

E V E R G R E E NH O S P I T A L

M A D I S O N H O U S EA S S I S T E D L I V I N G

E V E R G R E E N M E D I C A L O F F I C E

B U I L D I N G

C R O S S K I R K L A N D C O R R I D O R

EU P P E R M A L L

1 2 0 T H A V E N U E

128TH ST

1 24 T

H S

T

T O T E M LA K E B

L VD

I N T E R S T A T E 4 0 5

TO

TEM

LAKE W

AY

T O T E M L A K EP A R K

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

7

Page 8: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

T0.5TOPOGRAPHIC SURVEYcontent

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

PERVIOUS MATERIAL USED AT WETLAND BUFFER

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

8

Page 9: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

A1.0SITE PLAN 1”=100’-0”content scale

SPASPA

LAWNLAWNNN

DDDOGDOGLLLAWNLAWNDDOGDOGDDOGDOGDDOGDOG

1 BD

BBBQ /BQ /BBBQ / BQ /QQBB QB //Q ////ELLLLRREETT LISSELLLL SELLLL SLELLLL SLISISTRTRELELLLLISSSL SL SL SSSS

FFIREPIREPIT/TFFIREPIREPIT/TFFIREPIREFIREPPIT/TPIT/FIREPIT/ISISLLLLILILLLLEEELELLLLRERERRRTT STREETRELRELL ISSLLLLI

LAWLAWWWWWWWAALLLLLAWNNNNNNBBBBBBBBBBBBBOCCEBOCCEECCCCCCCCOOB EECCCCCCCOOOOBB CCCCCCCCOOB EECCCCCCCOOOOBB EEEEEEEEEEEEEE

BBQBBQQQQQQQQQ

FIREPFIREPIT/II TIEI TIEISLLLLREETRTR LE

LAWNLAWNNN

POOOOLL18'X'X60'6018 XX6060

AAAAAAAAASSPAASPASPAAAAAAAAA

T O T E M L A K EL AP A R K

120TH AVENUE

PUBLIC PLAZA

FIRE ACCESS ROAD

TOTE

M L

AKE

WA

Y

EXISTINGBANK

FUTUREDEVELOPMENT

FUTUREDEVELOPMENT

FUTUREDEVELOPMENT

FUTUREDEVELOPMENT

COMMERCIAL

COMMERCIAL COMMERCIAL

128T

H STR

EET

LOT

LOT

THEATRE

EVERGREENMEDICAL OFFICE

BUILDING

1 LEVEL ENTERTAINMENT2 LEVELS PARKING

4 LEVELS RESIDENTIAL3 LEVELS PARKING

5 LEVELS RESIDENTIAL2 LEVELS PARKING

DRIVEWAY

MADISON HOUSEASSISTED LIVING

HOTEL

2

1

N O R T H

N

DRIVEWAY

DRIVEWAY

GREEN PATH

DRIVEWAY

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

9

Page 10: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

#001

#001

#001

#001

#001

#001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001

#001 #001 #001

#001 #001 #001#001 #001 #001#001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001

#001

#001

#001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001 #001 #001#001

#001

#001

#001

#001 #001#001 #001#001

#001

#001

#001

#001

2

5 5 5 5

69

39

3

3

36

37

38

3

2

2% S

LOPE

2% S

LOPE

2% S

LOPE

2 1

#001 #001

PUBLIC PLAZA16,500 GSF

RETAIL PARKING412 SPACESRESIDENTIAL

PARKING40 SPACES

RESIDENTIAL PARKING

42 SPACES

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

LEASING LEASINGRETAIL

RESIDENTIAL LOBBY

RESIDENTIAL LOBBY

EXISTINGBANK

BOILERROOM

RETAIL & RESIDENTIALLOADING ZONE

RES.TRASH

GASMETERROOM

RES.TRASH

RES.TRASH

RES.TRASHRES.

TRASH

RES.TRASH

RETAILTRASH

RETAILTRASH

5 FUTURERESIDENT PARKING

5 FUTURERESIDENT PARKING

EMERGENCYGEN.

RETAILELECT.

RES.ELECT.

TRANSFORMERVAULT

RES.MPOE

RETAILELECT.

RETAILMPOE

RETAILMPOE GAS

METER ROOM

RES.MPOE

1 BD

1 BD

2 BD

1 BD

1 BD

1 BD

1 BD

2 BD

2 BD

STORAGE STORAGE

UNIT ENTRY

STORAGE

RETAIL

RETAIL

RETAIL

RETAIL MOVE-INROOM

MOVE-INROOM

RETAIL

RETAIL

ACCESS & EGRESS FOR BANK

PEDESTRIANENTRY

PEDESTRIANENTRY

THEATREENTRY

RETAIL & RESIDENTIALVEHICULAR ENTRY

RETAILENTRY

RESIDENTIAL + RETAILVEHICULAR ENTRIES

RESIDENTIALVEHICULAR ENTRY

DRIVEWAY

UNIT ENTRY

UNIT ENTRY

UNIT ENTRY

A2.0LEVEL 1 1”=80’-0”content scale

200’100’20’0’GRAPHIC SCALE

L O A D I N G / U N L O A D I N G

SNTN

SECTION 2 SECTION 1

SE

CT

ION

3

SE

CT

ION

3

SECTION 2SECTION 4 SECTION 1

SECTION 4

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

STORAGE/UTILITIES

PARKING

TOTEM LAKE PROPERTY

RETAIL

AMENITIES

APARTMENTS

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

10

Page 11: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

#001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001 #001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001

#001

#001 #001 #001#001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001 #001

#001

#001 #001 #001

#001 #001

#001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001 #001 #001 #001 #001

#001

#001

#001

#001

#001

#001 #001 #001#001 #001 #001#001 #001 #001#001 #001 #001 #001 #001

#001 #001 #001 #001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001#001#001

#001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001

#001 #001 #001 #001 #001 #001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001

#001 #001

#001

#001

#001

#001

#001

#001

#001

#001

#001

2 1

7

8

8

7

RESIDENTIAL PARKING

332 SPACES

RESIDENTIAL PARKING

226 SPACES

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

RESIDENTIAL LOBBY

FITNESSFITNESS

RESIDENTIAL LOBBY

1 BD

1 BD

1 BD 1 BD ST

ST

ST

ST

ST STSTST 1 BD1 BD

1 BD

1 BD 1 BD1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD2 BD 2 BD

2 BDRESIDENTIALVEHICULAR ENTRY

RESIDENTIALVEHICULAR ENTRY

STORAGE

STORAGE

STORAGESTORAGE

STORAGE

LOADING

BOILER ROOM

EMERGENCYGEN.

RES.ELECT.

FAN ROOM

FAN ROOM

RESID

ENTIA

L GAS

MET

ERS

RESIDENTIAL GAS METERS

TRTR

TR

TR

TRMAILROOM

MAILROOM

BIKE SHOP

BIKE SHOP

A2.1LEVEL 2 1”=80’-0”content scale

200’100’20’0’GRAPHIC SCALE

L O A D I N G / U N L O A D I N G

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

SECTION 2 SECTION 1

SE

CT

ION

3

SE

CT

ION

3

SECTION 2SECTION 4 SECTION 1

NNNR

SECTION 4

STORAGE/UTILITIES

PARKING

RETAIL

AMENITIES

APARTMENTS

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

11

Page 12: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001

#001 #001 #001#001 #001 #001#001 #001 #001 #001 #001 #001

#001 #001 #001#001 #001 #001#001 #001 #001 #001 #001 #001

#001 #001 #001 #001 #001

#001 #001 #001 #001 #001

#001 #001#001

#001 #001

#001

#001 #001

#001 #001 #001

#001 #001

#001 #001 #001#001 #001 #001 #001 #001

#001 #001

#001

#001

#001

#001

#001

6 0

6 0

6 0

6 0

6 0

6 0

2

1

THEATRE38,289 SF RESIDENTIAL

PARKING337 SPACES

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

RESIDENTIAL LOBBY

COURTYARD

DOGWASH

FITNESSRESIDENTIAL

LOBBY

1 BD

ST

1 BD 1 BD ST

ST

ST

ST

ST

STST STST 1 BD1 BD

1 BD

1 BD 1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD1 BD

1 BD 1 BD

3 BD

3 BD

1 BD

1 BD

1 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD2 BD2 BD

2 BD 2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD

STORAGE

STORAGE

THEATREEGRESS

OPEN TO FITNESSBELOW

OPEN TO FITNESSBELOW

(See Landscape Plans)

POOL EQUIPMENT

POOL ABOVE

STORAGETR

TR

TR

TR

TR

TR

ER

P OPERTY LI

A2.2LEVEL 3 1”=80’-0”content scale

200’100’20’0’GRAPHIC SCALE

SECTION 2 SECTION 1

SE

CT

ION

3

SE

CT

ION

3

SECTION 2SECTION 4 SECTION 1

SECTION 4

STORAGE/UTILITIES

PARKING

RETAIL

AMENITIES

APARTMENTS

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

12

Page 13: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

2

1

76 076 0

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

RESIDENTIAL LOBBY

COURTYARD

COURTYARD

COURTYARD

COURTYARD

RESIDENTIAL LOBBY

DOGWASH

1 BD 1 BD ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

STST

ST

ST

ST

ST

ST

ST

ST

STSTSTST 1 BD

1 BD 1 BD 1 BD 1 BD

1 BD 1 BD

1 BD

1 BD1 BD

1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD1 BD

1 BD 1 BD1 BD

1 BD

1 BD

1 BD

1 BD

1 BD 1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

3 BD

3 BD

1 BD

1 BD

1 BD

1 BD

2 BD

2 BD2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD 2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

1 BD1 BD

2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD 2 BD

2 BD

STORAGESTORAGE

STORAGE

STORAGE

STORAGE STORAGE

STORAGE

ELECT.

STORAGEIDF

POOL SPA

COURTYARD BELOW

TRTR

TR

TR

TR

(See Landscape Plans)

(See Landscape Plans)

(See Landscape Plans)

(See Landscape Plans)

PROPE

RTY

LINE ST

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

STORAGE

STORAGE

TR

ER

P OPERTY LI

A2.3LEVEL 4 1”=80’-0”content scale

200’100’20’0’GRAPHIC SCALE

SECTION 2 SECTION 1

SE

CT

ION

3

SE

CT

ION

3

SECTION 2SECTION 4 SECTION 1

SECTION 4

STORAGE/UTILITIES

PARKING

RETAIL

AMENITIES

APARTMENTS

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

13

Page 14: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

2

1

86 086 0

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

RESIDENTIAL LOBBY

RESIDENTIAL LOBBY

1 BD ST

ST

ST

ST

ST

STSTST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

STST

ST

ST

ST

ST

STST

ST

STSTST 1 BD 1 BD

1 BD 1 BD 1 BD 1 BD

1 BD

1 BD1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

3 BD

3 BD

3 BD

1 BD

1 BD

1 BD

1 BD1 BD

1 BD

1 BD

2 BD

2 BD2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD2 BD

2 BD

2 BD 2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD2 BD2 BD

2 BD 2 BD

2 BD

STORAGESTORAGE STORAGE

ELECT.

STORAGE

IDF

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

TRTR

TR

TR

TR

1 BD

1 BD

1 BD

2 BD

STORAGE

STORAGE

ST

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

STORAGE

STORAGE

TR

ER

P OPERTY LI

A2.4LEVEL 5 1”=80’-0”content scale

200’100’20’0’GRAPHIC SCALE

SECTION 2 SECTION 1

SE

CT

ION

3

SE

CT

ION

3

SECTION 2SECTION 4 SECTION 1

SECTION 4

STORAGE/UTILITIES

PARKING

RETAIL

AMENITIES

APARTMENTS

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

14

Page 15: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

2

1

96 096 0

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

RESIDENTIAL LOBBY

RESIDENTIAL LOBBY

1 BD 1 BD ST

ST

ST

ST

ST

STSTST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

STST

ST

ST

ST

ST

STST

ST

STSTST 1 BD

1 BD 1 BD 1 BD 1 BD

1 BD

1 BD1 BD

1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

3 BD

3 BD

3 BD

1 BD

1 BD

1 BD

1 BD

1 BD1 BD1 BD

2 BD

2 BD2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD2 BD

2 BD

2 BD 2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD

2 BD2 BD2 BD

2 BD 2 BD

2 BD

STORAGESTORAGE STORAGE

ELECT.

STORAGE

IDF

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

TRTR

TR

TR

TR

1 BD

1 BD

1 BD

2 BD

STORAGE

STORAGE

ST

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

STORAGE

STORAGE

TR

ER

P OPERTY LI

A2.5LEVEL 6 1”=80’-0”content scale

200’100’20’0’GRAPHIC SCALE

SECTION 2 SECTION 1

SE

CT

ION

3

SE

CT

ION

3

SECTION 2SECTION 4 SECTION 1

SECTION 4

STORAGE/UTILITIES

PARKING

RETAIL

AMENITIES

APARTMENTS

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

15

Page 16: The DRB’s feedback should be , the ‘upper Mall’ ofPDFs/... · Page 2. Movie Theater Final design details of the movie theater façade. ... DESIGN RESPONSE CONFERENCE. 09.12.2016

A2.6LEVEL 7 1”=80’-0”content scale

200’100’20’0’GRAPHIC SCALE

SECTION 2 SECTION 1

SE

CT

ION

3

SE

CT

ION

3

SECTION 2SECTION 4 SECTION 1

SECTION 4

2

1

02 6 002 6 0

PROPERTY LINE

PROPE

RTY

LINE

PROPERTY LINE

PRO

PERT

Y LI

NE

PRO

PERT

Y LI

NE

RESIDENTIAL LOBBY

CLUBHOUSE

CLUBHOUSE

RESIDENTIAL LOBBY

1 BD 1 BD ST

ST

ST

ST

ST

STSTST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

STST

ST

ST

ST

ST

STST

ST

STSTST 1 BD

1 BD 1 BD 1 BD 1 BD

1 BD

1 BD1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD 1 BD

1 BD

1 BD

1 BD

1 BD

3 BD

3 BD

3 BD

1 BD

1 BD

1 BD

1 BD

1 BD1 BD1 BD

2 BD

2 BD2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD2 BD

2 BD

2 BD 2 BD

2 BD 2 BD

2 BD2 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

2 BD 2 BD2 BD

2 BD

2 BD

2 BD2 BD2 BD

2 BD 2 BD

2 BD

STORAGESTORAGE STORAGE

ELECT.

STORAGE

IDF

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

COURTYARD BELOW

TR

TR

TR

TR

TR

TR

1 BD

1 BD

1 BD

2 BD

STORAGE

OUTDOOR OUTDOOR

ST

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

1 BD

2 BD

2 BD

2 BD

2 BD

2 BD

2 BD2 BD

2 BD

STORAGE

STORAGEER

P OPERTY LI

STORAGE/UTILITIES

PARKING

RETAIL

AMENITIES

APARTMENTS

FAIRFIELDRESIDENTIAL

5638.00 09.12.2016project date

ATTACHMENT 1

FILE NO. DRV16-00914

APPLICANT DESIGN RESPONSE

16