Upload
thammarak-hoisang
View
7
Download
0
Tags:
Embed Size (px)
Citation preview
Resume
Job Applied : Engineering Manager /
Project Manager
Expected Salary : (Negotiate)
Part 1: PERSONAL DATA:
Name in English: First Name Mr.Thammarak _______Last Name__Hoisang_____ Nick AOR
Gender Male Nationality Thai Date of Birth Feb 26,1979 Country of Birth Thailand
Passport/ID Card No. 3600200038752
Home Address with Post Code 337/15 , Lompo Village, Soi1, Bangkruai-Sainoi Rd., Bangrak-Pattana
District, Ampor. Bangbuathong, Nontaburi Province, 11110
Mobile No.: (+66) 0989645663
Email Address: No.: [email protected]
Part 2: SUMMARY HISTORY WORK.
DATE(MM-
YYYY ) Company
Job Title Main ResponsibilitiesFrom
To
May, 2011
Now
SAMARTCOMTECHCo.,Ltd.
• Presale, Solution, Implemen
• Optical Transportation Network (DWDM,OTN,SDH)
• Designer & Operation work• TOT 3G/LTE Network Planning
Page 1 of 19Rev.7.01.2014
tation• Optical Transport Expert Engineer & Specialist
• TOT MSAN (FTTX) Designer/Presale
• Designed Site Preparation, Tower, Interface, RF , Installation
April 2010
Oct 2011
Huawei Technologies .Co.,Ltd.
• Project Manager
• Site Supervisor
• Planning Issue, Progress Tracking , Negotiate with customer
• To control project Cost ,Progress , Timeline, Team member for engineer, Sub-contractor.
• Stocking control, Material approval for installation.
• Solve for cause and find the best way for project.
• Forecasted the problem that effect with project.
July, 2007
April 2011
ZTE (THAILAND) CO.,LTD.
• Project Manager
• Senior Engineer
• Planning Issue, Progress Tracking , Negotiate with customer
• To control project Cost ,Progress , Timeline, Team member for engineer,Sub-contractor.
• Stocking control, Material approval for installation.
• Solve for cause and find the best way for project.
• Forecasted the problem that effect with project.
• Training delivery to customer
Aug, 2005
July, 2007
Harris Stratex
Network (Thailan
• Support Engineer
• Lab &
• Testing , Presale for R&R Microwave Equipment.• Repair the faulty equipment• Design the Test tools and, find
Page 2 of 19Rev.7.01.2014
d) Limited
Test Engineer
the material for repair by local device.• Repairing Laboratory Leader
July, 2002
Aug, 2005
BFKT (Thailand) Limited
• Field Site Engineer
• OMC Engineer
•Operation any activities on BTS work.• Inspector for Site
prep. ,Civil, Transmission Link, BTS, Tower,
Antennas.• To software configure the equipment as BTS, Power, MicroWave and, ect.
• Site Acquiring and, Land Rental with Owner•Corrective Maintenance & Preventive Maintenance
Part 3: EDUCATION AND TRAINING RECORDS
3.1 Education: Time (MM-
YYYY) Name of School/Col
lege
Location of
School/College
MajorCertifica
teFrom
To
1991 1994Visittisuksa
SchoolNakornsa
wanM.3
1995 1997
Nakronsawan
Technical Collage
Nakornsawan
ElectronicVocational Education
1998 2000 Nakronsaw Nakornsa Electronics Diploma
Page 3 of 19Rev.7.01.2014
an Technical Collage
wan Computer Cert.
2000 2004
King Mongkut’sInstitute ofTechnology
North
BKK
ElectronicsTelecommu
nications Technology
Bachelor Degree
Part 4: LANGUAGES & DIALECTS
LANAGUAGES SPEAKING READING WRITING
Good
Fair
Poor
Good
Fair
Poor
Good
Fair
Poor
1.Local (Thai Language)
X X X
2. ENGLISH X X X
Part 5: SKILLS DETAILS & ABILITIES (Present – Experience)
1. Work @ SAMART COMTECH Co.,LTD
• Period: Oct,2011 to Now
• Job History Responsibility for Mobile Network
Designer (Planning) & Consultant Senior Engineer
Experience Details:
Engineering : To solution designing and, planning for
project groundwork and, preparing the BOM with costing
as Core Network , UTRAN (NodeB , eNodeB), Site-Prep,
Page 4 of 19Rev.7.01.2014
Site Tower, Civil Work , TOT 3G & LTE (4G) such as IBC
and, Macro site type and, also must be support for GSM-
R technology. (Thailand Rail Way)
Consultant & Specialist : To support Mobile vender as
NSN, ALU, Huawei , ZTE’s partner & customer
requirement, and find to best solution to user.
Other Technologies : ePassport system , Primary MUX,
Outside Plant for Optical Fiber , FTTx, MSAN.
2. Work @ Huawei Technology Co.,Ltd. (Thailand)
• Period: April 2010 to Oct 2011
• Job History Responsibility for Project Manager &
Site Supervisor Experience Details:
Project Management: To in-charge Thailand’s North
Region for Implementation Planning , Communicate
with TOT region Manager , Control Subcontractor for
installation follow for Huawei Standard , Feedback for
report to BKK center , Site Survey for Subcontractor for
IBC & Macro site follow with Huawei’s Equipment
Standard.
Engineering: To offer consulting for clients user &
Subcontract. And, then for co-working for Engineering
Team for troubled shooting. And, rechecking / Audit for
Page 5 of 19Rev.7.01.2014
Sub-contractor’s worked such as RF & Site Prep Site
Survey Report (TSSR), Telecom Equipment (TE)
Installation. And must be to coordinate any party team
as well.
3. Work @ ZTE Thailand Co.,LTD. (Thailand)
o Period: July 2007 to April 2010
o Job History Responsibility for Project Manager &
Optical Transmission Sr.Engineer
• Experience Details:
Project Management: I should was taken responding for since project started up until that finished such as below:
– To kick-up, Risk-forecast, Control, Progress Tracking and,
any Coordination between ZTE Company, Partner and
Sub-Contractor. Also should be made the tasked, Mile
stone, Planning revising, Investigated the root-cause for
fix any problem to relate with expect finished date.
– To support all engineering job till to project closed out
and got any documentation as Delivery Certificate, PAC,
FAC and each payment of project collecting.
Engineering : Commissioning worked, Installation and Maintenance to Optical Transmission
Page 6 of 19Rev.7.01.2014
- Equipment that had sole on Thailand Market or Some time will be trouble shooting and
the root cause when was requested by customer such as
TOT, CAT, EGAT, Partner or Sub-contractor.
- For Military and EGAT Project must be negotiated for
getting the customer requirement and - discussion with
partner to looking for best solution to be done.
- For some third party’s project equipment that also I will
be fast learning for to be configure them by myself and,
also teach the customer as well.
4. Work @ Harris Stratex Network (Thailand) Limited
• Period: Aug,2005 to July,2007
• Job History Responsibility for Laboratory Test
Engineer (Microwave System) Experience Details:
Pre test: To test Microwave units all model of product
such as Eclipse, DXR, XP4 (E1/E3 Capacity) and Altium
MX which anytime unit was removed from site or the
new shipped order unit from manufactory thence to
report the results to Project planning and R&R Division.
Commissioning microwave link: To offer
commissioning the Microwave link performance on at
Customer site what was requested.
Page 7 of 19Rev.7.01.2014
Analysis problem case: To looking cause of problem
and then feedback to Repair Center (Philippine) and
manufactory (Singapore and Thailand).
Customer Support: To take the care that customer
satisfaction or sub-contact requested for help that
information of product cause by cause to them.
Cause study Simulate: To simulated Microwave
system for development, adjustment and/or
reorganization the test processing to reduce time and
cost for customer most satisfy.
5. Work @ BFKT Thailand Co.,LTD. (Thailand)
• Period: July,2002 to Aug,2005
• Job History Responsibility for Field Site Engineer
for Mobile Network Experience Details:
Site acquisition & Site survey: To find out the best
candidate both technical and environment to build cell
site.
Site leasing support: To support company complete
site leasing with landlord for contract sign.
Site inspector: To control contractor construct all civil work such as Room, Shelter,
Container ,Tower, Fence, Access road, Main - AC power and etc. base on civil specification agreement.
Page 8 of 19Rev.7.01.2014
Equipment installation & commissioning: To
control vender install their equipment follow the
standard of procedure for each element such as BTS,
SDH, Optical fiber cable, Microwave, Repeater , Feeder
& Antenna, DC-AC power plant and also perform the
equipment commissioning with vender.
PAT & System integration: To do the acceptance
tested for all equipment with vender to achieve
standard and also do the system integration to ready
for network service.
Field maintenance : Taking care cell site both
Corrective and Preventive all equipment such as BTS,
SDH, OFC, Microwave, Repeater, Rectifier, Air-
conditioner, AC-power and all Infra control , Totally ~
300 sites in West Coast Region including with
Western Bangkok as Western Samutprakarn ,
Samutsakorn, Samutsongkram, Nakhonpathom,
Ratchaburi,
Kanchanaburi, Suphanburi, Petchaburi, Prachuapkirikhan, Lopburi, and Singburi province.
Customer complaint support : To take care case of
customer complaint by help central office to pin point
Page 9 of 19Rev.7.01.2014
the exact problem and resolve as soon as we can do for
customer satisfaction
Drive test support: To help central office check an RF
environment in such area which taking care then
feedback
Referral Project:
For Year 2015 – Present: . SCHQ DWDM Nationwide Network:
(Responsibility: ALU DWDM & SDH Testing & Commissioning Team for 1830PSS16,32,64/ 1626LM / 1678 )
TOT IIG Expansion project : (Responsibility: ALU DWDM & SDH Testing & Commissioning Team)
CAT DWDM NorthEast Project: (Responsibility: ALU DWDM & SDH Testing & Commissioning Team)
CAT DWDM East-West Project :(Responsibility: ALU DWDM & SDH Testing & Commissioning Team) CAT DWDM CLS2-SRT-CLS3 Project : (Responsibility: ALU DWDM & SDH Testing & Commissioning Team)
For Year 2014 – 2015 : TOT MSAN Charan-sanitwong: (Responsibility: Presale
& Consult) TOT MSAN Phaholyotin: (Responsibility: Presale &
Consult) TOT MSAN Onnut : (Responsibility: Presale & Consult) SCHQ DWDM Nationwide Network: (Responsibility:
Presale , Consult, Expect Operation Team) PEA DWDM Network: (Responsibility: Presale ,
Consult, Expect & Commissioning Team)
Page 10 of 19Rev.7.01.2014
TOT DWDM Network: (Responsibility: Presale , Consult, Expect Operation Team)
CAT AAG DWDM Network: (Responsibility: Presale , Consult, Expect Operation Team)
For Other : SDH Military Project on 2007. (Responsibility:
Engineer)
EGAT TNRP COMM07 on 2007. (Responsibility: Engineer and Co-ordinator)
TOT DWDM 7 ROUTE with Traviscom on 2008. (Responsibility: Project Manager ,Engineer and Co-ordinator)
CAT 9 HOP and Microwave 7.5 GHz with TTI company
on 2009. (Responsibility: Project Manager ,Engineer
and Co-ordinator)
TOT 2 ROUTE with Infitel company on 2009.
(Responsibility: Project Manager ,Engineer and Co-
ordinator)
TOT 4 HOP with TTI company on 2009.
(Responsibility: Project Manager ,Engineer and Co-
ordinator)
CAT ASON nationwide Thailand on 2009.
(Responsibility: Training Manager , Engineer and Co-
ordinator)
EGAT DWDM expension 2009 Project .(Responsibility: Project Manager ,Engineer and
Page 11 of 19Rev.7.01.2014
Co-ordinator)
TOT MSAN Phasichareon Area3: (2010). (Responsibility: Project Manager & Co-ordinator)
TOT MSAN Area4: (2010). (Responsibility: Project Manager & Co-ordinator)
EGAT DWDM expension 2010: (2010). (Responsibility: Project Manager & Co-ordinator
Engineer)
EGAT SDH 2 node : (2010). (Responsibility: Project Manager & Co-ordinator Engineer)
UIH ID4 trial testing : (2010). (Responsibility: Project Manager & Co-ordinator Engineer)
AIS PTN trial testing : (2010). (Responsibility: Project Manager)
TOT MSAN south 8K: (2011). (Responsibility: Project Manager & Co-ordinator)
TOT 3G Phase 1 & TOT3G Phase2 (Within 2013)
TOT 4G (200 Site LTE in BKK in soon for pilot project as TOT on sky-train BTS)
Page 12 of 19Rev.7.01.2014
TRAINING HISTORY:
High Light for Telecom Line:
Alcatel-Lucent DWDM / SDH : 1830PSS , 1626LM, 1678MCC, 1350OMS ,1354Phm
ZTE Transmission Equipment product: SDH DWDM ASON NMS Other ZXMP S385 ZXMP S330 S200
M800 M900 M600
Ciena C660
Software N100 and
EMS Software
E300
Power Supply
and Monitoring system
BTS & NodeB : Huawei NodeB ,MOTOROLA model SC-4812T ; SC-4812ET SC-300
General Equipment Training
o MW: Stratex-DMC model XP-4 ; DXR-711 ; Eclipse and
Altium. , HARRIS model Microstar o SDH: SIEMENS ;
NEC
o DC POWER PLANT: TYCO ; ELTEK ; ASCOM
o CCTV: Bosch Dinion CCTV
+ DiBos
Page 13 of 19Rev.6.18.2015
o MOTOROLA BTS (Base Transceiver Station) Training.
(Internal Training) o RF Optimization. (Internal Training)
o NEC-SDH Training by NESIC (Thailand) Ltd. o Using the
Cell/BTS Site Field Test (YBT350) for analysis signal. o
How to repair faulty module of Microwave DXR-711
model.
o WebDesign by Dreamwever and Photoshop.(ComART
Design School or www.Comart.com ) (Date :2005)
o Repairing Microwave units of Stratex Network at
Phillipines. (Repair Center) . (Date :Sep-2006) o Mobile
Repairing Training by Private Course. (Date : 20-Nov-
2006)
o BOSCH CCTV guide and installation. (Date: Jan-2007)
o CMA5000 and CMA3000 Family tester (OTDR and Data
Network tester) (Date: March 2007)
o SDH internal training of Jasmine Telecom System PLC
(Date: June 2007)
----------------------------------------------------------------------------------------------------------------------------------------
COMPUTER PROGRAM:
Office Program: Operating Window
95/98/ME/2000/XP, MS Access, MS PowerPoint,
MS Excel, MS Word, MS Outlook, IEInternet, ACDsee
Page 14 of 19Rev.6.18.2015
Technical Program: Sun Unix for CBSC ; LinkView (MW) ; I-CLT(SDH) ; Hyper-terminal
WinPower (Power Rectifier) ; Harris (BTS) ; Eclipse Portal ; DXR-NET
Other & Programming: Dreamwever 2004 MX IIS Photoshop 7 Multimedia Program
Protel 99se MySql C++ VB6 for Database by MS
Access. Basic of ASP and PHP language Hardware
and Software Reparing and Maintenance.
Knowledge the IP Address Network assignment.
------------------------------------------------------------------------------------------------------------------------------------------
Part 6: HOBBIES:
Looking new product on Internet, Learn new technical, Watch
Movie , Music, Travel, Seek for good delicious foods.
------------------------------------------------------------------------------------------------------------------------------------------
Part 7: PERSONALITY , CHARACTERS AND SELF ASSESMENT: Positive:
Good for team playing , I can acceptable for colleague opinion as therefore, it is difference with my opinion. and several time to use the brain-storming process for some
Page 15 of 19Rev.6.18.2015
trouble with my team working. But the sometime that should motivate for myself and, our teams.
Negative :
So worried and, I can’t rest if mission that was assigned
pending or unexpected thing happen for working finishing
date delay and, costing, So strictly the best performance of
worked result . I more over honorably, After has been
committed with veraciously.
------------------------------------------------------------------------------------------------------------------------------------------
Part 8: FAMILY DATA Marital Status
MARRIED
Passport /ID. Card No.
OccupationPresent
residence placeEmergen
cy Contact
K.Woranun Supanut Tel: 08-4671-8106
Page 16 of 19Rev.6.18.2015