Chinese Renewable Energy Industries Association(CREIA) WANG Weiquan The Challenges and Solutions for Renewable Energy Development In China Seoul December 12,2017

The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Chinese Renewable Energy

Industries Association(CREIA)

WANG Weiquan

The Challenges and Solutions for

Renewable Energy Development

In China

Seoul

December 12,2017

Page 2: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

2

Established in 2002 with the support of UNDP, the GEF

and the State Economic and Trade Commission (SETC)

Registered at the Ministry of Civil Affairs on March 25,

2002

Has 200 members from industry, academics, organizations,

include bio energy, wind energy, solar PV sector.

---------------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------Establishment of CREIA

Page 3: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

3

CREIA promotes the adoption of advanced

renewable technologies and the commercialization

of the Chinese renewable energy.

---------------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------Mission of CREIA

Page 4: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

4

---------------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------Functions of CREIA

serves as a bridge

is a window

provides a platform

CREIA

Page 5: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

5

---------------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------Research and Study(1)

China Wind Power Report 2016 China Wind Power Report 2014 China Wind Power Report 2014

China Solar PV Report 2014China Solar PV Report 2016

China Solar PV Report

2013

Page 6: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

6

---------------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------Research and Study(2)

Green Finance for Low-Carbon

Cities—Energy

Studies on Investment and Financing

Mechanism that Support Distributed

Solar PV Industry

China Solar PV Power Policy

Report: Differential Feed-in

Tariffs

China Roadmap of PV

Development—A Pathway to Grid

Parity

Clean Production of Solar PV

in China

Who Is the Leader in

Green Energy Competition?

The Study of Distributed

Power Generation

Technology Roadmap in

China

Making Renewable

energy planning for local

government such as Xingtai

city, Changzhi City, etc.

…..

Page 7: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

7

---------------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------Conferences and Exhibitions

China PV Summit Offshore Wind Summit

The 10th anniversary celebrations of

RE Law

SNEC International PV Summit

International Forum on energy

transition

PVCEC

Page 8: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Contents

2. The challenges of RE in China

1.The current situation of RE in China

3. The solutions for RE development in China

Page 9: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

The current situation of RE in China

1

Page 10: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Renewable Energy Facilitates Energy Revolution

China is leading the world in wind (150GW), solar (77GW) and hydro

(331GW) installations.

Hydro20.7%

Coal-fire

65.1%

Wind9.3%

Solar4.9%

2016 China’s cumulative installation

Hydro9.7%

Coal-fire

40.1%Wind15.5%

Solar28.7%

Nuclear6.0%

2016 China’s new-added installation

2016

1627GW

2016

120.6GW

Page 11: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Renewable Energy Facilitates Energy Revolution

In 2016, China installed

19.3GW of wind, with

cumulative installed capacity

of 149GW, generated

241billion kWh.

2016 China’s wind power installation

0

2000

4000

6000

8000

10000

12000

14000

16000

2008 2009 2010 2011 2012 2013 2014 2015 2016

New-added(10MW) Cumulative(10MW)

Page 12: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Renewable Energy Facilitates Energy Revolution

In 2016, China installed

3.45GW of Solar PV, and the

country’s cumulative installed

solar capacity reached 7.7GW,

generated 66.2billion kwh.

2016 China’s solar pv installation

44232

420

1480

2338

3712

6710

42 60230 265

467 606

1032

0

1000

2000

3000

4000

5000

6000

7000

8000

2010 2011 2012 2013 2014 2015 2016

Utility Distributed

Page 13: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s National Targets Support Renewable Energy

China’s Power Sector 13th Five Year Plan

China’s electric power consumption

will reach 6,800-7,200 TWh of

electricity, increasing on average by

3.6-4.8% each year.

China’s electric generation capacity

will reach 2,000 GW by 2020, with

an average increase of 5.5% each

year.

Page 14: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Power Sector 13th Five Year Plan

2020 China’s electric power installation

Coal-fire55%

Nuclear3%

Gas5%

Solar5%

Wind10%

Hydro17%

Bio1%

Others4%

2020

2000 GW

According to the plan, China will

achieve its 15% non-fossil energy

consumption target by 2020. Non-

fossil power capacity will reach

770GW, accounting for 39% of

total power installation, generating

31% of the country’s electric

power.

China’s National Targets Support Renewable Energy

Page 15: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Wind Power Development 13th Five Year Plan

China aims to have total installed wind capacity of 210 GW by 2020, of

which 5 GW will be off-shore wind projects.

China’s National Targets Support Renewable Energy

Page 16: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Wind Power Development 13th Five Year Plan

420 TWh of electricity will be generated from wind, accounting for 6% of

total electric power supply.. Wind curtailment is targeted to be solved.

China’s National Targets Support Renewable Energy

Page 17: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Wind Power Development 13th Five Year Plan

From 2016 to 2020, newly installed on-shore and off-shore wind capacity in

China’s eastern and southern area will reach 57% of the country’s total new-

added wind installation. The eastern and southern area will account for 1/3 of

the country’s cumulative wind capacity.

China’s National Targets Support Renewable Energy

Page 18: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Wind Power Development 13th Five Year Plan

From 2016 to 2020, wind power investment will reach 700 billion CNY, reduce

380 million tons of CO2 emissions per year, generate 420 TWh of electricity, and

create 300 thousand jobs.

China’s National Targets Support Renewable Energy

Page 19: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Solar Development 13th Five Year Plan

The 2020 solar target is more than 110GW, split into 105 GW of solar PV and

5 GW of Concentrating Solar Power (CSP).

China’s National Targets Support Renewable Energy

Page 20: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Solar Development 13th Five Year Plan

PV generation cost is committed to reduce over 50% on the basis of 2015

level, reaching grid parity by 2020.

China’s National Targets Support Renewable Energy

Page 21: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Solar Development 13th Five Year Plan

Distributed PV enjoys a very prominent position in the plan. 100 DG

demonstration parks are expected to set up by 2020. Innovative business

models and PV power market shall be created to stimulate demand in the DG

segment.

China’s National Targets Support Renewable Energy

Page 22: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Solar Development 13th Five Year Plan

Improve the planning of scaled ground-

mounted PV power bases, and increase

renewable energy electricity share in the

capacity of transmission channels.

Implement the competitive bidding

mechanism based “Top-Runner-Program”.

In 2016, “Top-Runner-Program” expanded

to 5.5 GW, accounting for 30% of last

year’s guiding target.

China’s National Targets Support Renewable Energy

Page 23: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s Solar Development 13th Five Year Plan

PV Poverty Alleviation Projects CSP Demonstration Projects

Solar Heating ProjectsNew Energy Micro-Grid Pilots

China’s National Targets Support Renewable Energy

Page 24: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

China’s 13th Five Year Plan – other renewable energy technologies

Add 40 GW hydropower capacity,

with total installation reaching 340

GW by 2020.

Reach 15 GW of bioenergy generation

capacity by 2020.

China’s National Targets Support Renewable Energy

Page 25: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

The challenges of RE

in China

2

Page 26: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Wind curtailment mainly in Northwest and Northeast. Solar PV curtailment

mainly in Northwest.

Curtailment

Wind power curtailment in 2016 Solar PV curtailment in 2016

安徽

北京

重庆

福建

甘肃

广东广西

贵州

海南

河北

黑龙江

河南

湖北

湖南

江苏

江西

吉林

辽宁内蒙古

宁夏青海 山东

上海

陕西

山西

四川

天津

新疆

西藏

云南

浙江

台湾

香港澳门

0%~5%

5%~15%

15%~30%

30%以上

安徽

北京

重庆

福建

甘肃

广东广西

贵州

海南

河北

黑龙江

河南

湖北

湖南

江苏

江西

吉林

辽宁内蒙古

宁夏青海 山东

上海

陕西

山西

四川

天津

新疆

西藏

云南

浙江

台湾

香港澳门

0%~5%

5%~15%

15%~30%

30%以上

Page 27: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

The light blue column is the gap.

The accumulated gap is getting

larger and larger.

The subsidy has slow down the

renewable energy development.

Subsidy deficit

The gap of the subsidy between 2016-2020

(108 Yuan)

Page 28: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

13th Energy Development Plan:Grid

Parity for PV by 2020.

13th Renewable Energy Development

Plan:Grid Parity for PV by 2020.

13th Solar Energy Development Plan:The cost of Solar PV would be reduced

by 50% on the basis of 2015. Grid

Parity will be realized.

FIT decreasing

The change of FIT for solar PV

(Yuan/kWh)

Page 29: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

3

The solutions for RE development in China

Page 30: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

The 13th five-year plan on renewable energy :

Set the total target for wind power, solar PV, biomass power, through

which the step will slow down and the project landscape will be

optimized.

The number of new projects is strictly controlled in the area with

serious curtailment.

Improve the project management mechanism and the installed

capacity is managed according to the different provinces by year. The

provinces will report the annual target during the 13th five-year plan to

NEA.

Development Planning

Page 31: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

The 13th five-year plan on renewable energy :

The operating hours should meet the requirements by the full

guaranteed purchase policy in curtailment area by 2020.

The Measures for Full Guaranteed Purchase of Renewable Energy was

issued in March, 2016. The minimum operating hours for wind power

and solar PV were issued in May, 2016.

Full guaranteed purchase Mechanism

Page 32: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Currently, the RE is mainly consumed

locally. The government is trying to

enlarge the market.

16TWh was transmitted across

provinces, mainly the wind power.

The amount and percentage of RE

through Extra-high Voltage lines is

monitored now. And it will be

appraised in the future.

Expand the consumption market of Renewable Energy

西北

西南 东部负荷中心

东北

Page 33: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

The reformation of electric power system put the RE in priority,

including generation, grid connection, purchase.

Promote direct transaction of RE.

--Direct transaction with the end users.

--Ancillary service transaction of peak-shaving

Reducing the operating hours of thermal power plants according to

the reformation of electric power system.

Promote the consumption market mechanism for RE

Page 34: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Enhance the flexibility and capability of coal-fire power plants through

technological retrofitting. The minimum load of pure condensing unit can reach

30-35%, even 20-25% . The minimum load of CHP unit can reach 40-45%.

Promote the peak shaving of gas turbines and captive power plants.

Promote the peak shaving of thermal power plants

Page 35: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

According to the 13th Five-Year Planning for the Electric Power Development ,133 GW of CHP units and 82 GW pure condensing units will be retrofitted to

increase the flexibility in Northwest China, Northeast China, and North China.

And peak shaving ability will increase by 45 GW.

8 projects has been retrofitted by the end of September, 2017, with total

capacity of 6.2 GW.

Promote the peak shaving of thermal power plants

Page 36: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

According to The Notice on the Pilot of Distributed Generation Market

Transaction, the projects can participate the power trading. The projects

should meet:

No more than 20MW for individual project.

In principle, the voltage grade is 35kV. 60 kV or 110 kV is also

accepted if 35 kV is not available.

The percentage of DG installation should less than 80% within the

area of power transformation.

Promote the development of distributed energy

Page 37: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Electric energy substitution

It includes heating with electricity, electric boilers, replacing coal

with electricity in rural area, ect.

89.4 TWh electricity has been used in the Electric energy

substitution.

Coal fired boilers

Oil-fired vehicles

Electric

boilers

Electric

vehicles

Electricity substitution

Page 38: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Develop energy storage technology

There are many energy storage technology. Pumping storage and

Chemical storage are developing quickly.

Page 39: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Pumping storage technology

It is the most reliable, economic, mature energy storage

technology, with the longest lifetime and the largest capacity. The

comprehensive efficiency can reach 70-80%, even 87%.

Page 40: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Pumping storage projects by National Grid Company

黑龙江

吉林

青海

新疆内蒙古

云南

四川

广西 广东

辽宁

宁夏甘肃

山东

河北

福建

浙江

江西

湖北

贵州 湖南

陕西河南

山西

安徽

江苏

台湾

北京

重庆

西藏

Plannedconstruction

operation

In Operation: 21,19.16GW

Under Construction: 14,21.75GW

In the Planning: 24,29.50GW

Page 41: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Notification on the trial of renewable energy green electricity certificate issuance and voluntary subscription

trading system was issued in January, 2017.

-- Voluntary subscription is tried in 2017

-- Quota system for RE and mandatory purchase will be started at the right

Voluntary subscription

---The wind power and Solar PV projects in the subsidized list can be issued the green power certification,

excluding the distributed PV, off-shore wind power, Solar thermal power, biomass power.

---Once the wind power and solar PV project owners get the benefit from the green power certification, they can't

get subsidy from the renewable energy special fund.

---The price of the green power certification should be no more than the subsidy from the renewable energy

special fund.

---The green certification can be traded only once.

The purpose of voluntary subscription

---Lay a found for mandatory subscription system

---Reduce the pressure of the subsidy deficit somehow

Compulsory subscription

---The power sources side

---The power grid side

Quota system and green power certification

Page 42: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

The FIT declining is general trend. It should decrease gradually based on

the real cost

Reducing the cost through technology progress and industry upgrading.

---Decrease the cost of wind turbines, solar panels, inverters, etc.

---Adopt the big data technology, smart grid technology, etc to raise the

efficiency and reduce the operational cost of power stations.

Reducing the cost of electricity

Page 43: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Biomass heating

---wood pellets

---biogas

---biomass CHP

Geothermal

Solar thermal

Wind power

…..

Promote clean heating with RE

Page 44: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Biomass heating

The total consumption of biomass solid fuel in China is 8,000,000 tons. It can

be used in industrial boilers for individual plant, residential house,

commercial area, hospital, universities, etc.

Page 45: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Geothermal heating

生产井

回灌井

地热站 换热站 热用户

一级网 二级网

Xiong County, Hebei province

Heating by 100% geothermal

Page 46: The Challenges and Solutions for Renewable Energy ... 1-4. Weiquan Wang_CREIA.pdfChina’s Wind Power Development 13th Five Year Plan From 2016 to 2020, newly installed on-shore and

Thank You!WANG [email protected]

+86 10 68002617www.creia.net