    The construction preliminary works are started with securing

    the site with a Fence. While securing the site , We can set up the site and do the

    welfare activities parally. So both these tasks can be started in the same day. There is a

    start relationship between these two tasks.

    We can start the demolition works after securing the siteonly. Other wise it would be harmful foe the people outside and inside the project. So

    there is a finish to start relationship between these two tasks.

    The demolition works and the site strip works can be

    identified as parallel work activities. ecause both activities are done by using heavy

    machinery so starting both tasks at a single time will less consume the time for the work

    activities. So it is start to start relationship.

    The round remediation work can be start after the securing the

    site because the round leveling process are long time consuming and they should bemonitored properly. The remediation process can be started from an area of less

    demolition work and the remediation work can be monitored afiter finishing the

    preliminary work. we can start the substructure work the substructure works can e

    started.

    The first work in the substructure stage of a project is

    marking the pilling positions accurately so after the ground remediation activities

    finished. We can start the marking the pilling mat. This is a finish to start process. !fter

    finishing the marking of pile position we can start the piling operations. This is also a

    finish to start process because all pile positions has to be identified before the pilingoperations.

    !fter the piling operations we can start the e"cavation of the

    pile caps to settle the ground beams ground beams link all the piles. So the operations

    has to be finished before the e"cavation.

    !fter the e"cavations we can place the underground utility

    ducts and drainage processes. it is also a finish to start process.

    !fter finishing the e"cavations and placing of utility and

    drainage ducts we can start filling the e"cavations with hard core substances.

    #n the finishing date of piling operations S$% pile caps can

    be done as a finish to start process. The S$% pile beams can also be finished in the

    same date of the S$% pile caps process. So the is a finish to finish process.

    This process will finish the substructure work and the

    superstore work has to be commenced with the fi"ing of the steel structure. !fter

  • 7/26/2019 The construction preliminary works docx

    2/2

    establishing the steel structure we can fi" the scaffoldings whole superstore works are

    helped by these scafolidings. When the steel frame is fi"ed we can start the building the

    masonary wall in the lower levels. When the scaffoldings are totally fi"ed we can build

    the upper levels of the masonary wall.

    The insulation works has to done as a finish to start processalong with the completion of the masonary wall. ecause the insulations has to be done

    in each of the masonary wall.

    !s the insulation process is over the roofing and claddin

    fi"ation can be started and also the window finishing can also be started. #n the

    completion of the roofing and cladding the windows must also be finished

    Then the mastic pointing has to applied complete the

    finishing works. This has to be done after completion of all the finishing works like

    insulation.