23
Resume Job Applied Engineering Manager / Project Manager Expected Salary (Negotiate) Part 1: PERSONAL DATA: Name in English: First Name Mr.Thammarak _______Last Name__Hoisang_____ Nick AOR Gender Male Nationality Thai Date of Birth Feb 26,1979 Country of Birth Thailand Passport/ID Card No. 3600200038752 Home Address with Post Code 337/15 , Lompo Village, Soi1, Bangkruai-Sainoi Rd., Bangrak-Pattana District, Ampor. Bangbuathong, Nontaburi Province, 11110 Mobile No.: (+66) 0989645663 Email Address: No.: [email protected] Part 2: SUMMARY HISTORY WORK. DATE (MM- YYYY ) Company Job Title Main Responsibilities Page 1 of 23 Rev.7.01.2014

ThammarakCV-2072015-EMPM

Embed Size (px)

Citation preview

Resume

Job Applied : Engineering Manager /

Project Manager

Expected Salary : (Negotiate)

Part 1: PERSONAL DATA:

Name in English: First Name Mr.Thammarak _______Last Name__Hoisang_____ Nick AOR

Gender Male Nationality Thai Date of Birth Feb 26,1979 Country of Birth Thailand

Passport/ID Card No. 3600200038752

Home Address with Post Code 337/15 , Lompo Village, Soi1, Bangkruai-Sainoi Rd., Bangrak-Pattana

District, Ampor. Bangbuathong, Nontaburi Province, 11110

Mobile No.: (+66) 0989645663

Email Address: No.: [email protected]

Part 2: SUMMARY HISTORY WORK.

DATE(MM-

YYYY ) Company

Job Title Main ResponsibilitiesFrom

To

May, 2011

Now

SAMARTCOMTECHCo.,Ltd.

• Presale, Solution, Implemen

• Optical Transportation Network (DWDM,OTN,SDH)

• Designer & Operation work• TOT 3G/LTE Network Planning

Page 1 of 19Rev.7.01.2014

tation• Optical Transport Expert Engineer & Specialist

• TOT MSAN (FTTX) Designer/Presale

• Designed Site Preparation, Tower, Interface, RF , Installation

April 2010

Oct 2011

Huawei Technologies .Co.,Ltd.

• Project Manager

• Site Supervisor

• Planning Issue, Progress Tracking , Negotiate with customer

• To control project Cost ,Progress , Timeline, Team member for engineer, Sub-contractor.

• Stocking control, Material approval for installation.

• Solve for cause and find the best way for project.

• Forecasted the problem that effect with project.

July, 2007

April 2011

ZTE (THAILAND) CO.,LTD.

• Project Manager

• Senior Engineer

• Planning Issue, Progress Tracking , Negotiate with customer

• To control project Cost ,Progress , Timeline, Team member for engineer,Sub-contractor.

• Stocking control, Material approval for installation.

• Solve for cause and find the best way for project.

• Forecasted the problem that effect with project.

• Training delivery to customer

Aug, 2005

July, 2007

Harris Stratex

Network (Thailan

• Support Engineer

• Lab &

• Testing , Presale for R&R Microwave Equipment.• Repair the faulty equipment• Design the Test tools and, find

Page 2 of 19Rev.7.01.2014

d) Limited

Test Engineer

the material for repair by local device.• Repairing Laboratory Leader

July, 2002

Aug, 2005

BFKT (Thailand) Limited

• Field Site Engineer

• OMC Engineer

•Operation any activities on BTS work.• Inspector for Site

prep. ,Civil, Transmission Link, BTS, Tower,

Antennas.• To software configure the equipment as BTS, Power, MicroWave and, ect.

• Site Acquiring and, Land Rental with Owner•Corrective Maintenance & Preventive Maintenance

Part 3: EDUCATION AND TRAINING RECORDS

3.1 Education: Time (MM-

YYYY) Name of School/Col

lege

Location of

School/College

MajorCertifica

teFrom

To

1991 1994Visittisuksa

SchoolNakornsa

wanM.3

1995 1997

Nakronsawan

Technical Collage

Nakornsawan

ElectronicVocational Education

1998 2000 Nakronsaw Nakornsa Electronics Diploma

Page 3 of 19Rev.7.01.2014

an Technical Collage

wan Computer Cert.

2000 2004

King Mongkut’sInstitute ofTechnology

North

BKK

ElectronicsTelecommu

nications Technology

Bachelor Degree

Part 4: LANGUAGES & DIALECTS

LANAGUAGES SPEAKING READING WRITING

Good

Fair

Poor

Good

Fair

Poor

Good

Fair

Poor

1.Local (Thai Language)

X X X

2. ENGLISH X X X

Part 5: SKILLS DETAILS & ABILITIES (Present – Experience)

1. Work @ SAMART COMTECH Co.,LTD

• Period: Oct,2011 to Now

• Job History Responsibility for Mobile Network

Designer (Planning) & Consultant Senior Engineer

Experience Details:

Engineering : To solution designing and, planning for

project groundwork and, preparing the BOM with costing

as Core Network , UTRAN (NodeB , eNodeB), Site-Prep,

Page 4 of 19Rev.7.01.2014

Site Tower, Civil Work , TOT 3G & LTE (4G) such as IBC

and, Macro site type and, also must be support for GSM-

R technology. (Thailand Rail Way)

Consultant & Specialist : To support Mobile vender as

NSN, ALU, Huawei , ZTE’s partner & customer

requirement, and find to best solution to user.

Other Technologies : ePassport system , Primary MUX,

Outside Plant for Optical Fiber , FTTx, MSAN.

2. Work @ Huawei Technology Co.,Ltd. (Thailand)

• Period: April 2010 to Oct 2011

• Job History Responsibility for Project Manager &

Site Supervisor Experience Details:

Project Management: To in-charge Thailand’s North

Region for Implementation Planning , Communicate

with TOT region Manager , Control Subcontractor for

installation follow for Huawei Standard , Feedback for

report to BKK center , Site Survey for Subcontractor for

IBC & Macro site follow with Huawei’s Equipment

Standard.

Engineering: To offer consulting for clients user &

Subcontract. And, then for co-working for Engineering

Team for troubled shooting. And, rechecking / Audit for

Page 5 of 19Rev.7.01.2014

Sub-contractor’s worked such as RF & Site Prep Site

Survey Report (TSSR), Telecom Equipment (TE)

Installation. And must be to coordinate any party team

as well.

3. Work @ ZTE Thailand Co.,LTD. (Thailand)

o Period: July 2007 to April 2010

o Job History Responsibility for Project Manager &

Optical Transmission Sr.Engineer

• Experience Details:

Project Management: I should was taken responding for since project started up until that finished such as below:

– To kick-up, Risk-forecast, Control, Progress Tracking and,

any Coordination between ZTE Company, Partner and

Sub-Contractor. Also should be made the tasked, Mile

stone, Planning revising, Investigated the root-cause for

fix any problem to relate with expect finished date.

– To support all engineering job till to project closed out

and got any documentation as Delivery Certificate, PAC,

FAC and each payment of project collecting.

Engineering : Commissioning worked, Installation and Maintenance to Optical Transmission

Page 6 of 19Rev.7.01.2014

- Equipment that had sole on Thailand Market or Some time will be trouble shooting and

the root cause when was requested by customer such as

TOT, CAT, EGAT, Partner or Sub-contractor.

- For Military and EGAT Project must be negotiated for

getting the customer requirement and - discussion with

partner to looking for best solution to be done.

- For some third party’s project equipment that also I will

be fast learning for to be configure them by myself and,

also teach the customer as well.

4. Work @ Harris Stratex Network (Thailand) Limited

• Period: Aug,2005 to July,2007

• Job History Responsibility for Laboratory Test

Engineer (Microwave System) Experience Details:

Pre test: To test Microwave units all model of product

such as Eclipse, DXR, XP4 (E1/E3 Capacity) and Altium

MX which anytime unit was removed from site or the

new shipped order unit from manufactory thence to

report the results to Project planning and R&R Division.

Commissioning microwave link: To offer

commissioning the Microwave link performance on at

Customer site what was requested.

Page 7 of 19Rev.7.01.2014

Analysis problem case: To looking cause of problem

and then feedback to Repair Center (Philippine) and

manufactory (Singapore and Thailand).

Customer Support: To take the care that customer

satisfaction or sub-contact requested for help that

information of product cause by cause to them.

Cause study Simulate: To simulated Microwave

system for development, adjustment and/or

reorganization the test processing to reduce time and

cost for customer most satisfy.

5. Work @ BFKT Thailand Co.,LTD. (Thailand)

• Period: July,2002 to Aug,2005

• Job History Responsibility for Field Site Engineer

for Mobile Network Experience Details:

Site acquisition & Site survey: To find out the best

candidate both technical and environment to build cell

site.

Site leasing support: To support company complete

site leasing with landlord for contract sign.

Site inspector: To control contractor construct all civil work such as Room, Shelter,

Container ,Tower, Fence, Access road, Main - AC power and etc. base on civil specification agreement.

Page 8 of 19Rev.7.01.2014

Equipment installation & commissioning: To

control vender install their equipment follow the

standard of procedure for each element such as BTS,

SDH, Optical fiber cable, Microwave, Repeater , Feeder

& Antenna, DC-AC power plant and also perform the

equipment commissioning with vender.

PAT & System integration: To do the acceptance

tested for all equipment with vender to achieve

standard and also do the system integration to ready

for network service.

Field maintenance : Taking care cell site both

Corrective and Preventive all equipment such as BTS,

SDH, OFC, Microwave, Repeater, Rectifier, Air-

conditioner, AC-power and all Infra control , Totally ~

300 sites in West Coast Region including with

Western Bangkok as Western Samutprakarn ,

Samutsakorn, Samutsongkram, Nakhonpathom,

Ratchaburi,

Kanchanaburi, Suphanburi, Petchaburi, Prachuapkirikhan, Lopburi, and Singburi province.

Customer complaint support : To take care case of

customer complaint by help central office to pin point

Page 9 of 19Rev.7.01.2014

the exact problem and resolve as soon as we can do for

customer satisfaction

Drive test support: To help central office check an RF

environment in such area which taking care then

feedback

Referral Project:

For Year 2015 – Present: . SCHQ DWDM Nationwide Network:

(Responsibility: ALU DWDM & SDH Testing & Commissioning Team for 1830PSS16,32,64/ 1626LM / 1678 )

TOT IIG Expansion project : (Responsibility: ALU DWDM & SDH Testing & Commissioning Team)

CAT DWDM NorthEast Project: (Responsibility: ALU DWDM & SDH Testing & Commissioning Team)

CAT DWDM East-West Project :(Responsibility: ALU DWDM & SDH Testing & Commissioning Team) CAT DWDM CLS2-SRT-CLS3 Project : (Responsibility: ALU DWDM & SDH Testing & Commissioning Team)

For Year 2014 – 2015 : TOT MSAN Charan-sanitwong: (Responsibility: Presale

& Consult) TOT MSAN Phaholyotin: (Responsibility: Presale &

Consult) TOT MSAN Onnut : (Responsibility: Presale & Consult) SCHQ DWDM Nationwide Network: (Responsibility:

Presale , Consult, Expect Operation Team) PEA DWDM Network: (Responsibility: Presale ,

Consult, Expect & Commissioning Team)

Page 10 of 19Rev.7.01.2014

TOT DWDM Network: (Responsibility: Presale , Consult, Expect Operation Team)

CAT AAG DWDM Network: (Responsibility: Presale , Consult, Expect Operation Team)

For Other : SDH Military Project on 2007. (Responsibility:

Engineer)

EGAT TNRP COMM07 on 2007. (Responsibility: Engineer and Co-ordinator)

TOT DWDM 7 ROUTE with Traviscom on 2008. (Responsibility: Project Manager ,Engineer and Co-ordinator)

CAT 9 HOP and Microwave 7.5 GHz with TTI company

on 2009. (Responsibility: Project Manager ,Engineer

and Co-ordinator)

TOT 2 ROUTE with Infitel company on 2009.

(Responsibility: Project Manager ,Engineer and Co-

ordinator)

TOT 4 HOP with TTI company on 2009.

(Responsibility: Project Manager ,Engineer and Co-

ordinator)

CAT ASON nationwide Thailand on 2009.

(Responsibility: Training Manager , Engineer and Co-

ordinator)

EGAT DWDM expension 2009 Project .(Responsibility: Project Manager ,Engineer and

Page 11 of 19Rev.7.01.2014

Co-ordinator)

TOT MSAN Phasichareon Area3: (2010). (Responsibility: Project Manager & Co-ordinator)

TOT MSAN Area4: (2010). (Responsibility: Project Manager & Co-ordinator)

EGAT DWDM expension 2010: (2010). (Responsibility: Project Manager & Co-ordinator

Engineer)

EGAT SDH 2 node : (2010). (Responsibility: Project Manager & Co-ordinator Engineer)

UIH ID4 trial testing : (2010). (Responsibility: Project Manager & Co-ordinator Engineer)

AIS PTN trial testing : (2010). (Responsibility: Project Manager)

TOT MSAN south 8K: (2011). (Responsibility: Project Manager & Co-ordinator)

TOT 3G Phase 1 & TOT3G Phase2 (Within 2013)

TOT 4G (200 Site LTE in BKK in soon for pilot project as TOT on sky-train BTS)

Page 12 of 19Rev.7.01.2014

TRAINING HISTORY:

High Light for Telecom Line:

Alcatel-Lucent DWDM / SDH : 1830PSS , 1626LM, 1678MCC, 1350OMS ,1354Phm

ZTE Transmission Equipment product: SDH DWDM ASON NMS Other ZXMP S385 ZXMP S330 S200

M800 M900 M600

Ciena C660

Software N100 and

EMS Software

E300

Power Supply

and Monitoring system

BTS & NodeB : Huawei NodeB ,MOTOROLA model SC-4812T ; SC-4812ET SC-300

General Equipment Training

o MW: Stratex-DMC model XP-4 ; DXR-711 ; Eclipse and

Altium. , HARRIS model Microstar o SDH: SIEMENS ;

NEC

o DC POWER PLANT: TYCO ; ELTEK ; ASCOM

o CCTV: Bosch Dinion CCTV

+ DiBos

Page 13 of 19Rev.6.18.2015

o MOTOROLA BTS (Base Transceiver Station) Training.

(Internal Training) o RF Optimization. (Internal Training)

o NEC-SDH Training by NESIC (Thailand) Ltd. o Using the

Cell/BTS Site Field Test (YBT350) for analysis signal. o

How to repair faulty module of Microwave DXR-711

model.

o WebDesign by Dreamwever and Photoshop.(ComART

Design School or www.Comart.com ) (Date :2005)

o Repairing Microwave units of Stratex Network at

Phillipines. (Repair Center) . (Date :Sep-2006) o Mobile

Repairing Training by Private Course. (Date : 20-Nov-

2006)

o BOSCH CCTV guide and installation. (Date: Jan-2007)

o CMA5000 and CMA3000 Family tester (OTDR and Data

Network tester) (Date: March 2007)

o SDH internal training of Jasmine Telecom System PLC

(Date: June 2007)

----------------------------------------------------------------------------------------------------------------------------------------

COMPUTER PROGRAM:

Office Program: Operating Window

95/98/ME/2000/XP, MS Access, MS PowerPoint,

MS Excel, MS Word, MS Outlook, IEInternet, ACDsee

Page 14 of 19Rev.6.18.2015

Technical Program: Sun Unix for CBSC ; LinkView (MW) ; I-CLT(SDH) ; Hyper-terminal

WinPower (Power Rectifier) ; Harris (BTS) ; Eclipse Portal ; DXR-NET

Other & Programming: Dreamwever 2004 MX IIS Photoshop 7 Multimedia Program

Protel 99se MySql C++ VB6 for Database by MS

Access. Basic of ASP and PHP language Hardware

and Software Reparing and Maintenance.

Knowledge the IP Address Network assignment.

------------------------------------------------------------------------------------------------------------------------------------------

Part 6: HOBBIES:

Looking new product on Internet, Learn new technical, Watch

Movie , Music, Travel, Seek for good delicious foods.

------------------------------------------------------------------------------------------------------------------------------------------

Part 7: PERSONALITY , CHARACTERS AND SELF ASSESMENT: Positive:

Good for team playing , I can acceptable for colleague opinion as therefore, it is difference with my opinion. and several time to use the brain-storming process for some

Page 15 of 19Rev.6.18.2015

trouble with my team working. But the sometime that should motivate for myself and, our teams.

Negative :

So worried and, I can’t rest if mission that was assigned

pending or unexpected thing happen for working finishing

date delay and, costing, So strictly the best performance of

worked result . I more over honorably, After has been

committed with veraciously.

------------------------------------------------------------------------------------------------------------------------------------------

Part 8: FAMILY DATA Marital Status

MARRIED

Passport /ID. Card No.

OccupationPresent

residence placeEmergen

cy Contact

K.Woranun Supanut Tel: 08-4671-8106

Page 16 of 19Rev.6.18.2015

Certification

Page 17 of 19Rev.6.18.2015

Page 18 of 19Rev.6.18.2015

Page 19 of 19Rev.6.18.2015