28
The Advantages of an Integrated Approach to Subsea Tie-Backs Egypt - Norway Technology Days Tim Crome, Cairo, 12 th February 2017

The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Embed Size (px)

Citation preview

Page 1: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

The Advantages of an Integrated Approach to Subsea Tie-Backs

Egypt - Norway Technology Days

Tim Crome, Cairo, 12th February 2017

Page 2: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 2

Meeting the world’s growing energy

needs requires accessing hard-to-reach

oil and gas resources that cannot be

fully developed without significant

and sustainable improvements in

project economics.

Change is needed, now more than ever.

Driving the change the oil and gas industry needs

Page 3: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 3

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, aenean commodo.

Section break title (32pt)

TechnipFMC is well-positioned to lead the change. By bringing together complementary skills and innovative technologies we can boost efficiency, lower costs, and accelerate schedules.

Our offerings extend from concept to project delivery and beyond. From an individual operation to an end-to-end solution, we are ready to transform project economics.

Page 4: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 4

Driving value for clients

Accelerate and integrate

technology innovations

Unlock possibilities to

transform project economics Develop better integrated

offerings across all operations

Page 5: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 5

Our commitments Broadest portfolio of solutions for the production and transformation of oil and gas

Subsea Onshore/Offshore Surface

Page 6: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 6

TechnipFMC operates in 48 countries around the world

Houston, TX Operational headquarters

London Operational headquarters

Paris Operational headquarters

Africa Algeria Angola Cameroon Congo Egypt Gabon Ghana Mozambique Nigeria Tunisia

Asia, Australasia and Middle East Azerbaijan Australia China India Indonesia Iraq Kazakhstan Kuwait Malaysia New Caledonia Oman Pakistan Qatar Russian Federation Saudi Arabia Singapore

Thailand United Arab Emirates Vietnam Europe Bulgaria Finland France Germany Greece Italy Netherlands Norway Poland Portugal Spain United Kingdom

North America Canada United States

South America Argentina Brazil Colombia Mexico Venezuela

Unique worldwide footprint

Page 7: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Integrated Subsea Technology

Page 8: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 8

Subsea services value chain and drivers

The subsea system life cycle

Operation and management

Maintain production,

increase recovery

Plug and

abandonment

Drilling and

completion

Installation

Subsea

Drilling

Systems

Installation Asset

Management

Production

Optimization Field IMR Well Services

Page 9: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 9

Capturing the iEPCI value

Advantage of the integrated contract model

Concept Pre-FEED FEED

SPS

SURF

First

oil

Concept Pre-FEED FEED First

oil

Integrated

SPS and

SURF

Tender

Tender Tender / Negotiated

Traditional SPS

and SURF

approach

Integrated EPCI

approach

Competition Award

Accelerated

First Oil

Page 10: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 10

Integrated approach to subsea design redefines project economics

Enhanced

Approach

Traditional

Approach

Enhanced

Approach

Enhancements

Reduced material costs

Simplified equipment set-up

Optimized flow assurance

Reduced installation phase

Accelerated time to first oil

Key benefits

Traditional approach

Enhanced approach

Umbilical

Proprietary technologies

Enhancements

One global contractor

Integrated procurement

Optimized subsea architecture

Fewer SPS interfaces

Reduced flowline and riser lengths

Less complexity through reduced

part counts

Up to 30%

CAPEX

reduction

Page 11: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 11

Transforming Project Economics

Conventional 8-Well Development of Today

Subsea Vision: Fully Integrated SPS + SURF

Deliver subsea fields at significantly lower cost with improved certainty of schedule and in less time

Page 12: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 12

Integration supported by recent achievements

First integrated project award

Unique leadership:

Integrated SPS+SURF solutions

Client: Statoil Project: Trestakk

Integrated EPCI (engineering, procurement,

construction, and installation) contract

Full suite of products and services including

subsea trees, manifold, umbilicals, and

installation

Early and broader involvement with operator

Significant reduction in total project costs

0

2

4

6

8

10

12

14

16

18

20

22

24

26

jul.15 sep.15 nov.15 jan.16 mar.16 mai.16 jul.16 sep.16 nov.16 jan.17

Nu

mb

er o

f St

ud

ies

Award Month

Integrated Front End Studies from start of Alliance

25

Page 13: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 13

TechnipFMC Subsea Tie-back Technology

Combination of SPS and SURF - elimination of interfaces

SPS

• Subsea Trees, Wellheads, Manifolds,

• Control Systems

• Tie-In Systems

• Subsea Processing and Compression

SURF

• Rigid and Flexible Flowlines

• Risers

• Umbilicals

• Installation vessels and equipment

Page 14: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 14

Complexity of Subsea Hardware - Subsea Tree

Page 15: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 15

Hydraulic Connector

Same functionality but only 7% of parts!

Optimization of hardware

640 Parts 43 Parts

Page 16: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 16

PLEM Mock-Up Size limitations

for in-line structures

Design for installation - pipelay

Page 17: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 17

Compact Manifold

Same functionality but fraction of weight and size allows installation by smaller vessels, or with pipeline

Optimization of hardware

~60T ~200T

Page 18: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 18

Integrated flexible pipe termination heads

Optimiszation of hardware

Integrated termination head

Traditional termination head

Page 19: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 19

Umbilicals – UK, USA (Houston) and Angola

Thermoplastic facility Steel Tube facility

Hose manufacturing R&D Facility

UK Facility - Newcastle

~60m high

Page 20: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 20

Integrated offering – Satellite Production System

Page 21: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 21

Protection Structure Installation

• SPS and SURF installation and well start-up

• Integrated tooling and personnel

• Combined reel umbilical and flowline installation

• Optimized logistics and mobilization

• Typical campaign duration 35-45days

• Accelerated first oil

Satellite Production System Integrated installation and pre-commissioning

TIWO – XT Installation Well Opening

Flowline & Umbilical Installation Trenching

Tie-In

Page 22: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Integrated EPCI Project Example

Page 23: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 23

Statoil, Head of Project Development:

“By rethinking our concept along with license partners and suppliers, we have arrived at a solution that costs almost 50% less than the original concept. At the same time, we have been able to increase the recoverable resources significantly”

Field discovered in 1986, investment decision made 30 years later!

Trestakk iEPCI® Project for Statoil

Page 24: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 24

Trestakk iEPCI® Summary

Project Summary

• Tie-back production to Åsgard A

• 5 wells; 1 template with 2 production and 2 gas injection wells and 1 satellite production well

• Control via a new umbilical from existing template

• Main marine season 2018

Main optimizations

• Routing of umbilicals, flowlines & use of direct tie-ins

• reduced lengths

• Structure design (template and satellite)

• Tailor made for installation vessel

• Flexible jumpers (instead of spools, with integrated heads)

• Optimized Marine Operations and simplified RFO

• Reduced Project Management and Client Teams

Page 25: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Page footer text | 25

Summary Trestakk iFEED® Cost improvements Q3 2015 to Q4 2016

Scope

optimization

iEPCI®

Benchmark

price before

optimization

iEPCI®

contract

value

Total cost improvement: 18% of iEPCI® price

at start of optimization study Q3 2015

Q3 15 Q1 16-

Q3 16

Net scope

changes post

start iFEED®

Q4 16 Q3 15 –

Q3 16

Q3 15 –

Q4 16

Net market

effects

[VALUE]

18%

2% 5%

75%

Page 26: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Page footer text | 26 Company profile presentation | 26

Commitment to

safety and quality

We cultivate a climate of safety and quality by exemplifying outstanding behavior.

Page 27: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated

Tim Crome - 12th Feb 2017 - Egypt / Norway Technology Days, Cairo | 27

Success will depend on our ability to deliver sustainable

substantial value to our Clients

50% Opex reduction

50% Capex reduction

50% Time to 1st oil

Unlock Long tiebacks, stranded

or uneconomic assets

Develop Integrated synergies in

a Life Cycle perspective

Anticipate Needs in a changing

economic climate

SUBSEA – High Level Aims

Ensure economic viability in a 30$ per bbl context

Page 28: The Advantages of an Integrated Approach to Subsea Tie … · The Advantages of an Integrated Approach to Subsea Tie-Backs ... Integrated approach to subsea design ... Integrated