16
The CASCADE Programme From Concept to Operations ICAO ACP ICAO ACP 5 July 2006 5 July 2006 José Roca José Roca CASCADE Deputy Programme CASCADE Deputy Programme Manager Manager [email protected] [email protected]

The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager [email protected]

Embed Size (px)

Citation preview

Page 1: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

The CASCADE Programme

From Concept to Operations

ICAO ACPICAO ACP

5 July 20065 July 2006

José RocaJosé Roca

CASCADE Deputy Programme ManagerCASCADE Deputy Programme Manager

[email protected]@eurocontrol.int

Page 2: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

Contents

When and WhereWhen and Where HowHowHowHow

What and WhyWhat and WhyWhat and WhyWhat and Why

CASCADECASCADEOverviewOverview

CASCADECASCADEOverviewOverview

Page 3: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

What is CASCADE?

Page 4: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

What is Stream 1?

Ground Surveillance Applications (ADS-B-out)

20082008

ADS-B Receiver

CPDLC and D-FIS

VDL2

In a radar environment In a non-radar environment On the airport surface (Airborne derived data)

Automatic-CPDLC Data link taxi Data link operational terminal information

Page 5: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

What is Stream 2?

Airborne Surveillance Applications (ADS-B-in & TIS-B)

20112011

CPDLC and other Services

Situational awareness on the surface Airborne situational awareness Visual separation on approach Sequencing & Merging – In Trail Procedure

Down stream clearance Flight Plan Consistency Graphical Trajectory Co-ordination

VDL2

Page 6: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

Why?

ADS-B

CPDLC

cost effectivequality surveillance

cost effectivequality surveillance

improved situational awareness

in the cockpit

improved situational awareness

in the cockpit

clear messagestimely & unintrusive

clear messagestimely & unintrusive

voice communicationworkload reduction

voice communicationworkload reduction

Page 7: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

How: Systems Impact – Stream 1

CPDLC air MCDU CMU VHF Mode 2 Radio No interface to FMS

ADS-B-out air Mode S transponder Extended Squitter enabled

ADS-B-out ground Antenna + Receiver Adapted Surveillance Processor

CPDLC ground FDPS adaptation HMI adaptations

Page 8: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

How: Systems Impact – Stream 2

CPDLC air MCDU CMU VHF Mode 2 Radio Interface to FMS

ADS-B-in air Mode S transponder Extended Squitter enabled 1090 Receiver Traffic computer CDTI

CPDLC ground Better graphical interface

Page 9: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

Economic Viability

Economic Viability

How? – Approach

Technical Feasibility

Technical Feasibility

Operational Need

Operational Need

20062006

2008200820072007

Simulate & Trial

Simulate & Trial Standardise Standardise Certify Certify Commit Commit Implement Implement

BaselineBaseline

Page 10: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

CASCADE CRISTAL Trials countries

FI

GE

AMAZ

EE

UA

MD

TR

FR

LV

LT

NL

GB

IE BY

RO

AL

MK

GR

IT

ATHU

ES

PT

DK

NO SE

PL

MA DZ TN

SY IQ

IR

KZ

LU SK

SI HR

BE

Where? - Validation sites

ADS-B Ground Station

ADS-B-NRA

ADS-B-NRA

ADS-B-NRAADS-B-RAD

ADS-B-RADADS-B-RAD

TIS-B

D-OTISD-TAXI

AUTO-CPDLC

ADS-BTest bed

ADS-B-NRA

ADS-B-RAD

Page 11: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

Where? - Partners

Aena

ENAV

AIRBUS

Page 12: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

FI

GE

AMAZ

EE

UA

MD

TR

FR

LV

LT

NL

IE BY

RO

AL

MK

GR

IT

ATHU

ES

PT

PL

MA DZ TN

SY IQ

IR

KZ

LU SK

SI HR

BE

When?

200820102012

CPDLC

ADS-B

Page 13: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

When? - Expected Deployment

ADS-B-NRA to fill gaps in radar coverage

As confidence grows ADS-B-NRA around secondary airports

AUTO-CPDLC in the LINK 2000+ area

2008 20112009 2010

ADS-B-APT in response to a local need

As confidence grows ADS-B-RAD to supplement radar

“ADS-B-IN”

“Advanced CPDLC”

D-OTIS & D-TAXI

Page 14: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

What about the others?

Page 15: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

In Summary

www.eurocontrol.int/cascadewww.eurocontrol.int/cascade

Existing InfrastructureExisting Infrastructure Global ImplementationGlobal Implementation

Exploit the Potential of Data LinksExploit the Potential of Data Links

Page 16: The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager jose.roca@eurocontrol.int

Thank You