2
Quotation for Repairs to Pillaiyar Kovil at Thavady S.No Description of work Unit Qty Rate 1 Sq.m 380.00 100.00 2 Sq.m 380.00 600.00 3 Cu.m 1.00 22000.00 4 Sq.m 140.00 400.00 5 Sq.m 35.00 200.00 6 Supplying and fixing of 2"x 1" Reapers L.m 110.00 200.00 supplying of Calicut pattern roof tiles No 100.00 60.00 7 Laying of available roof tiles Sq.m 35.00 100.00 8 Ridge tiles L.m 6.00 450.00 9 34.00 800.00 Total Work done VAT 12% Note: Unit rate with interlock block - 3850/= 50% Advance payment Measure and Payment method water and electricity will be provide by client Site Preparation and leveling to receive the interlock block sand and granite dust rate include laying available block Grade 20 concrete lining along the building plinth coat of filler and 2 coats of Enamel paint ( Red and white) Removing of Roof tiles and reapers in Moolasthanam Chipping off and 20mm thk 1:3 cement sand rendering to Floor m 2

Thavady Kovil - Eng Raj

Embed Size (px)

DESCRIPTION

kovil estimate

Citation preview

Page 1: Thavady Kovil - Eng Raj

Quotation for Repairs to Pillaiyar Kovil at Thavady

S.No Description of work Unit Qty Rate Amount

1 Sq.m 380.00 100.00 38,000.00

2 Sq.m 380.00 600.00 228,000.00

3 Cu.m 1.00 22000.00 22,000.00

4 Sq.m 140.00 400.00 56,000.00

5 Sq.m 35.00 200.00 7,000.00

6 Supplying and fixing of 2"x 1" Reapers L.m 110.00 200.00 22,000.00

supplying of Calicut pattern roof tiles No 100.00 60.00 6,000.00

7 Laying of available roof tiles Sq.m 35.00 100.00 3,500.00

8 Ridge tiles L.m 6.00 450.00 2,700.00

9 34.00 800.00 27,200.00

Total Work done 412,400.00

VAT 12% 49,488.00

Note:Unit rate with interlock block - 3850/=50% Advance paymentMeasure and Payment methodwater and electricity will be provide by client

Site Preparation and leveling to receive the interlock block

Preparing of 2" bed using 1:1 river sand and granite dust rate include laying available blockGrade 20 concrete lining along the building plinthPreparing the surface and applying 1 coat of filler and 2 coats of Enamel paint ( Red and white)

Removing of Roof tiles and reapers in Moolasthanam

Chipping off and 20mm thk 1:3 cement sand rendering to Floor m2