9
The Atlanta BeltLine Northeast Trail Update July 13, 2017 @atlantabeltline @atlantabeltline @atlantabeltline

The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

The Atlanta BeltLineNortheast Trail

UpdateJuly 13, 2017

@atlantabeltline

@atlantabeltline

@atlantabeltline

Page 2: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

• Where we are

on the

Atlanta

BeltLine

Page 3: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

Northeast Trail

Northeast Trail

Project Limits• Federally Funded

Project from Monroe

Drive north to Lindbergh

• Goal is to advance

design for the entire

extents within the next 2

years

Current Opportunity• Georgia Power Hairpin

Line replacement

• Ensure ABI aesthetics

• Ensure safe

environment for users

Page 4: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

Northeast Trail

Ansley Mall to

Mayson Street• Georgia Power

easement

• Georgia Power grading

this fall

• Georgia Power pole

construction in spring

2018

Mayson Street to

Armour Drive

Ansley Mall to

Westminster Drive

MAYSON ST

ARMOUR DR

WESTMINISTER DR

POSSIBLE ANSLEY MALL CONNECTION

10th STREET

This is conceptual

imagery to inform initial

public discussions and

preliminary planning of

this corridor.

Page 5: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM
Page 6: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

This is conceptual imagery to inform initial public discussions and preliminary

planning of this corridor.

Page 7: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

This is conceptual imagery to inform initial public discussions and preliminary

planning of this corridor.

Page 8: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

This is conceptual imagery to inform initial public discussions and preliminary

planning of this corridor.

Page 9: The Atlanta BeltLine · PowerPoint Presentation Author: Lauren Mross Created Date: 7/19/2017 1:27:13 PM

Thank you!

Beltline.org/engage // [email protected]