The Corporation of the Township of Malahide
CORRESPONDENCE AGENDA
April 20, 2017 – 7:30 p.m.
(F) Correspondence:
1. Association of Municipalities of Ontario - Watch File – dated April 6 and 13, 2017. (Pages C3 - 6)
2. Municipality of Port Hope – Resolution requesting the Ministry of the Environment to revise existing legislation to ban construction of incinerators, and phase out use of existing incinerators in Ontario. (Pages C7 - 8)
3. Region of Peel – Resolution authorizing the Region of Peel to proceed with
various steps regarding the practice of community water fluoridation. (Page C9 - 10)
4. City of Kawartha Lakes – Resolution regarding support to eliminate barriers to
employment opportunities for Certified Crop Advisors and allow Ontario farmers the freedom to engage in business with the expert of their choice. (Malahide supported a similar Resolution on October 6, 2016). (Page C11 - 12)
5. Municipality of Madawaska Valley – Resolution requesting the Province to
rescind proposed Building Code changes regarding mandatory five year septic tank pump out and records of retention by the owner. (Malahide supported a similar Resolution on March 2, 2017). (Page C13 - 14)
6. Municipality Dutton Dunwich – Resolution requesting the Province to halt all
wind power approvals in unwilling host communities. (Page C15) 7. Catfish Creek Conservation Authority – Financial Statements to December
31, 2016. (Page C16 - 38)
8. Elgin Area Primary Water Supply System – 2016 Compliance Report. (Page C39 - 73)
9. Stewardship Ontario – Industry funding for Municipal Blue Box Recycling,
2016. (Page C74) 10. Elgin County Land Division Committee – Notice of Decision for Severances:
i) Application No. E15/17 of Calton Line Inc. relating to property at Part Lot 34, Concession 4, Malahide – Granted. (Pages C75 - 77)
ii) Application No. E16/17 of Carolinian Winery & Eatery Inc. relating to property at Part Lots 8 and 9, Concession 2, Malahide – Granted as Amended. (Pages C78 - 80)
11. Town of Aylmer – Notice of Public Meeting for Zoning By-law Amendment relating to property at 53 Fourth Avenue, Aylmer. (Page C81)
12. Municipality of Central Elgin- Notice of Passing of Zoning By-law Amendment relating to property at 7987 Fairview Road. (Page C82)
1
Diana Wilson
From: AMO Communications <[email protected]>Sent: Thursday, April 06, 2017 10:01 AMTo: Diana WilsonSubject: AMO WatchFile - April 6, 2017
AMO Watch File not displaying correctly? View the online version | Send to a friend Add [email protected] to your safe list
April 6, 2017
In This Issue - 2017 P.J. Marshall Municipal Innovation Awards - call for submissions. - Proposed changes to one-third tax allowance. - AMO/MEDG support local economic development. - Learn about new LAS programs - attend a cost free Town Hall session. - Use cutting edge technology to perform roads assessments. - Broader Public Sector (BPS) Reporting Portal now live! - Careers with LAS, York Region, Kirkland Lake and Simcoe County. AMO Matters Submit your municipal government project that demonstrates excellence in the use of innovative approaches to improve capital and/or operating efficiency and to generate effectiveness through alternative service delivery initiatives and partnerships. Deadline May 14, 2017. Federal Matters The 2017 Federal Budget contained a decision to remove the one-third tax allowance of ”municipal office holders” remuneration, to be implemented in 2019 (see page 208). AMO is gathering information about this change, and will be conducting a survey of municipal treasurers to evaluate local impact in order to inform advocacy. AMO is coordinating with other provinces. Provincial Matters The AMO/MEDG Business Burden Reduction Project has identified innovative, transferable initiatives in London, Barrie, Peterborough, Hamilton and Bruce County to facilitate local business development. MEDG is supplementing this joint project and other Ministry programs with the “Smart Moves” Conference, April 26, 2017, focused on staff development of business-friendly regulatory approaches. AMO, LAS and ROMA Events LAS Town Hall sessions will be offered in four more locations in April and May. This year’s tour focuses on new programs, including the recently launched Roads Assessment Service. Discover all the ways LAS is helping Ontario municipalities - register today! LAS LAS formally launched its newest service at this week's AMO Asset Management Symposium. Discover how this program targets aging road infrastructure with the goal of reducing operating and maintenance costs, while at the same time raising the average condition of Ontario road networks.
3
2
The BPS reporting portal is open for the 2017 reporting period under O. Reg. 397/11. Public Sector organizations are required report on their 2015 energy consumption by July 1, 2017. Information on how to complete the annual energy and GHG report, along with the dates and times for Ministry-hosted webinars, can be found in the toolkit area by logging into the Ministry of Energy’s Portal. Contact [email protected] if your require further information. Careers LAS Program Manager - AMO. The Program Manager is responsible for the overall administration, marketing plan, and growth of assigned (i.e. One Investment, Natural Gas, Electricity) programs and management of the assigned program customer relationships. The position will lead the identification, research, program and contract development, and marketing of potential new programs for LAS. The Program Manager will also act as a subject matter expert resource to the municipal sector in all issue areas relevant to assigned programs. Apply by 12:00 PM April 21, 2017 by sending your resume to [email protected]. Manager, Ontario Works Transformation #20580 - York Region. Department: Community and Health Services, Social Services Branch. Location: Newmarket. Temporary Full-Time: approximately 21 months. Please apply online at York Region Careers by April 13, 2017, quoting competition number 20580. Chief Administrative Officer - Town of Kirkland Lake. Please submit your résumé (complete with references and covering letter) in confidence by Monday, April 24, 3:00 p.m. to: Human Resources Coordinator, Town of Kirkland Lake, P.O. Box 1757, Kirkland Lake, ON P2N 3P4. Email: [email protected], fax: 705.567.4707. Transit Manager - County of Simcoe. To view this job description in its entirety and to apply online, please visit Simcoe County Career Opportunities. Application deadline: April 21, 2017. About AMO AMO is a non-profit organization representing almost all of Ontario's 444 municipal governments. AMO supports strong and effective municipal government in Ontario and promotes the value of municipal government as a vital and essential component of Ontario's and Canada's political system. Follow @AMOPolicy on Twitter! AMO Contacts AMO Watch File Team, Tel: 416.971.9856 Conferences/Events Policy and Funding Programs LAS Local Authority Services MEPCO Municipal Employer Pension Centre of Ontario Media Inquiries, Tel: 416.729.5425 Municipal Wire, Career/Employment and Council Resolution Distributions
*Disclaimer: The Association of Municipalities of Ontario (AMO) is unable to provide any warranty regarding the accuracy or completeness of third-party submissions. Distribution of these items does not imply an endorsement of the views, information or services mentioned.
Please consider the environment before printing this.
Association of Municipalities of Ontario200 University Ave. Suite 801,Toronto ON Canada M5H 3C6
To unsubscribe, please click here
4
1
Diana Wilson
From: AMO Communications <[email protected]>Sent: Thursday, April 13, 2017 10:01 AMTo: Diana WilsonSubject: AMO WatchFile - April 13, 2017
AMO Watch File not displaying correctly? View the online version | Send to a friend Add [email protected] to your safe list
April 13, 2017
In This Issue - AMO/MEDG support local economic development. - Risks & Rewards of Social Media. - Showcase at the AMO Conference this August. - The benefits of employee energy management training. - Ontario Small Urban Municipalities Conference - Rural Meets Urban. - Careers with LAS, York Region, Ontario Public Service and Amherstburg. Provincial Matters The AMO/MEDG Business Burden Reduction Project has identified innovative, transferable initiatives in London, Barrie, Peterborough, Hamilton and Bruce County to facilitate local business development. MEDG is supplementing this joint project and other Ministry programs with the “Smart Moves” Conference, April 26, 2017, focused on staff development of business-friendly regulatory approaches. AMO, LAS and ROMA Events What are the risks and rewards of social media use for elected officials? Explore this topic on April 19th during AMO’s social media lunch and learn, register today as space is limited. Are you a municipal supplier or vendor? Do you have a product or service that would benefit the municipal sector? Then register today for the AMO Annual Conference Exhibit Hall. One of the largest municipal trade shows in Canada this is one show you can not afford to miss. Download the exhibitor application today. LAS Employee turnover is noted as one of the most costly expenses for any business or organization, and a lack of training opportunities is often cited as a reason why. Discover how energy training can help retain employees, increase job satisfaction, and save your municipality money. Municipal Wire* Town of The Blue Mountains invites you to the 64th Annual Ontario Small Urban Municipalities (OSUM) Conference, to be held May 3-5, 2017. The theme of the conference is “Rural Meets Urban," recognizing the challenges many of us face as our areas become increasingly urbanized through growth and the migration of people from larger cities to our municipalities. Registration and program information is available on the OSUM website. Careers LAS Program Manager - AMO. The Program Manager is responsible for the overall administration,
5
2
marketing plan, and growth of assigned programs (i.e. One Investment, Natural Gas, Electricity) and management of customer relations. The position will lead the identification, research, program and contract development, and marketing of potential new programs for LAS. The Program Manager will also act as a subject matter expert resource to the municipal sector in all issue areas relevant to assigned programs. Apply by 12:00 PM April 21, 2017 by sending your resume to [email protected]. Manager, Human Services Strategy & Partnerships #20619 - York Region. Department: Community and Health Services, Strategies and Partnerships Branch. Location: Newmarket. Please apply online at York Region Careers by April 20, 2017, quoting competition number 20619. Senior Policy Advisor - Ontario Public Service. Location: Ministry of Transportation, Transit Policy Branch, Toronto. Please apply online, only, by Monday, April 24, 2017, by visiting Ontario Public Service Careers and entering Job ID 106397 in the Job ID search field. Please follow the instructions to submit your application. Director, Safe Schools and Student Well Being - Ontario Public Service. Location: Ministry of Education, Toronto. Job Term: Temporary, 18 months. Please apply online, only, by Tuesday, April 25, 2017, by visiting Ontario Public Service Careers. Please follow the instructions to submit your application. Director, Policy & Analysis / Director, Programs & Integration - Ontario Public Service. Location: Ministry of the Status of Women, Toronto. Note: Candidates are asked to indicate their preferred position, if any. Please apply online, only, by Tuesday, April 18, 2017, by visiting Ontario Public Service Careers. Please follow the instructions to submit your application. Training Instructor / Firefighter - Town of Amherstburg. Please submit a resume no later than Friday, April 28, 2017 to: Town of Amherstburg, Human Resources Department, 271 Sandwich St. South, Amherstburg, ON N9V 2A5. Email: [email protected]; Fax: 519.736.5403. About AMO AMO is a non-profit organization representing almost all of Ontario's 444 municipal governments. AMO supports strong and effective municipal government in Ontario and promotes the value of municipal government as a vital and essential component of Ontario's and Canada's political system. Follow @AMOPolicy on Twitter! AMO Contacts AMO Watch File Team, Tel: 416.971.9856 Conferences/Events Policy and Funding Programs LAS Local Authority Services MEPCO Municipal Employer Pension Centre of Ontario Media Inquiries, Tel: 416.729.5425 Municipal Wire, Career/Employment and Council Resolution Distributions
*Disclaimer: The Association of Municipalities of Ontario (AMO) is unable to provide any warranty regarding the accuracy or completeness of third-party submissions. Distribution of these items does not imply an endorsement of the views, information or services mentioned.
Please consider the environment before printing this.
Association of Municipalities of Ontario200 University Ave. Suite 801,Toronto ON Canada M5H 3C6
To unsubscribe, please click here
6
7
8
From: ZZG-RegionalClerk [mailto:[email protected]] Sent: Friday, March 31, 2017 10:56 AM Subject: Resolution 2017-185 I am writing to advise that Peel Regional Council approved the below resolution at its meeting held on Thursday, March 9, 2017. This resolution is provided to you for your information only.
Resolution 2017-185:
Whereas the Community Water Fluoridation Committee (CWFC) was established on February 11, 2016 to closely examine the current practice of water fluoridation in the Region of Peel and make recommendations to Regional Council on community water fluoridation in Peel; And whereas, over the past year the CWFC has reviewed information and research related to the effectiveness, safety and cost of community water fluoridation using hydrofluorosilicic acid and heard from a number of experts and stakeholders; And whereas, Regional Council has supported the Committee’s recommendation to advocate to the provincial government that they clarify and assume their legislative role in community water fluoridation; Therefore be it resolved, that while waiting for the Province to respond to the above request:
a) The Region of Peel undertake to reduce the concentration of fluoride in
Peel’s lake-based municipal water supply, adjusting it to the lowest level in accordance with provincial standards for the prevention of tooth decay;
b) And further, that the Region of Peel modify the fluoride additive used in the
Region’s water supply to reduce the levels of residual components; substituting a fluoride additive from calcium fluoride or such other source as will have the desired effect of reducing the levels of residual components;
c) And further, that Peel Public Health reaffirms its commitment to ongoing
monitoring of the oral health status of Peel residents – especially children of school age – as well as relevant evidence on the effectiveness and safety of community water fluoridation;
d) And further, that the CWFC suspend meetings until such time as the Province clarifies its role in community fluoridation; or until such time as Regional Council reconvenes the Committee;
e) And further, that copies of this resolution be circulated to the Region of York
(which receives a portion of their water supply from the Region of Peel), all Ontario municipalities and all Peel-area MPPs.
Thank you
9
Summer MacGregor Legislative Assistant Clerk’s Division, Legislative Services 10 Peel Centre Drive, Suite A
Brampton, ON L6T 4B9 Phone: (905) 791-7800 ext. 4465 Email: [email protected]
10
The Corporation of theCity of Kawartha Lakes
P. O. Box 9000, 26 Francis St.,LINDSAY, ON KgV 5R8
Tel. (705) 324-9411 Ext 1295, 1-888-822-2225Fax: (705) 324-8110
Judy Currins, City Glerk
April 10,2017
Lisa Thompson, MPPRoom 425, Legislative BuildingToronto, ONM7A 148
Dear Ms. Thompson
Re: Municipal Resolution on Supporting Gertified Grop AdvisorsCorrespondence from Gity of Belleville and MPP Lisa Thompson
Your August 26,2016 correspondence regarding the above referenced matter was onthe December 13, 2016 Regular Council Meeting agenda for consideration. Thefollowing resolution was adopted at that meeting:
cR2016-',,241
RESOLVED THAT the Memorandum from Kelly Maloney, Agriculture
Development Officer, regarding Municipal Resolution on Supporting Certified
Crop Advisors, Correspondence from City of Belleville and MPP Lisa Thompson,
be received;WHEREAS, Ontario-grown corn, soybean and wheat crops generate $9 billion in
economic output and are responsible for over 40,000 jobs;
WHEREAS, Ontario farmers are stewards of the land and understand the
importance of pollinators to our environment and ecosystems;
WHEREAS, the Ontario government is implementing changes to ON Reg. 63109
that would prevent any Certified Crop Advisor (CCA) from carrying out a pest
assessment if they receive financial compensation from a manufacturer orretailer of a Class 12 pesticide;
WHEREAS, Ontario's 538 Certified Crop Advisors are capable of and willing to
conduct pest assessments and the number of CCA's eligible to service theOntario industry will be reduced to only 80- should the proposed changes to the
definition of professional pest advisor be implemented in August 2017;WHEREAS, the reduction in CCAs would force corn and soybean farmers to step
aside from the relationships that they have built with experts that understand their
unique crop requirements, soil types and field conditions, placing undue delays
on planting crops;
11
THAT the Council of the City of Kawartha Lakes support the efforts of theMember of Provincial Parliament for Huron-Bruce to eliminate barriers toemployment opportunities for CCA's and allow Ontario farmers the freedom toengage in business with the expert of their choice; andTHAT a copy of this resolution be fonruarded to all Members of ProvincialParliament and municipalities.
CARRIED
Please contact myself (705-324-9411 , ext . 1295) if you have any questions with respectto this matter.
Yours very truly,
Judy Currins, CMO,City ClerkCity of Kawartha Lakes
cc: All Ontario Municipalities, Members of Provincial Parliament
12
13
14
15
CATFISH CREEK
CONSERVATION AUTHORITY
Financial Statements
December 31, 2016
Council Agenda MC. A. O./ Clerk pDir. of Finance Dir. Physical Serv. Dir. Com/ Corp. Serv. Dir. Fire/ Emerg Serv. Other
File:
Name:
Date Received:--
APR 0 4 2017
16
CATFISH CREEK CONSERVATION AUTHORITY
Financiai Statements
Year Ended December 31, 2016
Table of Contents PAGE
Independent Auditors' Report 1 - 2
Statement of Financial Position 3
Statement of Operations 4
Statement ofAccumulated Surplus 5
Statement of Change in Net Financial Assets 6
Statement of Cash Flows 7
Notes to the Financial Statements 8- 15
Schedule of Internal Reserves 16
Schedule of Program Expenditures 17
Schedule of Other Expenditures 18
Schedule ofAdministrative Expenditures 19
Schedule of Tangible Capital Assets for 2016 20
Schedule of -Tangible Capital Assets for 2015 21
17
19 1 GRAHAM SCOTTENNs LLP
CHARTERED PROFESSIONAL ACCOUNTANTS
R 519- 633-0700 • F. 519- 633-7009 R 519- 773- 9265 - F. 519-773- 9683
450 Sunset Drive, St. Thomas, ON N5R 5V1 25 John Street South, Aylmer, ON N5H 2131
www.grahamscottenns. com
INDEPENDENT AUDITORS' REPORT
To the Members of Catfish Creek Conservation Authority:
Report on the Financial Statements
We have audited the accompanying financial statements of Catfish Creek Conservation Authority, which comprise the statement of financial position as at December 31, 2016, and the statements of
operations, accumulated surplus, changes in net financial assets, and cash flows for the year then ended,
and a summary of significant accounting policies and other explanatory information.
Management' s Responsibility for the Financial StatementsManagement is responsible for the preparation and fair presentation of these financial statements inaccordance with Canadian accounting standards for public sector entities and for such internal control asmanagement determines is necessary to enable the preparation of financial statements that are free frommaterial misstatement, whether due to fraud or error.
Auditor' s ResponsibilityOur responsibility is to express an opinion on these financial statements based on our audit. We
conducted our audit in accordance with Canadian generally accepted auditing standards. Those standardsrequire that we comply with ethical requirements and plan and perform the audit to obtain reasonableassurance whether the financial statements are free of material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures inthe financial statements. The procedures selected depend on the auditor's judgment, including theassessment of the risks of material misstatement of the financial statements, whether due to fraud or error.
In making those risk assessments, the auditor considers internal control relevant to the entity's preparationand fair presentation of the financial statements in order to design audit procedures that are appropriate in
the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity'sinternal control. An audit also includes evaluating the appropriateness of accounting policies used and thereasonableness of accounting estimates made by management, as well as evaluating the overallpresentation of the financial statements.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis forour qualified audit opinion.
1-
18
19 1 GRAHAM SCOTTENNS LLP
CHARTERED PROFESSIONAL ACCOUNTANTS
P. 519- 633- 0700 - F 519- 633- 7009 R 519- 773- 9265 • F. 519- 773-9683
450 Sunset Drive, St. Thomas, ON N513 5V1 25 John Street South, Aylmer, ON N51- 1 2C1
www.grahamscottenns.com
INDEPENDENT AUDITORS' REPORT (CONTINUED)
Basis for Qualified Opinion
Tn cornnion wit -11 mgnxt har,tahla nrgani?atinnc the nr ani7 tion derives revenue from charitable
donations the completeness of which is not susceptible of satisfactory audit verification. Accordingly, ourverification of these revenues was limited to the amounts recorded in the records of the organization and
we were not able to determine whether any adjustments might be necessary to contributions, the annualsurplus or deficit, financial assets and accumulated surplus.
Qualified Opinion
In our opinion, except for the effects of the matter described in the Basis for Qualified Opinion paragraph, the financial statements present fairly, in all material respects, the statement of financial position ofCatfish Creek Conservation Authority as at December 31, 2016, and the statements of operations, accumulated surplus, changes in net financial assets, and cash flows for the year then ended in accordancewith Canadian accounting standards for public sector entities.
Aylmer, Ontario
January 26, 2017
5;=" scams 45" 4.&,4;V
CHARTERED PROFESSIONAL ACCOUNTANTS
Licensed Public Accountants
19
CATFISH CREEK CONSERVATION AUTHORITY
Statement of Financial Position
As At December 31, 2016
FINANCIAL ASSETS
Cash
Term deposits ( Note 2)
Accounts receivable
LIABILITIES
Accounts payable and accrued liabilitiesDeferred revenues (Note 4)
TOTAL LIABILITIES
NET FINANCIAL ASSETS
NON-FINANCIAL ASSETS
Tangible capital assets ( Pages 20 and 21)
ACCUMULATED SURPLUS (NOTE 5)
See accompanying notes to the financial statements. 3-
2016
133,234
309,974
177,928
2015
126,268
408,453
167, 577
621, 136 702,298
62,048 45, 682
119, 765 69,544
181, 813 115,226
439,323 587,072
1, 612,324 1, 526, 124
2,051, 647 2113, 196
20
CATFISH CREEK CONSERVATION AUTHORITY
Statement of Operations
Year Ended December 31, 2016
1, 145, 519 1, 197, 783 1, 309, 301
EXPENDITURES ( NOTE 11)
2016 2016 2015
Camping and day use ( Page 18)
Budget Actual Actual
Program expenditures - Mandated Programs ( Page 17)
Unaudited -Note 7)
233, 368 239, 483
Program expenditures - Watershed Stewardship ( Page 17) 127, 467 107, 986 140, 459
REVENUES
179, 093 170, 883 145, 736
Camping and day use 514,710 541, 076 518,446
Municipal levies (Note 6) 288,002 263,793 258, 168
Other nrnviiat orant 82. 348 125, 829 118, 741
Ministry ofNatural Resource and Forestry grants 79, 835 79,835 79, 835
Federal grants 23, 300 60,945 142, 080
Watershed Stewardship 103, 957 48,543 70,995
Donations and sponsorships 38, 367 41, 989 90, 140
Ontario and Federal works programs 15, 000 30,285 25,669
Interest 5,488 5, 227
1, 145, 519 1, 197, 783 1, 309, 301
EXPENDITURES ( NOTE 11)
Camping and day use ( Page 18) 526,653 526,448 491, 274
Program expenditures - Mandated Programs ( Page 17) 321, 152 233, 368 239, 483
Program expenditures - Watershed Stewardship ( Page 17) 127, 467 107, 986 140, 459
Administrative expenditures ( Page 19) 179, 093 170, 883 145, 736
Special projects, surveys and studies (Page 18) 23, 403 181, 802 241, 712
Amortization (Page 20 and 21) 36, 178 36, 178 33, 803
Motor Pool (Page 18) 91, 565 1, 749 288)
Acquisition of small tools and equipment 918 387
DEFICIT) SURPLUS FOR THE YEAR
1, 305, 511
See accompanying notes to the financial statements. 4-
1, 259,332
6( 1, 549)
1, 292,566
16, 735
21
CATFISH CREEK CONSERVATION AUTHORITY
Statement of Accumulated Surplus
Year Ended December 31, 2016
BALANCE, BEGINNING OF YEAR
Deficit) surplus for the year
BALANCE, END OF YEAR
See accompanying notes to the financial statements. 5-
2016
2, 113, 196
2015
2, 096,461
61, 549) 16.735
2, 051, 647 2. 113, 196
22
CATFISH CREEK CONSERVATION AUTHORITY
Statement of Change in Net Financial Assets
Year Ended December 31, 2016
ANNUAL SURPLUS (DEFICIT)
A_ . E: +; r Ft1,,0 ; tot11111V11.1GQL1V11 VlIL AV cap; o1 " 0 --
Acquisition of tangible capital assets
Gain)/ loss on sale of tangible capital assets
Proceeds on sale of tangible capital assets
CHANGE IN NET FINANCIAL ASSETS
NET FINANCIAL ASSETS, BEGINNING OF YEAR
NET FINANCIAL ASSETS, END OF YEAR
2016 2016 2015
Budget Actual Actual
Unaudited -Note 7)
159,992) 61, 549) 16, 735
36, 178 36178 vi Rm
122,949) 42, 853)
5,429)
6,000
123, 814) 147,749) 7,685
587,072 587,072 579,387
463, 258 439,323 587,072
See accompanying notes to the financial statements. 6-
23
CATFISH CREEK CONSERVATION AUTHORITY
Statement of Cash Flows
Year Ended December 31, 2016
CASH FLOWS FROM OPERATING ACTIVITIES
Cash receipts
Cash expenditures
Interest received
CASH FLOWS FROM INVESTING ACTIVITIESSale ( purchase) of investments
CASH FLOWS FROM CAPITAL ACTIVITIESAdditions to tangible capital assets
Proceeds on disposal of tangible capital assets
Purchase of assets under construction
NET CHANGE IN CASH DURING THE YEAR
CASH, BEGINNING OF YEAR
CASH, END OF YEAR
2016
1, 226,736
1, 206,788)
5,488
See accompanying notes to the financial statements. 7-
2015
1, 220,994
1, 23 8, 073)
5, 227
25,436 ( 11. 852)
98,479 ( 4,991)
98,479
122, 949)
6, 000
4, 991)
42,853)
116.949) ( 42, 853)
6, 966 ( 59,696)
126,268 185, 964
133,234 126 268
24
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
PURPOSE OF THE ORGANIZATION
Catfish Creek Conservation Authority (CCCA) is established under the Conservation Authorities Actof Ontario to further the conservation, restoration, development and management of natural resources, other than gas, oil, coal and minerals, for the watershed within its jurisdiction. CCCA's jurisdiction
includes areas in the City of St. Thomas, the Municipality of Central Elgin, the Town of Aylmer, theTownship of South-West Oxford and the Township of Malahide. The organization is also a
eni i.n
registeredcharitycharity and as such is exempt from income taxes under paragraph 1499' I')() ui L11C ruicviuc
Tax Act.
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
The financial statements of CCCA are prepared by management in accordance with Canadiangenerally accepted accounting principles for organizations operating in the local government sector asrecommended by the Public Sector Accounting Board of Chartered Professional Accountants - Canada. Significant aspects of the accounting policies adopted by CCCA are as follows:
Accounting Estimates
The preparation of these financial statements in conformity with Canadian accounting standards forpublic sector entities requires management to make estimates and assumptions that affect the reported
amount of assets and liabilities, the disclosure of contingent assets and liabilities at the date of thefinancial statements, and the reported amounts of revenues and expenditures during the currentperiod. These estimates are reviewed periodically and adjustments are made to income as appropriatein the year they become known. There are no significant estimates.
Financial Instruments
Measurement offinancial instruments
CCCA initially measures its financial assets and liabilities at fair value, except for certain non -arm' slength transactions.
CCCA subsequently measures all its financial assets and financial liabilities at amortized cost, exceptfor cash, which is measured at fair value. Changes in fair value are recognized in the statement of
changes in net financial assets until they are realized, at which time they are recognized in surplus forthe year.
Financial assets measured at amortized cost include term deposits and accounts receivable.
25
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES ( CONTINUED)
Financial Instruments (continued)
Financial liabilities measured at amortized cost include accounts payable and accrued liabilities.
Financial assets measured at fair value include cash.
Revenue Recomg 'tion
Municipal levy revenue is recognized in full once the Municipalities approve the levied amount.
Campground rental revenue is recognized when the campsite is used. For seasonal campgroundrentals the revenue is recognized over the camping season to which it relates.
Grant revenue is recognized during the period in which the corresponding expense is incurred.
Donation and sponsorship revenue is recognized when received.
Funds received that do not meet the recognition criteria are recorded as deferred revenue.
Classification of Expenditures
Expenditures are reported in four main categories, which follow the classifications designated by theMinistry of Natural Resources and Forestry for program grants. By following these guidelines, therewill be consistency of reporting by the 36 Conservation Authorities in Ontario. These are furtherexplained as follows:
General administration expenditures include those associated with head office functions other thantechnical staff and associated programs.
Water and related land management expenditures include program administration, capital works forwater related projects along with associated programs such as floodplain regulations, conservationservices, dam operation and maintenance.
Conservation and recreation land management expenditures include capital works for recreationrelated projects along with associated programs such as wildlife conservation services.
Other operational expenditures include conservation areas, special employment projects, vehicles andequipment operations.
M
26
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (CONTINUED)
Tangible capital assets
Tangible capital assets are recorded at cost which includes all amounts that are directly attributable toacquisition, construction, development or betterment of the asset. The cost, less residual value of thetangible capital asset, is amortized on a straight- line basis over its estimated useful life as follows:
Buildings 50 years
Dams 100 years
Bridges, boardwalks and other wood structures 30 years
Water services and wells 50 years
Equipment 30 years
Hydro services 50 years
Vehicles 8 years
One half of the annual amortization is charged in the year of acquisition and in the year of disposal. Assets under construction are not amortized until the asset is available for productive use.
Contributions of tangible capital assets
Tangible capital assets received as contributions are recorded at their fair value at the date of receiptand also are recorded as revenue.
Non-financial assets
Non-financial assets are not available to discharge existing liabilities and are held for use in theprovision of services. They have useful lives extending beyond the current year and are not intendedfor sale in the ordinary course of operations. The change in non- financial assets during the year, together with the annual surplus or deficit, provides the Change in Net Financial Assets for the year.
2. TERM DEPOSITS2016 2015
GIC, 1. 00%, matures on May 16, 2017 4,974 4,886
GIC, 1. 35%, matures on September 25, 2017 305.000 403. 567
30 408,453
10-
27
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
3. RESERVES
CCCA has established a number of internal reserves in order to ensure that funds are available tosupport future activities. The following reserves have been established:
Operational Reserve
The purpose of the operational reserve is to use any accumulated funds for the payment ofexpenditures that are not covered by government funding.
Capital Acquisition Reserve
This fund has been established to support the acquisition of various tangible capital assets as theybecome due for replacement.
Special Programs Reserve
This fund has been established to support funds designated by donors for special conservationprojects to be carried out in the watershed.
Land Acquisition Reserve
This fund has been established to support the acquisition of environmentally significant propertiesthat would further the objectives of the Catfish Creek Conservation Authority
Conservation Areas Development Reserve
This fund has been established to support the development of environmentally significant propertiesthat would further the objectives of the Catfish Creek Conservation Authority
The reserve fund transfers for the year are outlined in the Schedule of Internal Reserves on page 16 ofthe financial statements.
4. DEFERRED REVENUES
Camping revenuesGrant revenues
11-
2016 2015
72, 556 60,672
47,209 8. 872
119. 765 69. 544
28
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
5. ACCUMULATED SURPLUS
The accumulated surplus balance consists of general fund, balances in reserves and investment intangible capital assets and is made up as follows:
2016 2015
General fund 10,492) 376
Reserves and reserve funds:
Operational reserve 148, 500 174,373
Capital acquisition reserve 31, 910 65, 500
Special programs reserve 149,373 185, 408
Land acquisition reserve 75,757 75, 757
Conservation Areas development reserve 44,275 85, 658
449,815 586.696
Invested in tangible capital assets 1, 612,324 1, 526, 124
2,0 2, 113, 196
6. MUNICIPAL LEVIES
The municipalities that participate as members of CCCA and their corresponding financial levies areas follows:
2016 2015
Township of Malahide 102, 023 105, 641
Municipality of Central Elgin 69,511 64, 764
Town of Aylmer 68, 116 64,654
City of St. Thomas 15,257 14,554
Township of South-West Oxford 8,886 8, 555
263,793 258, 168
The municipal levy for the Township of Malahide noted above includes a special levy of $11, 418
2015 - $ 19,648) related to the ice management program in Port Bruce.
12-
29
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
7. BUDGETED AMOUNTS
The budget figures presented in these financial statements are based upon the 2016 budget approvedby the CCCA board. Adjustments to budgeted values were required to provide comparative budgetvalues based on the full accrual basis of accounting. The chart below reconciles the approved budgetwith the budget figures presented in these financial statements. Budget amounts are unaudited.
EXPENDITURES
Camping and day use ( Page 18)
Approved
526, 653
PSAB
Budget Adjustments Budget
321, 152
Watershed Stewardship ( Page 17) 127, 467 127, 467
REVENUES
179, 093 179, 093
Special projects, surveys and studies ( Page 18)
Camping and day use 514,710 514,710Municipal levies (Note 6) 288,002 288, 002
Federal Grants 23, 300 23, 300Other 103, 957 103, 957
Ministry ofNatural Resource and Forestry Grants 79, 835 79, 835Other provincial grants 82,348 82,348
Donations and sponsorships 38,367 38, 367Employment Program Grant 15, 000 15, 000
Reserves 194, 550 194, 550)
Reserves - special projects 51, 836 51, 836)
Prior year surplus 377 377)
1, 392,282 246,763) 1. 145, 519
EXPENDITURES
Camping and day use ( Page 18) 526,653 526, 653Program expenditures
Mandated Programs (Page 17) 321, 152 321, 152
Watershed Stewardship ( Page 17) 127, 467 127, 467Administration (Page 19) 179, 093 179, 093
Special projects, surveys and studies ( Page 18) 146, 352 122, 949) 23, 403Motor Pool ( Page 18) 91, 565 91, 565
Amortization (Page 20 and 21) 36, 178 36, 178
1_,392,282 ( 86,771) 1, 305, 511
DEFICIT) FOR THE YEAR - ( 159, 992) 159 992)
13-
30
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
8. FINANCIAL INSTRUMENTS
Risks and Concentrations
CCCA is exposed to various risks through its financial instruments. The following analysis providesa measure of the CCCA' s risk exposure and concentrations at the statement of financial position date.
Liquidity Risk
Liquidity risk is the risk that the CCCA will encounter difficulty in meeting obligations associatedwith financial liabilities. CCCA is exposed to this risk mainly in respect of its accounts payable andaccrued liabilities. Management does not feel this risk is significant.
Credit Risk
Credit risk is the risk that one party to a financial instrument will cause a financial loss for the otherparty by failing to discharge an obligation. CCCA' s main credit risk relates to its accounts
receivable. Management does not feel this risk is significant.
It is management's opinion that the entity is not exposed to any significant market, interest rate, foreign currency or price risk.
No financial liabilities of the CCCA were in default during the period.
The CCCA was not subject to any covenants during the period.
9. DONATED SERVICES
Community members have volunteered their time and talents to CCCA. Since these services are not
normally purchased and because of the difficulty of determining their fair value, donated services arenot recognized in these statements.
10. GROUP RRSP
CCCA has established a Group RRSP plan for all regular full-time employees. Under the terms of
the plan, CCCA and the employee are required to make contributions equivalent to 5% of the
employee' s gross salary.
14-
31
CATFISH CREEK CONSERVATION AUTHORITY
Notes to the Financial Statements
Year Ended December 31, 2016
11. SUPPLEMENTARY INFORMATION:
Current fund expenditures by object:
Other program expenditures
Salaries, wages and employee benefitsInsurance
Amortization
Municipal taxes
12. COMPARATIVE FIGURES
2016
583,356
584,416
40,558
36, 178
14,824
2015
622,352
583, 236
39,355
33, 803
13. 820
1, 259,332 1, 292,566
Some prior year figures have been reclassified to conform to the current year's financial statementpresentation.
15-
32
CATFISH CREEK CONSERVATION AUTHORITY
Schedule of Internal Reserves
Year Ended December 31, 2016
Operational Reserve
16-
2016 2015
BALANCE, BEGINNING OF YEAR 174,373 187, 173
Transfer from (to) operating surplus 136,881) 7, 710
Transfer from (to) capital acquisition reserve 33,590 2, 000)
Transfer from (to) special programs reserve 36,035 6,411)
Transfer from (to) land acquisition and development reserve 41, 383 12, 099)
BALANCE, END OF YEAR 148,500 1 74,3 73
Capital Acquisition Reserve
2016 2015
BALANCE, BEGINNING OF YEAR 65,500 63, 500
Transfer from (to) operational reserve 33,590) 2, 000
BALANCE, END OF YEAR 31,91000
Special Proarams Reserve
2016 2015
BALANCE, BEGINNING OF YEAR 185,408 178, 997
Transfer from (to) operational reserve 36,035) 6,411
BALANCE, END OF YEAR 149,373 185,408
Land Acquisition Reserve2016 2015
BALANCE, BEGINNING OF YEAR 75,757 75, 757
Transfer from (to) operational reserve
BALANCE, END OF YEAR 75,75757
Conservation Areas Development Reserve
2016 2015
BALANCE, BEGINNING OF YEAR 85,658 73, 559
Transfer from (to) operational reserve 41, 383) 12, 099
BALANCE, END OF YEAR 44,275 85, 658
16-
33
CATFISH CREEK CONSERVATION AUTHORITY
Schedule of Program Expenditures
Year Ended December 31, 2016
233, 368 239, 483
Watershed Stewardship ProgramsWater management programs
2016 2015
Conservation information and education
Actual Actual
Watershed stewardship 21, 422 33, 160
PROGRAM EXPENDITURES
15, 943 27, 958
Mandated Programs
8, 547 7, 667
Flood forecast and warning 142, 835 142, 747Plan input 32,503 29, 777Ice management 22,837 33, 027
Watershed planning 18, 151 16,617Flood control structures 10,945 10,927Technical studies 6,097 6. 388
233, 368 239, 483
Watershed Stewardship ProgramsWater management programs 39,537 47,914
Conservation information and education 22,537 23, 589
Watershed stewardship 21, 422 33, 160
Tree planting 15, 943 27, 958Woodlot management 8, 547 7, 667
Fish and wildlife habitat 171
107,986 140.459
Total Program Expenditures 34 379.942
17-
34
CATFISH CREEK CONSERVATION AUTHORITY
Schedule of Other Expenditures
Year Ended December 31, 2016
Camping and Day Use
2016 2015
Actual Actual
Campground wages 266,358 253, 583
Campground expenses 122,737 109, 896
Utilitiesnn n i
aa,u3o 5 nnni , aaz
Maple syrup program 49,317 51, 913
Bad Debts
526,448 491, 274
Special Projects, Surveys and Studies
2016 2015
Actual Actual
Other conservation lands 157,652 201, 998
Special projects - other 3,381 37,313
Special projects - contract services 174
Special projects - Springwater Conservation Area 18,454 2, 401
Bad Debts 2, 141
Insurance and licences
181. 802 241, 712
Motor Pool
18-
2016 2015
Actual Actual
Maintenance and general repairs 20,370 18, 128
Fuel 9, 455 11, 421
Insurance and licences 8,248 9, 361
38,073 38, 910
Less internal charges forusage3S 6,324) 3 9, 198)
1, 749( 2-
18-
35
CATFISH CREEK CONSERVATION AUTHORITY
Schedule of Administrative Expenditures
Year Ended December 31, 2016
2016 2015
Actual Actual
WAGES AND BENEFITSAdministrative staff salaries 76,321 65, 562Employee benefits 20,320 17.217
96, 641 82. 779
GENERAL EXPENSES
Conservation Ontario Levy 17, 782 17, 051Professional fees 7,886 7,632Insurance and taxes 6,818 7,013General expenses 2,368 2, 623Bank charges and interest 428 420
Postage
35,282 34. 739
RENT AND UTILITY SERVICES
Office cleaning and maintenance 11, 230 2,087Light, heat, power and water 6,467 5, 680Telephone 2, 686 2.368
20,383 10. 135
TRAVEL EXPENSES AND ALLOWANCEMembers allowances and expenses 6, 721 6,664Staff mileage and expenses 543 570
7,264 7.234
EQUIPMENT PURCHASES AND RENTALEquipment purchase and rental 5, 024 5, 887Equipment maintenance 2, 784 2. 311
7,808 8. 198
MATERIAL AND SUPPLIES
Stationery and office supplies 2, 556 1, 694Postage 949 957
3, 505 2. 651
170,883 14
19-
36
ASSET TYPE
Infrastructure Related
Land
Buildings (?.otc 1)
Dams
Bridges, boardwalks and
other wood structures
Water services and wells
Hydro services
General Capital
Equipment
Vehicles
Total Tangible Capital Assets
CATFISH CREEK CONSERVATION AUTHORITY
Schedule of Tangible Capital Assets
Year Ended December 31, 2016
Opening Ending OpeningHistorical Historical Accumulated
Cost Cost Amortization
Balance 2016 2016 2016 Balance Balance 2016 2016
Jan 1/ 16) Acquisitions Disposals Write -Offs ( Dec 31/ 16) ( Jan 1/ 16) Disposals Amortization
891, 436 - 494zic 68, 193
216, 100 -
129,690 -
78,926 -
44, 510
1, 854, 977 68, 193
891, 436 -
562, 508 247, 849
216, 100 94, 968
129, 690 58, 602
78, 926 26, 944
44,510 2, 225
1, 923, 170 430, 588
9316
2, 161
4, 011
1, 579
890
17,957
105, 842 - - 105, 842 37,218 3, 528
182, 453 54, 756 41, 878 195, 331 149, 342 14, 693
288,295 54, 756 41, 878 301, 173 186,560 18,221
2, 143,272 122, 949 41, 878 2, 224,343 617, 148 36, 178
See accompanying notes to the financial statements. 20-
37
CATFISH CREEK CONSERVATION AUTHORITYSchedule of Tangible Capital Assets
Year Ended December 31, 2015
Opening Ending OpeningHistorical Historical Accumulated
Cost Cost AmortizationBalance 2015 2015 2015 Balance Balance 2015 2015
Jan 1115) Acquisitions Disposals Write -Offs ( Dec 31/ 15) ( Jan 1/ 15) Disposals Amortization
ASSET TYPE
Infrastructure Related
Land 891, 436 - - 891, 436
Buildings (Note 1) 451, 462 42, 853 - 494,315 239,437 8, 412
Dams 216, 100 - - 216, 100 92, 807 2, 161
Bridges, boardwalks and
other wood structures 129, 690 - - 129, 690 54, 591 4,011Water services and wells 78, 926 - - 78, 926 25, 366 1, 578
Hydro services 44,510 - 44,510 1, 335 890
1, 812, 124 42,853 - 1, 854,977 413,536 17,052
General Capital
Equipment 105, 842 - - 105, 842 33, 690 3, 528
Vehicles 182,453 - - 182,453 136, 119 13, 223
288,295 - 288,295 169,809 16, 751
Total Tangible Capital Assets 2, 100,419 42, 853 - 2, 143,272 583,345 33.803
Note 1: included in tangible capital assets for the year is a building under construction. The additions for the year end total $ 42, 853 and are not being amorti
See accompanying notes to the financial statements. 21-
38
March 29, 2017
Attention: CAO/ Clerk
Re: Elgin Area Primary Water Supply System 2016 Compliance Report
Dear Sir/Madam:
Please find the attached copy of the Elgin Area Primary Water Supply System ( EAPWSS) 2016Compliance Report. The intent of this report is to meet specific reporting obligations underSchedule 22 of O. Reg 170/ 03 ( Drinking -Water Systems).
A copy of this report has been sent to each of the benefitting municipalities of the Elgin AreaPrimary Water Supply System. In addition, a copy has been posted on the Regional WaterSupply website at http://www.watersupply. london. ca/ reports.html and the report will be madeavailable to the public upon request at the Regional Water Supply office in London.
Should you have any questions, please feel free to contact our office at your earliest
convenience.
Best regards,
VAffl i'
Erin McLeod
Quality Assurance & Compliance Manager
Elgin Area Primary Water Supply System
Council Agenda ft File: ate,_ C.A.O./ Clerk O Name: DPW 7SDir. of Finance 0 Subject: aot- Dir. Physical Sere E3 ll-e' r'-It'f_ +•— Dir. Com/Corp. Serv. " A pate Received: Dir. Fire/Emerg Serv. D
MAR 31 2017Other
Elgin Area Primary Water Supply System c/o The City of LondonOffice 519. 930.3505 ext: 2714 Regional Water Supply DivisionFax 519.474.0451235North Centre Rd. Suite [email protected]' London, Ontarioahttp://watersuppiy.london. ca/ N5X 4E7
IS014001
39
Elglti,AreaPrVrnary Water Supply Syser-n
2016 COMPLIANCE REPORT
2016 Compliance Report Elgin Area Primary Water Supply System Page 1
40
TABLE OF CONTENTS
PROFILE......................................................................................................................... 3
WHOWE ARE............................................................................................................ 3
WHATWE DO............................................................................................................. 4
WHAT' S IMPORTANT................................................................................................. 5
ELGIN AREA PRIMARY WATER SUPPLY SYSTEM: AT A GLANCE ....................... 6
THE WATER TREATMENT PROCESS...................................................................... 7
2016 HIGHLIGHTS......................................................................................................... 8
ALGAL TOXINS MONITORING PROGRAM............................................................... 8
ASSET MANAGEMENT PLAN.................................................................................... 8
FINANCIAL PLAN....................................................................................................... 9
2016 CAPITAL PROJECT HIGHLIGHTS...................................................................... 10
RESIDUALS MANAGEMENT FACILITY ( RMF)........................................................ 10
STORAGE BUILDING............................................................................................... 12
CARBON PUMPS..................................................................................................... 12
CHLORINE EMERGENCY ACTUATED VALVES..................................................... 13
FILTER REPLACEMENTS........................................................................................ 14
2016 FLOW SUMMARY................................................................................................ 16
2016 CHEMICAL CONSUMPTION............................................................................... 18
2016 WATER QUALITY SUMMARY............................................................................. 18
MINISTRY OF THE ENVIRONMENT AND CLIMATE CHANGE INSPECTION............. 20
APPENDIX A: 2016 Flow SummaryAPPENDIX B: 2016 Annual Report
2016 Compliance Report Elgin Area Primary Water Supply System Page 2
41
PROFILE
WHO WE ARE
The Elgin Area Primary Water Supply System Board of Management owns and governsthe drinking water system. The Board of Management is made up of members appointedfrom each of the seven member municipalities that are currently supplied with water fromthe Elgin Area Primary Water Supply System ( EAPWSS). One of these member
municipalities, the City of London, acts as the Administering Municipality. Accordingly, the City of London provides all associated administrative and management services onbehalf of the Board. The Board of Management currently utilizes the services of anindependent contracted Operating Authority.
The water system is operated and maintained by Ontario Clean Water Agency ( OCWA) under contract to the Joint Board of Management.
OPERATING AUTHORITY:/"\ ONTARIO CLEAN WATER AGENCYAGENCE ONTARIENNE DIES EkIl I
E , .'. AreaPrimary Water Snappy Sy;ssterr
2016 Compliance Report Elgin Area Primary Water Supply System Page 3
42
WHAT WE DO
Water Treatment & Supply
The Elgin Area Primary Water Supply System is responsible for the treatment andtransmission of drinking water to seven ( 7) municipalities in southwestern Ontario. Thepopulation served by this system is approximately 130, 000. Water is provided bulkwholesale to the municipalities who then distribute it to their customers.
The Elgin Area Water Treatment Plant ( WTP) employs pre -chlorination, screening, powder activated carbon addition ( seasonally on an as -required basis), coagulation,
flocculation, sedimentation, dual -media filtration, UV disinfection, post -chlorination,
fluoridation and pH adjustment using both carbon dioxide and sodium hydroxide to treatraw water obtained from Lake Erie. After the water is treated it is pumped from the WTP
to various communities or to the terminal storage reservoirs. The drinking water systemis monitored at various locations throughout the system via a Supervisory Control andData Acquisition ( SCADA) system.
Figure 1: Low Lift Pumping Station located on Lake Erie
2016 Compliance Report Elgin Area Primary Water Supply System Page 4
43
WHAT' S IMPORTANT
Values of the Water System
The values of the Elgin Area Primary Water Supply System are the inherent beliefs ormoral standards that generally reflect what the Elgin Area Primary Water Supply SystemBoard of Management stands for and believes in:
Sustainable - be financially, environmentally, socially, and physically
sustainable;
Inclusive - provide access to bulk drinking water for current and prospective
members, in accordance with Board policy; Fair and equitable - balance the interests of individual members with the best
interests of all members, as well as the needs of existing members with theneeds of new members;
Vigilant - ensure an adequate supply of safe and reasonably priced drinkingwater is available to members;
Innovative - be receptive to and supportive of new ideas and opportunities for
improvement;
Cooperative — be supportive to the needs of the Elgin Area Primary Water
Supply System; Open and transparent — conduct business in a manner that enables member
municipalities and the public to review and provide input into major decisions as
appropriate;
Public Ownership — retain ownership of the water system in public hands.
2016 Compliance Report Elgin Area Primary Water Supply System Page 5
44
ELGIN AREA PRIMARY WATER SUPPLY SYSTEM: AT A GLANCE
Figure 2: Elgin Area Primary Water Supply System Major Infrastructure Locations
2016 Compliance Report Elgin Area Primary Water Supply System Page 6
45
THE WATER TREATMENT PROCESS
The following figure provides a general overview of the conventional water treatmentprocess. The processes outlined below are very similar to the treatment at the ElginArea Water Treatment Plant, although they are not an exact representation. Some
details may vary.
Water Intakes
Untreated water flows ins, v0
intake cribs and throtugh iantake
pipe a ns far as 1 kin affshc e. Ths intake crib ate equrpiroed
NBr` itY8Y8Yfu" Y ri itPyfwith I l rune solution, rth. erf
m a an iii orrg pfrau Zebra Mussel coartrol 1
Sedimentation
In the setring tanks, thre speed of theflowing water is slowed down so that the largersuspended particles carr
settle out by gravity andcer(lect on the tank
lrottono. The clear
water on the surface
then spills over the
trip of the tank, on -route to the fi hens.
Filtration
Filtration is the frenal step on renrovi ng She particulatemratter. Layers of gravel, sand,
and anthracite filter out the
reuararuring suspended
particles, nachicling finerpieces of ffler, ak, gae, silt,
and other inrpurt¢es.
Jw?"M;.;_—, When a fillfer accurnu-
a l aces too rnrany solids itis taken out of service
and backwashed.
Intake Screens
Mechanically cleanedtraveling screens renvvelarge objects and debris,
such as leases, stocks, and
occasionally fish from theraw water
Coagulation -Flocculation
The floccLAition b in gerny . agnates the water to corcerrfrata
the mrd€ d solids in an efflcuexnt
rrraarruer. Addbortad chenocals rrraybe added to the fbotutaton priceseither upatreran of the flash rivers
or as a pact of the roagLill
floctriaticin prams, rnct, dine : laas ccogulant aas) caustic scala
powlered activated carborT ( tor ( for pH aelyrsss1W1t}, Or chfaarkre
taste and odsur corat*cadp; pohmwrs (for disinfection),
Post -chlorination
Chlorine is added to the water to kill anyrernaining disease causing organismsand to sustain a chlorine residual in the
water as it makes its way through thedistribution systenn.
Fluoridation
At the Eigrn Water Treatment Fac.lity, fGuonde is added to help prevent suavirres.
Pre -chlorination
Chlorine is added tothe raw waterto kill most
disease causing micro- porganisms and Inetp control' taste and cwdour causingubstancees,
Flash MixtngAlum is adtled to
fast -stirring flashmixers which rause
very fine par6ekessuch as salt), that
would not readilyl' settle out of the water,
to clump together intolarger particles cafled floc.
Clear Weil
With the treatment process compnlete, the
purified water collects in a clear well below
the filters and is stored before beingdischarged into
the distribution
sysSern.
Figure 3: General Overview of the Water Treatment Process
At the Elgin Area Water Treatment Plant, several additional treatment steps take place:
Carbon dioxide is injected prior to the flash mixing ( Step 4) to lower the raw waterpH in order to improve the treatment process effectiveness and efficiency. A UV reactor is located after each filter ( Step 7) for additional disinfection whenrequired.
Sodium Hydroxide is added as the treated water leaves the water treatment plant
and enters the transmission system ( Step 11) to raise the treated water pH,
resulting in reduced corrosion potential.
2016 Compliance Report Elgin Area Primary Water Supply System Page 7
Distribution
tfOt9tttdAMltfdttf
y
rmrd.
Yi
iy
pa
4..,,, njit spied wale,
distribute
mains to reservoirs, primrrpingstations, and consumers. Thi rraugh-
out the system, water is tested
regularly to ensure high quality,
Figure 3: General Overview of the Water Treatment Process
At the Elgin Area Water Treatment Plant, several additional treatment steps take place:
Carbon dioxide is injected prior to the flash mixing ( Step 4) to lower the raw waterpH in order to improve the treatment process effectiveness and efficiency.
A UV reactor is located after each filter ( Step 7) for additional disinfection whenrequired.
Sodium Hydroxide is added as the treated water leaves the water treatment plant
and enters the transmission system ( Step 11) to raise the treated water pH,
resulting in reduced corrosion potential.
2016 Compliance Report Elgin Area Primary Water Supply System Page 7
46
2016 HIGHLIGHTS
ALGAL TOXINS MONITORING PROGRAM
In recent years, Lake Erie has experienced severe blue-green algal ( cyanobacteria)
blooms. Algal blooms can create challenges for the water treatment plant by producingunpleasant taste and odours, interfering with treatment plant performance, and
producing cyanotoxins which can impact human health.
The United States National Oceanic and Atmospheric Administration ( NOAA) has
indicated that the 2016 cyanobacteria bloom in Lake Erie was mild compared to the
previous few years. Because of the relatively mild bloom, the areas of scum in LakeErie were fewer, less dense and less toxic than in 2014 and 2015. As a result, the
EAPWSS did not experience any major impacts to the water treatment plant or waterquality due to the 2016 bloom.
Through the Ministry of the Environment and Climate Change ( MOECC) Drinking WaterSurveillance Program ( DWSP), in 2016 the EAPWSS continued participation in an algal
toxins monitoring program. The purpose of the research study was to monitor algaltoxins to determine the levels of microcystins and Anatoxin -a in drinking water. Participation in the study took place for a six month period, June through November. Atotal of 25 samples of both raw and treated water were submitted to the MOECC
laboratory for analysis. Of these samples, there were two detectable results for
microcystins ( total) in the raw water, which were trace at the detection limit of 0. 15 pg/ L. There were no detectable results in the treated drinking water.
For operational purposes, the EAPWSS also took an additional weekly microcystin- LRsample from July through the end of October. A total of 21 raw water samples weretested for microcystin- LR. Of these samples there was only one detectable result in theraw water, the value detected being 0. 14 pg/ L.
ASSET MANAGEMENT PLAN
The Asset Management Plan ( AMP) update for the EAPWSS was awarded on
December 3, 2015 to CH2M. The AMP progressed to the next tier of asset
management through the incorporation of the customer level of service framework, risk
mitigation framework, condition assessment and evaluation, as well as the Master
Water Plan which was finalized in September 2015. The update provided accurate
valuation of the assets for the Financial Plan update being undertaken concurrently, such that appropriate funding of maintenance and repair activities is in place, infrastructure life is maximized and additional costs of premature replacement are
avoided. The update moved beyond the strategic level of asset management such that
assets may be assessed at a tactical level.
The updated Asset Management Plan for the EAPWSS was finalized and endorsed at
the October 6, 2016 Board Meeting. The final AMP report is availableonlliln .
2016 Compliance Report Elgin Area Primary Water Supply System Page 8
47
FINANCIAL PLAN
The Financial Plan update for the EAPWSS was awarded on December 3, 2015 to
Watson & Associates Economists Ltd. The project reviewed the pressures and
challenges currently facing the water system and the solutions implemented through theprevious 2007 Strategic Financial Plan. It updated all facets of the previous financial
plan and considered tools to meet the challenges facing the Board based on thefinancial components in place and the findings and recommendations of studies
completed or underway.
The update to the Financial Plan was undertaken to ensure that funds are available to
meet required needs of the regional water system in a timely and planned way well intothe future. It reviewed the policies, directions, and specific actions that are designed to
be inclusive, fair, and equitable and renewed them to address current and anticipated
pressures and opportunities facing the Board as detailed in recent and ongoing studies.
The update assists the Board in continuing to accomplish a number of key goalsincluding continuing to move toward full lifecycle replacement funding structure andensuring the ability to replace infrastructure at the end of its useful life. It also ensures
compliance with Provincial legislation and continues to place the Board in very strongand robust financial position.
The updated Financial Plan confirms that the Board continues to move to appropriate
funding of maintenance and repair activities, ensuring that infrastructure life ismaximized and avoid the additional costs of premature replacement. It also considered
the status of the reserve funds to ensure that they continue to remain strong in order tostabilize rates and minimize use of debt by accessing the Board reserves.
The updated Financial Plan for the EAPWSS was finalized and endorsed at the October
6, 2016 Board Meeting. The Financial Plan is y hilblonline. i
2016 Compliance Report Elgin Area Primary Water Supply System Page 9
48
2016 CAPITAL PROJECT HIGHLIGHTS
RESIDUALS MANAGEMENT FACILITY (RMF)
When the Elgin Area Water Treatment Plant was originally constructed in the mid1960' s by the Province of Ontario ( via the Ontario Water Resources Commission), provision of a Residuals Management Facility ( RMF) to treat the waste by- productsfrom the treatment process was not required. At that time, it was typical practice to
discharge the waste from sedimentation basins and the filter backwash processes of
conventional water treatment plants back to the source water. With increased concern
over environmental impacts, pollution, and general due diligence, the introduction of
new environmental standards and regulations are now in place to prevent such
practices from occurring with newly constructed water treatment facilities.
The need to install a RMF to address the treatment of residuals materials created
during the water treatment processes was essential in order to meet the currentlegislated requirements for discharges to receiving water bodies. The lack of residuals
management in concert with the practice of allowing residual materials to be dischargeddirectly back to Lake Erie made the Elgin Area Water Treatment Plant non- compliantwith existing environmental regulations. It is noted that the plant was operating under aMunicipal Drinking Water Licence, and previously a Certificate of Approval, whichallowed for this operating practice. The construction of an RMF for the Elgin Area
Water Treatment Plant was required to improve the quality of process waste waterreturned to Lake Erie.
The detailed design for the RMF was completed by AECOM in 2012 - 2013. In October
2013, the project tender was awarded to Hayman Construction Inc. Construction began
in January 2014 and the project was granted substantial completion in December 2016. On January 9, 2017 the operating authority began operating the new RMF under aninitial three month operating " transition period".
Work completed on the RMF in 2016 included:
Start- ups and integration of RMF components such as sludge pumps, polymer
dosing systems, thickeners, centrifuges and truck loading systems;
Development and testing of the RMF' s Supervisory Control and Data AcquisitionSCADA) system;
Facility wide testing and full commissioning of the RMF.
This project was included as one component of the HELP Clean Water initiative and
has received grant funding from senior levels of government.
2016 Compliance Report Elgin Area Primary Water Supply System Page 10
49
Figure 4b: Residuals Management Facility — southwest elevation.
Figure 4a: February 2016 - Inspection
of the backwash equalization tank. Figure 4c: Residuals Management Facility — northeast elevation.
Figure 4d: Centrifuge Room Figure 4e: Pipe Gallery
2016 Compliance Report Elgin Area Primary Water Supply System Page 11
50
STORAGE BUILDING
In June 2016 the EAPWSS Board of Management accepted a design -build proposal
from Aveiro Constructors Limited for a Water Treatment Plant storage building. Thenew storage building replaces a small Quonset but that was previously used for storagebut removed as part of the RMF construction as the Quonset but location was where
the RMF building is now situated.
The new storage building incorporates both heated and unheated areas. In the
unheated area, equipment and materials that are currently located at numerouslocations will be consolidated and stored. In the heated area temperature sensitive
equipment can be stored, and maintenance and repair activities can be undertaken.
The storage building will also house various mobile equipment, including the system' soff-road tracked vehicle used for pipeline and chamber inspections and maintenance
activities.
The storage building was substantially completed in early 2017.
Figure 5: Exterior of the new storage building.
CARBON PUMPS
The Powder Activated Carbon ( PAC) system was modernized in 2016. The work
included replacement of four (4) 1995 vintage diaphragm feed pumps. The system was
modernized with two ( 2) peristaltic type pumps able to feed through the complete plant
design production range and provide improved dosage control. Included in the project
was replacement of piping and flushing systems, cleanup of redundant control systemswithin the control panel and replacement of two ( 2) suction air actuated valves with
electric actuated valves to reduce overall energy costs by moving away fromcompressed air operated equipment.
2016 Compliance Report Elgin Area Primary Water Supply System Page 12
51
Figure 6: New carbon pumps
CHLORINE EMERGENCY ACTUATED VALVES
The four (4) chlorine tonners were fitted with emergency electric actuated operators thatin the event of a chlorine gas leak detection the units will automatically close the tonnerisolation valves. The installation of this system was completed as a risk mitigation
measure to reduce potential negative impacts to the environment and public. The
system includes four ( 4) control panels, backup power supply and integration to theplant SCADA system for control and monitoring purposes.
Figure 7: Chlorine tonners with emergency actuated valves
2016 Compliance Report Elgin Area Primary Water Supply System Page 13
52
FILTER REPLACEMENTS
In December 2012, Filter # 4 suffered a catastrophic failure of the media block and
channels, and was subsequently replaced using a new stainless steel underdrainsystem. The replacement of Filter # 4 was undertaken on an emergency basis. Duringthe emergency repair, it was noticed that similar evidence of pending failure wereobserved for the remaining filters. In late 2014 a project was initiated to subsequentlyreplace the three remaining original filters.
Construction began December 2015 with the removal of media and underdrains in Filter
3. At this stage it was noted that additional remediation would be required, with the
concrete filter box structure requiring additional repairs and waterproofing. This
additional work was required for all filters. Upon completion of the additional work on
Filter #3, the new underdrains were installed and successfully tested. Work on Filter #2began in April 2016 and was completed in May 2016. Work on Filter # 1 began in May2016 and was completed in June 2016.
The work on Filters # 1, # 2 and # 3 included:
Replacement of the existing filter underdrains and media to match the design ofFilter #4,
Removal of the existing bituminous coating and repair of any concrete crackingor spalling;
Application of a waterproofing coating to the walls and floor;
Modification of surface wash piping;
Air scour system upgrades, including addition of new air scour supplyconnections from the existing header to Filters # 1, # 2 and # 3.
Various programming and instrumentation upgrades.
As previously noted, Filter #4 was replaced prior to this capital project as a result of itscatastrophic failure in 2012. Due to the emergency scope of work at that time, Filter #4concrete remediation and waterproofing was not undertaken as part of the previousemergency replacement, but was incorporated into this project. As a result, in July2016 the media and underdrains in Filter #4 were removed and stored on- site while the
concrete repairs were completed.
Concurrently to the underdrains and media being installed in all filters, new actuatorswere installed on the backwash pump control valve and a new air/surge relief valve wasinstalled downstream of the backwash pumps to prevent damage to the new
underdrains.
The project was substantially complete as of October 21, 2016 and minor deficienciesare currently being addressed.
This project was included as one component of the HELP Clean Water initiative and
has received grant funding from senior levels of government.
2016 Compliance Report Elgin Area Primary Water Supply System Page 14
53
Figure 8a: Removal of the previouslyexisting filter media (sand andanthracite), exposing the old clay tileunderdrains.
Figure 8b: Filter at the completion of the
new stainless steel underdrain installation,
prior to the filter media placement.
2016 Compliance Report Elgin Area Primary Water Supply System Page 15
54
2016 FLOW SUMMARY
As per the water system' s current Permit To Take Water ( PTTW), the amount of raw
water taken into the Elgin Area Water Treatment Plant cannot exceed 91. 0 million
litres/day or 63, 194 litres/ minute. This converts to 1053L/ s.
The water taking in 2016 was approved under PTTW # 6283-8QZM3N.
As per the water system' s Municipal Drinking Water Licence ( MDWL), the rated
capacity of the Water Treatment Plant is 91. 0 million litres/day. The maximum dailyvolume of treated water that flows from the treatment plant into the distribution system
shall not exceed this value.
The following table contains a flow summary, with comparison to the system' s ratedcapacity and permit limits in order to assess the capability of the system to meetexisting and planned uses.
A complete flow summary for the Elgin Area Primary Water Supply System can befound in Appendix A.
Raw water instantaneous peak flow rates exceeded the requirements of the PTTW on
one ( 1) occasion in 2016:
Total DailyFlow
ML/day)
Total DailyFlow (% of
Capacity)
DailyInstantaneous
Peak Flow
L/s
Instantaneous Reason
Flow Rate
Permit To Take Water (PTTW) —
permitted amount of raw water taking
91. 0 100. 00% 1053
Raw Water Flow — Average Day 45. 359 49.85% 724
Raw Water Flow — Max. Day 68.219 74.97% 1187
Water Treatment Plant Rated Capacity 91. 0 100. 00% 1053
Treated Water Flow — Average Day 42. 945 47. 19% 725
Treated Water Flow — Max. Day 57. 605 63.30% 1100
A complete flow summary for the Elgin Area Primary Water Supply System can befound in Appendix A.
Raw water instantaneous peak flow rates exceeded the requirements of the PTTW on
one ( 1) occasion in 2016:
2016 Compliance Report Elgin Area Primary Water Supply System Page 16
Raw Water
Date Instantaneous Reason
Flow Rate
August 25, 2016 1187 Us Maintenance — sedimentation basin cleaning
2016 Compliance Report Elgin Area Primary Water Supply System Page 16
55
Treated water instantaneous peak flow rates exceeded the requirements of the MDWL
on one ( 1) occasion in 2016, as listed in the table below.
The majority of the volume of treated drinking water from the EAPWSS is used by theCity of London. As shown in Figure 9, London takes approximately 55. 9% of the
volume, with the other six municipalities using the remaining 44. 1 %.
Figure 9: 2016 Treated Water Volume per Municipality
2016 Compliance Report Elgin Area Primary Water Supply System Page 17
Treated Water
Date Instantaneous Reason
Flow Rate
May 31, 2016 1100 Us Exceedance occurred when performingmaintenance of high lift pumps.
The majority of the volume of treated drinking water from the EAPWSS is used by theCity of London. As shown in Figure 9, London takes approximately 55. 9% of the
volume, with the other six municipalities using the remaining 44. 1 %.
Figure 9: 2016 Treated Water Volume per Municipality
2016 Compliance Report Elgin Area Primary Water Supply System Page 17
56
2016 CHEMICAL CONSUMPTION
A variety of water treatment chemicals are used at the Elgin Area Water TreatmentPlant to ensure safe, clean drinking water. The following table outlines the chemicalsmost frequently used for the Elgin Area Primary Water Supply System. As part of thesystem' s registered IS014001 Environmental Management System, objectives and
targets are currently in place to optimize chemical usage.
Chemical PurposeTotal amount
used in 2016
Aluminum sulphate Coagulant 611, 992 kgPolymer Coagulant 290 k
Powdered activated Taste and odour control ( seasonally) 14, 220 kgcarbon
Chlorine gas Primarydisinfection 32, 714 k
Chlorine gas Zebra mussel control at the intake crib 2, 473 k
Fluoride Prevention of dental cavities 8,401 k
Carbon Dioxide pH adjustment - injected at the start of the 167, 634 kgtreatment process to lower the raw water pH
for improved treatment effectiveness and
efficienc
Sodium Hydroxide pH adjustment — injected at the end of the 265, 100 L
treatment process to raise the treated water
H for reduced corrosion potential
2016 WATER QUALITY SUMMARY
WATER QUALITY SAMPLING AND MONITORING
The Elgin Area Primary Water Supply System ( EAPWSS) consistently provides treateddrinking water with water quality above the standards required by provincial regulation. Where desirable, the EAPWSS standards are more stringent than what is required byregulation. For example, the target at the Elgin Area Water Treatment Plant for treated
water turbidity ( a measure of the cloudiness of water) is 10 times more stringent thanthe provincial standard. The EAPWSS is practicing continual improvement to ensurethat high drinking water standards are maintained and enhanced where possible.
All water quality sampling at the Elgin Area Primary Water Supply System ( EAPWSS) isperformed in accordance with the Safe Drinking Water Act and its associatedregulations. All samples are collected by licensed operating authority personnel and aresubmitted to Canadian Association for Laboratory Accreditation ( GALA)/ Standards
Council of Canada ( SCC) accredited laboratories for both bacterial and chemical
analysis.
2016 Compliance Report Elgin Area Primary Water Supply System Page 18
57
In 2016, a total of 517 microbiological samples were collected from raw, treated and
distribution system water, and were tested for E Coli, total coliforms and heterotrophic
plate count ( HPC). There were no incidents of adverse microbiological test results in
2016. For more information please see the Annual Report, which is attached as
Appendix B.
Annual samples are collected and tested for inorganics ( metals) and organics which
include herbicides, pesticides and volatile organic parameters. Quarterly sampling isalso conducted for trihalomethanes, haloacetic acids, ( disinfection by-products), nitrates
and nitrite.
In addition, the water treatment plant operator samples the raw, in -process and treated
water six times per day and carries out a battery of physical and chemical tests foroperational control.
As required by regulation, the EAPWSS also prepares an Annual Report which includesa summary of water quality test results and a maintenance report. The Annual Reportcan be found in Appendix B.
RESEARCH & PARTNERSHIPS
The Elgin Area Primary Water Supply System acknowledges the importance ofscientific research on water quality and the effects on human health. The EAPWSS haspartnered with the Natural Sciences and Engineering Research Council ( NSERC) Chairin Drinking Water Research at the University of Waterloo and University of Toronto topursue research opportunities, as well as University of Western Ontario and is amember of the Water Research Foundation (WRF). In addition, the EAPWSS continues
to evaluate and conduct specific research on the efficacy of the existing treatmentprocesses, optimizing and improving treatment systems, and evaluating the potentialand need of more advanced treatment alternatives. The EAPWSS also participates in
the Ministry of the Environment' s Drinking Water Surveillance Program ( DWSP) andintake monitoring studies.
2016 Compliance Report Elgin Area Primary Water Supply System Page 19
58
MINISTRY OF THE ENVIRONMENT AND CLIMATE
CHANGE INSPECTION
ANNUAL INSPECTION
The Ontario Ministry of the Environment and Climate Change ( MOECC) conducts aninspection of the Elgin Area Primary Water Supply System annually. A MOECCinspection took place in June 2016. The final inspection report was issued on July 26, 2016. A total of zero ( 0) non- compliance was identified in the inspection report. The
final inspection rating received for the 2016-2017 reporting year was 100. 00%.
Elgin ', i' rirmry MPr3tr: r `; qDa y+ Syvterru
Regional Water Supply Division235 North Centre Road
Suite 200
London, ON N5X 4E7
519- 930- 3505 (ext. 2714)
www.watersupply. london. ca
2016 Compliance Report Elgin Area Primary Water Supply System Page 20
59
APPENDIX A - 2016 FLOW SUMMARY
60
I.L
aU)
0LL
toT"
ONI
Q0C0JLL
wQzLJJ
Q
0JO0CDCY6NNED0- zzMN0coM00NCOk4) NY0dEU) O_ Q764Ed
4
QCN6z
Mr'
Ln
T
hr
It
NN
(D
MM
0) (
OM
(O
T
MM
1- (O
(Or
ON
MM
ON
Oy
Mr
CO
a0
NO
OO
MN
d1
M0
OM
Ln
M
t\ O
Or-
I` r
NM
OO
M
OM
MI--
N0
0r
00
0
0M
ON
It
1- O
MO
O
rC
Or
N
MN
M
00
00
I
VN
N (
OO
C
OO
(O
Ln
Ni
ML
nL
nt\ .
1C
O06
O
C0
) (
OO
CO
Ln
OLO
NO
y,
Lo
vv
Ln
MN
MM
vv
vv
NL
nN
v
Nco
VM
.4
MM
MM
Mv
NN
Lo .4
r
LM
I- I-
LL) L
nL
nm
Ln
mm
Ln
ti
MN
Ln
00
MC
D -;
I- M
rN
Or,- L
nM
MI-
Ln
00r
00
Ln
Mco
ItO
rItT
NM
MN
Ln
OM
O0
0L
nC
OO
MN
(O
zTr
OM
Ln
Ln
OM
rM
NM
OM
I- M
Or
I- M
Ln
MM
MO
M
MM
M (
D (
Dh
NI'-
O-
MO
Ncc
MN
NN
r_
Ln
P_ L
nti
NN
MM
MO
I- L
nO
r_
MO
MM
Ln
MO
O0
0Ln
4t
It
It
It
It
It
Ln
N
tL
nM
;I -
Ln
't
It "tLn
hco
Ln ;I-
zr
Cl)
Nt
Ln
Ln
Ln
It
OO
1-1-
OIZ
T(
DC
D (
DO
00 t(
DN
NM
'tM
Ln
CO
MIZ
T0
0N
LO
MM
-'T
Ny'}
MI,-
I- 00
MN
In (
D (
DO
-;t
hN
CD
MM
MC
DM
MO
Nh
NM
MM
OC
o0
00
0
QN
C0
0M
Or
Imo_ (
Dr
CO
(D
OL
nM
rh
00
(D
00
NN
Ln
COr
Ln
ML
nr
NNd
j
mN
OO
VC
OO
Ma
7O
MO
Ln
Ln
(p(
pN
OO
a0
LnM
O
Ln
Ln
D
Ln
ML
nv
LO
vL
n
vN
MLn
MN
vv
vcl
NL
aly
QDLI- -
tt
hM
t
I` O
M :
tC
OL
nM
CO
MC
ON
-tt
N (
D (
Dt`
t` M
Or
Ln
O00
Ln
toM
Oco
rM
rti
NO
(D
[,- r-- '
ITM
ItTL
nL
nO
rO
ti
M0
0L
nO
Cl)
SLnr
OLn
WLn
coO
NL
nN
00
00
00
(0
M0
0M
OO
DI-
OM
MO
CO
00
Itr
00
OM
I- N
rC
OO
Mf
CO
O06
CN
CM
NO
Ln
00
M
MO
LnO
O0) (
6Ln
O
00
CT
P-: r
MM
LC) cn
Ln
MM
't
Nt
Nt
Nt
Nt
InIt
Min
"t
00
yO
Ln
co
Nt
O
Mco
MO
Ln
(O
00
mO
Ln
NN
N;
I-
I- O
MO
-
00
M
7M
NL
nM
0)
00
NN
ItT
Mco
M
MM
M0
01
1,
ncoI-
MO
LL
n
Or-
ML
OO
co
d)
d)
rM
I- L
nLQ
CM
MO
rO
r0
0r
t\ c
Mt\
f)
C\[ LLL) O
Mt\
0) (
VC
VLn
C0
0M
L[) i
LnM
SO
Ln
OL
nC
Ot`
OV
) Ln
00 (
DM
OM
[,-
Ln
olC
) lC
) LC)
Ln
M
ML
nlf)
lf) M
Nt
mM
Ln
It
Mm
0)
Ln
(D
OL
nO
NM
Nt
CO
Oti
Nt
Nt
00
OM
I" O
MM
OM
CO
OMt
Ot`(
DI- M
00 -,tA
yN
(D
CO
ON
MO
I- (D
N
(D
NM
OM
OM
Ln
(D
CO
Ln
N
N
O00
OI-
M (
DV
3M
MM
't (D
OM
Nr
OM
NM
(.0N
MN
(D
MM
OM
N
ON
MI--
MM
(.0
00M
d7O
Ln
4N
Ln
Ln
Oti
4M
OM
Ln
MN
Ln
Cr
OP- _:
00
ML
nM
NL
n _
N
NO
MLo
I` I`
I` L
nL
nL
nL
n '
tL
nM
t t t
Lf) t
NL
nIt
Ln
;I-
Cl)
Ln
Cl)
Ln
Ln
Ln
NL
n
Ln
0)
00
N0
0It
0) (
DC
l) O
I- M
MzT
zTr
Lnr
Ln
00
Ln
(D
00r
NC
) t -
O00
0) 0)
I- r
0)
Miy
Ln
NL
n0) r
OO
WO
mM
Ln
MM
MI"
OI--
I-- (D
(D
OM
MLn
r,- Ln
rO
I`
3L
nr
Or
rO
MO
rN
OI
MO
Cr
C0
0L
nL
n00
O00
Ln
01
I r
ON
vj (
ON
IO
P-
Om
00
Mw
(
DM
NW
(D
Nr--
00
00
00
N -
,tO
hh
Ln
MO
C;;
NC
OM
I- O
OI`
Ln
Ln
ItTIt
N 't
IttL
nL
nM
NzT
ItT t t
Ln
La
lN
't
Ln
Ln
Ln
Ln
ML
n (
DN
QO
"zr
Nr
r
rO
Ln
M"t
M00
MM
M
Ln
MO
00
MI-
t` M
Ot` (
DO
NO
Ln
N
Nt
Nm
co
LO
OC
OL
nO
MO
00
Th
NM
Nr
I- M
Oco
MM
M
CO
NL
CN
(
DN
L N
rM
rr (Ot
rO
MO
rt
tM
Mt
LnLn
MM
tM
MM
NN
';Zt
0)
O (
N
MO
CO
Ln
Ln
N-
Izi
Ln
Oti
N(
07
I` C
Or
Ln -ti
Ln
Or
Mr
0)
ON
I- V
NL.n
MM
Ln
Ln
ML
nM
Ln
Ln
NIn
-t
00
00
Mm
MI-
ML
DM
Il- L
nM
M (
OO
LO
(D
I- N
NO
OI-
MLn
OI"
MN
coCO
OO
syrM
OM
(D
r- rl-
MItT
Mti
OW
(D
r- 0
0O
VO
rr
W (
0r (D
OO
o)
I- M
0)
00
0)
cc
OM
(O
OM
0) (
DO
(=
r
Ln
,* N
rN
rN
0) r (D
MC
O (
DLc
DO
r- M
NN
CO
Ln
OM
00
NN
O0
0O
Cl)
N (
Dt`
Ln
M00 (
DO
me
r- M
00N
'tt
MM
It
NL
n '
ItM
It
Ln
Mc?
NLo -
t
I`
SItT
M0) N
r (O (
D ',I- NO
COLn
N00
00O
I;t0) 0) O
I- LO
NM
I,- I-
r0) 00
00M
I, O
I\ N
rl- r
rr
r0) O
M0) (
DN
O
OM
rM
4
N0
0A
NO
OO
MM
N
O
I` 00
00
OM
It
I- N
00
00
Mr
00
I- L
nr
d)
00
M0
0 (
DL
n0
0O
ti
C)
47
tM
t
00
O11,
tt
LOM
mM
00
O4
00
O (
DL
n0
) M
MM
MN
4N
00
MM
OO
4L
nM
Ln
NM
OO
ML
nL
nM
Ln
M '
t
MLn
Ln
't
Ln
't -,
Y -,
tM
ML
o -t
co
LO
OM
MO
'tM
NLn
MM
M"tM
I-M
OM
MI-
LO
Ln
NM
(D
OO
OM
I--
yr
rM
LO
00
I-
OL
nM
ON
LO
MI -
M1
-M
MO
MC
OM
OM
It
r
VI-
MO
OM
MM
(D
MM
MN
Or
NM
rM
NM
Ln
MO
(D
CDt
OL
nI`
O
13
Nr-
NN
Ot`
00
MC
ON
OO
Ln
Ln
N0
)
t` O
MO
MN
ti
Ln
ti
ti
Ln
I-- N
MI-
Ln (
DL
nM
ItM
Ln
MM
Ln
't 't t t t t tI '
tL
nce
Cl) LP)
It
LL
Mt`
ON
O0)
M0
0O
Ln
ML
n (
D0
0L
nL
n (
Dr (D
00
Ln
ti (
OM
-
OI-
I- N
zTM
O0
0r
OR
ihr
m (D
NIt
It
Ot-
Ln
t- M
-Z
tM
NI-
MM
NLn
I- 00
Ln
It (
DM
WM
OLn
h (
DM
NN
O3
M (
O (
Oh
0)
0) r
Lnr (O
(Or
LnO
O (
3N
Z: O
'zt
0)
00N
() "zt
N "
IO
"I
M
O0
) 'Z:t
ti
Ch
00
00
00
00
Ln
Mh
h -,t
h0
00
0L
oM
OOt
NI--
WW
WO
N00
DO
OM
00 (z
Ln
zTT
ItT '
ITIt
L[) M
't
IttN
zTL
nM
Ln
'IT
MM
ItTL
n 't
Itt 'IT
ML
nz
NL
nV
Ej
d
zQ
NM
leLn (
OI`
00M
O-
NM
SL
nC
Or-
00
mO
-
NM
I-* o
CO
l- 00
mO
-
ER
xT
TT
TN
NN
NN
NN
NN
NM
ML
xCD
0JO0CDCY6NNED0- zzMN0coM00NCOk4) NY0dEU) O_ Q764Ed4QCN6z
61
I.L
aCl)
OJLL
T0NaXZLLlaaa
vi
iii......
mE
. 00
VN
Vm
w
OM
VV
VIn
Om
OO
Or
VN
OO
NV
Ln
I- r
Nr
M00
00
Ln
00
f 00
qM
O)
MT
rT
CO
CO
I\ N
00
00
CD
Ln
M (
DM
MM
't
O)
00
00
Tm
M
ca
O
O00
LnO
TCO
I- I`
I` I`
I` I`
CO
I\ I\
I\ I\
I\ r- M
COr
I- I`
I` C
OO
Ln
OLn
Or - --
I
QN
r
aiM
OO
a7
MN
a7
a7
MO
00
I- r- (
DLn
OM
NM
MT
MLn
Ln 'tM
't
coNr
OI-
OI`
O00
OC
OO
00
mO
Om
MO
) O
) M
Ln
OO
O)
00
I` M
Om
mO
Ln
OC
O00
r- O
] O
] 00 (
D00
Il- (D
(D
rl- (D
CD
r- (
DP- (
DLO
TI\
I\ I\
co
m (
or-
LO
(D
LOT
r- 0Zi
yC
OM
CO
Ln
CM
N (
D1--
Mr
ON
;t
M;
3- O
NI-
00
OO
) q
OO
M1`
MC
oI-
CO
I- L
nr
Ou..
Ln
O)
00
Om
O6
) O
Ln
OO
OO
O0
0O
OO
I- O
CO
OI`
OO
ON
O0
0O
mLn
I` I`
00
O00
Cfl
I` LL)
CO
O00
00
00
co
00
00
00
I- I`
I` I`
I` C
DC
OO
OI`
OI`
I` L
nO
Ln
Ln
00
I-
40)
OO
OC
OO
CA
VC
Or
rO
) 6
) LO
r-L
nr
Nf- r
MC
OC
DC
DLO
CD
VO
COr
CO
Or
CO
00
00
00
OT
OL
nO
OMO
) MO
) O
I- Ln
CO
OO
OO
OO
O)
O)
Ln
L) (D
L) Ln
Ln
It
OO
O00
OO
COr
CO
CO
co
00
co
co
a0
I- r
O00
co
CO
CO
CO
CO
f- O
rLn
OLn
LC) O
r--
W
Ln
TT
MM
NM
Ln
MM
ON
CD
MM
Mr-
MI`
MN
(D
(D
Ln
I- r-
MI-
NM
NM
0M0
O)
OO
O)
OC
OO
) L
f) I-
O)
OO
00
I- M
CO
00
CO
OO
) C
DI-
O)
O) r
Oco
OO
) N
O)
CCOC
Or
Ln
DI-
I\ (D
co
r- (D
I- r-
co
r- r%
- rl-
rl- I\
rl- I\
I\ co (
DLn
I- (D
(D
co
I- co (
DI-
I\ Ln
Trl-
yC
) N
Ln
TN
NC
OI-
CO
NM
TN
00
00
MO
) O
O)
COr
TM
N0
00
MM
Ln
00
It
rLn
VLn
OO
MM
CO
OO
OO
Or(
DO
MO
O)
O)
OO
OI- r
r(
DM
MC
OO
) C
l) 00
Il- I-
I- I-
I` 00
CO
OM
Or-
r- I-
I- I`
I- Ln
OI` (
fl (fl
I` rl-
r- r-
00
00
hO
OLn
00
Il -
yM
MN
NO
NM
rr
rM
NN
NM
TI-
Mr
N;
J- r
NLn ;t
NN
Or-
rO
Orl-
Orl- N
OO
Il- O
OO
OO
mO
I` M
OO
00
00
00
I` O
Or
CD
Or
I r-
I` I`
Ln
CD
CD
I-- I--
mI--
I-- I`
I` O
I` I`
Ln
Il- I`
I` I--
I-- I--
I-- I--
I` r%
- r-
00
Ln
0)
Il -
yr
1%- 1%-
OM
NM
Mg
CO
CO
qN
1` 1`
InA
MC
Oq
qO
00
00r
MN
MM
1` 0
0Ln
Lnr
CO
COr
00
OO
x0
00
Il- O
NO
OLn
OO
OO
Ln
OO
X0
00
MO
OVr
OL
OO
a0
Cfl
I` r
I` I`
I` I`
OI`
I` I`
I` I`
CO
I` 00
I- I`
LO
co
Lyy
CO
O;
tO
OO
MM
I%- '
trl- M
CD
TT
Mr
NT
I- T
OM
Ln
Tg
OM
N;
4-
OL
nI-
O)
O)
O)
ON
OO
) O
) M
Ln
CO
O)
MO
Oco
MO
r- 00
OO
) m
OLn
OO
) M
O)
co
00
Om
OC
D (
flM
I` Ln
co
co
CD
I- I`
OI`
I` I`
I` I`
I` co
co
I` co
Cfl
co
I` I`
OI`
CD
CD
M00 (
fl
tO
)(D
MIl-
CO
TM
CO
Ln 't 't
O 't 't
MC
OC
O ;
TN
(D
;3-r
O) '
tLn
Ln
CD
TM
(D
MN
M (
DI-
M (
AM
(A
I- = M
OM
I- I`
MO
MM
I- I\
CO
LO
LOr
rO
OO
) O
) C
OO
MC
OC
OMr
I- (fl (
flI`
CD
I` (D
(0
00
OI`
I` O
Om
(fl
I- I`
Ln
I- I`
r- r-
Ln
OO
OI` (
D (
oLn
Ln
O)
I -
NO
CO
NLn
Or
rr (D
Ln
ON
CO
TN
CO
OLn
gN
rM
I` r- ;
3- I`
TL
nm
r%
-
co
O)
rl- O
) O
) C
DC
OC
DC
DC
OO
) m
(.0
mm
mO
) O
) (D
O)
O)
O)
07
Ln
00
mm
OO
mLn
O00
O (
oI`
I- L
OL
OL
f) LC
) I--
rl- Ln
Or- (
flO
I` Ln
O (
D (
o (
0LC
) (D
Il- (D
r-
Ln (
DLn
I- (fl
d' LLihi
yN
MM
tN
rC
OLn
NN
00
NO
NN
NN
Ln
Nr
1- O
rr
CO
AN
ON
MO
) L
nO
00
CD
CD
mO
00
OO
Ln (
Dti
O) (
DO
) O
) O
) O
) O
) O
OO
CO
Ln
OO
BO
Om
mC
DLn
OI`
GLn
Ln
U)
OO
Ln
Il- (D
I` Ln
co
co
Ln
OO
OO
OI`
O (
DLn
CD
OO
OO
OO
OLn
I- (D
Y
Da) Q
rN
ML
AtO
hO
O6)
rN
MIq
Ll)
W[-
CO
(n
Or
NM
IqLn
W1
00
0)
Or
rr
rr
rr
rr
rr
NN
NN
NN
NN
NN
MM
7
E[!
a
M
62
Qc EOJLL
wQwQwo
4)
o
Ln
LO
I- LO
M "
tM
MC
OC
DL
nO
OL
OLO
OM
MO
00
MM
hM
MO
M"
Lo
L() I--
r3O
00
O
Ln
ON
M
WW
Ln
II- L
O '
ItC
DM
I-- C
Oh
OII-
NN
OO
co
Ln
oco
VN
N_
OI-
MM
Mt`
MM
Ln
Wr
N (.0
or-
MU
') M
I` M
MM
"t
OC
O '
Cfl
No
NM
MM
OL
MO
Ln
II '
M00
r- P.
NI`
L6
r- M
OM
ML
n (
o -t
NCO
yV
) M
MM
MIt
tIt
tN
It
NIt
tM
NM
It
MIt
MM
tM
MM
Mt
NN
LOM
d
iL
O
OO
r
r O
Ln
MN
(
DC
DLn
Vm
1- O
OC
Orr
Nr
MM
Ih0
MC
A1-
OV
Mr-- m
Vy
VN
00
Ln
NO
h (
Dhr-
L() [,-O
VN
VV
NN
NM
MO
LO
ON
MM
EV
NM
00
r- M
M00
ON
rM
Co
OO
ON
Ln
OC
D (
Dr
CD
OM
VC
or
00
NLC)
MV
WM
NM
Mn
O()
VC
An
NO
Ln
Ln
OO
(
DL
n (
DL
Ln
OC
OO
L() N
L() O
nO
) L
OM
GV
VV
VV
IqIT
VV
VV
VV
VV
VV
MV
VV
VV
NV
Ln
VV
M
NL
nV
Zr
LO
MO
rO
lhr--
00
00
Or
Ln
rM
Mr
VLn
CD
VN
Nr
oM
r- OLO
r
00
VM
NC
OO
- O
Ln
IhN
Co
NV
VO
00
O0
0M
ON
Ln
VO
Ln
MV
VL!)
OH
OLn
VN
rO
Vr
Wtir
NO
NIh
MM
Cfl
Lnr-
00O
Wti
CDM
OV
MO
MO
rC
ON
CO
-
q00 ;
iN
Or-
OO
(D
OO
MM
LnV
OO
) O
CON
OV
(D
OO
Ln6
) V
MO
nO
ON
MIT
Ln
ML
nV
VV
Ln
VV
VV
MIq
ITIT
ITN
VM
Nr
MN
MIT
IqM
hN
LnV
v
O
NV
rr
r0
0r
I- N
MM
ON
Yh
00
MlO
NM
r0
0M
Ln
Ln
ti
OV
LO)
as
Nco
mO
00
OO
wN
OM
CD
Ln
tir
oL
nC
OO
OO
VO
VO
MN
VC
oV
rO
In
dG
I: L
Vr
VP
- (D
V6)
Otir
CO
CD
I- M
V0) r
N00
6) ti
CD
6) O
rLn
NO
OMr
no
0C
PM
Ln
NO
NO
OM
CD
VN
cD
VV
nV
c.000
VN
rN
CD
I` N
NT
MM
IT
VV
Ll') V
VM
VM
MLn
r
toL
O0
0M
OM
MV
WM
LON
LflM
OV
«)
Co
O0
0
OM
NN
OC
DLo
NO
MN
NO
00
OM
LO
LO
M0
MLO
LSON
CDN
O(D
00O
VO
Ln
VLO
O0
«)
Lo
OO
MLn
Vr
L(1C
n
rM
OC
D
r0
Ln
CO
CD
OV
VC
DO
VO
CA
OC
DO
OLtO
MM
CD
OM
f,(
VV
MV
LOM
MV
VM
(MM
VV
VV
VV
VV
MV
VV
MV
VV
V0
hC
oLo
V
O0
00
OM
MO
r-
VL
nIT
rC
ON
vN
Vr-
Ln
VO
Vr
OC
OM
ITL()
NO
O0
rN
Mr
MV
r- W
MI-
MV
Ln
O0r
VV
NM
ML
nM
rN
OC
Or
LL) m
Ln
NC
OL
n0
CD
Ln
00
Oor
Ln
VV
rL
n «
') L
nN
V (D
OO
MV
Nr
CDr
MO
r
Ln
OV
oO
OV
nN
Nn
MN
Mc6
nN
Ln
(D
On
Mo
MV
Nco
OO
NO
n07
MM
oIn
'T
V«)
VM
LOLn
VM
VL()
NV
VV
VV
NV
VV
Ln
VM
Ln
MIq
T0Iq
TV
cl? N
U) ;
3-
r- r- M
MN
Ln
NN
Ln
OL
f) C
DC
DM
Ln
CD
Mr-
O)
1- O
VL
OC
DC
DO
CO
VLn
co
NI --
CD
Mr-
I- V
NM
WL
f) N
00
Vr
Ln
OV
Or-
VI-
tiN
NM
CD00
O) 0
OL
nV
";
tM
WLn
Ln
Cf
MM
oc
Ln
O
00
h (
nL
nLnhrN
LO
'...
EV
rV
V
VV
M1
1-
Lnn
tiV
MO
MCD
MM
CD
M (
D0
0O
CO
MM
N00
nO
nM
nV
VV
(n
VM
NV
VV
VV
VM
NV
VV
VV
VN
VLn
U')
Ln
VM
V (
nN
Ln
V
LO
00
0O
) C
DV
WM
ti
ti
ML
ntX
JO
VM
CD
MM
Ln
VO
ti
MN
NO
Oti
00
CD
OIn
Lsy
VO
Nr
CD
Mr
MW
NW
OO
Mti
Ln
CO
Nti
OC
DO
ti
OM
ti
VO
CD
wl6
00V
Mr
00 (D
CDr
Cfl
tiM
VN
r00
Vti
MO
VM
NC
DN
NV
rM
CDN
O0
0M
(fl
2n
VM
OM
Ln
NO
NLn
Ln
nN
OM
MV
MV
(O
O (.
0N
OC
ON
MV
VV
rV
VM
VV
VV
VV
MV
VV
Ln
MM
InV
VV
VM
Ln
Ln
TV
C'7r
LnV
N
MO
inO
VO
CO
MLO
r- r-
NW
NO
Mto
NO
VV
Nin
VC
DW
MN
inM
Min
MN
MM
CO
I- in
OC
Dr
P- in
P- V
MO
r- V
-
MMM
rC
Dr
NL
nV
CD
O0
00
NLSO (
DM
CO
r- r
Or
MLO
CD
Or
Ln
NL
) N
Nr
I- M
OO
TOr
00
QM
(9
nO
00N
0000 (
DM
LnCO
0000
OM
VI-
VO
OM
LnM
O7
00 (r
nLn
LO0
0O
ITM
ITM
MIq
MM
ITIq
TM
'IT
NV
MM
IT
NV
VV
VV
VM
MV
NV
V
O
OM
NN
WM
MM
MN
ON
Ln
O'
tM
r- LO
LO
rl- O
Mm
Nm
M0
ON
00
MN
OL
nI-
NM
mM
OO
N0
0O
Mm
Ot
OM
OL
nM
N0
0O
Cl)
OC)
N
Mqzt
MO
MCO
MS
Mr-
MLT
rN
LnO
I r
LnCO
OCO
OM
Mr
OLn
MM
06
MM
NE
MI-
Ln
LO
r- N
CD
CD
MM
M -
-
L0) N
I- - O
MO
toM
MN
MN
Ln
(.00
oOr
NC
hM
MM
MM
Ln
qt
Mq
tM
tM
MIt
tq
tt
tM
ML
o -t
LO
mO
MM
MI-
OM
I` M
CO
Ot
OO
ON
Ln
mw
OI`
Om
m0
0M
MO
LC
flr
rr
rD
) O
Ln
M '
tLO
NM
(fl
OO
Nq
tO
OM
O
ti
NM
NW
OL
n (
fl0
0
iL
nM
O)
MO
' o"t
NI-
hM
CI-
NM
ON
00Ln
LnLn
ocO
I` D
) M
LnO
00
NM
S (
fl ti't
mti
MLO
NLO
00
LOti
OL
nM
mN
LON
MM
LOM
Crj
MC
liW
qt -
tN
NN
MM
qt
Mt
Zt
M't
MM
Ln
t
Mt
M
tM
11
-'t'
t't
It
tN
MLo
LLi
CD
OL
nr-
MV
(
DN
OO
Oo
VM
Co
VN
I- V
Ln
CD
OO
I- C
DV
0O
VV
V (
Dm
4yr--
IhV
Mr-
Ow
OM
OO
Ilr
mN
or
rC
OMi
rNT
NM
OLO
0.)) r
(D
3E
00
NLn
ML
nr
ti
MO
Ln
MV
MN
Ln
Vr
Ov
MInrM o
oM
COD00
Oj
rIn
Cn
MC
OV
ON
Ln
N (
DC
DV
M0
0C
OIn
(D
00
VO
Ln
Ln
nn
00
DM
Nh
VV
VV
VM
InV
VM
VV
NV
VV
Ln
M'
ITV
MM
VV
VV
VM
VM
NL
nV
Or
NM
IVL
nW
r00
0O
rN
M
0W
nM
OO
rCDCD
QDr
NC
l) lfi
to00
Or
rr
rr
rr
rr
rN
NN
NN
NN
NN
NM
ME
E`
Ec+
K
d0
63
CQ
CG
GOJLL
TNX0ZWaaQ
OJLLYQwam
U)
DOwzQzQNz
LL
wQwQw
d
AM
MI-
M (
OO
(DO
MM
OM
NMt
MM
NM
00
OL
OI`
CO
O
OL
OM
I- (D
oor- M
m (
Tm
I` C
) O
r—
Ln
I` (D
OC
OLO
LO
NC
ONt
Nt
MM
NO
Ln
tI`
NC
bf
OC
O0
0m
Or-
r- C
bI
CO
I W
I r-
r- r-
LO
r- p
0I-
InC
OI-
CO
CO
f- O
CO
OLO
Mt`
4?
0) L
noo
CO
CO
(O
CO
ON
ON
WM
N't
00
0 (
OLn
CO
M
NM
Ln
OO
InIn
OO
WW
LO
I- r-
InO
MLn
Ln
CO
CO
MO
Or- Mr-
NO
MN
N (
ON
V) 0
0
yL
nO
) I
00
1 -C
OW
r- L
oLn
r --In
CO
I- I-
r- I-
co
r -(fl
r- C
OI
CO
W
I In
O)
r-
0Z
1O
O0
0L
OM
LM
(0
MC
OLM
M0
OV
LM
(0
O
MI-
MV
0V
MO
00
0V
coM
LM
co
mV
(0
V0
0co
NO
V
NO
(fl
MO
LMV
m (
flM
OLM
00
V0
) O
Li
flC
DL
nI`
1- 0
01`
co
LM (
flt`
00
I` 00 (
fl00
OI`
I- I`
co (
0LM
LM
(0
LM
co
CD
1-- C
D (
flL
n0
0I`
0s..
52
V1
vL
nO
) L
n7
CD
VLn
MO
MV
OV
I N
VN
OLn
I` 00
I` C
OV
OC
O7
V (
nq5
VN
MN
O)
ON
Ln
MM
MN
CD
MV
OM
CO
N
Ln
Ln
CO
MM
OV
OV
0)
I- n
(.0
r- L
nr-
ti
00
CO
(fl
OD
P n
Nn
(
o00
hI-
I` 0
0LC)
Ln
(fl
CO
Ln
OC
DLO
00
f
7N
CO
Ln
VW
00
NV
VI-
pW
(A
OM
OV
I- O
NO
LMI
VI-
NO
NV
co
M
00r- r-
r- 00r- CO
CO
Cc
CO
CO
00r
co
'IT
7LO
LOLL
C4
00
CO
o0
W
(fl (
D0
0C)
I- o
0Ln
Ll (DLam
() O
Q
NN
-t
NLn
00
NC
O -t
OO
1- O
MO
CO
O0
)
CO
Ln
00
Lal
I- N
MM
(N
CO
co
I- 0)
Ln
Cl)
t (D
ON
NLn t
OL
nM
t
Ln
Ln
O t (D
t
N
r- O
00
M0)
CO
't
I-- 0
000
I- 00
00
I` 1`
co
I-- r-
00
I- I`
r- I`
r- (fl
Ln (
flC
Om
Wco
O (
T0
000
OLn
I- L
n0)
I-
1- L
M0
0 (
DV
NM
1- 0
0V
00
00
ON
VL
nM
I- Ln
I- N
NV
7O
(0
V (
DLn
00
LM
MI-
Ln
OM
OV
N
OV
) M
(T
00
NN
0') V
0N
O1-
LM
TV
Ln
NL
nN
Ln
N00
00
00
Ln
CO
LMI-
00
co
t` (.0r
N (
0C
OI-
co
CO
I- I-
I- 1-
00
00
co
I- C
o (
TL
nO
r-
t—
t —lM
t
P- W
—
ML
MO
Ot
O (
DIn
CD
NC
O ;
d -
Mti
OM
M
Op
pr.-
p
mO
CD
LM
W
WO
ti
MO
M't
ON
(A
hO
CD
N1-
NLM
LM
NC
DL
MO
co
hlM
LM
WdD
lMC
Oco
r-- co
co
co
co
co (
DC
D0
0lM
40 [:
O ;:
WC
OW
OD
ti
OD
ti
lM -
LM
4lM
f-
ND
COV
Vr- M
MV
LOOV
VM
Mn
NM
NM
MM
LO(COOV
1- M
Nn
LMO
m
Qp
CDLn W
I- LM
Ln
co
I (4
LM00
I- p
co
00
I` C
D (
vn
I- I`
Ln
Ln
OI` (
Oo0
CD
(4
LM00
CD
MLn
M0)
00
00
CO
NC
O
I- O
OC
OM
OO
W
ON
O1-
00
Co
w `
ON
OL
nn
COMM
OCOM
NM
Ln
NO
MM
CO
CO
NO
0) L
nM
OLn 't
CO
oo
1` 0
000
00
NO
OI
I- r
OO
I- r
I- I`
I- r-
I` C
OI-
OD
I- C
O1-
I- r-
CO
CO
co
Ln
00
I`
Ln
LM
CD
OW
Ln
O_
N
I- M
LO
OC
O0')
0')
V0
000
LON
OO
iI-
O (
OCOM
MCOM
O (
O
Ln
Op
NV
CD
MLO
LM0
0M
( LM
(.0
00
00
co (
o (
flI` (
fl (O
I- L
MC
flLM
r-
CO
(O
I- O
P- (fl
00 (
flL
MI-
Ln
0') (.0
dLLRy
Ln
O00
Nr-
NLM
OM
O0
0N
MO
CO
00
CO
(O
Nt t
t0
) O
't
BO
OO
) r-
Nr -
NO
Oco
M0)
pN
00
NO
ON
ON
MO
(A
O -
,t
V)
M (
flM
't
ML
nU
) 0
0C
Oco (
DC
OL.0
co
ti (
DM
I• co (
DIl-
CO
r-
I` (D
N (
DO
00
CO
OO
co (
DIl-
rl- co
Tp
0
lq0
)
O —
N
ML
nC
OI-
00
C1
O —
N
MIT
LMC
OI
Co
a)
O —
N
ML1'1
LD
NW
T--
r—
r—
r—
r
NN
NN
NN
NN
NN
MM
E£ (LO
ag
WQ
64
APPENDIX B - 2016 ANNUAL REPORT
65
r`
tl" ntarb Drinking-Water Systems Regulation O. Reg. 170/ 03
Drinking -Water System Number: Drinking -Water System Name: Drinking -Water System Owner:
Drinking -Water System Operating Authority: Drinking -Water System Category: Period being reported:
Complete ifyour CateZorV is Lanae MunicipalResidential or Small Municipal Residential
Does your Drinking -Water System servemore than 10,000 people? Yes [ X] No[ ]
Is your annual report available to the public
at no charge on a web site on the Internet?
Yes [ X] No [
Location where Summary Report requiredunder O. Reg. 170/03 Schedule 22 will beavailable for inspection.
Lake Huron and Elgin Area Water Supply Systemsc/ o Regional Water Supply Division235 North Centre Road, Suite 200
London, ON N5X 4E7
http:// www.watersupply.london.ca
Elgin Area Water Treatment Plant
43665 Dexter Line, Union, ON
210000871
Elgin Area Primary Water Supply SystemElgin Area Primary Water Supply SystemJoint Board of Management
Ontario Clean Water Agency (OCWA) Large Municipal Residential
January 1, 2016 through December 31, 2016
Complete for all other Categories.
Number of Designated Facilities served:
N/A
Did you provide a copy of your annualreport to all Designated Facilities you
serve?
Yes [ ] No [ ]
Number of Interested Authorities you
report to: N/A
Did you provide a copy of your annualreport to all Interested Authorities you
report to for each Designated Facility? Yes [ ] No [ ]
List all Drinking -Water Systems ( if any), which receive all of their drinking water fromyour system:
Systems that receive their drinking water directly from the EAPWSS:
Drinking Water System NameDrinking Water System
Number
City of London Distribution System 260004917
St. Thomas Area Secondary Water Supply System 260078897
Aylmer Area Secondary Water Supply System 260004722
Port Burwell Secondary Water Supply System 260004735
Municipality of Central Elgin 260004761
St. Thomas Distribution System 260002187
Drinking Water Systems Regulations Page 1 of 8
P1BS 4435e01) February 2017
66
r`
tl" ntarb Drinking-Water Systems Regulation O. Reg. 170/ 03
Systems that receive their drinking water indirectly from the EAPWSS:
Drinking Water System NameDrinking Water System
Number
Aylmer Distribution System 260002136
Malahide Distribution System 260004774
Dutton/Dunwich Distribution System 220002967
Municipality of Bayham 260004748
Southwold Distribution System 210001362
Ontario Police College Distribution System 260002161
St. Thomas Psychiatric Hospital Distribution Supply 260005255
Did you provide a copy of your annual report to all Drinking -Water System owners thatare connected to you and to whom you provide all of its drinking water?
Yes [ X] No [ ]
Indicate how you notified system users that your annual report is available, and is free of
charge.
X] Public access/ notice via the web
X] Public access/ notice via Government Office
Public access/ notice via a newspaper
X] Public access/ notice via Public Request
Public access/ notice via a Public LibraryX] Public access/ notice via other method News Release
Describe vour Drinking -Water Svstem
The Elgin Area Primary Water Supply System employs pre -chlorination, screening, processpH adjustment (utilizing carbon dioxide), powder activated carbon addition (seasonally on an
as -required basis), coagulation, flocculation, sedimentation, dual -media filtration, UV
disinfection, post -chlorination, final pH adjustment ( utilizing sodium hydroxide) and
fluoridation to treat raw water obtained from Lake Erie. The WTP has a rated capacity of 91ML/day (MLD). Water is pumped from the plant through two 750 mm and 900mm diameter
water mains to various communities en route to the Elgin -Middlesex terminal reservoir
located northeast of St. Thomas in the Municipality of Central Elgin. The drinking watersystem is monitored at various locations throughout the system via a Supervisory Control andData Acquisition (SCADA) system.
List all water treatment chemicals used over this rei)ortin2 period
Carbon Dioxide
Aluminum Sulphate
Cationic Polymer
Powder Activated Carbon
Chlorine Gas
Hydrofluosilicic Acid
Sodium Hydroxide
Drinking Water Systems Regulations Page 2 of 8
P1BS 4435e01) February 2017
67
r`
ntariO Drinking-Water Systems Regulation O. Reg. 170/ 03
Were any significant expenses incurred to? X] Install required equipment
X] Repair required equipment
X] Replace required equipment
Please provide a brief description and a breakdown of monetary expenses incurrednri+nl Dvniun+a•
PAC system upgrades — new pumps and piping
Filter rebuild project
Replaced low lift valves # 2 and # 3
Instrumentation replacement
Installed chlorine tonner actuators ( emergency shutoff) SCADA network communications
SCADA security upgradesResiduals management facilityStorage buildingConcrete crack injection
Drain pipe replacements
Flash mixer replacements
Low lift and high lift tie breaker decommissioningCell 1 level meter
Settled water level meter
mtenance rrolects:
Remedial work high lift pump #4Removed valve house control panel
Increased low lift UPS battery capacityReplaced packing and lantern rings on high lift pumps # 2, # 3 and #4
Replaced security camerasInstalled new chlorinator controller
Installed flushing valve on P042B main isolation valveReplaced fluoride pumps # 1 and # 2
Replaced sodium hydroxide hot water tank
Replaced surge tank safety relief valvesInstalled 5kv marker posts from plant to low lift
Replaced compressor pump #3 and #4 in surge facilitySecurity exterior lighting improvementsAlum tank life cycle condition inspection
Drinking Water Systems Regulations Page 3 of 8
P1BS 4435e01) February 2017
68
r`
tl" ntarb Drinking -Water Systems Regulation O. Reg. 170/ 03Provide details on the notices submitted in accordance with subsection 18( 1) of the Safe
Drinking -Water Act or section 16-4 of Schedule 16 of O.Reg.170/ 03 and reported toSpills Action Centre
Incident
Range of E. ColiRange of Total
Treated Water Free Chlorine ( mg/ L) Continuous Monitoring 0. 50)-( 2. 15)
ResultsColiform
Unit of CorrectiveReport Parameter Result
Treated Water Fluoride ( mg/ L)
Corrective Action
min #)-( max #) counts/ 100 mL) counts/ 1 mL)
0. 28)-( 0. 80
Measure
NTU)
Action DateDate
Raw Water 103 10)-( 200) 0)-( 50, 000) 10)-(> 2, 000)
NA NA NA NA NA NA
Microbiological testing done under the Schedule 10, 11 or 12 of Regulation 170/ 03, during this reporting period.
Operational testing done under Schedule 7, 8 or 9 of Regulation 170/ 03 during theperiod covered by this Annual Report.
Parameter
Range of E. ColiRange of Total
Treated Water Free Chlorine ( mg/ L) Continuous Monitoring 0. 50)-( 2. 15)
ResultsColiform Range of HPC
Number ofcounts/ 100 mL)
Results Results
Treated Water Fluoride ( mg/ L)
Samplesmin #)-( max #)
counts/ 100 mL) counts/ 1 mL)
0. 28)-( 0. 80
Filter # 1 - Filtered Water Turbidity NTU)
min #)-(max #) min #)-(max #)
Raw Water 103 10)-( 200) 0)-( 50, 000) 10)-(> 2, 000)
Treated Water (WTP) 258 0) 40) 0) 40) 0)-( 490)
Distribution (EMPS
0. 006)-( 1. 213)
Combined Filtered Water Turbidity NTU 2024
Valve House & 156 0) 40) 0) 40) 0)-( 20)
Fruitridge Surge
Facility)
Operational testing done under Schedule 7, 8 or 9 of Regulation 170/ 03 during theperiod covered by this Annual Report.
Parameter Number of Grab Samples
Range of Results
min #)-(max #)
Treated Water Free Chlorine (mg/L) Continuous Monitoring 0. 50)-( 2. 15)
2025 0. 81)-( 1. 80)
Treated Water Turbidity (NTU) Continuous Monitoring 0. 02)-( 2. 00)
2019 0. 016)-( 0.477)
Treated Water Fluoride ( mg/L) Continuous Monitoring 0. 17)-( 2. 00
672 0.28)-( 0. 80
Filter # 1 - Filtered Water Turbidity NTU) Continuous Monitoring 0. 008)-( 2. 000)
Filter #2 - Filtered Water Turbidity NTU) Continuous Monitoring 0. 010)-( 0. 880)
Filter #3 - Filtered Water Turbidity NTU Continuous Monitoring 0. 003)-( 0. 704)
Filter #4 - Filtered Water Turbidity NTU Continuous Monitoring 0. 006)-( 1. 213)
Combined Filtered Water Turbidity NTU 2024 0. 007)-( 0. 138)
NOTE:
Turbidity spikes above 1. 00 NTU on filtered and treated water coincide with instrumentcalibrations, instrumentflushing, pump start-ups, or maintenance. Filter effluentturbidity spikes did not exceedfifteen minutes on any of thefilters.
Drinking Water Systems Regulations Page 4 of 8
P1BS 4435e01) February 2017
69
r`
ntarb Drinking -Water Systems Regulation O. Reg. 170/ 03
Summary of Inorganic parameters tested during this reporting periodAll tests were conducted on treated water leaving the WTP unless otherwise noted)
Parameter Sample Date Result Value Unit of Measure Exceedance
January 5, 2016 0. 11 pg/L NOAntimony August 30, 2016 0. 31 pg/L
NOAlachlor
January 5, 2016 Not Detected pg/L NOArsenic
August 30, 2016 0. 3 g /L
NO
metobolites
January 5, 2016 21. 8 pg/L NOBarium
August 30, 2016 24. 7 pg/L
NOAzinphos- methyl
January 5, 2016 23. 9 pg/L NOBoron
August 30, 2016 18. 0 pg/L
NOBenzene
January 5, 2016 0. 009 pg/L NOCadmium
August 30, 2016 0. 012 L
January 5, 2016 0. 04 pg/L NOChromium
August 30, 2016 0.44 L
Lead January 5, 2016 Not Detected pg/L NO
EMPS Valve House) August 30, 2016 0. 03 g/ l_
January 5, 2016 Not Detected g/ L NOMercury August 30, 2016 Not Detected pg/L
January 5, 2016 0. 14 pg/L NOSelenium
August 30, 2016 0. 20 pg/L
Sodium January 5, 2016 15. 5 mg/L NO
January 5, 2016 0. 027 pg/L NO
Uranium August 30, 2016 0. 051 pg/L
January 18, 2016 Not Detected mg/L NO
NitriteApril 5, 2016 Not Detected mg/LJuly 5, 2016 Not Detected mg/L
October 11, 2016 Not Detected m / L
January 18, 2016 0.303 mg/L NO
NitrateApril 5, 2016 0.218 mg/LJuly 5, 2016 0. 116 mg/L
October 11, 2016 0. 096 mg/L
Summary of Organic parameters sampled during this reporting periodAll tests were conducted on treated water leaving the WTP unless otherwise noted)
Parameter Sample Date Result ValueUnit of
ExceedanceMeasure
January 5, 2016 Not Detected pg/L NOAlachlor
August 30, 2016 Not Detected L
Atrazine + N-dealkylated January 5, 2016 0. 11 g/ L NO
metobolitesAugust 30, 2016 0. 05 g/ L
January 5, 2016 Not Detected g/ L NOAzinphos- methyl August 30, 2016 Not Detected g /L
January 5, 2016 Not Detected pg/L NOBenzene August 30, 2016 Not Detected g/ L
Drinking Water Systems Regulations Page 5 of 8
P1BS 4435e01) February 2017
70
r`
ntarb Drinking -Water Systems Regulation O. Reg. 170/ 03
Drinking Water Systems Regulations Page 6 of 8
P1BS 4435e01) February 2017
January 5, 2016 Not Detected g/ L NOBenzo( a) pyrene August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOBromoxynil August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NOCarbaryl August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NOCarbofuran August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOCarbon Tetrachloride August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOChlorpyrifos August 30, 2016 Not Detected g /L
January 5, 2016 Not Detected g/ L NODiazinon
August 30, 2016 Not Detected L
January 5, 2016 Not Detected g/ L NODicamba
August 30, 2016 Not Detected L
January 5, 2016 Not Detected g/ L NO1, 2 -Dichlorobenzene
August 30, 2016 Not Detected L
January 5, 2016 Not Detected g/ L NO1, 4 -Dichlorobenzene August 30, 2016 Not Detected g/ L,
January 5, 2016 Not Detected g/ L NO1, 2- Dichloroethane August 30, 2016 Not Detected g/ L
1, 1- Dichloroethylene January 5, 2016 Not Detected g/ L NO
vinylidene chloride) August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NODichloromethane August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NO2- 4 Dichlorophenol August 30, 2016 Not Detected g/ L
2, 4- Dichlorophenoxy acetic January 5, 2016 Not Detected g/ L NO
acid (2,4- D) August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NO
Diclofop-methyl August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NODimethoate August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NODiquat August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NODiuron August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NOGlyphosate August 30, 2016 Not Detected pg/L
January 5, 2016 Not Detected pg/L NO
Haloacetic Acids (HAA' s) April 5, 2016 Not Detected g/ LEMPS Valve House) July 5, 2016 Not Detected g/ L
October 11, 2016 Not Detectedg/ L
January 5, 2016 Not Detected g/ L NOMalathion
August 30, 2016 Not Detected g /L
Drinking Water Systems Regulations Page 6 of 8
P1BS 4435e01) February 2017
71
r`
ntarb Drinking -Water Systems Regulation O. Reg. 170/ 032 -Methyl -4- January 5, 2016 Not Detected pg/L NO
chlorophenoxyacetic acid August 30, 2016 Not Detected L
January 5, 2016 0. 02 pg/L NOMetolachlor August 30, 2016 Not Detected g /L
January 5, 2016 Not Detected g/ L NOMetribuzin August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NOMonochlorobenzene August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOParaquat August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOPentachlorophenol August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NOPhorate August 30, 2016 Not Detected g /L
January 5, 2016 Not Detected pg/L NOPicloram August 30, 2016 Not Detected g/ L
Polychlorinated Biphenyls January 5, 2016 Not Detected pg/L NO
PCB) August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOPrometryne August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOSimazine August 30, 2016 Not Detected g/ L
January 5, 2016 9. 2 pg/L NOTotal Trihalomethanes
April 5, 2016 11. 0 g/ L, TAMs)
July 5, 2016 15. 0 g/ LEMPS Valve House) October 11, 2016 17. 0
g/ LTotal Trihalomethanes
TAMS) 2016 13. 1 g/ L, NO
EMPS Valve House)
Running Annual AverageJanuary 5, 2016 Not Detected pg/L NO
TerbufosAugust 30, 2016 Not Detected L
January 5, 2016 Not Detected pg/L NOTetrachloroethylene August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NO2, 3, 4, 6- Tetraehlorophenol August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected g/ L NOTriallate August 30, 2016 Not Detected pg/L
January 5, 2016 Not Detected g/ L NOTrichloroethylene August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NO2, 4, 6 -Trichlorophenol August 30, 2016 Not Detected pg/L
January 5, 2016 Not Detected pg/L NOTrifluralin August 30, 2016 Not Detected g/ L
January 5, 2016 Not Detected pg/L NOVinyl Chloride August 30, 2016 Not Detected/ Lg
Drinking Water Systems Regulations Page 7 of 8
P1BS 4435e01) February 2017
72
r`
ntarb Drinking-Water Systems Regulation O. Reg. 170/ 03
NOTE: During 2016, no Inorganic or Organic parameter(s) exceeded half thestandardprescribed in Schedule 2 ofOntario Drinking Water Quality Standards.
Drinking Water Systems Regulations Page 8 of 8
P1BS 4435e01) February 2017
73
Thinkin
bolls
StewardshipOntario
March 31, 2017
MALAHIDE, TOWNSHIP OF
87 John St. South
Aylmer, ON
N5H 20
RE: Industry funding for Municipal Blue Box Recycling for the quarter of the 2016 Program Year
Dear Mayor and Members of Council:
Packaging and printed paper companies, represented by Stewardship Ontario, fulfill their responsibilities to fund 50% of
the net cost of the Blue Box Program by making cash payments to municipalities on a quarterly basis.
On June 15, 2016, the Waste Diversion Ontario (WDO) Board determined that payments to municipalities will be basedon a 2016 funding obligation of $121,552,551. WDO provided further details with respect to the WDO Board' sdetermination of the 2016 obligation in a report on their website. The report can be read here.
Stewardship Ontario is providing payments to municipalities in accordance with the WDO Board' s decision.
On behalf of Stewardship Ontario, I want to thank you for your continued efforts to increase waste diversion in thisprovince.
Sincerely,
David Pearce
Supply Chain Officer
Stewardship Ontario
Council Agenda A File: CO /
C. A. O./ Clerk Name:
Dir. of Finance Subject: rte_ Dir, Physical Serv. 0 avrn.xxrtr
Dir. Cam/ Corp. Serv. ; Date Received:
Dir. Fire/ Emerg Serv. Other APR 0 3 2017
1 St. Clair Avenue West T. 416.323.0101 www.stewardshipontario.ca
7th Floor F. 416.323.3185
Toronto, Ontario [email protected] 1K6
74
CORPORATION OF THE COUNTY OF ELGIN.
NOTICE OF DECISION
CONSENT APPLICATION NO. E 15/ 17
PART LOT 34, CONCESSION 4, TOWNSHIP OF MALAHIDE
CALTON LINE INC.
ATTACHED is a certified copy of the decision of the Land Division Committee of the County ofElgin in the matter of an Application E 15/ 17 for a consent pursuant to Section 53 ( 17) of thePlanning Act, R. S. O. 1990, as amended.
You will be entitled to receive notice of any changes to the conditions of the provisional consent ifyou have either made a written request to be notified of the decision to give or refuse provisionalconsent or make a written request to be notified of changes to the conditions of the provisionalconsent.
ANY PERSON or public body may appeal the decision and/ or any conditions) imposed by theCommittee to the Ontario Municipal Board by filing with the Secretary -Treasurer of the LandDivision Committee, not later than the 19 " day of April 2017, a Notice of Appeal, accompaniedby the Board' s fee, in the amount of $300. 00 for the first appeal and $ 25.00 for each furtherappeal related to the same matter. ( N. B. — Certified Cheques or Money Orders are to be madepayable to the Minister of Finance). If you wish to appeal, a copy of.an appeal form is availablefrom the OMB website at www.omb. gov.on. ca. or for pick- up at the County Municipal Offices, 450Sunset Drive, St. Thomas.
Only individuals, corporations and public bodies may appeal decisions in respect of applicationsfor consent to the Ontario Municipal Board. A notice of appeal may not be filed by anunincorporated association or group. However, a notice of appeal may be filed in the name of anindividual who is a member of the association or group on its behalf.
ADDITIONAL INFORMATION regarding this application for consent is available for inspectiondaily, Monday to Friday, between 8: 30 A.M. and 1: 30 P. M., at the County Municipal Offices, 450Sunset Drive, St. Thomas.
Please note that these lands are subject to an application for a Zoning By -Law Amendment — Number unknown. For further information regarding this application please contact the Clerk ofthe Township of Malahide.
Dated at the Municipality of Central Elgin this 30th
day of March 2017.
Susan D. GallowaySecretary -TreasurerLand Division Committee450 Sunset DriveSt. Thomas, OntarioN5R 5V1
Encl. C. C. David Roe, Agent
Township of MalahideC. Watters, County EngineerCatfish Creek Conservation AuthoritySteve Evans, Manager of Planning
Progressive by Nature
Council Agenda ot File: bioC. A. C./ Clerk Name:
Dir. of Finance Subject:
Dir. Physical Serv. AG1sI i1
Dir. Com/ Corp. Serv. t1f Date Received: Dir. Fire/ Emerg Serv. Other --- APR n 4 Zan ---
County of ElginEngineering Services450 Sunset DriveSt Thomas, On N5R 5V1Phone: 519- 631-1460
www.elgln-county.on. ca
75
Application # E 15/ 17
DMarch29, 2017
ECISION
In the matter of an application for a consent pursuant to Section 53 ( 1) of the Planning Act, R. S. O. 1990, as amended, as it affects the following property:
PART LOT 34, CONCESSION 4, TOWNSHIP OF MALAHIDEof a severance of a portion of the above-mentioned premises as shown on a sketch attached to theapplication of a lot with a frontage of 73. 8 metres along Calton Line by a depth of 95.9 metres, Area6860. 8 square metres ( 1. 69 acres) containing one house and one barn, proposed to create one new lotsurplus to the needs of the applicants. The owners are retaining 72. 81 acres, proposed to remain inagricultural use.
Consent requested by: CALTON LINE INC.
Consent granted to: UNKNOWN
DECISION: GRANTED - The Elgin County Land Division Committee considered all written and oralsubmissions received on this application, the effect of which helped the committee to make an informeddecision.
Conditions: This decision will expire unless a deed is presented for stamping by: March 29, 2018. Providing that the requirements of the County of Elgin Engineers Office (Direct connection to aMunicipal Drain for each lot created is required — If an existing connection is unavailable, the proponentshall petition for a Municipal Drain under the Drainage Act, RSO 1990, to provide a legal outlet for thesubject lands and that the cost associated with the drainage works be assessed on a proportional basisreflecting the increased needs of the development) and the Township of Malahide( The applicant isresponsible to apply and pay all fees to the Township with respect to Civic Addressing Numbers/ Signage for the severed and retained portions of property prior to the condition being deemed fulfilled; The applicant initiate and assume, if required, all engineering costs associated with the preparation of arevised assessment schedule in accordance with the Drainage Act, R.S. O. 1990, as amended, withsuch costs to be paid in full to the Township prior to the condition being deemed fulfilled; That theapplicant initiate and assume, if required, all engineering and construction costs associated withconstruction of a new Municipal drain, or, the relocation of Municipal drain, in in accordance with theDrainage Act, RSO 1990 with all costs to be paid in full to the township prior to the condition beingdeemed fulfilled; All entrance permits are acquired from the appropriate road authority; That alloutstanding work orders or by-law enforcement issues be resolved to the satisfaction of the ChiefBuilding Official prior to the conditions being deemed fulfilled; The applicants initiate and assume allplanning costs associated with the proposed severance as required in accordance with the Ontario
Planning Act, R.S. O. 1990, with such costs to be paid in full to the Township and that the requiredprocess be successfully completed prior to the condition being deemed fulfilled.; Confirmation thatprivate sewage system be confined entirely within the boundaries of the newly created parcel, whichsystem be in conformance with all required setbacks from lot lines prior to the condition being deemedfulfilled; All applicable property taxes, municipal fees and charges be paid to the Municipality prior tothe stamping of the deeds; Three copies of a reference plan be submitted to the satisfaction of theMunicipality, one of which shall be either 8 % x 14 or 11 x 17, and an electronic version of the plan shall
also be submitted) are met and written notice be received from same confirming the conditions prior tostamping the deed.
County of ElginReasons: Surplus dwelling as a result of farm consolidation. Engineering Services
St_ Tho s, On 5R 1
Phone: 519-631-1460
www.elgincounty.ca
e e
76
DECISION
Application # E 15/ 17
Members concurring in the above ruling:
Page 2 of 2
March 29, 2017
Where conditions have been imposed and the applicant has not, within a period of one yearfrom the giving of the notice of decision pursuant to subsection ( 17) of Section 53 of the Act, fulfilled the conditions, the application for consent shall thereupon be deemed to be refused, but where there is an appeal under subsections ( 19) or (27), the application for consent shall
not be deemed to be refused for failure to fulfill the conditions until the expiry of a period of oneyear from the date of the order of the Ontario Municipal Board issued in respect of the appealor from the date of a notice issued by the Board under subsection (29) or(33).
CERTIFICATION
I, Susan D. Galloway, Secretary -Treasurer of the Land Division Committee of Elgin, certify thatthe above is a true copy of the decision of the Land Division Committee with respect to theapplication recorded herein.
Dated this29th
day of March 2017.
d Division Committee
77
CORPORATION OF THE COUNTY OF ELGIN
NOTICE OF DECISION
CONSENT APPLICATION NO. E 16/ 17
PART LOTS 8 & 9, CONCESSION 2, TOWNSHIP OF MALAHIDE
CAROLINIAN WINERY & EATERY INC.
ATTACHED is a certified copy of the decision of the Land Division Committee of the County ofElgin in the matter of an Application E 16/ 17 for a consent pursuant to Section 53 ( 17) of thePlanning Act, R.S. O. 1990, as amended.
You will be entitled to receive notice of any changes to the conditions of the provisional consent ifyou have either made a written request to be notified of the decision to give or refuse provisionalconsent or make a written request to be notified of changes to the conditions of the provisionalconsent.
ANY PERSON or public body may appeal the decision and/ or any condition( s) imposed by theCommittee to the Ontario Municipal Board by filing with the Secretary -Treasurer of the LandDivision Committee, not later than the 19 h
day of April 2017, a Notice of Appeal, accompaniedby the Board' s fee, in the amount of $300. 00 for the first appeal and $ 25.00 for each furtherappeal related to the same matter. ( N. B. — Certified Cheques or Money Orders are to be madepayable to the Minister of Finance). If you wish to appeal, a copy of an appeal form is availablefrom the OMB website at www.omb. gov.on.ca. or for pick-up at the County Municipal Offices, 450Sunset Drive, St. Thomas.
Only individuals, corporations and public bodies may appeal decisions in respect of applicationsfor consent to the Ontario Municipal Board. A notice of appeal may not be filed by anunincorporated association or group. However, a notice of appeal may be filed in the name of anindividual who is a member of the association or group on its behalf.
ADDITIONAL INFORMATION regarding this application for consent is available for inspectiondaily, Monday to Friday, between 8: 30 A.M. and 1: 30 P. M., at the County Municipal Offices, 450Sunset Drive, St. Thomas.
Please note that these lands are subject to an application for a Zoning By -Law Amendment — Number unknown. For further information regarding this application please contact the Clerk ofthe Township of Malahide.
Dated at the Municipality of Central Elgin this 30th
day of March 2017.
Susan D. GallowaySecretary -TreasurerLand Division Committee450 Sunset DriveSt. Thomas, OntarioN5R 5V1
Encl. C. C. David Roe, Agent
Township of MalahideC. Watters, County EngineerCatfish Creek Conservation AuthoritySteve Evans, Manager of Planning
Progressive by Nature
Council Agenda ' W File: bto
C.A.O./ Clerk E3 Name:
Dir. of Finance 0 Subject: ti
Dir. Physical Serv. 1 Cl
Dir. Com/Corp. Serv." Id Date Received: Dir. Fire/ Emerg Serv. O
APR 0 4 2017Other
County of ElginEngineering Services450 Sunset Drive
St. Thomas, On N5R 5V1
Phone: 519- 631-1460
www.elgin-cou nty.on. ca
78
Application # E 16/ 17 March 29, 2017DECISION
In the matter of an application for a consent pursuant to Section 53 ( 1) of the Planning Act, R. S. O. 1990, as amended, as it affects the following property:
PART LOTS 8 & 9, CONCESSION 2, TOWNSHIP OF MALAHIDE
of a severance of a portion of the above-mentioned premises as shown on a sketch attached
to the application of a lot with a frontage of 150 metres along Jamestown Line by a depth of155 metres, Area 23,250 square metres ( 5. 74 acres) containing one house, one winerybuilding, one barn and one kiln, proposed to create one new lot for agricultural use (Winery). The owners are retaining 20.7 hectares ( 51 acres), proposed to remain in agricultural use.
Consent requested by: YOUNG CAROLINIAN INC.
Consent granted to: RON BARR OR RELATED COMPANY
DECISION: GRANTED AS AMENDED- The Elgin County Land Division Committeeconsidered all written and oral submissions received on this application, the effect of which
helped the committee to make an informed decision. Conditions: This decision will expire unless a deed is presented for stamping by: March 29, 2018. Providing that the requirements of the Township of Malahide are met (That the applicantis responsible to apply and pay all fees to the Township with respect to Civic AddressingNumbers/ Signage for the severed and retained portions of property prior to the conditionbeing deemed fulfilled; All entrance permits are acquired from the appropriate road authority; All outstanding work orders or by- law enforcement issues be resolved to the satisfaction of theChief Building Official prior to the conditions being deemed fulfilled; The applicants initiate andassume all planning costs associated with the proposed severance as required in accordance
with the Ontario Planning Act, R. S. O. 1990, with such costs to be paid in full to the Townshipand that the required process be successfully completed prior to the condition being deemedfulfilled; Confirmation that private sewage system be confined entirely within the boundaries ofthe newly created parcel in conformance with all required setbacks from lot lines prior to thecondition being deemed fulfilled; All applicable property taxes, municipal fees and charges bepaid to the Municipality prior to the stamping of the deeds; Three copies of a reference plan besubmitted to the satisfaction of the Municipality, one of which shall be either 8'/ x 14 or 11 x
17, and an electronic version of the plan shall also be submitted; That the preparation of an
Environmental Impact Study be completed or, alternatively, confirmation from the ConservationAuthority that an Environmental Impact Study is not required) and written notice be receivedfrom same confirming the conditions prior to stamping the deed. THIS CONSENT WASGRANTED AS AMENDED — Registered owner of property is correct to be Young CarolinianInc.,
Reasons: Farm Winery in accordance with the policies of the Township of Malahid&OffigalPlan. Engineering Services
450 Sunset Drive
St A1Yi' e0j rof 2/1Phone: 19-631-1460
www.elgincounty.ca
79
DECISION
Application # E 16/ 17
Members concurring in the above ruling:
Page 2 of 2
March 29, 2017
Where conditions have been imposed and the applicant has not, it ' n a period of one year
from the giving of the notice of decision pursuant to subsection ( 1 of Section 53 of the Act, fulfilled the conditions, the application for consent shall thereupon be deemed to be refused, but where there is an appeal under subsections ( 19) or (27), the application for consent shall
not be deemed to be refused for failure to fulfill the conditions until the expiry of a period of oneyear from the date of the order of the Ontario Municipal Board issued in respect of the appealor from the date of a notice issued by the Board under subsection ( 29) or(33).
CERTIFICATION
I, Susan D. Galloway, Secretary -Treasurer of the Land Division Committee of Elgin, certify thatthe above is a true copy of the decision of the Land Division Committee with respect to theapplication recorded herein.
Dated this 29th day of March 2017.
ecretary-TreasurerLand Division Committee
80
CORPORATION OF THE TOWN OF AYLMER
NOTICE OF PUBLIC MEETING
TAKE NOTICE that the Council of the Corporation of the Town of Aylmer will hold a public
meeting on Monday, May 1, 2017, commencing at 7: 00 p. m. in the Town of Aylmer CouncilChambers, Aylmer, Ontario, to consider a proposed amendment to the Town of Aylmer
Zoning By-law 57- 99 under Section 34 of the Planning Act.
The lands affected by the Zoning By -Law Amendment are located on the east side of FourthAvenue south of Clarence Street and are known municipally as 53 Fourth Avenue in the Townof Aylmer. The subject lands, comprising an area of approximately 838 square metres ( 9, 020sq. ft.), frontage of 20.6 metres ( 68 ft) and depth of 40.6 metres ( 133 ft), are occupied by anolder single detached garage and two accessory buildings (detached garage and storage shed). The owner, Mark Hulst, proposes to remove the existing dwelling and replace it with a semi- detached dwelling.
The Amendment to the Zoning By -Law changes the zoning on the subject lands fromResidential Type 1 B ( R1 B) Zone" to " Residential Type 2 ( R2) Zone". Permitted uses of the R2
zone include a single detached dwelling, semi-detached dwelling, duplex dwelling, converteddwelling, home occupation and an accessory use. The proposed semi- detached dwelling wouldbe subject to minimum standards as set out in Section 9( 3) of the Zoning By- law.
The lands are designated ` Low Density Residential' in the Town of Aylmer Official Plan. Theproposed zoning by-law amendment is considered to be in conformity with the relevant policiesof the Plan.
The accompanying Key Map shows the location of the lands to which the Zoning By- lawAmendment applies.
ANY PERSON may attend the public meeting and/or make written or verbal representation insupport of or in opposition to the proposed Zoning By-law Amendment.
IF A PERSON OR PUBLIC BODY that files an appeal of a decision of the Corporation of the
Town of Aylmer in respect of the proposed Zoning By- law Amendment does not make oralsubmissions at a public meeting or make written submissions to the Corporation of the Town ofAylmer before the proposed Zoning By- law Amendment is adopted, the Ontario Municipal Boardmay dismiss all or part of the appeal.
ADDITIONAL INFORMATION relating to the proposed Zoning By- law Amendment is availablefor inspection at the Town of Aylmer Municipal Offices at 46 Talbot Street West, during normaloffice hours, 8: 30 a.m. to 4:30 p. m. If you wish to be notified of the adoption of the proposedZoning By- law Amendment, you must make a written request to the Town at the address below.
DATED at the Town of Aylmer this 29th day of March, 2017.
I y - SUBJECT LANDS
MAP 9SCALE 1: 4,000
Nancie J. Irving, CMOClerk, Town of Aylmer
46 Talbot Street West
Aylmer ON N5H 1 J7
Phone: ( 519) 773-3164
Fax: ( 519) 765- 1446
www.ayimer.com
PAiI,QCouncil C3 Agenda P, File: lel
C.A. O./ Clerk O Name: np_ "
Dir. of Finance D Subject: Xp. MDir. Physical Serv. D S3
Dir. Com/Corp. Serv. 1* tate Received: Dir. Fire/Emerg Serv. D
MAR 31 2017Other
81
MUNICIPALITY OF CENTRAL ELGINNOTICE OF PASSING
CONCERNING PROPOSED ZONING BY-LAW AMENDMENT
Part of Lot 7, Concession 6, Geographic Township of Yarmouth7987 Fairview Road
TAKE NOTICE that the Council of the Corporation of the Municipality of Central Elgin passedBy- law No. 2132 on the 27th day of March, 2017 pursuant to Section 34( 18) of the Planning Act, R. S. O. 1990 as amended.
The subject lands, which are located on the west side of Fairview Road, south of SouthdaleLine, have approximately 484 metres of frontage on Southdale Line and are approximately38.40 hectares ( 94.9 acres) in lot area ( see Key Map below). Municipally known as 7987Fairview Road, they may be legally described as being Part of Lot 7, Concession 6, geographicTownship of Yarmouth, now Municipality of Central Elgin.
The applicant is proposing to rezone the retained lands from a severance of a surplus farmdwelling ( LDC Application E79/ 16), to prevent a new dwelling from being built, in accordancewith the Municipality' s policies for surplus farm dwelling severances. The applicant is alsoseeking to permit rural -residential use of the severed surplus dwelling lot.
The purpose of By- law No. 2132 is to place the subject lands into the Open Space Zone 2OS2- 88 & OS2- 89) of the Township of Yarmouth Zoning By- law No. 1998 as amended. The
effect of By- law No. 2132 will be to permit farm use but no farm dwelling on the retained landsfrom Consent E79/ 16; and to permit rural residential use within the existing dwelling on thesevered lands from Consent E79/ 16.
In coming to its decision Council considered the planning report prepared by staff. There wereno written submissions and nobody appeared at the public meeting to speak to this matter.
AND TAKE NOTICE that any person or public body may appeal to the Ontario Municipal Boardwith respect to the By- law by filing with the Clerk of the Corporation of the Municipality ofCentral Elgin, not later than the 21st day of April, 2017, a notice of appeal, setting out thereasons for the appeal, and must be accompanied by the fee required by the Ontario MunicipalBoard.
Only individuals, corporations and public bodies may appeal a by- law to the Ontario MunicipalBoard. A notice of appeal may not be filed by an unincorporated association or group. However, a notice of appeal may be filed in the name of an individual who is a member of theassociation or group on its behalf.
No person or public body shall be added as a party to the hearing of the appeal unless, beforethe by- law was passed, the person or public body made oral submissions at a public meeting orwritten submission to the council or, in the opinion of the Ontario Municipal Board, there are
reasonable grounds to add the person or public body as a party.
The complete By- law is available for inspection daily, from Monday to Friday, during regularoffice hours, at the Clerk' s Office.
ADDITIONAL INFORMATION relating to the proposed Zoning By- law Amendment is availablefor inspection daily, Monday to Friday, 9: 00 A.M. to 4: 00 P. M. at the Municipal Offices and at theCentral Elgin Planning Office, 9 Mondamin Street, St. Thomas.
DATED at the Municipality of Central Elgin, this 1st day of April, 2017.
Key Map ( not to scale):
PROPOSED SEVERED
Dianne Wilson, Deputy ClerkMunicipality of Central Elgin450 Sunset Drive, 1 st Floor
St. Thomas, Ontario
N5R 5V1
519) 631- 4860, Ext. 286
Council AgendaC.A. O./ Clerk p
Dir. of Finance pDir. Physical Sere p
Dir. Com/ Corp. Serv. ) fDir. Fire/ Emerg Serv. pOthar
File:
Name:
Subject: Nol.,
Date Received:
APR ' 0 5 2017
82