tffl Hca anNORTH CENTRAI. RAILWAY
trf 2020-2i t* fde2.50 rfe ri it iFaT arara
tfr 5i9di`iifaFT dFTffi trfu un(t5q - 9rfu d5Taf rty
I,ISToFfumxpoife®Worig(sCosmNg
®q=f ,Or^/ apvmias 2.50 cq!9q]S E}4cJ{(Inc[ulingsu6-Vm6reflhWorfes)
qoR.ryiear 2020~21
JT5"fro a±tjT\rdidrtydi pTiffl
--211015
H EADQUARTERS OFFICEENGINEERING BRANcllA~211015
LAW BOOK 2020-21
CAPDRFDF(1)DF(2)DF(3)DF(4)S. FundSRSFWMS0LWRR.MACBOLTB0TOYWDep. (RVN)Addl.Repl.(P)(S)
EH gaEa5 a T]gtFa ±ip t* fan ggrigrHIT 9TFfha fan tfr fan FgzFETfha fan (an u gltig fa oua`idic»clTai tfr fca 3giv)d} fad -fha tan (ffiffl tzicaTOT) tg fan qgtFatha fan (I+i&ciioioi " ap tfr fan 99zFFTffu fan (air eidfl ap tg fan q9zFagiv fan t} fan p9tFa.fan fro Bigiv fan tfr fca qgzFFTcnlaieuicdl frfu 5iia t} fan ggzFaraTqL iPIT5i5T fEL (qTap.) d} tan p9zFiTHmzia iITijiRT tfr fan pgzFafrm grfin (Tip) tis fan pgtFafaTtry agTTfin ,ugT, t5RTiiTFtIT aim tfr tan 3]9zFaffty uri+Hoioi, 5aaitTFT thijTan t± fan qgtFailmFT fin tg 7Trfha tn# aijTan tfr fca p9zFETfa ffro tin i} p55 qftr tS fan qgcFar
(Liitqi^dia]) t} fan ggzFiT(ghq) tE fan -
ABBREVIATIONS USED IN THIS BOOK
CapitalDepreciation Reserve FundDevelopment Fund (Passenger & Otlier Railway Users Amenities)Development Fund (Staff welfare)Development Fund (Operating Improvement)Development Fund (Safety Works)Safety FundSpecial Railway Safety FundWorkshop Manufacture SuspenseOpen Line Works (Revenue)Ordinary RevenueMiscellaneous Advances (Capital)Build, Own, Lease & Transfer SchemeBuild, Operate & Transfer SchemeOwn Your Wagon SchemeOutlay to be provided from Rail Vikas NigamAdditionalReplacement(Primary)(Secondary)
How to read `P D,LAW Book 2020-21 can also be generated on lRPSM under option "Report>LAW Bookreport„.Project-lD is based on 14Di its I D-Protocol assigned to each and every sanctioned work,so that it may a ways be unique y identified.
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Railway Division Plan Head Sanction Sanctioning Executing Serial Nc).year Authorlty Agency
v' The representation of the project lD will be as : 06.02.51.10.3.50.007
/ The significance of each digit is as under :
Digit NO. No. ofDigits Significance Example
1&2 2. Ra,'way `06' for North Central Railway.
3&4 2 Divlsion
`01 ' for Agra Division.
•02' for AIIahabad Division.
'03' for Jhansi Division
`04' for Jhansi workshop.
5&6 2 Plan Head `51 ' for Plan Head -Staff Quarters.
7&8 2 SanctionYear `10' for the year 2010-2011.
9 1 SanctioningAuthority
`1 ' for Sanctioned under Board's power costing>2 5 cr
`2' for Sanctioned under Board's power costing<2.5 cr .
'3' for Sanctioned under GM's power.
'4' for Sanctioned uncler DRM's & CWM's power
10 & 11 2 ExecutingAgency
'10' Means CTE/NCR.
`11 ' Means CBE/NCR.
'12' Means CAO/IRPMU.
`13' Means FA&CAO/F&B.
`30' Means CAO/C/NCR.
`50' Means DRM/AGC.
'51' Means DRM/ALD.
`52' Means DRM/JHS.
'71 ' Means CWM/JHSW.
`72' Means Dy CE/CPOH.
12,13 &14 3 Serial No `007' Means 7'h proposal for the specified Railway,
Division, Plan Head, Sanction Year & SanctioningAuthority.
Details for each digit of lD-Protocol may, however, be downloaded from Help Menu oflRPSM.
GENERAL INDEX
LAW BOOK 2020-21 (Volume-V)List of approved works costing less than Rs. 2.50 Cr. each. (lncl. Sub-Ubmrella Works)
Assets-Acquisitlon , Construction. and Replacement for 2020-21.
S.No. Plan Head Page NO.
From To
1 ANNEXURE-A LIST 0F WORKS DROPPED/COMPLETED/NOT PERTAINING.I viii
2 ANNEXURE-B OUTLAY FOR WORKS. (WORKS IN PROGRESS) ix xiv
3 ANNEXURE-C OUTLAY FOR WORKS. (NEW WORKS) XV x'x
4 16 TRAFFIC FACILITIES.YARD REMODELUNG AND OTHERS. 1 3
5 17 COMPUTERISATloN. 3 5
6 29 ROAD SAFETY WORKS-LEVEL CROSSING. 5 7
7 30 ROAD SAFETY WORKS-ROAD OVER /UNDER BRIDGES. 7 29
8 31 TRACKRENEWALS 29 52
9 32 BRIDGEWORKS. 52 57
10 33 SIGNALLINGAND TELECOMMUNICATION WORKS. 57 63
11 36 OTHER ELECTRICAL WORKS. 63 65
12 42 WORKSHOPS INCLUDING PRODUC"ON UNITS. 65 69
13 51 STAFFWELFARE 69 73
14 53 PASSENGERAMENITIES. 73 82
15 64 OTHER SPECIFIED WORKS. 82 86
16 65 TRAiNiNGmRD 86 86
ANN€XuR€-R
List of Deleted Works
North Central Railway
(confirmedon|yH|2Works)(DeletionDateBETWEEN°4/10/2°49AND%/89t/?n°i°h)ousandsofRs.)
Sr.NO.Rly
PlanHeadProject lD. Name Of Work Division Cost Balance toComplete Reason*
1 NOR 16 06.02.16.06 hikohabad, Pata & Bhadan: Provision of sand ALD 493 A.2.51.002 ump on loops at Bhadan(UP&DN),Pata(UP) &
hikohabad/UP\.2 NCR 36 06.01.36.06 gra Cantt -Augmentation of capacity of 33/11 kv AGC 1335 71 A
.2.30.001 ub-station with 2x3 mva transformers
3 NCR 36 06.01.37.14 gra Division- Replacement of rusty cantilevers in AGC 1527 51 A.2.50.001 ara- Palwal section
4 NCR 36 06.01.37.15.2.50.001 gra- Palwal - Repl. of rusty cantilevers AGC 1637 129 A
5 NCR 36 06.02.36.09.2.51.001 ughalsarai-Ghaziabad: Replacement of contactire/25kms). ALD 1870 A
6 NOR 36 06.02.37.15 llahabad Division Provision of Retroreflective ALD 1739 61 A.2.51.001 umber plates on OHE mast for high speed
rains in Mugalsarai-Gaziabad section
7 NOR 36 06.03.36.10 hansi Division:Provision of 11 KV power supply JHS 2189 1591 A.2.30.001 ith dedicated Railway Feeder .( 09 stns)
8 NCR 36 06.03.37.17 hansi division- Upgradation of protection relays JHS 1722 A.2.52.001 ith numarical relav at JHS division.
9 NCR 42 06.02.42.08.2.51.001 anpur (Goods Marshalling Yard): Premium endoendexaminationfacilities(Phase-II)(2008-09) ALD 2369 A
10 NOR 42 06.03.42.11 hansi-Setting up of CTRB over Hauling Section JHS 2410 6481 A.2.71.001 n Jhansi WorkslioD.
11 NOR 42 06.04.42.07 hansi Workshop -20 ton crane with gantry (bay JHSW 1785 1105 A.2.30.001 o 2` (shed A\
12 NOR 51 06.01.51.05.2.50.002 dgah-Repl. of quarters, type RB-I -20 units. AGC 951 1 A
13 NCR 51 06.01.51.06 haratpur - Bandikui -Re'pl.of gang huts, type RB AGC 195 1 A.2.50.002 . 88 units
14 NCR 51 06.02.52.06 llahabad- Rewiring of quarters (type-I -700. ALD 1600 1 A.2.51.001 voe-ll -700 & tvDe-lll -100 units\.
15 NCR 51 06.02.52.10.2.51.001 llahabad-Rewiring of staff quarters (1000 Nos). ALD 1510 9 A
16 NCR 51 06.03.52.10 hansi Division-Improvement of illumination of JHS 2250 15821 A.2.30.002 treets /8 stations)
17 NCR 51 06.03.52.10 hansi: Augmentation of water supply system of JHS 2480 397 A.2.52.001 ana Dam, Naut Ghat, Baveri pumping
nstalations at .Ihansi.18 NCR 53 06.02.53.09 llahabad division: Raising and extension of PF a ALD 2825 211 A
.2.51.001 irathu. Khaaa & Bharwari stations.19 NOR 53 06.02.53.09 llahabad division: Raising and extension of ALD 2811 A
.2.51.002 latforms at Unchdih, Manda Road and Chunartations.
TOTAL
.Note .A - Work financially closed or completed8 - Work shor( closod/reduced in scope, rotaining productivityC -Work closed as progress is NIL/negligibleD - Do not DeleteE - Work is duplicateF - Other ReasonsG -Work(11 ) not included in Latest Pink Book
Page: 1 of 1
35.46,87 5,74,06
Ul)List of Deleted Works
North Central Railway
(Confirmed only) (13 Works) (Deletion Date BETWEEN 01/10/2019 AND 03/08/2020)(Cost ln Thousands of Rs.)
Sr.No.Rly
PlanHeadProject lD. Name of Work Division Cost Balance toComplete Reason*
1 NCR 16 06 .02.16 .10 anpur: Extension of platform No.1 towards west ALD 621 266 A.3.51.007 nd. (00T\
2 NOR 16 06.03.16.07.3.52.002 ilwara: Provision of x-over at JHS end. JHS 426 a
3 NOR 16 06.03.16.11.3.30.001 airu : Shifting of station building. JHS 1686 1264 A
4 NOR 16 06.03.16.15 HOLPUR: Jhansi DMsion-Provision of JHS 920 C.3.52.001 xtension of shunting neck at Dn side at AGC end
o accomodate fLJll Goods train.5 NOR 17 06.01.17.14 gra Division - Repl. of UTS and PRS equipment AGC 390 23 A
.3.13.001 ver Acira Division.6 NOR 17 06.02 .17 .14.3.13.001 llahabad Division-Replacement of TerminalanaciementSvstem/TMS\eauiDment. ALD 63 3 A
7 NCR 17 06.02.17.16 LD Divn. -Replacement of . UTS Thin ALD 497 4 A.3.13.002 lients,PRS line Printers. PRS Dumb Terminals
ith Kev Boards.8 NCR 17 06.03.17.14 hansi Division - Replacement of UTS and PRS JHS 791 41 A
.3.13.001 ouiDment for reolacement.9 NCR 17 06.03.17.14 hansi Division Replacement of Terminal JHS 193 11 A
.3.13.002 anaaement Svstem (TMS`.10 NOR 29 06.01.29.06.3.50.001 gra Division: Upgradation of Level Crossing. AGO 410 61 A
11 NCR 29 06.01.29.07 dgah-Bandikui: Provision of CC block speed AGC 811 126 A.3.50.003 reaker & asphating of approaches of L-Xing.
12 NCR 29 06.01.29.13 athura -Achnera section -Provision of diversion AGC 575 49 A.3.50.001 oads for closure of LC nos. 364,370 and 374
13 NCR 29 06.01.29.15 rovision of sliding boom in Agra Cantt - Mathura AGC 977 279 A.3.50.001 n, Mathura Jn - Palwal & Mathura Jn -Alwar &
undla - Bandikui section in Agra Division.
14 NCF3 29 06.03.29.09 ina-Basai: Provision of heavy duty standard Ht. JHS 413 A.3.52.002 auge , heavy repairs to road surface and
rovjsion r}f tie bars fencina at level crossina.15 NCR 29 06.03.29.09 anpur sub division.. Improvement to L-xing road JHS 434 204 A
.3.52.009 urface and standardization of approaches.
16 NCR 29 06.03.29.10 hansi Divn. : provision of height gauge at L-xing JHS 895 67 A.3.52.003 o. 407, 394, 384, 386. 369, 371, 426, 427, 442,
49. and 448-a.17 NOR 29 06.03.29.10 HS Division: Electrification of 85 Nos. JHS 580 15 A
.3.52.005 onelectrified manned level crossing gates byrovidincl Solar I)ower Dack svstem.
18 NCR 30 06.01.30.12 rovision of subway in lieu of level crossing No.80 AGC 1460 1 A.3.50.016 t Kin 1483/0-1 between GVH-JBS in MTJ-AWRectinn.
19 NCR 30 06.01.30.12 rc)visicin of subway in lieu of level crissing No.81 AGC 1252 A.3.50.017 I Kin 1483/14-15 between GVH-JBS in MTJ-
WR section.20 NCR 30 06.01.30.12 revision of subway in lieu of level crossing No.82 AGC 1309 10 A
.3.50.018 t Kin 1484/4-5 between GVH-JBS in MTJ-AWRectir)n.
21 NCR 30 06.01.30.12 rovision of subway in lieu of level crossing AGC 2317 10 A.3.50.019 o.101 at Kin 1499/8-9 between RAH-OTD in
TJ-AWR section.
Page: 1 of 7 As on : 03/08/2020 12:22:20 PM
|iDSr.NO.
R'yPlanHead
Project lD. Name of WorkDivision
CostBalance toComplete Reason*
22 NCR 30 06.01.30.12 rovision Of subway in lieu Of level crossing AGC 1446 15 A.3.50.020 o.105 at Kin 1508/11 -12 between OTD-AWR in
TJ-AWR section.23 NCR 30 06.01.30.19 gra cantt:-Renewal of two Nos. span ( 1x39.98 AGO 12738 12738 U
.3.00.001 & 1xl8.30 in) of Kheria more ROB no.1343/3t AGC vard
24 NCR 30 06.01.30.19 athura-Alwar -Construction of subways in lieu o AGC 1 1 1 66 11166 U.3.00.003 evel crossincis /05 Nos\
25 NCR 30 06.01.30.19 dgah-Bandikui-Construction of subway in lieu of AGC 35609 35609 U.3.00.004 evel crossings having TVU upto 100000 (18 Nos
26 NOR 30 06.01.30.19 ayana-ldgah - Construction of subways in lieu of AGC 35790 35790 U.3.00.005 evel crossings (tvu upto 100000) (18Nos)
27 NCR 30 06.02.30.11 RN-ETH Section: Construction of LHS in place ALD 18181 A.3.51.001 f manned level crossina No.57-C.
28 NCR 30 06.02.30.11 RN-ETH section: Construction of LHS in place o ALD 1819 1819 A.3.51.002 nmanned level crossing No.61-C by pushingethod
29 NCR 30 06.02.30.11 RN-ETH section: Construction of LHS in place o ALD 1391 A.3.51 .003 nmanned level crossing No.63-C by pushingethod.
30 NCR 30 06.02.30.12.3.51.002 onstruction of limited height subway in place ofnmannedL-XingNo.28-CinBRN-ETHsection ALD 1832 179 A
31 NOR 30 06.02.30.12 onstruction of limited height subway in place of ALD 1586 1 A.3.51.004 nmanned L-Xing No.66-C in BRN-ETH section
32 NCR 30 06.02.30.12 onstruction of limited height subway in place of ALD 1542 1 A.3.51.005 nmanned L-Xing No.15-C in BRN-ETH section
33 NOR 30 06.02.30.14 tawah-Mainpuri:-Construction of limited height ALD 2305 1993 A.3.30.005 ubway lieu of level Crossing No.34 between
eeratour hault & Mainnuri34 NCR 30 06.02.30.14 tawah-Mainpuri:-Construction of limited height ALD 2347 566 A
.3.30.008 ubway R.C.C box size 4.50mx4.00m in lieu ofevel Crossing No.1 &2 between Etawah &aidDura halt.
35 NCR 30 06.02.30.14 1l^/-MNQ:-Construction of limited height subway ALD 3500 I A.3.30.009 .C.C box size 4.50mx4.00m in lieu of level
rossing No.4&5 between Etawah & Vaidpuraalt.
36 NCR 30 06.02.30.14 TW-MNQ:-Construction of limited height subway ALD 4400 809 A.3.30.010 .C.C box size 4.50mx4.00m in lieu of level
rossing No.6&7 between Etawah & Vaidpuraalt.
37 NCR 30 06.02.30.19 aini -Manikpur : Elimination of interlocked ALD 1 9478 19478 U.3.00.001 anned Level Xing no. 410,412,416,419 by
rovjding RUBs (4 Nos.) .
38 NCR 30 06.02.30.19 aini - Manikpur : Elimination of non interlocked ALD 292181 292181 U.3.00.002 anned Level Xing no. 404,405,411,413,414 &
26 by providing RUBs (6 Nos.) .
39 NCR 30 06.03.30.14 it-Konch;-Provision of Limited height subways in JHS 2044 1844 F.3.1 1 .075 ieu of Level Xings with cover (no.169F)at kin
226/12-13 ,between AIT KONCH St
40 NOR 30 06.03.30.14 it-Konch;-Provision of Limited height subways in JHS 2044 1844 F.3.11.076 ieu of Level Xings with cover (no.169H)at kin
1229/2-3,between AIT KONCH St
Page: 2 Of 7
``\vJ
Sr.No.Rly
PlanHeadProject lD. Name of Work
Division Cost Balance toComplete Reason*
41 NCR 30 06.03.30.14 it-Konch;-Provision of Limited height subways in JHS 2044 2044 F.3.11.079 ieu of Level Xjngs with cover (no.169I)at kin
1224/12-13,between AIT KONCH St
42 NCR 30 06.03.30.14 gra-Etawah section:- Provision of subway in lieu JHS 2493 1 A.3.30.002 f level crossing no. 20 at CH29367 in new Agra-
tawah B.G. Rail Line.43 NCR 30 06.03.30.14 gra-Etawah section:- Provision of subway in lieu JHS 2493 165 A
.3.30.003 f level crossing no.16 at CH:23790 in new Agra-tawah B.G. Rail Line.
44 NOR 30 06.03.30.14 gra-Etawah section:- Provision of subway in lieu JHS 2504 285 A.3.30.004 f level crossing no. 8 at CH:13060 in new Agra-
tawah B.G. Rail Line.45 NCR 30 06.03.30.14 gra-Etawah section:- Provision of subway in lieu JHS 2454 126 A
.3.30.006 f level crossing no.10 at CH:14110 in new Agra-tawah B.G. Rail Line.
46 NOR 30 06.03.30.14 gra-Etawah section:-Provision of subway in lieu JHS 2491 3 A.3.30.048 f level crossing no. 58 at CH:101633 in new
clra-Etawah B.G. Rail Line.47 NCR 30 06.03.30.14.3.30.069 hind -Etawah section:-Elimination of Levelrossingsno.71betweenBhindandPhoop JHS 2463 2263 F
tations bv Drovision of Subwav.48 NOR 30 06.03.30.14.3.30.078 hind - Etawah section:- Elimination of Levelrossingsno.70betweenBhindandPhoop JHS 2172 1772 F
tations bv nrovision nf Silh wav..49 NOR 30 06.03.30.14 hind - Etawah section:- Elimination of Level JHS 1734 1534 F
.3.30.081 rossings no. 77 between Bhind and Phooptations bv r)revision of Sub wav..
50 NOR 30 06.03.30.19 ina-Jhansi Section : Provision o f Normal JHS 18879 18879 U.3.00.028 eight Subways (RUBs) in lieu of L -xing
a.328.332 & 33551 NCR 30 06.03.30.19 `na-Jhansi-Section : Provision o f Normal JHS 18879 18879 U
.3.00.029 eight subways (RUBs) in lieu of L-xing• i . ; `
52 NCR 30 06.03.30.19 INA-JHANSI SECTION .. Provision o f Normal JHS 17929 1 7929 U.3.00.030 eight subways (RUBs)in lieu of L-xing
a.317.319 &32553 NCR 30 06.03.30.19 INA-JHANSI SECTION : Provision o f Noi.mal JHS 177991 177991 U
.3.00.031 eight subways (RUBs) in lieu of L-xingo.311 _313 & 315
54 NCR 30 06.03.30.19 lNA-JHANSI SECTION : Provision o f Normal JHS 59331 59331 U.3.00.032 eight subway(RUB) in lieu of L-xing No.31
55 NCR 31 06.01.31.17.3.50.001 dgah- Bayana section-Replacement of fittings ofhannelSleeDer1232Nos. AGC 1162 130 A
56 NCR 31 06.01.31.17 undla-Yamuna Bridge -Agra Fort Section- AGC 1119 289 A.3.50.008 eplacement of fittings of Channel Sleeper
1186 Nos.\57 NCR 31 06.02.31.10 anpur - Ghaziabad -Conversion of 03 Rail ALD 877 577 A
.3.51.011 annel into LWR on looD line.58 NCR 31 06.02.31.10.3.51.014 alwan - CTR (S) Of Ballast siding ALD 448 398 A
59 NCR 31 06.02.31.13 aini -Allahabad : Scattered Rail Renewal ( ALD 994 644 A.3.51.014 rimary ) between Kin. 820.50 -Kin. 822.50 on
P Line.60 NCR 31 06.02.31.13 asulabad-Chandari (RUB-CNBl):- ALD 927 179 A
.3.51.016 tandardization of cess from Kin. 921.00 to Kin.015 in the section of ADEN/Fatehpur. (UP-80.00in & DN-80.00 km`
61 NCR 31 06.03.31.10 hairar - Bhimsen -TTR -03 nos & through JHS 757 441 A.3.52.021 eralna Switch Renewal - 05 nos
62 NCR 31 06.03.31.13 ina-Agra DN Road section TRR(P) = 1 kin from JHS 951 22 A.3.52.020 in 1262.650 to Kin 1263.650.
Page. 3 of 7
uSr.No.
RlyPlanHead Project lD. Name of Work Division Cost Balance toComplete Reason*
63 NCR 32 06.02.32.09 Ilahabad-Naini: Repl. of top flange plate & deck ALD 999 A.3.1 1 .003 late of Br. No. 31 (RUB) UP & DN line and Br.
o. 33-A /RUB\ lJP A DN line .64 NCR 32 06.02.32.17 hunar-Chopan:Balance work of inspection ALD 721 308 A
.3.51.003 athwav to Br. No. 39965 NCR 32 06.03.32.02 hansi-Kanpur: Replacement of 7 span of 6.10 M JHS 210 741 A
.3.52.002 or girder bridge Nos.1144/1 and 1179/1 by PSC..
66 NCR 32 06.03.32.02 HS-DLl -Replacement of 7 spans of 6.10m for JHS 235 135 A.3.52.004 8 Nos.1200/3,1209/3 & 1271/2 by PSC slab.
67 NOR 32 06.03.32.02 HS-MKP -Replacement of 7 spans of 6.10m for JHS 237 172 A.3.52.009 8 Nos.1164/1,1222/1 & 1245/2 by PSC slab.
68 NCR 32 06.03.32.02 HS-MKP - Replacement of 7 spans of 6.10m for JHS 210 129 A.3.52.010 8 Nos.1356/1 & 1369/2 bv PSC slab.
69 NCR 32 06.03.32.02 HS-MKP Sect.:Replacement of 7 spans of 6.10 JHS 210 84 A.3.52.011 for GB Nos.1062/2 on BINIHS 1189/1 on
HS-DLl and 1344/1 and 1369/2 on JHS-MKP bySC slab.
70 NOR 32 06.03.32.02 lD-BZM see.: Replacement of 7 spans 6.10 in. JHS 217 167 A.3.52.012 or girder Br.No.1140/1,1141/1, 1142/1,1183/1,
n JHS-DLl and 1349/2 on KID-BZM section bySC slab.
71 NCR 32 06.03.32.02 eplacement of 7 spans of 6.10m for GB JHS 250 131 A.3.52.013 os.1062/2 on BIN-JHS,1189/1 on JHS-DLl &
344/1 & 1369/2 on JHS-MKP section by PSClab.
72 NCR 32 06.03.32.03 lNA-TKD: Replacement of 2 Span of 6.10m JHS 108 48 A.3.52.001 irder Br. No.1039/1 UP & Dn. bv PSC slab.
73 NCR 32 06.03.32.03 HS div:Repl.of 6 spans of 6.10m girder JHS 295 164 A.3.52.002 r.No.1160/1,1170/1,1153/1, 1261 /1,1175/1,22912.
74 NCF? 32 06.03.32.17 ithouli-Dhaulpur section:- Provision of inspection JHS 936 26 A.3.52.001 teps on major and important bridges (12 Nos)
75 NCR 33 06.01.33.12 p-gradation of Data logger in lDH-BXN & AGO- AGC 971 96 A.3.50.002 TJ section.
76 NCR 33 06.01.33.16 gra Division : Provision of MIS in Agra Division AGC 718 145 A.3.50.001 nd connectivity to MIS at CRIS through NOR HQ
77 NOR 33 06.01.33.17 athura~~Alwar~~Up gradation of Data Logger AGC 2492 44 A.6.50.002 t El stations and OFC Hut at BEHAJ & Paperera
tn of Ar]ra I)ivision.78 NOR 33 06.01.33.17 athura~~Alwar~~Agra Division: Elimination of AGC 2492 65 A
.6.50.005 oken less Instruments with block panel inathura -Alwar section of Acira division.
79 NCR 33 06.02.33.10 llahabad-Panki: Supply, installation, testing and ALD 921 297 A.3.51.006 ommissioning of maintenance free earth with `A'
lass protection with A,B&C protection.
80 NOR 33 06.02.33.14 ignaling work in connection with provision of ALD 994 994 A.3.51.001 PAC on third line in Aligarh -Ghaziabad section.
81 NCR 33 06.02.33.16 ughalsarai - Kanpur section of AIlahabad ALD 861 103 A.3.51.003 ivisiom Provision Of Perimetric Earthing as per
DS0 Scheme for El Installations at 43 stations.
82 NCR 33 06.02.33.17 anpur central~~Ghaziabad~~Segregation and ALD 2261 345 A.6.51.002 trengthening of power supply at EI Stations in
anpur -Ghaziabad section of AIlahabad division.
Page: 4 of 7
|vi)Sr.No.
RlyPlanHead
Project lD. Name of WorkDivision Cost Balance toComplete Reason*
83 NCR 33 06.02.33.18 llahabad Division:-Augmentation of Wi-Fi based ALD 1807 572 A.3.51.001 N network for Railnet access for central on-line
r}nitorinn at DRM Office84 NOR 33 06.03.33.12 HS division Provision of additional SSDAC for ALD 986 16 A
.3.51.002 edundancy with axle counter for BPAC in 6lr}ck sections in MKP-NYN section .
85 NCR 33 06.03.33.15 YN -:MKP -: Replacement of old version ALD 820 A.3.51.002 ntecirated Power SuDDlv svstem at 6 stations
86 NCR 33 06.03.33.06 hansi Division: Provision of telecom cables for JHS 322 7 A.3.52.002 uamentation communication facilities.
87 NCR 33 06.03.33.06 HS Workshop: Replacement of telephone JHS 297 296 A.3.52.003 xchanQe with diciital exchanci.
88 NOR 33 06.03.33.12 lN-JHS:- Provision of Axle counters for JHS 730 A.3.52.004 edundency with Track circuits over PFTC at
alitpur.Dhaiira and Karonda stations on Jhansiivision .
89 NCR 33 06.03.33.12 hansi-Agra:- Provision of Axlecounters for JHS 873 427 A.3.52.005 edundency with Track circuits over PFTC at
abra,Gwalior,Dholpur and Morena stations onhansi division.
90 NCR 33 06.03.33.12 hansi division:-Provision of Axle counters for JHS 999 162 A.3.52.009 edundancy with track circuits over bridges having
teel channel sleepers/PFTC over jhansi division.
91 NCR 33 06.03.33.13 lNA -GWALIOR :- Replacement of old version JHS 739 A.3.52.003 ntegrated Power Supply system at 9 stations
92 NOR 33 06.03.33.14 wall.or -Agra cantt :- Replacement of old version JHS 678 A.3.52.001 ntegrated Power Supply system at 7 stations
93 NCR 33 06.03.33.14 eplacement of old version integrated power JHS 971 A.3.52.002 upply systems installed at Level crossing gates
nd inter mediatf! block sections94 NOR 33 06.03.33.17 mprovement in earthing arrangement of S&T JHS 969 A
.3.52.003 ears as per RDSO specification at Kotra-Matatilaection (10 stations) in Jhansi division.
95 NCR 33 06.03.33.17 hansi division: Improvement in earthing JHS 2155 1049 A.6.52.003 rrangement of S&T gears as per RDSO
pecification at Jhansi-Dhaulpur section in Jhansiivision.
96 NCR 36 06.02.36.99 LD: Replacement of earthing stations of such ALD 2:2:I 13 A.3.51.001 LS at ALD-GZB see. and PTFE nutral see. in
GS-GZB sec.97 NCR 36 06.03.36.09.3.52.003 hansi: Provision of centralized TRD store depot . JHS 483 1941 A
98 NOR 36 06.03.36.10 gra-Bina: Replacement of womout oil type BMs JHS 9181 197 A.3.52.001 ith SF-6 /vacuum tvoe BMs.
99 NCR 36 06.03.36.15 hansi and Gwalior -Replacement of old JHS 925 306 A.3.52.001 abricated steel towers of Yards by High Mast
ower with LED liahtina arranc]ement.100 NCR 42 06.01.42.07 gra: Provision of WDM-2 (3 tier) pit line for diese AGC 289 196 A
.3.50.002 ned AGC.101 NCR 51 06.01.51.09 dgah-Bandikui : Repl of qtrs. 01 no. at MURD, 02 AGC 456 A
.3.50.001 os at CIK, 03 nos at KL and 02 nos at KPO forneratina staff.
102 NCR 51 06.01.51.10.3.50.001 ichpuri-Bharatpur & Mathui.a-Alwar: provision of0numbersRB-lvquarterswithelectrificationfor AGC 912 A
tation Master Of 10 stations.
103 NOR 51 06.01.51.10.3.50.004 athura -Palwal: provision of 16 numbers RB -11uarterswithelectrificationworkforOperating AGC 700 A
taff.
Page, 5 Of 7
|v`,i)Sr.No. R'y
PlanHeadProject lD. Name of Work Division Cost
Balance toComplete Reason*
104 NCR 51 06.01.51.10 athura-palwal.. provision of 12 numbers RB -111 AGO 704 A.3.50.005 uarters withelectrification work for operatingtaff.
105 NCR 51 06.01.52.08 gra Fort: Replacement of existing steel tank with AGO 250 240 C.3.50.003 CC tank caoacitv 225 KL.
106 NCR 51 06.03.52.15 holpur station: Provision of RCC tank 2,25,000 AGC 692 A.3.50.001 tr water capacity for Augmentation of wateruDnlv
107 NCR 51 06.02.52.15 atehpur: Providing & laying S.W. pipe with ALD 6501 67 A.3.51.004 hamber, pump house to malgodam / OHE office
n North colonv at FatehnLlr station.108 NCR 51 06.02.52.15 hikohabad-Farukhabad: First time Electrification ALD 549 A
.3.51.005 f Manjc)orgarhi. & Kosma railway stations andta ff auarters.
109 NCR 51 06.03.51.10 albehat: Replacement of 18 unit old K type qtrs JHS 982 499 F.3.52.005 f aana staff bv std tvDe-ll otrs.
110 NOR 51 06.03.52.06.3.30.005 hajuraho: Provision of Holiday Home. JHS 289 59 A
111 NOR 53 06.02.53.09 anpur: Provision of 01 no. escalator at PFo.4&5. ALD 853 74 A.3.51.010
112 NCR 53 06.02.53.11 undla: Provision Of facilities for Adarsh station at ALD 1965 284 A.3.51.005 undla.
113 NCR 53 06.02.53.15.3.51.005 llahabad Divn.: Supply & Installation of CCTVamerasforPRSat ALD 1051 283 A
ZP,BDL,Col,NYN,FTP,CNBantt.GOY.PNK.PHD.Ell/V.SKB.FZD.TDL.ALJN
114 NCR 53 06.02.53.15 llahabad: Setting up of Mechanized laundry at ALD 1970 A.3.51.008 llahabad .
115 NCR 53 06.02.53.15.3.51.011 undla-Ghaziabad section:Provision of 3.05MewFOBatChamrolaandPoraStationatALDivision. ALD 2789 A
116 NCR 53 06.02.53.17 hheoki: Provision Of washable apron in Col ALD 1615 A.3.51.001 tation at Platform No.2&3.
117 NCR 53 06.02.53.18 UGHALSARAl-Ghaziabad: Provision of ALD 2040 2040 C.3.51.016 tainless Steel Benches at Stations over
llahabad Division.118 NOR 53 06.02.53.18.3.51.022 anpur central: True colour LED Display BoardsortraininformationsystematKanpurstation. ALD 1249 A
119 NCR 53 06.03.53.13 anikpur: Provision of Washable Apron with ALD 1995 1995 C.3.51.002 leanina svstem
120 NCR 53 06.03.53.03 WL : Augmentation of water supply arrangemen JHS 348 A.3.52.001 or station and carriage washing & watering by
roviding 2 Nos. bore well and one over headCC tank.
121 NCR 53 06.03.53.06 anmore: Extension of platform for handling 24 JHS 472 1301 A.3.52.001 oaches trains.
122 NCR 53 06.03.53.10 houlpur: Extn. of PF No.1 to accommodate JHS 1361 58 A.3.52.002 4/26 coach trains and extension of FOB to
irculate area and provision of landing towardsHS end.
123 NCR 53 06.03.53.10 walior: Augmentation of PF shelter on remaining JHS 1328 32 A.3.52.003 enQth on PF No. 1 .
124 NCR 53 06.03.53.10.3.52.009 alitpur: Increase in level/ heihgt of PF No. 1 and/3makeHLplatformandextensionofPFNo.1. JHS 2270 2101 A
125 NCR 53 06.03.53.13 hansi East: Provision of RCC ground water tank JHS 1430 404 A.3.52.001 ncluding augmentation of pipe line for carriage
aterina at JHS station.126 NOR 53 06.03.53.14 WALIOR: Provision of Mechanised Laundry for JHS 1768 2321 A
.3.52.002 asliinc] linen.
Page: 6 of 7
|vtii)Sr.No.
RlyPlanHead
Project lD. Name of Work Division Cost Balance toComplete Reason*
127 NCR 64 06.02.64.13 anpur:- Proposal for 08 rooms hostel for ALD 539 9 A.3.51.001 ccomodation of trainees in CETA at Kanpur ancl
enair to amund floor nf r:eta hr]stal floor128 NCR 64 06.02.64.14 RTMTC-SFG: Rehabilitation of Electrical ALD 545 84 A
.3.51.001 nfrastructure at lRTMTC-SFG129 NCR 64 06.03.64.10 ina-Jhansi: Proposed stabilization of formation JHS 806 8061 F
.3.52.001 ith lime slurry pressure injection on Up & Dn/L=15 Kms. /OOT`
TOTAL
'Noto -
A - Work financially closed or completed8 - Work short closed/reduced in scope. retaining productivltyC -Work closed as progress is NIL/negligibleD - Do not DeleteE - Work is duplicateF - Other ReasonsG -Work(11 ) not included in Latest Pink Book
Page: 7 01 7
3.60,75,65 2.61,93,18
f+NNt: XVKC -[5
|`,xJ
#=0'
CO
ei8= aCV
aI8I=
C,C,® 8 S®0iI a,I
i_
g1)
U,I=1=aC, CJ a
aI §CJCN aa
8 <a. iI a:
¥iI=
8a C) C)
Ia :0=
i5U'£I E)
a:8;% S
§CL uZa =®r`EII®qL C,
;i:
a 8 8
g =
ii
EEi:
C)E8CU
=J ieIIIagi
lLa:C)LLI)
acO=Fa.I±i?0J=6ot'0'I0i,0EgI¥80JE0EEaIa0IIJ!1
cOaI0cOIaJ=IC=g
3fC)3¥ C,? a!
=CV§
a8co C'
;I5a a a a C, a C, a
U,Iia:aC, 8 a : : C, a
?
a:a:a 3aCD 8 a aa : r`|r)® C, aa)®
00:a 8 8 C) ®N g:r- C' C)
B
0!0Z=aco! C,=® C, a8 a)CO® c®§ C, cOt®
;!!
C, C,
a gCVa a cOa
= = S S S S S
3eEI
EiaE¥ ?aEi i =N a8CO a§
?N
&IIE=a50a
aa0 LL0£C)LLI)
S2,LLa SLLC]±2a: LLZZ'E
UKJ
inV'g8'
U)t'I0a,I
i5:§
I
=a a
C'J= a,III II_.9LL 0
® § §Ia. iI i.
¥iV'a
aI-3 r-cOcO
<a,0' iIII)a'I a
0 8|r,CV :rvI aI St= =a' IE>ai!£ C)
a:8:at 8:aa
&0Z
:j>a
a a£cOg8
!!g5i3Y
a=a®E =£
=
c,
EEr`C,3
8=0 dILI aEI .Ia ®L
EL 3i:a= f
9
Iu,=
IJIC'
a'aaa
0O'
U,aI#I
- !€I
=CJ C,
aI cOIII 2I-8
a
a, ; ga, Iit7' ia a:
II¥i0'0'IcOU' a
§88 a8
<i.a
u : !a a0 <® Ir
i¥a
a:
®E ar`C»
a 0=a€OD Zia
§ §|J!!!g
a, €i:iOuIaa'I 3£
S
i:
EEaC,?
IIO :iaL >E4J
i)Ia'L
ii!a= i
8
¥&a:
EJE=a8aa
|x\J
U'U,
cOI,I0U}J
C,E! r-3CV
f 8
=a C, C,
aI a,ILI
ig
u
®a a C,8a,
® a C,
8 C,CO
8 IIEL =I¥= C)
Ia
CV£ N8r\
<U, i
J= a:
=EaC)
0 ? %a ?co0 10
8 €IIEE0®0 =a:a
a:
a§gi
iE0Z
1,Ia0'I0I0' =®
:!a
C' i icO 5=Y®r,Ia =£
= f
cq
EE ir`c,a8
0I :iI >Eq J==I:Ia= £
j2EJt=a€a
C1IcOCr0=
a 0CJ
in
cOaC=3I:
=a aaC'
=a C) a
aJ=II cOI
:_
8®
a,J=ia:aa a C)a a a8 uD au)
aC, a C,
V' a C) a0 1® u) C,I CV
IJ, <9 ia. a:I¥ a
®a 8N 8a a r`
= 8CV
0' =a:ai:fa'a)
a:
a?0 E!c®
t' 0Za) =NO|J0a'IIai: 0
;i!
C) CV CV
S g
c,
Eii! aaa
=J ei.
€IJIa8
C1
Ia U,a:
a 8 0±
|x,-j'
V'8
cOI,Iaa,IaIIIg
-aaa
?aS
?Sei
aIi5C,|r, C)|r) a 88 aa
cO
a aC, a C>8 C>Xi
ItJ' ia i
LI07Ia EEa
aa a a a8 cj|r,
= I<
0 a:
II5 I)
0a C, C) aaCV C,SCV
at, <I|J =a a:
L0'I|J a
0£
SC,a a a:03 Sr`=
I 00 ZI =
aaJ=¥:¥I1000
:!!
C,=i C' 8S3 CJ: C,S
S S S S
03
i!E 8a 8 aa 8®®I 8== Dia >EL
i:=J eI
&IJt=a€a
|La:C) c,LLaI#Of
a 8
in!0'9ELIEiaa:IaI¥:d0i;a'iE0J=68a0a,II0a.
OnUI0ODIaiI.5IL:
§CVC,8in
ar`Xi a=
i5C, C, a a C' a a
a,IiC)a ?r` C) a
Ei : ®R
9:aCJ C,8 a a +~
8;CO Ba
®=a:aa : a a 8 ? ?
a:0iaC,® S;N a : g 8
;i!
?C,
Sa
a ! ®S
= = = S = g
i+
EiaiiI8a 8R
ar`u,CV
?
=EJIaia
cl8 LLa:C)|LC) %a 9uC)
±#a:
cJ)iD
U,aC=00}J0J=IIB
:|r, a ?¢ §CV co C,i
;IiC, a a a a
cO a i icoS ®®S
Ii CV
V'ia,= C)
C)
C,
! :u) 8 g€a. I< aI iu' a:i:i a
0 : i :® =a) C)%
W a u, t0 <= =I aEa'E<a'0' a
a:0a 88;C, Sr` a? =®u,
I Z®V' =t„E®LO00 0
I:I
cJ
i §a
?
a'II0a. =8
S S S E
ia
EE ?8: u)®% C,SC)
q}B.iI
=JE
eIIIaia
a lLLLC)
±8 U)i 8 0=I) 0:Cr
U'8
cOI8I:
%r`?
SCȴ
=a a a a
aJ= =LI i_
g0
ODII=a 5C,5 C,a
5
aa8S a8i aa® a!
I0, <9 i
a.I¥± a:a
8< aC,
ScO §®
=® a:
JE±3=a
0=8;® ?
cOa ODSin
0 aIcO i10I0®I
a
1!?
C'au) §
r`a
I 5=Y0CL 38
S S =
I,
EiiI=r` §¢ §a
== i=IJIaii;0a
C| EDN|La
a ®C)
qw)
Ow0)®
cOIOJa)If
i a:
=a a C'
aJ= 0,III :g
0
a,Iia :® ? i
aa: a? ai
I0' <9 ia. a:I¥a Cl
® ? ? ?iC) a
=D£
a:I®II a
B:
a a a
9 0ZL i100EIIeL 0
;i!
a C, a
= S
i3
Eii!:co !
=J f.i91=IIai68a
S±u_aI2a:
cOi0'9a.E¥i±±ta'+0aaU,aJ=0SE0IiaaL
Owt'I#IaiIg8i
aS aC,X!a C»®CJ LOa 88 ®u,h 3Cu!
5I5C, a c, CJ a a C, C>
cOIiacClC)u,cO C) C,3 ul®
8CV a i a
C):IraaR C> S a 8® C' C' Sa
a0:C] S C)S
a a ¥ 3rv CVa
a:0:0CV a CV a
au,Lr,® 8C,? i!
!!!
§§
a C,
E;C, =:
S = S S = = g
Ii
Ei¥a:
?co B 3§
®K
i
=IjIai6
C1
eLL S±LLCl c®ICJ ±#ua Za
a 8 8 0:a ua
ftNNGxuRt~~
U'
a)0I03a,J
OS
C,E!
L-
= aCVa,CJur)S]
aJ= cOILI Ii=
ga
U,
|eg |f)g
Iiia:C)
C'
0a Lr)a
J£ I: <i
D!
5ZIa
aC,S C,S
a a<d0 iEE
gIaEa a
I:8acO 8%
®r`Ia®II® 0Z=a
a a
Ii!a- ±£
S
a3
EE ?8aB}1>EaJ®J®L
=f== f
P
LLQfa
IJI0aaJ9a
¥£=0Zaa'I6oeC„I®BaE9I¥in.9aJ!0iI®-i,00II0a.
a,aIcoU,I0iIg :icO a® 8a c>a c,;
:CD 8aa
;IiC, a C) C, C3 a a C,
cOIia:aSro Sa, 8co ®S ®8 ®8 a C,=
e:C)®E: aa co®a a)§ coaCV
§C, aclr.
0ia % 8:C1 8!N SCV 8CV £a Sg
a:0Ziaa§ C,a8 aC,8 88 88 8aCe 8aC,10 aCVr`
i:i
C, C, a CJ C) a a a
S = i S = S S
ei
EiaitJ![88 : ! ? i
CJ:
!
±IJIaia
a8 Ill0:aLLa
9IJ-a Ea±20= u0:a]|L'
thvJ
t®
U,BIqcOIaJ=I-I5
ctl
a:ul¢
€+
=CJ CJ
a,Iii=0
cO8COa)
C>8®
Ii=a±C)
a 8tCO a:EE II,
= iD!
5ZU'C)
aCJSS aCOa
gI£J*098iD:a
a:88CO 8aacO
I ®Zi®t'3Ii 0
0 C'
!!ga 55JLa. =£
=
a,
i!Eaia
£E>E4=eJOL
ff== i
&
±£
III.90uaa
¥=±0Z8
0,0IaJU'IaJ=II8
i;
c>:¢
€i.
±C) a
a,II==0
0,8cO C)sOcO
Iiia:a
aa8C,
i0'B aId a=
a,t'II a
u ?10C)£IJ,
Ia' a> S0 =
e£¥± a
a: ! :to0==
a0a
:i!
a C,cOe0£0®Ia®
=fi
=
i3
i!E?II
£Ea >Ea. J==|JJ
a'L
IEa= eI
e
icO0=a:
IIIaaaaa
J=
0,0IcocOIaJ=I-ICJ)LL
88JI
=CJ a
0Iii=0
cO
C)§:CVIii
:5ZI:C)
a gia?I
V'<i0'IcOcOBa OEC)
a : ig
aSa =I a:
0,I± a
0!
cJ8a 8C,¢
a Zfi =cOe0aC„NI0a'IIa 0
C' C,
!!:5=Y.=8
g
03
EE i;C,aL
£E>E&=eJOL
g!=J ie
rB
E=jEa01,aa
|xvii)
U)I)Ico0,I0iI8
_ ! 8C,to aC,§ C,:
ef +
=a,Ii0a C> C) a a
OnI: :CV aCVacO aCOa, a&®
U' I:E=5 a
aIarYa CNLf' co8 aa
?®Z <a :D:IaI a
® : SCO =|r) ! 8clCh
¥ ?1,a a±=8'=0 a
a±
a? a: aS C,8OD
:®CV
a' ®ZlLl =IaJ=0 a
C' a C' a a®®Ba0IIaI
;i!i = S S
03
Eiai:Iaaaa C>?
§a ?q
== ijgIJIag
a LL0=a ®LLa I2a:
a qC)
V'
a,BIE3i
:L„ :C,
=C3 a a
C)I a,I+C= =_ ±.g'LL 0
a,aa a§ C,8a
tl: IL i= !
5Za,a
a aN EiKiECr'
± I<
± iaI05
0 a : 8CV
I aI iE =E8aE! EE:a
a:
aE a?:®
|J 0I Z0 it»Ia a
CJ a ai0'u)®®Ba0II0
;!!= =
i:
Ei:u) i
a. aioJ8!
== i&IIt=aa;0aa
a.cO®±COa:a±
a,BI3I
ii8?
€I
=0 C)
aI U,III I=_CJ)LL a
On
acO ®00
II=a±a
C) : gV' I
JE <La i==0Z a:a
0 : :Ov a
JX: s!a =
=a'0't•=d EE:a
B!8co 8uJ
0Z8;t =a
Cj C,a0II0L
::I=£
S
CC
i!EC,a¢
j!E>EJ2=tJOL
±!== fe
±cO0=0±
IjiaI,0a<
|riij'
¥
U,tI#J f:i :|f} :c.
=a C> CJ C,
aJ= a,III :_
g®
cOIiaaco : CVa
!
I)I€ 8a SCV £r` aaa
Ia :=5Z a
0 =u, ai¥a
cof=
= ?J! =
'
±5 a
a:
C,aro aaC,CV aEa a8¢
aZ10O =a
C' a a a8Ii®
!!ia. ::i
= = S
T=
EigE:E:a a: aa
== i&IJCai
a |La:C)LLC)i aC)
a
U,aI#IaJ=I-C=B
ai:u, :Lr, i !
aIi 8una : CJ: C,8®:CV
OnI8|r) C,LO
8 : ?I ia a:=5Z a
aa8 C,8 aa
? :LO
j9I<
I IIIa'i3I D:a
® : : a a gCVi a8 i
EL =t»ItiaI a
0! ! 8a 8a¢ 8C3a :®- 0U' Z1 IaI¥ a
C) a a a C'
±%Ida'IIaEL
;isS S E g
i;
EigE¥[! 88 :a !
== i±IJE=.2?
a. aa 9IJ-C)¥2CE
a cOa
cOI,IaJV'II
:|r) :10
=C, a a
aJ= ¥LI i_.±LL 0
U,I=a:C)a8 a8
:N
a RC,a a%
0' IJE <I:5Z ia
0C>g
a :aa: 8I =a:
a)IIE10®I C'
a:0aE aa 8%
Z=0
CJ C, C)
8II0!!€
EL ::iS =
i:
EiaitJ£[8a C,C,8
=J eI
eEIIaa8a
CVirI) ±#
¥a
U,aC=#I:
C,aro C,8CV :
=C) a a CJ
aJ=LI 0,I
=_.iLL- a
cOIiaS cO? ®a cO3
C)
~S : gcO:CV
= I<= i® a=
ZV'Ia a
0 aCOcoa ®C, cO®C®
= 8t ia' a:i=0a'a.cO a
0! a : : E!C.
® aJ= =a®®Iaa' 5
I::C) C, C, C,
I 5£tLIa0- =£
= = a
iEi9E:[
a8a :
== f±IJIa5a
a LLD±I) gaa a0
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20TRAFFIC FACILITIES
A -Works in Progress
o6.02.16.ll.2. (i) Extension of CSR of BEP down Loop by 27M to
extend it from 688M to 715M.(ii) Extension of
CSR of FTP L.No.5 by 45M to extend it from 670M to
715M.(iii) Extension of CSR of CHK down loop by
31M to extend it from 684M to 715M
06.0216.16 2 Kanpur: Improvement of damaged drain/Nala in CPC
goods shed kanpur.
3 06.0316163. iRADATGANI: Direct reception and despatch facility
in une no 5 goods line
4 06.02.16.183. A||ahabad DMsion -Provision of simultaneous
movement from 3rd & 4th line at Ghaziabad end and
from North & south lines at Lucknow end by
nsertion of 03 cross avers and extension of overrun line no 11 at Lucknow end in Kanpur yard.
5 0603.16183. Agasod_Malkhedi: Provision of lB signal between
Agsod-Malkheri in UP direction only.
6 06 01.16.19.3. Mathura.-Provision of water hydrant on p/ F No-9 (
line no-3 of branch line).
7 060Z.16193 A||ahabad Division-Yard remodelling work at
Allahabad yard.
8 06.0316.18 3 Chithari: Splitting of longer block section by
converting existing D Class station to a Class
crossing statlon.
9 06.02.16.19.3. A||ahabad Division work in connection with
extension of line No. 08 at Mirzapur for loading
and unloading on high level platform and extension
of shunting neck to full length.
o6021615.3 A||ahabad Division-linking of Line No 8 of
Mirzapur to point No 213 towards East End by
providing extra track of about 200 metres.
o601.1619 3. Agra Division-Provision of Rest Room and
lavatory at 32 stations for operating staff.
0€ 0316.183 KHAluRAHO : Provision of chord IIne from Mohaba
line to Lalitplir line
06.01.16.]5.3, Mathura |n-Palwal:- Extention of FOB on 3rd
line yard at Vrndaban Road station.
0601.1618.3. Bah_udi More-Splittln8 of more than 38 Kms long
block section by converting Mansingh ka pura D
class station into 8 class station in the section.
DF(3) 97,35 72,ZS 1 25,09
DF(3) 40,00
RRSK 66,62
Cap 14,73,49
RRSK 10,cO,00
Cap 13,SO,00
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CEN"`AI RAllwAV
(Figures in thousands of rupees)
Item P,Oject'D
NO.
Particulars of Works AIIo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20TRAFFic FAaiiTiEs
:: £31619 3 Bijoli: Provision of goods shed at Biioli.
06 0216.183 A||ahabad Division -Development of Subedar8anj
o6 0316.19 3. |hansi : Provision of 18 signal between Bhimsen -
18 06,02.16.18.3. A||ahabad Division.Provision of 20 Sand Humps/Over
runs between AIIahabad-Kanpur Section at loop
lines at 13 stations .
ig 0602,1618.3. A||ahabad Division-Conversion of 'D' class
station (Vishwanathpuri) into `8' class station
between Chunar and Shakteshgarh for splitting of
long Block section (20.94 Kin)
2o 06.02.16,19.3. A||ahabad Division -Provision of rest room at 33
way side Stations and attached toilets at 48 road
side stations .
o6.0216`19.. A||ahabad Division -Development & Modernization
of Control office of Allahabad includlng HQ
control offiee on the line of East Coast Railway.
06.oZ.16.19.3. A||ahabad Division -Insertion of new cross over
between 8T & point No. 206A at Shikohabad Yard.
o6.o3.16.19.3. Gwa|ior-Etawah : Provision of additional loop at
two line stations Sanichara, Gohad & Soni.
o6.o2,1608.. A||ahabad : Stabllng line in connection with 3rd
line between Allahabad-Subedar8anj station.
25 0€.02,16,09.3, Chheoki: Extension of FOB to connect link line pF
& new up P/Form.
26 06.02.16.10.3. Bheerpur: Extension of CSR of up loop line by 31m
to increase CSR from 684m to 715m.
27 06.02.16,10.3 Ahraura Road: provision of sand hump (UP & DN).51001
28 06.Ou.16.10.3. Banda: Additional room at Banda running room.52 001
29 06.02`1613 3 A||ahabad Divtsion : Provis.Ion of shunting neck of51 °°[ loo in at subedarganj east end south side.
3o 06.0116.17 6. New Junction panel cabin-Provision of 700M long5°col shunting neck with its electrification for
placement and removal of rakes on and from FCIsiding Agra Cantt.
ce o2.1619.3. A||ahabad D.ivislon -Provision of lntermed'Late51 cos Block signalling between Manikpur-Panhai,
Panhai-Dabhaura and Dabhaura-Katayadandi in
Allahabad-Manikpilr section.
DF(3) 49.95 6,00 4,SO 39,45
DF(3) 95,5S 78,53 3 16,99
DF(3) 98,00 25 97,75
list of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works AIlo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work
2019-20TWFIC FACILITIES
o€,o2.1619 3. A||ahabad Division :-Two small spurs at Kanpur
Anwarganj station may be extended and PF be made
on second line.o6.co.16.20.3. works costing below DRM'S PowercO.999
a -New Works
34 06.02.16.20.3 Prayagrai Division -Improvement of loadmg and
unloading area of goods shed at Panki Dham.
35 g£`[[62° 3 :::#::Laja:i:is;::tin::a°:'fs::|o°afdfn°g°&SuS;::::,ng
- of misc. materials.
o6.01.16.20.3 Extension of Platform No. 2 and provision of high50.col mast iight& merchantroom fac"ltiesforloading/
unloading at RAMGARH station.
o6.co.16.203 works costing below DRM's Power00.999
COMPUTERISATION
A - Wo.ks in Progress
060317.13.5 ihansi Division-Provision of 40 nos. of 16 port
Terminal Servers for JTBS locations.
06.Oa.17 06.2` North Central Railway -Unification of Passenger
reservation system & unreserved ticketing system
network and creation of zonal network hubs
4o 06,0317163. jHS Divn. Replacement of 72 mos. of PRS Dumb13 Col terminals with Key Boards,144 nos. of PRS
printers, 26 nos. of PRS charting printers and 03nos. of PRS line printers
List of Approved Works Costmg less Than F(upees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of riipees)
Item ProjectlD
NO.
Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20COMPU1.ERISA110N
o603.17163 |Hs Divn -Replacement Of 152 nos. of UTS Thin
Clients and 61 nos. of UTS Ticket printers
06.01.1716.3. AGC Divn -Repl. of 28 mos. of UTS Dumb Terminal
with key boards, 71 mos. UTS Thin Clients with
keyboards, 94 mos. of Urs Ticket printers, 29 nos.
of PRS ticket printers and 03 nos. of PRS Line
printers.
06.0217.16 3 A||ahabad Divn.-Repl. of 20 nos. of PRS ticket
Printer, 06 mos. of PRS l]ne printer,157 nos. of
UTS ticket printer and 41 nos. of Terminal Server
of Phase-1 & Phase-2.
06.0217.16.3 subedarganj: Replacement of Railnet equipments at
HQ office Subedarganj, Allahabad.
45 06.02.17.17.6, A||ahabad; Provison of UTS/PRs equipments for Ardh
Kumbh mela (2018-19).
46 060Z.17183 A||ahabad Division: Procurement of pfts/UTS
Equipment's at various stations of Allahabad
division.
47 06.031718 3 |hansi division : Replacement of uTs ticket
printer (95 stations) , UTS report printer (95stations) and PRS chart printers (5 stations) at
stations
48 06.02.1719.3, A||ahabad: Procurement of TMs equipment i e
Monitorwith CPU, Key board, UPS ,RR Printer.
49 06.02.17.19.3. Provision of LAN wiring to various activity
centres, sub-dlvisional offices, field offices and
SSE depots of En8ineerin8, Electrical and
Mechanical department at Aligarh area.
5o 060017`203. Works costing below DRM's Power00.999
TOTAL-WORKS IN l>ROGRESS
a -New Works
51 06,0217.20 3 Replacement of server for lT cell/NCR/HQ. in51.°°. order to ensure smooth functionmg of various web
applications like "Acl(, E-Nirikshan, Rest House
Booking and others in House web Apps.
52 06.0217.20.3. Replacement of lT assets for implementation of51.002 e.office working over paryagraj division.
53 06.cO 17 20`3. works costing below DRM's Power00.999
TOTAL-N EW WORKS
list of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO,
Pa rt`icu la rs of Works AIlo-cation Anticipated Outlay
Cost expectedto end of2019-20
Outlay Balanceto
2020-21 complete
work
TOTALtcmputerlsatlon
ROAD SAFETY -LEVEL CROSSINGS
A -Works in Progress
o6.03,29 ls.2. jhansi division :-Provision of sliding boom
arrangement at interlocked level crossing gates
0€.03-29.07 2 North Central Railway: Electrification of 131 nos.
L-xing gates. (JHS-78, AGC-53)
56 06.02.29.09.2. Tundla-Ghaziabad: Construction of new Gate Lodges
( 21 Nos.)
s7 06.01.29.16,3. Agra Division.-Provision of Automatic Banner flag
on manned non-interlocked Level crossings.
58 06.01,2917.3 Agra Division -Provision of diversion road from
LC no. 7 to 6 in ldgah-Bayana section
59 o6.ol.29183. TD|-BXN-: Interlocking of 2 Nos non Interlocked
LC gate 3AB & 7 with Electric lifting Barrier in
section
6o 060l.29143 |a|itpur sub Division:Provision of fibre
reinforced precast RCC blocks at Lxings.
61 06.03.29.13.3. jHS_CNB,MRA,KURJ & MKP-NYN:-Provision of sliding
boom arrangements at inter locked trafic level
crossing gates at panel stations in '8' & .D'
routes of jhansi division.
62 06.03.29.06.3. jHS DMsion: Electrification of 15 Nos Level
crossing gate Nos. 309, 310, 320, 3S2, 353, 357,
418, 463, 472, 477, 478, 479, 481, 487, 492 in
Bina-J HS-AGC section
63 06.01.Z9.cO`3. Agra div|sion: Electrical of 25 level crossing
gates by electrical connectlon from SEB .
64 060129.09`3. ld8ah, Bayana & Id8ah-Bandikuj: Replacement of
gate lodges at 20 Nos L-Xing.
65 06 02.29.10.3 Kanpur-Tundla: Improvement to level crossing road51.007 surfece and provision of retro reflective board
under ADEN/ Line/Kanpur.
66 06.02.29.10.3 Tund|a_Aligarh: Improvement to level crosslng road51.010 surface, fencing & safety boards (14 Nos.).
o6 02 29.10.3. A||ahabad Division ; Manufacturing & supplying of51.°°3 Retroref|ective level crossing road sign boa rds &
track indicator Boards for level crossings.
o6.o3.Z9.12 3 jHS D|VN : -Provision of sliding boom arrangementS2.009 a, interlocked Lc gates.
DRF i,50.00
DF(1) 2,00
List Of Approved Works Cost`ing Less Than Rupees Two Crore F.iftv Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work
2019-20
ROAD SAFETY -lEVEL CROSSINGS
o601.29.17.3. Agra Divis|on -Provision of diversion road from
LC no. 45 to 44 in ldgah-Bayana section
7o 0602`2918.6. Provision of secured communicatLon with recordln8
facility between ASM and lavel crossing gate in
Chunar-Chopan, Shikohabad-Farrukhabad, Aligarh-
Herduagunj and Hathrus-Hathrus fort section.
o6.01.Z9.18.6. DHo -Pa|wa| : Provision of secured commllnication
equipment with voice logging between level-xing
gates.
o6,ol Z9.18 6 Agra Fort - Band.ikui : Prov.Lsion of Electric
l.ifting Barrier in lieu of mechanical /lifting
barrier in AF-Bt(I section.(10,11,15, 25, 26,
31, 49, SO, 57, 68, 69, 82, 87, & 96 of (AF-BKl)
o6.ol.2918 6 provision of Electric Llfting Barrier in lieu of
mechanii:al /lifting barrier in Mathura Jn -
Alwar section and leftover gate of Agra Division.
49, 50, 59, 60 & 70 (MTJ-AWR) and 9, 29, 40
(lDH-BXN).
74 06 01.29.18.6. DHO-PWL section : Replacement of overaged
electrical lifting barriers in section.
469,473,489,493(DHO-AGC),
508,510,511,512,514,515,517,518,520,521, 522, S23
524 & 526 (AGC-MTJ)
06 012918.6. AGc-DHO : Interlocking of non Interlocked LC gate
3 Nos(466,467 & 470) with Electric lifting Barrier
in section
06.01.29,18.6. AGC _ OHO . Interlocking of remaining non
Interlocked lc gate 2 Nos(475 & 482) with Electric
Lifting Barrier in section
0601.2918-6. AF_B|(I-: Interlocking of non Interlocked lc gate
2 Nos(37 & 39) with Electric Lifting Barrier in
sect`lon
o6.ol.29,18 6 BXN_ JAB-: Interlocking of non Interlocked LC50°°2 gate 2 Nos(5 & 39) with Electric Lifting Barrier
in section
79 060129.18.6, MTj-AWR-: Interlock.in8 of 2 Nos(98 & 108) non5°'°°8 Interlocked Lc gate with Electric Lifting Barrier
in section
8o 0602.29.18.6 Naini_M@nikpur; Interlocking of level crossingS1.°Ou gates No. 433 between Link Jn & lradatganj
stations.
81 06,02 29.18.6. Interlocking of level crossing gates No.19 at51 °°Z Lusa station in chunar-Chopan section of
AIIahabad division.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Pa rticu la rs of works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work
2019-20
ROAD SAFETY - L£\/ E L CROSSI N GS
o6.o3 29 ae.6 |hansi Division : Provision of Interlocking of 0352.°°` ic Gates of GWL-DHO section with TVU >50000 of
Jhansi division.
83 06.03.29.18.6. |hansi Division : Provision of Interlocking of 02
LC Gates of JHS-Gwl section with TVU >50000 of
Jhansi division.
84 06.02.29.18.6. Provision of secured communication with recording
facility between ASM and lavel crossing gate in
Kanpur-Naini-Manikpur section.
85 06,Ol`29.18 6 Provision of secured commun`ication equipment with
voice logging between level-xing gates at
remaining 47nos. LC gates over Agra division
86 06 02 29.19 6 Naini-Manikpur: Interlocking of level crossing
gates No. 431 between Link Jn & Iradat8anjstation.
87 06,03.Z9.19.6, |hansi Division : Provision of Interlocking of o1
lc Gates of JHS-MKP section with lvu >50000 of
Jhansi division.
88 06.00.Z9.203. Works costing below DRM's Power00 999
TOTAL-WORus lN PROGRESS
a -New Works
89 as00 29.20`3. works costing below DRM's Power00 999
TOTAL-NEWWORKS
TOTAIAoad Safety - level
ciosslngs
ROAD SAFETY , ROB/RUB
A -Works ln Progress
06.01.30.12.3 Provision of subway in lieu of level Crossing]`'°°` No.368 in between BSA-PRK at Kin.366/10-11 in
MTJ-AH Section.
91 06`02.3014.3. Mugha lsarai-AIIahabad : Provision of grade`]`°°7 seperaterat Levelcrossing no.113 at kin.
677/11-13 in between Bloock Hut-K-Jeonathpur
stations.
92 06.O)`30.14.a, Bhind -Etawah section:-Elimination of Level3°`°]3 crossings no. 82 between phoop and udl stations by
provision of Sub way.
060330.14,3 Bh.ind -Etawah section:, Eliminat.lan of Level30.°22 crossings no. 88 between phoop and udi stations by
provision of Sub way.
RRSK cO,00 60,00
RRSI( 60,00
RRSK .. 13,60,00
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures ln thousands of rupees)
Item ProjectlD
No.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
ROAD SAFETY -ROB/RUB
o6a3.30.143. Bhind -Etawah section:-Elimination of Level
Crossings no. 91 between Phoop and Udi statlons by
provlsion of Sub way.
06.01.30.15.3 Agra Division: Construction of subway in lieu of
level crossings no. 29 & 30 in lDH-BKl section
underjurisdictionofADEN/Line/Agra
06.a.,30.rs.3 jhansi_I(anpur ;-Provision of subways in lleu of
Level no.121 at kin 1136/5-6 between
Mustra-Garamah statlons.
o6.o3`30.1S,3 ihansi-Kanpur ;-Provision of subways in lleu of
` Level no.122 at kin 1137/9-10 between
Mustra-Gara mah stations.
06 cO .o,ls.3. jhansi-Kanpur ;-Provision of subways in lieu of
Level no.170 at kin 1218/5-6 between Ail-Bhua
stations.
99 06 03 30.1S 3 |hansi-Kanpur ;-Provision of subways in lieu of
Level no.172 at kin 1223/2-3 between Ait-Bhua
stations.
loo 06.03.30.15.3. ihansi_Kanpur ;-Provision of subways in lieu of
Level no.175 at kin 1228/1-2 between Ait-Bhua
stations.
|o| 06.03.30.153. |hansi-Kanpur ;-Provision of subways in lieu of
Level no.199 at kin 1281/4-5 between Chaunrah,
Pukhrayan stations.
io2 06.03.30.15.3 jhansi-Kanpur ;-Provision of subways in lieu of
level no. 201 at kin 1285/1-2 between Chaunrah-
Pukh rayan stations.
io3 06.03.30,15,3, jhansi-I(anpur ;-Provision of subways in lieu of
level no. 206 at kin 1290/7-8 between
Pu khrayan-Malasa stations.
io4 06.03.30,15 3. jhans.i-Kanpur ;-Provision of subways ln lieu of52 °13 Level no. 2o7 at kin 1292/2-3between
Pukh raya n-Ma lasa stations.
io5 0603 30.1S 3 jhansi.Kanpur ;-Provision of subways in lleu of52.0" Level no. 2og at kin 1295/O-1 between
Pukh rayan-Ma la5a stations.
|o6 06.03.30as3 |hansi-Kanpur;-Provision of subways in lieu of52.°°' Level no. 210 at kin 1297/2-3 between
Pukh rayan-Ma lasa stations.
::£73°]"#:::;V,i:I::L'::::::::rdo!:s||-::::t;;Ct!°n°f
List of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
Nol,
Particu la rs of works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
ROAD SAFETY -ROB/RUB
log 0€,03 30.163 |hans.i-Manikpur section:-Provision of
additional opening of Sub way in lieu of Level
crossings No.438 at kin 1280/9-10
log 06.OZ.30,17J. Chunar-Ctopan: Provision of covershed and drainage51.°°Z on LHS No. 2o & 22 between Lusa and Khairai.
Ilo 060130.18.3. |dgah-Bandikui-Construction of subway in lieu of
level crossings LC no. 12
111 06.03.30.19.3. Khairar-Bhimsen section:-Provision of limited
height Sub way in lieu of Level crossings No.S-74
at kin 1409/8-9.
112 06.0130.19.3, Agra Division:-Construction of LHs in lieu of lc
113 es.0130.12.3, Provisionofsubwayin lieu oflevel crossing
No.375 in between PRK-AH at Kin.377/9-10 in MTJ-AH
Section.
114 060130`153. Agra Division: Construction of subway in lieu of
level crossings no. 34 in lDH-BKl section under
jurjsdiction of ADE N/Line/Agra
i 15 06.01.3016.3. Agra Division-Idgah-Ba ndikui-Construction of
subway in lieu of level crossing no. 48
116 060330.163 BNDA-BZMsection-Provision of drainage
arrangement ,sump well, water retaining cover at
4 nos. Subways (at LC no. S-7, S-19, S-20, S-22)
117 060l.30183 ldgah-Bandikui-Construction of subway in lieu of
level crossLngs lc rio.14
118 as0330.193 Proposedconstruction ofR0B In lieu oflevel
crossing No. 418 at Kin 1221/40-42 on
Jhansi-Gwa l`ior section
119 06.03.30.19.i. Jhansi-Manikpur section:-Provision of limited
height Sub way in lieu of Level crossings No.373
at kin 1144/9-10
i2o 06 01.30.12`3. Provision of subway in lieu of level crossing
No.17 at kin 0022/8-9 between RAl-AH in lDH-BKI
section.
121 06.a.,3014.i. jhansi-Gwalior section -provision of subway in52'°7Z lieu of I.xing no. 393 at kin 1179/8-10 between
Dabia &Kotra stations.
122 0601.]0.15.i. Provision of subway in lieu of level crossing50.°°1 no.44 & 47 in between FTS + KIB at KM.0050/7-8 &
0052/10-11 in lDH-BXN section.
S Fund 20,78,42
EBB(D.p) 36,82,96
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 10
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20ROAD SAFETY -ROB/RUB
123 06.03.30.16... jhansi-Manikpur section:-Provis`ion of limited
height Sub way in lieu of level crossings No.449
at kin 1302/1-2
124 06.01.30.16.3, Agra Division-ldgah-Ba ndiku i-Construction of
subway in lieu of level cross`ing no. 52
125 0603.30.16.3. BNDA-MKP section-Provision of drainage
arrangement ,siimp well, water retaining cover at
4 mos. Subways( at LC no. 452,493, 494,500 )
126 06,OIJO.18.3. ldgah-aandikui-Construction of subway ill lieu of
level crossings LC no. 22
127 060130.12 3 Provision of subway in lieu of level crossing
No.75 at kin 0108/0-1 between KL-GOS in lDH-BKI
section.
128 06,03.30-14,3. Manikpur-Allahabad section-Proposed construction
of limited height subway to eliminate 'D' class
cattle crossing no. 420 at kin 1328/4-5.
129 06,01`30.15.3 Provision of subway in lieu of level crossing
no.48 & 49 in between FTS -KLB at KM.0053/16-
54/1 & 0054/13-14 in lDH-BXN section.
|3o cO0130.163 Agra Division-ldgah-Bandikui-Construction of
subway in lieu of level crossing no. 55
131 06.03 3016.3. |HS-BNDA section-Provision of drainage
arrangement ,sump well, water retainlng cover at
3 nos. Subways( at LC no. 429,441,447 )
132 0601..a,1e`3 |dgah-Bandikui-Construction of subway in lieu of
level crossings LC no. 23
133 06.03,30.19.3 Proposed construction of ROB in lieu of level
crossing No. 351 at Kin 1090/20-22 on Bina-Jhansi
section
134 0603 3019.I. |hansi-Khairar section:-Provision of limited
Height Sub way in lieu of Level crossings No.439A
at kin 1283/2-3 between Baripura-Kabrai stations.
135 06.Ol.30.11,3. Yamuna Bridge-Chalesar set. :Construction of50.Ore Limited height subway at Kin. 87/29-30 in between
JAB-CllLR section towards CHLR end under
J urisdiction Of ADE N/HQ/Agra.
136 0601..012J). Provis`ion of subway ln lieu of level crossing```°°5 No.76 at kin o|og/9-110/0 between KL-cos in lDH-BKI
section.
137 06,01.30.15. Provision ofsubwayin lieuoflevel crossing50.°°S no.5o & 51 in between FTS -KLB at KM.0055/11-12
& 0057/07-08 in lDH-BXN section.
S Fund 41,29,58
EBR(Oap)
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 11
(Figiires in thousands of rupees)
Item ProjectlD
No.
Pa rt'icu la rs of works AIIo-cation Antlcipated Outlay
Cost expectedto end of2019-20
Outlay Balanceto
2020-21 complete
work
ROAD sAFETy -ROB/Rue
138 06,03.Sole.3. jhansi-Manikpur section:-Provision of limited52.°°2 height sub way in lieu of level crossings NO.402
at kin 1223/2-3
139 06.013016 3. Agra Division-ldgah-Bandikui-Construction of
subway in lieu of level crossing no. 62
i4o 060..016.3, jHS-BNDA section-Provision of drainage
arrangement ,sump well, water retaining cover at3 nos. Subways ( at LC no. 370, 412, 438)
141 06,013018.3. |dgah-Bandikui-Construction of subway in lieu of
level crossings LC no. 32
142 06.03.30.19 3` Proposed construction of ROB in lieu of Level
crossing No. 407 at Kin 1203/6-8 on Jhansi-Gwalior
section
143 06.Ou,sO.193. jhans.I-Khairar section:-Provision of limited
Height Sub way in lieu of Level crossings No.445
at kin 1294/6-7 between Kabrai-Mataundh stations.
144 06`Ol..0113 AGC-PWL section: Provision of subway in lieu of
level crossing No.508 at Kin.1359/13-15 between
RNKA-KXM.
145 06.Ol.30,12 3 Provision of subway in lieu of level crossing No.
09 at kin 1409/09-10 between MORA-GDO in MTJ-Awfl
section.
146 06.03.30.16.3, jhansi-Manikpur section:-Provision of limited
height Sub way in lieu of Level crossings No.431
at kin 1269/1-2
147 06.01.30.163. Agra Division-ldgah-Bandiku.I-Construction of
subway in lieu of level crossing no. 67
148 0603.30`16.3. jhansi,Banda section:-Provision of retaining
walls, approaches, cover shed and sump well at
subway in lieu of Level crossings No.429 at kin
1266/0-1
149 06.Ol.30.17,3 ldgah-Bayana-Construction of subway in lieu of
level crossing No.3
i5o 06`Ol.30.18,3` ldgah-Bandikui-Construction of subway in lieu of
level crossings LC no. 33
151 060330.19.3, proposedconstructionofROBin lieu ofLevel'5.°2` crossing No. 4o7 B at Kin 1205/6`8 on Jhansi
-Gwalior section
152 06,03.3019,3. Khairar-Bhimsen section:-Provision of limited52.010 Height sub way in lieu of Level crossings No.S-6
at kin 1319/4-5 between lchauli-Akona stations.
S Ful`d 41,29,58
EBR(D®p)
S Fund 41,29,58
EBR(Dep)
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
Item ProjectlD
NO.
Particulars of Works
PAGE NO : 12
(Figures in thousands of rupees)
Allo-cation Ant.icipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
ROAD SAFETY -ROB/RUB
153 06`0130.11.3. AGC-PWLsection: Provision of subwavin lieu of30.°°4 level crossing No.5|0 at Kin.1361/13-15 between
RNRA-KXM.
154 06J)13012J. Provision of subway in lieu of level crossing5°.°°7 No.15 at Kin 1416/14-15 between BTSR-GDo in MTJ-AWR
section.
155 06.03.90.16.a. BNDA-BZM &JHS-Ml(Psection-Provision of52.°19 drainage arrangement ,sump well, water retaining
cover at 3 nos. Subways( at LC S-16 ,436 and
479)
156 06.01,3017.3` Mathura-Alwar: Provision of subway in lieu of lc50.°°7 no.55 (bet. Bedam-Brij Nagar station)
157 060130.18.3. |dgah.Bandiku`i-Construction of subway in lieu of
level cross.ings LC no. 25
158 06.03.30`19-3 Proposedconstruct'ion of ROBin lieu of Level'S.033 crossing No. 449 at Kin 1262/2-4 on Gwalior-
Dholpur section
159 06.03.30.19.3. Khairar-Bhimsen section:-Provision of llml`ed52 a" Height sub way in rieu of Level crossings NO.S-10
at kin 1325/2-3 between lchauli-Akona stations.
i6o 060l.30`11.3. AGC_PWL sectionprovision of subway in lieu of3°.cos level crossing No.512 at Kin.1364/26-65/2 between
RNRA-KXM.
161 06.01`3012.3. Provision of subway in lieu of level crossing
No.26 at Kin 1426/5-6 between GOO-DEEG iri MTJ-AWR
section.
162 06`03,3016.3..hansi-Manikpursection:, Provision of limited
height Sub way in lieu of Level crossings No.405
at kin 1229/0-1
163 06.01,3016.i. Agra Division -Provision of subway in I.leu ofLC
no. 364 in MTJ-AH section.
164 06.Ol.30.17.3, Mathura-Alwar : Provision of subway in lieu of LCsO a" no.io ( in bet. Mora-Goverdhan stations)
165 06.Ol`30.183 |dgah-Bandiku.i-Construction of subway in lieu ofSOcO6 level cross'|ngs Lc no. 26
166 a603.30.19.3. Proposed construction of ROB in lieu of Level]5`°Z° crossing No. 451 at Kin 1265/12-14 on Gwalior-
Dholpur section
167 06.03.30.19 3 Khairar-Bhimsen section:-Provision of limited52 °`2 Height sub way in lieu of Level crossings No.S-12
at kin 1327/3-4 between Akona-Ragaul-stations.
S.f uno 41,29,58 2o,cO 41,09,S8
EBR(D€p)
i Fund 41,2958
EBR(I)ep)
List of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs EachNORTH CENTRAL RAILWAY
PAGE NO : 13
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cat`ion Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work
2019-20
ROAD SAFETY - ROB/RUB
168 ce.Ol.30,113 AGC-PWLsectionprovision of subwayin rieu of3°.°°6 level crossing No.514 at Kin.1368/5-7 between
KXM-FAR..
169 06.01.30,12.. Provis.Ion of subway in lieu of level crossingsO.°°9 No.6iB at Kin 1464/13-14 between BINR-GVH ln
MTJ-AWR section.
i7o 06.03.30,143. Bhimsen-lngohta;-Provision of Limited height52.°Z5 subways in lieu of level xings no. S-30 at kin
1353/1-2 between I ngohta-Bharwasu merpur stations.
171 06.03 30.14.3. Bhimsen-I ngohta;-Provision of limited height52.026 subways in lieu of Level xings no. S-33 at kin
1357/2-3 bet`^/een -Bharwasumerpur-Jamu nasouth ban k
stations.
172 06.0330,14.3. Bhimsen-ln8ohta;-Provis.lan of Limited height
subways in lieu of Level Xings no. S-34 at kin
1358/4-5 between -Bhan^/asumerpur-Jamu nasouth ba nk
stations.
173 06.a3.30.14`3. Bhimsen-Ingohta;-Provision of Limited height
subways in lieu of Level Xings no. S-38at kin
1362/1-2 between -Bharwasumerpur-Jamunasouth bank
stations. with cover.
174 06.03 30143. Bhimsen-Ingohta;-Provision of Limited height
subways in lieu Of Level Xings no. S-63at kin
1396/4-5 between -Ghatampur patara stations. withCover.
175 06.Ou`)0.14,3 Bhimsen-lngohta;-Provision of LimLted height
subways in lieu of Level X`in8s no. S-68Aat kin
1402/6-7 between -Ghatampur patara stations. with
Cover.
176 06`es30.14.3. Ait.Konch;.Provision of urn.ited height subways in11.07° lieu of Level xings with cover (no.169B)at kin
1219/3-4,between AIT KONCH Stations
177 06.0330.14.3 Ait-I(onch;-Provision of I.Imited height subways in11 °7[ lieu of Level X.in8s with cover (no.169C)at kin
1219/3-4,between AIT KONCH Stations
178 06.0330.14.3. Ait-Konch;-Provision of Limited height subways in11.°73 I,eu of level xin8s witn cover (no.169D)at kin
1224/1-2,between AIT KONCH Stations
179 06.03.30.14.3. Ait-Konch;-Provision of Limited height subways in`'J'74 lieu of Level xings with cover (no.169E)at kin
1225/8-9,between AIT KONCH Stations
180 o6ol.3o.183 Agra Divis`ion-8ayana-ldgah see., Construction ofS°`°°3 subways in lieu of level crossing no. 32
List of Approved Works Costing Less than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAy
(Figures in thousands of rupees)
Item ProjectlD
No.
Part`icu la rs of Works Allo-cation Anticipated Oiitlay outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
ROAI) SAFrllr -ROB/RUB
181 06.03.30,19,., Khairar-Bhimsen section:-Provis.lan of limited
Height Sub way in lieu of Level crossings No.S-2
at kin 1311/7-8 between Khairar-lchauli stations.
182 06,03.30.19 3 |hansLGwal`ior section : Provision of Normal
Height Subways (RUBs) in lieu of 9 Nos. L -xings
(No.371, 377,382,385,388,,389,391, 392 & 394 )under jiirisdiction of ADEN L.ine JHS.
183 06 0130.11.3. AGC-PWL section:Provision of subway in lieu of3°cO3 level crossing No.515 at Kin.1370/19-21 between
KXM-FAR.
184 06 0130.12`3. Provision of subway in lieu of level crossing
No.63 at Kin 1466/16-1467/1 between BINR-GVH in
MTJ-AWR section.
185 0603 3014 3 Bhind -Etawah section:-Eliminat.lan of level
Crossings no. 69 between Bhind and Phoop stations
by pi.ovision of Sub way.
186 06.03.30.14`3` jhansi.Manikpur section:-:-Provision of limited
height Sub way in lieu of Level crossings No.374
at kin 1147/1-2
187 06.03.30.14.3. jhansi_Manikpur section:-:-Provision of limited
height Sub way in lieu of Level crossings No.425A
at kin 1260/4-5
188 as.0330.14.3. |hans|-Man`ikpur section:-:-Provision of limited
height Sub way in lieu of Level crossings No.425
at kin 1259/9-10
189 06.03`30.14.3. jhansi_Manikpur section:-:-Provision of limited
height Sub way in lieu of Level crossings No.424
at kin 1257/6-7
|9o 0603JO.14.3. jhansi-Manikpur section:-;-Provision of limited
height Sub way in lieu of Level crossings No.420
at kin 1251/4-5
191 06.0330.14.3. |hansi.Manikpur section:-:-Provision of limited
height Sub way in lieu of level crossings No. 416
at kin 1245/9-10
192 06.03.30.14.3. |hansi-Manikpur section:-:-Provision of limited'`.042 height sub way in lieu of Level crossings No. 415
at kin 1244/9-10
ig3 06.0330,143..hans`i-Manikpur section:-:-Provision of rimited]].Ou. he,ght sub way in lieu of Level crossin8s No.413
at kin 1242/9-10
0603 30.14.3. jhansi.Manikpur Section:-:-Provision of llmited11.°" height sub way in lieu of Level crossings No.411
at kin 1239/8-9
List of Approved Works Costing Less Than Riipees Two Crore Fifty lakhs EachNORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
ROAD SAFETY -ROB/RUB
195 06,03 3014.3. |hansi-Manikpur section:-:-Provision of limited]` 052 height sub way in lieu of Level crossings No.437at
kin 1279/7-8
ig6 06ce30.14.3` jhansi-Manikpur section:-:-Provision of limited1]`°53 height sub way in lieu of Level crossln8S NO.434
at kin 1275/3-4
ig7 06.03.30,14.3. |hansi-Manikpur section:-:-Provision of limited
height Sub way in lieu of Level crossings No.433at
kin 1274/4-5
198 06.03`30.14.). I(hairar-Bharwa sumerpur section:-:-Provision of11.055 limited height sub way in rieu of Level crossln8S
No.S-26 at kin 1345/9-0
igg as0330,14.3. |hansi-Manikpur section:-:-Provision of limited
height Sub way in lieu of Level crossings No.478
at kin 1355/7-8
2oo 06.0130.18.3. Agra Division-Bayana-ldgah sec.-Construction of
subways in lieu of level crossing no. 36
2o| 06.03.30.19,a. Khairar-Bhimsen section:-Provision of limited
Height Sub way in lieu of Level crossings No.S-23
at kin 1342/6-7 between Ragaul-lngota stations.
2o2 06 03.30,19.3. |hansi-Gwalior section : Provision of Normal
Height Subways (RUBs) in lieu of 9 Nos. L -xings
(No.399, 400, 401A, 402, 403, 404, 407A, 408 & 412
) under jurisdiction of ADEN Line JHS.
2o3 ce.03.30.11,3` jhansi-Gwalior sectlon :-Provision of lim.Lted
height sub way in lieu of l-xing No. 411 at Kin.
1206/31-29 between Antri-Sandalpur stations.
2o4 06.Ol.30.12... Provision of subway in lieu of level crossing5°.a" No.65 at Kin 1468/3-4 between BINR`GVH in MTJ-AWR
section.
2o5 06.03,.014.3 Agra-Etawah section provision of subway in lieu of
level crossing no. 60 at CH:104473 in new
Agra-Etawah B.G. Rail Line.
2o6 06,03`30.14 3. A8ra-Etawah section provision of subway in lieu of3°`°3` Tress passing at cH:49650 in new Agra-Etawah B.G.
Rail L'ne.
2o7 0603.30.14.3, Agra-Etawah section provision of subway in lieu of3°.°35 Tress passing at cH:24250 in new Agra-Etawah B.G.
Rail Line.
208 06.03`30`14.3. A8ra-Etawah section:-Provision of subways in lieu'°.036 of Tress passing at cH:40600 & 55200 in new
Agra-Etawah B.G. Eta.il Line.
List of Approved Works Cost.ing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
noAD sAi:ETy -roB/RUB
::.%5'°"'3':rger:sitaas:janhgsaet%::n3:;:V:::0:e°;SAugbr:.aEyt;nw';ehu8°:.
Rail Line.
o6.03 30.143, Agra.Etawah section:-Provision of subway in lieu
of level cross.ing no. 31 at CH:52819 in new
Agra-Efawah B.G. Rail Llne.
06.03.30`14 i Agra-Etawah sectlon:-Provision of subway in lieu
of level cross.ing no. 51 at CH:88934 in new
Agra-Etawah B.G. Rail Line.
2i2 060330.14J. Agra.Etawah sect.io"-Provision of subway ln lieu
Of level crossing no. 44 at CH:73446 in new
Agra-Etawah B.G. Rail Line.
213 06.Oa.]014.9 Agra-Etawah section:-Provision of subway in lieu
Of level crossing no. 30 at CH:51685 in new
Agra-Etawah B.G. Rail Line.
214 06.03.30.14,3, Agra.Etawah section:-Provision of sl/bway in lieu
of level crossing no. 34 & 54 at CH:60084 & 95137
in new A8ra-Etawah B.G. Rail une.
215 06.03.30.14.3. Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 61 at CH:105544 in new
Agra-Etawah B.G. Rail Line.
216 06.03.30.I.,3. Agra-Etawah section:-Provision of Subway in lieu
of level crossing no. 33 at CH:57008 in new
Agra-Etawah B.G. Rail Line.
217 06.03.30.14.3. Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 29 at CH:50399 in new
Agra-Etawah 8.G. Rail Line.
218 06,03.30.14,3. Agra-Etawah section:-Provision of subway ill lieu
of level crossing no. 42 at CH:71638 in new
Agra-Etawah B.G. Rail Line.
2ig 06033014`3 Agra-Etawah section:-Provlsion ofsubwayin lieu
of level crossing no. 43 at CH:72000 in new
Agra-Etawah B.G. Rail Line.
22o 06.03.30.14.3. A8ra.Etawah section:-Provision of subway in lieu
of level crossing no. 32 at CH:55688 in new
Agra-Etawah B.G. Rail Line.
221 06`03.30.14,.. Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 41 at CH:70804 in new
Agra-Etawah B.G. Rail Line.
o603 30.14.3. Agra,Etawah section:-Provision of subway ln lieu
of level crossing no. 40 at CH :69957 in new
Agra-Etawah B.G. Rail line.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Pa rticu lars of works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
ROAD SAFETY -ROB/RUB
223 06-03 30.i..a, Agra-Etawah sect.iom-Provis`ion of subway `in lieu30.°cO of level cross.ing no. 56 at cH:98440 in new
Agra-Etawah B.G. Rail Line.
224 0603.30-14.3 Agra-Etawah section:-Provision ofsubwayin lieu30.cO7 of level crossing no. 2 & 21 at cH:4840 & 31196 in
new Agra-Etawah B.G. Rail Line.
225 0€,0330.14.3 Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 6 at CH:11150 in new
Agra-Etawah B.G. Rail Line.
226 D6.03.30.14,3, Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 3 at CH:7214 in new
A8ra-Etawah B.G. Rail Line.
227 ce03JO`14.3. A8ra-Etawah section:-Prov.ision of subway in lieu
of level crosslng no. 55A at CH:96331 in new
Agra-Etawah B.G. Rail Line.
228 06.03JO.14.3. Agra-Etawah section:-Prov.Lsion of subway in lieu
of level cross`ing no. 24 at CH:39044 in new
A8ra-Etawah B.G. Rail Line.
229 06.0330.14.3` Agra.Etawah section:-Provision of subway in lieu
of level crossing no. 19 at CH..28140 in new
Agra-Etawah a.G. Rail Line.
23o 060330.14 3 Agra-Etawah section:-Provision of subway in lieu
of level cross'ing no.14 at CH:21150 in new
Agra-Etawah B.G. Rail Line.
231 06.03`30.14,3, Agra.Etawah section:-Provision of subway in lieu
of level crossing no.11 at CH:15447 in new
Agra-Etawah B.G. Rail Line.
232 06.03JO.14.3. Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 27A at CH:46770 in new
Agra-Etawah B.G. Rail line.
233 06es 30.14`3. Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 28 at CH:48229 in new
Agra-Etawah B.G. Ra.il Line.
234 06.03`30.14,3 Agra-Etawah section:-Provision of subway in lieu
of level crossing no.13 & 25 at CH:18833 & 39976
in new Agra-Etawah B.G. Rail Line.
235 06.0330.14,3 Agra-Etawah section:-Provision of subway in lieu
of level crossing no. 22 & 27 at CH:36295 & 43985
in new Agra-Etawah B.G. Rail Line.
236 06.03.30.143, Agra-Etawah section:-Provision of subway in lieu
of level crossing no.15 at CH:22766 in new
Agra-Etawah B.G. Rail Line.
list of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs EachNORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particiila rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20
ROAD SAFETY -ROB/RUB
0€03.30.14.3 Agra-E`awah section:-Provision of siibway in lieu
of level crossing no. 5 at CH:10307 in new
Agra-Etawah B.G. Ra`il L.ine.
238 0€.Ol.30.17.3. Mathura-Alwar: Provision of subway in lieu of LC5°.0" no.92 (in bet. |adoli Ka Bas-Ramgarh stations)
239 06.01.30.18.3. Mathura-Alwa r-Construction of su bways in lieu of
Level crossing no 518
24o 0603.30.19.3. Khairar-Bhimsen sect.ion:-Provision of limited
He.Lght Sub way in lieu of Level crossings No.S-25
at kin 1345/4-5 between Ragaul-lngota stations.
241 06.0330.19.3. Sithou|i-Dholpur section : Provision of Normal
Height Subways (RUBs) in lieu of 08 Nos. L -xing
( No.415, 428,430,432,434,435,436 &437) under
jur'isdiction of ADEN GWL.
242 06.03.30.11.3, Bina-jhansi section:-Provision of limited height
sub way in lleu of L-xing No. 314 at Kin.
989/22-24 between Agasod-Karoda stations.
243 06.013012.. Provision of subway in lieu of level crossing
No.66 at Kin 1470/1-2 between BINR-GVH in MTJ-AWR
section.
244 060130.17 3 Agra Division-ldgah-Bayana &
ldgah-Bandikui-Provision of cover over shed on
subway approaches LC no.48,49,51&53 in lDH-BXN and
lc no.17&86 in IDH-BKI sec.( 6 mos )
245 06.Ol,3018.3. Mathura-Alwar-Construction of subways in lieu of
Level crossing no 49
246 06`03.30,193 Khairar-Bhimsen section:-Provision of limited
Height Sub way in lieu of Level crossings No.S-71
at kin 1405/9-10 between Patara-I(athara Road
stations.
247 06.03.30.19.3, Dholpur-Sithouli sectiori : Provision of Normal
Height Subways (RUBs) in lieu of 08 Nos. L -x`ln8
(No.439,440,445,447,448,448A, 450, & 455 ) under
jurisdiction of ADEN GWL.
248 06.ee.30.11.3, 8|N.jHS section: Provision of limited height sub']°°3 wayin|ieuof L-xingNo.321atKm.1014/8-10
between Dhau ra-Jakhla u n stations.
249 0€.0130.12.3. provision of subway in lieu of level crossing
No.68 at Kin 1473/3-4 between BINR-GVH ln MTJ-AWR
section.
25o 06.03.sO,14 3 Bhind -Etawah section:-Eliminatlon of Level3°`°6° crossings no. 72-A between Bhind and phoop
stations by provision of Sub way.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAI LWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
ROAD SAFETY -ROB/RUB
%%;ac"3#:aw:;V:Sj::;::Ohv::i::::;°6:::::e[r]Soh(e:::s„
Mathura-Alwar & LC no. 363&378 (2 Nos.) in
Mathura-Ach h nea r section
252 aso1`3018J. Mathura-Alwar-Construction of subways in lieu of
level crossing no 50
253 ee.03`30.19 3 Khairar-Bhimsen section:-Provision of limited
Height Sub way in lieu of level crossings
No.S-79at kin 1420/1-2 between Kathara Road-S.irhi
ltara Stations.
254 06.03 30 )13 Gwalior-Agra section:-Provision of limited height
sub way in lieu of L-xing No. 484 at Kin.
1327/20-22 between Jajau-Bhandai stations.
255 06.Ol.30,1Z.3. Provision of subway in lieu of level crossing
No.75 at Kin 1479/3-4 between GVH-JBS in MTJ-AWR
section.
256 06.03.30.14.3. Bhind -Etawah section:-Elimination of Level
Crossings no. 75 between Bhind and Plioop stations
by provision of Sub way.
257 06.01JO.17 3 Mathura-Alwar: Provision of cover over shed on
subway a pproaches LC no 13,19,21,29,33,34,39,41&68
I 9 NOs )
258 06.01,30.18,3, ld8ah-Bandikui-Construction of subway in lieu of
level crossing no. 18
259 06.03.30.19.3. Khairar-Bhimsen section-Provision of limited
Height Sub way in lieu of Level crossings No.S-78
at kin 1418/4-5 between Kathara Road-Sirhi ltara
Stations.
26o 06.03,3011.., Gwalior-Agra section:-Provision af limited height
sub way in lieu of L-xing No. 479 at Kin.
1322/20-22 between Jajau-8handai stations
261 06.01.30`lz.3. Provision of subway in lieu of level crossing
No.77 at Kin 1480/14-15 between GVH-JBS in MTJ-AWR
section.
262 06.Ol.]0.17.3. Mathura-Alwar -Provision of cover over shed on
subway approaches on LC no. 74,66,618,52,47,26( 6
nos)
263 ee.03.30.19.3. Khairar-Manikpur section;-Provisron of limited
Height Sub way in lteu of level crossings No.460
at kin 1324/9-10 between Banda-Dingwai stations.
264 06.01.30.17.3, Etmadpur-Kuberpur -Provision of shed to protect
list of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAI LWAY
PAGE NO : 20
(Figures in thousands of rupees)
Item ProjectlD
NO.
Pa rticulars of Woi.ks Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
ROAD SAFETY -ROB/RUB
06.03.30193. Khairar-Manikpur Section:- Provis.len of lim.lted52.011 Height sub way in lieu of Level crossings NO.487
at kin 1370/5-6 between Badausa-Bharatkup stat`ions.
266 06.03.3016.i I(ha.irar-Bhimsen section:-Provision of limitedS2'°°9 height sub way in lieu of unmanned Level crosslngs
No.S-4 at kin 1315/6-7
267 06.02.30173. Etah-Barhan:-Pi.ovision of cover shed on approaches51.col of RUB at Level crossing No.15 & 28 in
Etah-Ba rhan section.
268 06.01.30.18.3` Moth ura-Alwar section-Provision of cover shed on5°.022 subway approaches at level crossing
no.35,37,43,61C &63 (5Nos.)
269 06.03 30.19`3 Khairar-Man.ikpur section:-Provision of limited
Height Sub way in lieu of Level crossings No.459
at kin 1323/5-6 between Banda-D`ingwai stations.
27o 06.03.30.1l.3. |hansi-Kanpur:-Replacement of LC No. 229(M)52 °29 between PMN_BZM stns Kin 1324/5-6 by provision of
LHS.
271 06.OZ,3012.3. CAR-CPU: Provision of LHS with RCc box in lteu of
un manned Level Crossing no. 22 C in CAR-CPU
section under ADEN/CAR
272 06.03.30.16`3. Khairar-Bhimsen section:-Provision of limited
height Sub way in lieu of Unmanned Level crossings
No.S-9 at kin 1323/9-0
273 06J)3 3017J. jhansi-Kanpur: Provision of cover over approach
at Limited Height Subways constructed in lieu of
LC No.152, 160&171
274 06.0130183. Mathura-Alwar section-Provision of cover shed on
subway approaches at level crossing
no.65,75,77,78&79 (SNos)
275 06.03 30.19.3. GWAL|oR.BHIND section:-Prop cover over shed over52.0" approaches of newly constructed LHs in lleu of
LCNO.37 at kin No.1277/5-6,and LC No.38 at kin
1280/8-9
276 06.03.30.16.3. Khairar-Bhimsen section:-Provision of limitedS2'°`' height sub way in lieu of unmanned Level
crossings No.S-13 at kin 1329/4-5
277 06.0330.17.3 |hansi.t(anpur :-Provision of coveroverapproach52.°°9 at Limited Height subways constructed in lieu of
LC No. 219, 226
278 06.Ol.30.17 3. Mathura-Alwar: Provision of subway in lieu of LC5°°°5 no.42 ( in bet. Deeg-Bedam stations).
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
Item ProjectlD
NO.
Particulars of Works
ROAD SAFETY -ROB/RUB
279 a€ 01.30.18,3 Mathura-Achhnera section-Provision of cover shedsO.°14 on subway approaches at level crossing no.
365,368,375,376&377 (5 Nos)
28o 06.033019,a, GWA||oR-BHIND section:-Prov`ision of cover shedS2.018 over over approaches af newly constructed LHs in
lieu of LCNo.30 at kml263/5-6,LCNo..32 at kin
1265/4-5, lc No.35 at kml273/7-8,
281 06.02.30.12 3 Construct'ion of limited height subway in place of5l.cos unmanned L-Xing No.38-C in BRN-ETH section
282 06.03.30`16.3` I(hairar-Bhimsen section:-Provision of limited52.0" height sub way in lieu of unmanned Level crossings
No.S-14 at kin 1330/7-8
283 06.03.30.17.a. jhansi-Kanpur :-Provision of cover over approach52.003 at L.imited Height subways constructed in lleu of
LC No.187,188,
284 06013017 3. Mathura-Alwar: Provision of subway in lieu of LC
no 73 (in bet`^/een Govind Garh-Jadoli Ka Bas
stations)
285 06J)1`3018.3. Mathura-Alwar section-Provision of cover shed on
subway approaches at level crossing
no.80,81,82,86&91(5Nos)
286 06J)3.30.ll.3, Manikpur-Allahabad section:-Provisioil of limited
height sub way in liew of L-xin8 No. 409 at Kin.
1291/2-3 between Kataiya Dandi-Bargarh stations.
287 06cO3017 3. Bh`imsen-lngohta: Provision of cover over approach
at Limited Height Siibways constructed in lieu of
LC No. S-71A,S-77A & S-42.
288 060130.17 3 Mathura-Alwar: Provision of subway in lieu of LC
no.25 (in bet. Goverdhan-Deeg stations)
289 06.Ou30.17.3. Gwalior-Bhind section:-Provision of cover aver
approach at Limited Height Subways constructed in
lieu of LC No. 8,10,12 &17.
29o 06.OIJO.17.3 Mathura-Alwar: Provision of subway in lieu of LC50.003 no.2 (in bet. Bhu!eshwar-Mora stations)
291 06,03`30183 jhansi-Manikpur: Provision of coverover52 °°6 approach at subway constructed at LC NO. 402,
405, 411, 415.
292 0602JO.12.3. Construction of limited height subway in place of
Unmanned L-Xing No.29-C in BRN-ETH section
293 06J)i.3016.3. Agra DMsion-Mathura-Alwar, Provision of drainage5°.°°1 system,retaining wall,road work & height gauge at
11 subway
AIIo-catlon Antic.ipated Outlay
Cost expectedto end of2019-20
(Figilres in thousands of rupees)
Outlay Balanceto
2020-21 completewo,k
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Fi8llres in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Antic`ipated Outlav
Cost expectedto end of2019-20
Outlay Balanceto
2020-21 complete
work
ROAD sAFETy -Roe/RUB
294 06,03,]O`17.i Gwalior-Bhind section:-Provision of cover over52.cO4 approach at Limited Height subways constructed in
lieu of LC No. 5,5A,6 & 7.
295 06.01,30`17.3. Mathura-Alwar: Provis'Lon of subway in lieu of LC
no.31 (in bet. Goverdhan-Deeg stations )
296 060330.18.3. Provision of cover over approach at subway
constructed at LC No. S-4, S-9, S-13, S-14 in
Khairar- Bhimsen section
297 06.03..a llJ` Bina-Jhansi section:-Provision of Limited height
sub ways in lieu of L-xing No. 340 at kin
1069/30-32 between Bijra utha-Da ulta statios.
298 06.O].3017.a. Gwalior-Bhind section:-Provision of cover over
approach at limited Height Subways constructed in
lieu of LC No. 23,26,27 & 36.
299 06,01.30.17.3. Mathura-A|war: Provision of subway in lieu of LC
no.98 (`in bet. Jadoli Ka Bas-Ramgarh )
3oo 06.03.30.11.3. Bina-|hansi section:-Provision of limited height
sub way in lieu of L-xing No. 331 at Kin.
1042/18-20 between La litpu r-Da ilwara stations.
3oi a6.0130.17.3. Mathura-Alwar: Provision of subway in lieu oflc
no.70 (in bet.Govind Garh-Jadoli ka Bas stations)
3o2 06 03.30.17.3 Gwalior-Bhind section:-Provision of cover over
approach at umited Height Subways constructed inlieu of LC No. 46,47,48 & 49.
3o3 06.0330.18.3. |hansi-Manikpur: Prov.ision of cover over
approach at subway constructed at LC No. 449,
449A, 478.
304 06.03.30`11.., |ha nsi-Gwalior sect`ion:-Provision of Lim ited
height sub way in lieu of L-xing No. 406 at kin
1200/22-24 between Anantpaith-Antri stations.
3o5 0603.30,163 jhansi-Manikpur sectLon:-Provision of limited
he'ight Sub way in lieu of level crossings No.387at
kin 1183/7-8
306 06.Ou.30,17.3. Gwa|ior-Bhind section:-Provision of cover over
approach at Limited Height Subways constructed in
lieu of LC No. 34,42,43 & 44.
3o7 06-03.30.18.3, Khairar-Bhimsen: Provision of cover over
approach at subway constructed at LC No. S-26,
S-30, S-33, S-34.
3o8 06.03.30.11.3. Bina.|hansi section:-Provision of limited height
sub way in lieu of L-xing No. 312 at Kin.
985/12-14 between Agasod-I(aroda stations.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL l`AILWAY
PAGE NO : 23
(Figures in thousands of rupees)
Item Projectlo
NO.
Part`icu lars of Works Allo-cation Antic.ipated Outlay outlay 8alanceto
Cost expected 2020-21 complete
to end of work2019-20
ROAD SAFETY -ROB/RUB
3og 0609.30,16`3 Man.ikpur-Allahabad section:-:-Provision of11.cos limited height sub way in lieu of Level crossings
No.407 at kin 1283/9-10
3io 06.Ol`30.17.3. Agra Divis.ion-Bhandai-Oodi section-Construct`ionS°°]9 of subway in lieu of unmanend level crossing No.38
at kin 1439/9-10 between Bah-Udimore
311 06.03JO.18.3. Khairar-Bhimsen: Provision of cover over52 cod approach at subway constructed at LC NO. S-63,
S-65.
312 06,03 30.11.3. Bina-jhansi section:-Provision of limited height
sub way in I.ieu of L-xing No. 333 at Kin.
1049/26-28 between Dailwara-Ja kha ura stations.
313 06.01.30123. Provision of subway in lieu of level crossing50.°Z] No.72 at Kin 1476/9-1o between GVH-JBs in MTJ-AWR
section.
314 06.ee.30.16 3 jhansi-Manikpur section:-:-Provision of limited
height Sub way in lieu of Level crossings No.449A
at kin 1304/3-4
3 15 06.01.30.17.}, Agra Division-Bha nda i-Oodi section-Construction
Of subway in rieu of unmanned level crossing No.39
at kin 1441/3-4 between Bah-Udimore
316 06.03.30.18,3. alNA-SITHoULl ;-Section provision of cover shed
over newly constructed LHSs i.e at LC No.310,320 &
350at kin 980/4-6,1012/16-18 & 1088/3-4 respectivly
317 06.03.30.1l.. jHS-GWL section-Provision of Limited height sub11.°]2 ways in lieu of L-xing No. 387 at kin 1164/26-28
near Sonagir station.
318 0601.30.12`3` Provision of subway in lieu of level crossing
No.74 at Kin 1478/11-12 between GVH-JBS in MTJ-AWR
section.
3ig 06.OIL)a.17 3. Agra Divislon-Bhandai-Oodi section-Construction
of subway in lieu of unmanned level crossing No.40
at kin 1443/2-3 between Bah-Udimore
32o 06.cO.30.co.3. BiNA_S|THoull ;-Section provision of cover shed52.002 over newly constructed LHSs i.e at LC
No.366,372&397 at kin 1 125/34-26,1138/6-8&1185/18-20
respectivly under ADEN/line/jh s&LAR
321 060130.1l`3` MTj-AWR section: Provision of restricted he'ightS°.°°7 subway in lieu of level crossing No. 21 at Kin
1420/6-7 between BTS R-G DO.
322 060130.12.3 Provision ofsubwayin lieu oflevelcrossing5°'°23 No.76 at Kin |480/2-3 between GVH-JBs in MTJ-AWF(
section.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
(Figures ln thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay
Cost expectedto end of2019-20
Outlay Balanceto
2020-21 complete
work
ROAD SAFETY -ROB/RUB
323 06.a.3018.3. |hansi-Kanpur:-Provision of coveroverapproachS2 °cO at subway being constructed at LC No. 239 in
Bhimsen-Govind puri section.
324 as 0130,11.3. MT|-AWR sect`ion: Provision of restricted height
subway in lieu of level crossing No.39 at Kin.
1436/13-14 in block section GDO-DEEG.
325 06.0130.12.3` Prov.ision of subway in lieu of level crossing
No.363 at Kin 363/6-7 between BSA-PRK in MTJ-AH
section.
326 06.cO.30.18.3. B|NA-SITHO U LI ;-Section provision of cover shed
over newly constructed LHSs i.e at LC
No.352,253&365 at kin
1091/18-20,1094/14-16&1123/16-18 respectivly
327 06.01..0113. MTj-AWR section: Provision of restricted height
subway in lieu of level crossing No.78 at Kin.
1482/2-3 in block sei:lion GVH-JBS.
328 06,01.30.12,a. provision of subway in lieu of level crossing
No.365 at Kin 364/15-16 between BSA-PRK in MTJ-AH
section.
329 06.Ol.30.18.3. Bayana-ldgah-Construction of subway in lieu of
level crossing No.58
330 06.01.30.11,3. MTj-AWB section: Provision of restricted height
subway at level crossing No.86 at Kin.1487/6-7 in
block section JBS-RAH.
331 06,01.30.12J, Provision of subway in lieu of level crossing No.
29 at Kin 1428/5-6 between GOO-DEEG in MTJ-AWR
section.
332 06.OIJO.18.3. Bayana-ldgah-Construction of subway in lieu of
level crossing No.S9
333 06.0130123 Provision of subway in lieu of level crossing
No.34 at Kin 1432/6-7 between GDO-DEEG in MTJ-AWR
section.
334 06.Ol`30.18 3 |dgah-Bandikui section-Provision of cover over
shed on subway approaches road at level crossing
no75,76,77,87 &100
335 06.01.30.18 3` Mathu ra-Ach hnera section-Provision of su bway in
lieu of closed LC No.374
336 06.03 3011.3. Bina-|hansi section:-Provision of Limited height11.013 sub ways in lieu of L-xing No. 350 at kin lo88/3-4
near Basai station.
337 060130.12.3. Provision of subway io lieu of level crossing11.028 No.376 in between pRl( -AH at Kin.379/6-7 in MTJ-AH
Sect-'On.
Llst of Approved Works Costing Less Than Riipees Two Crore fifty Lakhs EacnNORTH CENTRAL RAILWAY
PAGE NO : 2S
(Figures 'in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo{ation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20
ROAD SAFETY -ROD/RUB
338 06.01.30.ll.3. MT|-AWR section: Provision of restricted height50 °°9 subway in rieu of level cross.ing No. 91 at Kin.
1489/13-14 between JBS-RAH .
339 06,0130.12 ) Provision of silbway in lieu of level crossing`] °29 No.377 in between PRK-AH at Kin.380/8-9 in MTJ-AH
Section.
34o 06.0130.113. MT|,AWR sect.io" Provis.Lan of restricted height50.°1° subway in lieu of level crossing No.110 at Kin.
1512/8-9 between OTD-AWR .
341 06`0130.12.J, Provision of subway in lleu of level crossing No.5°.°3° 41 at Km|439/8-9 between DEEG-BEDM in MTJ-AWR
section.
342 0601`3011.3. MT|,AWR section: Provision of restricted he.ight
subway in lieu of level crossing No.12 at Kin.
1413/3-4 between BTSR-GDO .
343 06.01.30.12.3, Provision of subway in lieu of level crossing
No.68 at kin 0098/3-4 between NBl-KL In lDH-BKI
section.
344 06.03.30113. Bina-|hansi section:-Provision of umited height&'`°`S sub ways in I.ieu of Lxing No. 348 at kin 1087/6-7
between Matatila-Basai Stations.
345 06.01.30`12... Provision of subway.In level crossln8 No.47 at Kin
1446/5-6 between DEEG-BEDM in MTJ-AWR section.
346 06,03 30.11.a. |hansi-Gwalior section:-Provision of Lim`ited
height sub way in lieu of L-xing No. 409 at kin
1205/13-15 between Antri-Sa ndalpur stations.
347 06.0130123. Provision of subway in lieu of level crossing No.
52 at Kin 1454/10-11 between BEDM-BINR in MTJ-AWR
section.
348 06.03 30.11.i. |hansi-Gwalior section:-Provision of L.imited11.02. height sub ways in lieu of L-X.ing No. 376 at kin
1145/0-2 between Karari-Datia stations.
349 060130.12.3` Provision of subway in lieu of level crossing No.11.°34 77 at kin oi|o/9 -111/0 between I(L-GOs in lDH-BKI
section.
35o 06.01,.0113. MT|-AWR section:Provision of restricted height5°'°13 subway at level crossing No.17 at Kin.1418/9-10
between BTSR-G DO.
351 06`O`cO.12.3` Provision of subway in lieu of level crossing``.°35 Na.86 at kin o|25/3-4 between MURD-KP0 in lDH-BKI
section.
Llst of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL F`AILWAy
PAGE NO : 26
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo,cation Antlcipated Outlay
Cost expectedto end of2019-20
Outlay Balanceto
2020-21 complete
worl(
ROAD SAFETY -ROB/RUB
06.01.30.12.3 Provision of subway in lieu of level cross.ln811.036 No.87 at kin 125/9-126/0 between MURD-KPo in
IDH-BKI section.
353 06 03 30.11.3. jhansi-Gwalior section:-Provision of Limited11°29 height subwaysin lieu of L-Xing No. 396at kin
1184/4-6 between Da bra-Anantpeth station.
354 06.0330,11.3. |hansi-Gwalior section:-Provision of Limited11`°26 height sub ways in lieu of L-Xing No. 398 at kin
1188/12-14 between Dabra-Ana ntpeth station.
355 06.03.30.11.3, jhansi-Gwalior section:-Provision of Limited
height sub way in lieu of l-xing No. 405 at kin
1199/22-24 between Anantpaith-Antri stations.
356 06.0330.11`3` Bina-jhans'i sect|on:,Provision of Limlted height
sub ways in lieu of L-xing No. 353 at kin
1094/14-16 between Basa i-Bu rhpura stations.
357 06.03`30113. Bina-jhansi section:-Provision of limited height
sub ways in lieu of L-xing No` 352 at kin
1091/18-20 near Basai station.
358 06`03.]0113` Bina-jhansi section:-Provision of limited height
sub way in lieu of L-xing No. 326 at Kin.1025/6-8
between Jakhlaun-Jiron stations.
359 06.03.30`113. Bma-jhansi section:-Provision of limited height
sub way in lieu of L-xing No. 336 at I(in.
1059/18-20 between Jakha u ra-Bijrautha stations.
36o 06.03.30`11.3. Bina-jhansi section:-Provision of Limited height
sub ways in lieu of L-xing No. 355 at kin 1100/6-8
between Burhpura-Ba b'ina stations.
361 06.es301l.3.hansi-Gwalior section:-Provision of Limited
height sub ways in lieu of L-Xin8 No. 370 at kin
1134/16-18 between Jhansi-Karari stations.
362 06.02.30,10.3. Vindhyachal`Mirazapur: Replacement of existing
steel girder of Br. No. 518 (RUB) at kin. 738/19-21
by providing PSC girder.
363 06.03.30.lo.3. jhansi-Kanpur: Provision of limited height subway52.0°3 in iiew of i_xing no. 239 at kin.1338/9-10.
364 06.02.30.lo.. Mirazapur : construction of new Road under Bridge
(size lx5.50x3.50) between Level crossing No. 8&9.
365 06.01.30`1..3 Provision of subway in lieu of level crossing5°.°°3 no.35 in between GOO-DEEG at KM.1433/02-03 in
MTJ-AWR sect.lan .
366 06 01.30.13... Provision of subway in lieu of level crossing5° °°] no.37 in between GOO -DEEG at KM.1435/2-3 in
MTJ-AWRsection.
ust of Approved Works Cost`ing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particu la rs of works Allo-cation Antic.ipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
ROAD SAFETY -ROB/RUB
367 06J)1.30.13.3. Provision of subway in lieu of level I:rossing
no.378 in between PRK-AH at KM. 381/4-5 in AH-MTj
section.
368 0601JO.14 3 |dgah-Band.|kui section:Provision of subway in
lieu of level crossing no.63 & 64 jn between
Nadbai -Kherii at KM. 91/6-7 & 93/1-2.
369 06.0130143. |dgah-Bandikui section:Provision of subway in
lieii of level crossing no.65 & 70 in between
ldgah-Ghosrana at KM. 94/4-5 & 100/0-1.
37o 06.0130143. |dgah-Bandiku.isection:Provision of subway in
I.ieu of level cross.ing no.99 & 101 in between
Biwai-Bandikui at I(M.140/3-4 & 145/6~7.
371 06.01.sO.143 Mathurajn.-Alwarsection: Provision ofsubwayin
lieu of level crossing no.11&13 in between Mora -
Govardhan at KM.1412/5-6 &1414/05-06 .
372 06.013014J. Mathura ln.-Alwar section: Provision of subway in50.cO2 lieu of|eve| crossingno.33 &43 In between
Gova rdhan-Deeg-Bed ham at KM.1442/03-04.
373 %.%;30 ".3. ldgah-Bandikui section:Provision of subway in
lieu of level crossing no.66 & 89 in between
Nadbai-Kherli & Karanpura -Biwai at KM. 0095/8-9
&Or2:Jl|-8.
374 %:;;.01®3. ld8ah-Bandikui section:Provision of subway in
lieu of level crossing no.72 &73 in between
Kherli-Ghosrana at KM. 103/ 3-4 & 010S/4-5 .
375 060130.14.3. Mathura Jn.-Alwar section:Provision of subway inS°°°5 iieuof|eve|crossingno.61/C& 79 ln between
Brij Nagar-Govindgarh - Jadali Ka Bas at I(M.
1465/8-9.
376 06.01.30.143. |dgah-Bandikuj section:Provision of subway in
lieu of level crossing no.36 & 61 in between
lkaran-Kherli at KM. 47/4-5 & 88/7-8.
377 06.Ol.30.143 Mathura-Alwarsection :Provision ofsubwayin
lleu Of level crossing no. 19 C in between Mora -
Goverdhan stations at KM.1420/4-5.
378 060230.14,3 Etawah-Mainpuri:-Construction of limited height
subway f!.C.C box size 4.50mx4.00m in lieu of level
Crossing No.9&10 between Vaidpura hault & Saiphai
tiault of Etawah Mainpuri New B.G.Railway
line.(Annexure-lv)
379 06,02 30.14.3, Etawah-Mainpuri:-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.11&13 between Vaidpura hault & Karhal
station of Etawah Mainpuri New B.G.Railway
line.(Annexure-V).
ust of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs EachNORTt+ CENTRAL RAILWAY
PAGE NO : 28
(F`igures in thousands of rupees)
Item ProjectlD
NO.
Pa rticulars of Works Allo-cation Anticipated Outlay outlay Balanceto
Cost expected 2020-21 completeto end of work
2019-20
ROAD SAFETY -ROB/RUB
38o 0602 30.14.3. Etawah-Mainpuri:-Construction of llmited height3°.a" subway R.c.c box size 4.50mx4.00m in lieu of level
Crossing No.14&15 between Saiphai hault & Karhal
stat.ion of Etawah Mainpuri New a.G.Railway
line(Annexure-Vl)
381 as 02.30.14.3. Etawah-Mainpu ri :-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of
level Cross.ing No.17&19 between Saiphai hault &
Bujhia hault of Etawah Mainpuri New 8.G.Rallway
line.(same as Annexure-I)
382 06.OZ.}0.14`3. Etawah-Ma mpu ri :-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.20&21 between I(arahal station & Bujh.ia
hault of Etawah Mainpuri New a.G.Railway
line.(same as Annexure-lv)
383 06.02 Solo.i Etawah-Mainpuri:-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.22&23 between Karahal station & Bujhla
hault of Etawah Mainpuri New B.G.F(ailway
line.(same as Annexure-V)
384 06.02 3014.i. Etawah-Mainpuri:-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.24&25 between Bujhia hault & Keeratpur
hault of Etawah Mainpuri New B.G.Railway
line.(same as Annexure-lv)
385 06.02 30.14.3 Etawah-Mainpuri:-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.26&27 between Bujhia hault &
Keeratpur liault of Etawah Mainpuri New B.G.Railway
line.(same as Annexiire-ll)
386 06.02.Solo... Etawah-Mainpuri:-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.29&30 bet\^/een Keeratpur hault &
Mainpuri station of Etawah Mainpuri New
B.G.Railway line.(same as Annexure-Ill).
387 06.02.30.14.3. Etawah-Mainpuri:-Construction of limited height
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.32&33 between Keeratpur hault &
Mainpuri station of Etawah Mainpur.I New
B.G.Railway line.(same as Annexure-I)
388 06.0130.15 3. Provision of subway in lieu of level crossing
no.53& 56 in between FTS -KLB -MIQ at
KM.0059/2-3 & 0062/02-03 in lDH-BXN section.
389 06.02..a IOJ. Provision of shed and drainage system on LHs at
LC 409 in Naini-Manikpur.
List Of Approved Works Costing less Than Rupees Two Crore Fifty lakhs EachNORTH CENTRAL RAILWAY
(Figures ln thousands of rupees)
Item Project'O
No.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
ROAD SAFETY -ROB/Rue
39o ceo030.20.3. Worksco;tingbelow DRM'sPowercO.999
TOTAL,WORKS IN PROGRESS
8 -Now Works
391 06.03.30.20.i. Bina-Jha nsi section :-Protection of seepage
through joints/gap in f`CC BOX Of lHS/RUB and
other associated works on its approaches of
Subway no.310,352,35S,359& 366 under ADEN LAR
Jurisdictioo.
392 06.03.]O.20.3. jha nsi-Gwa lior sect`ion :-Protection of seepage
through joints/gap in RCC BOX of lHS/RUB and
other associated works on its approaches of
Subway no.372,378,384,397 under ADEN (Line)
JhansiJurisdiction.
393 06.03.30.203, protection of seepage through jts./gaps in RCc box
of lHS/RUB in GWL-BIX sect.Ion &other associated
works on its approaches at lHS
NoZ4,25, 26, 27,29,30,32,35,36,37,38&39 under
ADEN/Gwljur'isdiction.
394 06,03.30.20.a, I hansi-Man ikpur section :-Protection of seepage
through joints/gap in RCC BOX of LHS/RUB and
other associated works on its approaches of Subway
no.387,392 & 399 under AOEN Mahoba Jurisdiction.
395 06.02JO,ZO.I. Allahabad-Kanpur : Construction of ROB in lieu of
LC No.60 at kin 967/9-11 between AIIahabad-Kanpur
section.
396 ce.OO.30,ZO.3. Works costing below DRM's PowercO.999
TOTAL-NEW WORKS
TOTAlutoad Safety -ROB/RUB
TfunK RENEWALs
A - Works in Progress
397 06.01.91.173. AGC-MTj section-"R(P) 2.128 kin with 60kgsO.002
398 06.02.31.17J. Bamurauli : Complete Track Renewal (Secondary) OF
Loop unes:1.371 I(ms
399 06,03.3l.ls 3 MAN|KPUR-NAINI Sction CTR/P-O.430 KM ON MKP-NYN
4oo 06.023lae.3. Agori_Churk: Throughweld Renewalwith mobile
flush butt welding
4oi 06.0331.12.3. jhansi-TTR(P) =5 Nos.(1 in 8.5) HP19 to HP23 at
A. C. Loco Shed Jhansi
4o2 06ou31.13.3 B|NA-Agra: TFR= 11.281 Kms. on DN road in
S.Fund . 16,90,00
RRSK .. 43,45,07
2,40,00
1,10,00
4,00,00
.. 18,00,00
•. ¢n f tF,,in
ust of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 30
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Ant'icipated outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
TRACK RENOwALS
Complete T.ack Renewal
403 %%231".2 Agra cantt-Mathura-CTR (S)-1.677 Kin
Comi)lete Track Rene`^/al
4o4 060131.1S.2 Agra Diy.-Agra-Palwal section CTR(S) 1.00 kin in
AGC & BFP yard
Complete Track Renewal
4o5 06J]9.91.15.2, |hans.I-Manikpur: CTR ( S) 0.960 KM on Banda yard.52JX'1
Complete Track Renewal
4o6 0603.91,163 Bina,Sithauli section: CTR(P) = 0.500 Kms. From
kin.1086.100 to 1086.600 on UP maln line on Betwa
Bridge.
Complete Track F`enewal
4o7 06023117 3. Bidanpur: Complete Track Renewal (Secondary) OF
Loop unes:0.706 Kms
Complete Track Renewal
4o8 o6.02.31.17.3. Manauri : Complete Track Renewal (Secondary) OF
Loop Lines:1.385 Kms
Complete Tpck Renowal
4o9 06.OZ31.17.3. Sayadsarawan: Complete Track Renewal (Secondary)
OF Loop Lines:1.437Kms
410 06 02.3l.17.3. Manohar8anj: Complete Track Renewal (Secondary) OF RRSX
Loop Lines: 1.436Kms
Complete Track nenewal
411 06.02.31.17.3. Sirahu: Complete Track Renewal (Secondary) OF Loop
Complete Track Rene`^/al
412 06.02.3l.17.6-Manikpur-Naini ; Through Rail Renewal (Primary)
: 2.06 Kms (UP Line)
Complete Track Renewal
413 06.02.31`17.6. Manikpur -Naini : Through Rail Renewal (Primary)
Complete Track Renewal
414 06.OZ,3l`17.6. Manikpur -Naini : Through Rail Renewal (Primary)
= 1.05 Kms (DN Line)
Complete Track Renewal
415 0602.31.18.3. A||ahabad -CTR (S) of Yard Line no. 8 & 951 Ore
Comi)Iete Track Renewal
416 06.0231.18.3. A||ahabad -CTR (S) of Yard Line no.13 and 14S1.003
Complete Track Renowal
417 060231.18`3. Kanpur.Through Raimenewal(P) oflllrd line:
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works AIIo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRACK RENEWALS
Complete Track Renewal
418 ac.0331.15.3, jHS-MKP: CTR(P) = 0.538 Kms. From kin 1128.462 to
1129.000 on JHS-Ml(P main I.ine of Jhansi yard.
Complete Track Rene`^/al
4ig 06.a..31153. Bina-Agra cantt. Section: C"(S) =0.700 on DN Loop
Complete Track Renewal
42o 06.02.3l.13.3. Kanpur (Loco) : Complete Track Renewal of stabling
Line no. 1 & 2
Complete Track Renewal
421 06.03.31.15J. B`ina-Agra cantt. Section: CTR(S) =0.700 on Goods
Loop at DAA from Kmll52.000 to Kin 1152.700
Complete Track Renewal
422 06.02 3113... Panki : Complete Track reenwal ( Secoundary ) of
Complete Track nene`^ral
423 0603.31.15J. B|N-AGC section : CTR(S)=0.700 Kms on DN Loop of
DBA yard from Kmll82.400 to Kin 1183.100
Complete Track Renowal
424 0603J1.15.3. |hansi Yard: C"(P) = O.403 I(ms. From kin.
1128.646 to 1128.875 on JHS-CND main line and
from kin.1128.258 to 1128.432 on JHS-MKP main line
ofJhansiyard.
Conplete Track Renewal
4-25 as0331.153 Bina-Agra cantt. section: CTR(S)=O.700 Kms.on
Goods Loop-I from kin. 982.700 to 983.400 at Agasod
station.
Complete Track Renewal
426 a6.03J1.1S.3. Bina-Agra cantt. section: CTR(S) = 0.700Kms. on
Goods Loop-ll from kin. 982.650 to 983.35o at
Agasod station.
Complete Track Renewal
427 06,09.3l.10,3, Chauah station CTR (S) of Ballast sidng52.008
Complete Track Renewal
428 06.Ol..1.10.3 Achanera yard -CTR (S) -Of Ballast sidingSO.col
Complete Track Renewal
429 06.Ol.31.10.3` Govindgarh yard -CTR (S) -of Ballast siding50.010
Comi)lete Track Rene`A/al
43o 06,02.3l.10.a-Tundla -CTR (S) of Ballast siding51.019
Complete Track Renewal
431 06.0231.13.3 |uhivard : CompleteTrackrenewal ( Secoundary )=
0 .737 kin. of Line no. 22
RRSK 91,97
R- 3,98
RFtsK 80,73
f\. 51
RRSK 99,39
fl. SS
RRSK SO,S7
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
PAGE NO : 32
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRACK RENOwAIS
Complete Track Renewal
06.02.31.17.6, Manikpur -Naini : Complete Track Renewal5l.Ou (primary) = Kin. 1255.64 -1256.94 (UP Line)
Complete Track Renewal
433 06.02.}1,18.3. Manikpur -Chheoki : Complete Track renewal (P)
Throilgh Rall Renewal
434 06.01.3116.2. Dhautpur-Agra cantt -Through Rail Renewal
(Primary) 1.166 kin
Through Rail Renewal
435 06.01.31.15.2. Agra Div.-ldgah-Bandikui section TRft(P) 1.40 kinSO.001
Through Rail Renewal
436 06.OZ.3l.11.3. Allahabad dMsion :-Through rail renewal
(Pr'imary)of 0.80 Kin. lines in the section of ADEN
/ Line / CNB
Through Rall Renewal
437 06.OZ,31.14.3. Allahabad-Kanpur: Through Rail Renewal( Primary)
1.00 Kin. of UP Line in CNBi-CNB Diversion
Through Rail Renewal
438 06.03.31.153, Bina-Agra up Road section TRR(P) = 0.900 kin from
Through Rall Renewal
439 06.Ol.3l.16.3. Agracantt.-Palwal-Through Rail Renewal (Primary)
0.800 kin with 60kg
Through Rail Renewal
44o 0603J}1.163 Bina-Sithauli section: TRR(P) = 0.750 Kms on up
road from I(in 1208.130 to Kin 1208.500 and from Kin
1209.COO to Kin 1209.380
Through Rail Renewal
441 06.033l.16.3. Bina-Sithauli section: TRR(P) = 0.750 Kms on up
Through Rall Renewal
442 06cO31.163. Bina-Sithauli section: TRR(P) = 0.750 Kms on up
road from Kin 1211A.650 to Kin 12118.400.
ThroLigh Rail Renewal
443 06.01.31.16.3. Agracantt.-Mathura-Through Rail Renewal (Primary)
Through Rail Renewal
444 060131.17.3. AGC-Ml-j section-TRR(P) 2.10 kin with 60kg50 0es
Through Rail Reoewal
445 06.Ol.31.17.3. AGC-MT| section-TRR(P) 2.00 kin with 60kg50.OOu
Llst of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAI LWAY
PAGE NO : 33
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cat`ion Anticipated Outlay outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRACI( RENOwAIS
Through Rail Renevral
446 0602.31.17.3. Kanpur :Through Rail Renewal (Secondary) : 2.25
Through Rail Renewal
447 06.02.31.17.3 Tundla -Ghaziabad : Through Rail Renewal
(Primary) : 1.378 Kin. (uP Main)
ThrolJgh Rall Renewal
448 06.OZ.3l.183. Mughalsarai -Allahabad : Through Rail Renewal
(Primary) : 1.88 Kms.
Through Rail Renewal
449 06,02.31.18.3, Tundla -Ghaziabad : Through Rail Renewal
(Primary) : 2.00 Kms.
Through Rail Renewal
45o 06.02.3l.18.3. Tundla -Ghaziabad : Through Rail Renewal
(Primary) : 2.00 Kms.
Through Rall Renewal
451 06.03,311819 Bina-jhansi section: TRR(P) = 2.200 kms. from I(in
1084.970 to kin 1085.930 and kin 1086.760 to kin1088.00 UP Road.
Ttlrougll Rail Renewal
452 06.03J1.18.3. Bina-jhansi section: TRR(P) = 2.205 kms. from Kin
1084.978 to kin 1085.878 and kin 1086.695 to kin
1088.00 DN Road.
453 06.0..31.183, |hansi -Sithouli section: TRR(P) = 2.20 kms. from
Kin 1155.220 to kin 1156.220 and kin 1159.600 to kin
1159 A .800 UP Road.
Tr.rough Rall Renewal
454 06.Ou31,18.3. jhansi -Sithouli section: TRR(P) = 1,156 kms. from
I(in 1176.0 to kin 1176.620 dn Road and kin 1176.0
to kin 1176.536 UP Road.
Through Rail Renewal
455 06.01.3l.18.6. A8ra cantt-Billochpura section-TRR(P)2.175 kin DN
Road
Through Rail Renewal
456 06.013l.18.6. Vammuna Bridge-Tundla section = TWR 13.loo kin TWR RRSK 2,.2,81
(1310 Joint) DN Road
Through Rail Renewal
457 ce,023l.18.6 Man|kpur-Naini : Through Raimenewal (Primary)
Through Ra.I Ben-I
458 06023l.19.6. Pt. Deen Dayal upadhyay-AIIahabad :TRR(P) -
List of Approved Works Costing Less Than Rupees Two Crore Fifty Laths EachNORTH CENTRAL RAI LWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Ant.icipated outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work
2019-20TRACK RENEWALS
Through Rail Renewal
459 06.02.31.123. Casual Rail Renewal (Primary) From Kin.1151.00 to
Through Rall Renewal
46o 06.02-31.14.3. AIlahabad -kanpur : Through Rail Renewal
(Primary) : Kin.1018-1019 of DN line in CNBI -CND
Diversion
Through ftail f`enewal
461 0603J1.15,3 Bina. Agra up Road section TRR(P) = O.9 kin from Kin
Through Rail Renewal
462 0602.al 183 Kanpur-Tundla -Through Rail Renewal (P) of lvth
TI`rouBh Rail Renewal
463 06.0331.14.3 Bina.A8ra :TRR(P) 1 kin from I(in 1219.800to I(in
1220.800 KM on DN Road on BIN-AGC section .
Th.ough Rail Renew]1
464 0603.91.153 Bina-Agra up Road section TRR(P) = 0.8 kin from Kin
Through Rail Renewal
465 0603.31.143 Bina-Agra : TRR(P) = 1 km from Kin 1222.000to Kin
Through Rail Renewal
466 06J)..31153. Bina-Agra up Roadsection"R(P)=0.6kmfrom Kin
1284.400 to Kin 1285.00.
Through Rail Renow@1
467 06.02.3117.6. Through f`ail renewal(Primary)on DN Main une in
Through RaLI Renewal
468 06,03 3l.17,6 jhansi-Sithouli section TFR = 19.45 kms from kin
1153.0 to kin 1172.450 on DN Road .
Through Rail Renevral
469 06.03.}1.1¢.3. Bina-Agra up Road section TRR(P) = 1 km from I(in
Ttirough Rail Renewal
47o ce.03`31.14.3. Bina-Agra up Road section TRR(P) : 1 kin from Kin
Through Rail Renewal
471 06.03.3l.15.3, B|NA-AGC section : TRR(P) = 0.800 Kms on up road
from I(in 1212.00 to kin 1212.80
Through Rail Renewal
472 06.03,31,14.3 Bina-Agra up Road section TRR(P) = 1 kin from Kin
List of Approved Works Costing less Than Rupees Two Crore F'ifty Lakhs EachNORTH CENTRAL RAILWAY
(figures in thousands of rupees)
Item ProjectlD
NO.
Pa rticu lars of works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TfurK RENEWAis
Throiigh Rall Renewal
473 060..3115.3. BINA-AGC section: TRR(P) = O.900 Kms on up road
from Kin 1173.60 to Kin 1174.00 & on DN road from Kin
1207.80 to Kin 1208.30
Through Rall Renewal
474 06.cO..115.3. B|NA-AGC section: TRR(P) = O.500 I(ms on up road
from Kin 1129.000 to Kin 1129.500
Tt`rough Rail F\eneunl
475 06.03.31.15`3. B|NA-AGC section: TRF((P) = 0.800 Kms on up road
from Kin 1145.000 to Kin 1145.800
Through Rall Renewal
476 06.03.3l.15.3, |hansi -Kanpur section: TRR of existing 52 kg.
rail on imp. & Major bridge and bridge approach by
26 in rolled rail at bridge Ilo: 1301/1, kin:
1301.200 to 1301.500 and 1325/1, kin 1325.00 to
1325.300.
Through Rail Renewal
477 06.a...1153. jhansi -Kanpur section: TRR of existing 52 k8.
rail on imp. & Major bridge and bridge approach by
26 in rolled rail at bridge no. 1275/2, kin; 1275.45
to 1276.45.
Throiigh Rail Renewal
478 06.03.al.15.3. B|N_AGC section : TRR(S) = 1.175 Kms on washlng
pit lines of CNB Sdg & MKP Sdg in JHS Yard.
Through Rail Renewal
479 06.02.3l.11.3. A||ahabad Division:-Through rail renewal
(Primary) on Major bridges in the section of Sr.DEN / Vl / ALD
Through Rail Renewal
48o 06.03.31.13J. Bina-Agra up Road section TRR(P) = 1 kin from Kin
1264.00 to to Kin 1265.00.
Through Rall Renowal
481 06103.3l.19.3. Bina-Agra up Road section TRR(P) = 1 kin from I(in
Through Rall Renewal
482 06.03.31.„.9. Bina-Agra up Roadsection TRR(P)=1 km from Kin
Through Ra.I Renewal
483 06.02.3l.13.3. AIIahabad -Naini : Scattered Rail Renewal (
Primary ) between Kin. 820.40 - Kin. 822.40 on DN
Line.
Through Rall Renewal
484 06.023l.18.3, Manikpur-Naini :Through Rail Renewal (Primary)51.004 = Kin. 1312.o3 -1314.03 (DN Line)
List Of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Anticipated outlay outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRACK RENEWALS
Through Rail Renewal
o¢o2 31.183. Manikpur -Naini : Through Rail Renewal (Primary)51 cos = Kin. 1314.o3-1315.27 (DN Line)
Through Rail Renewal
486 0602jl`18.6. Miighalsarai-AIIahabad : Through Rail Renewal
(Primary) =2.020 Kms.
Through Rail Renewal
487 06,0231.186` Mugha|sarai-Allahabad : Through Flail Renewal
(Primary) :2.082 Kms.
Through Sleeper Renewal
488 06.02.3l`17.2. Shikohabad-Farrukhabad : 603 Nos. Through steel
Channel Sleeper Renewal on Girder Bridge no. 2, 3,
24 & 136
Through sleeper Renewal
489 0602.31,16.3. Shikohabad-Farrukhabad : Through steel channel
sleeper Renewal on Girder Bridge no.
25,37,52,60,74,86, & 126
Through Sleeper Renewal
49o 06.03.31.17.3. Sithouli -Dhaulpur section TSR(P) = 2.8 kin up
Th.ough Sleeper Renewal
491 06.OJ,31.15... Bina-Agra up Road sect.ton TSR(P) =1 kin from Kin
Through Sleei)er Renewal
492 06On.31`15j. Bina-Agra up Road section TSR(P) =O.950 kin from
Kin 1267.050 to Kin 1268.00.
Through Sleeper Renewal
493 06.03.3l.lJ... BINA-Agra: TSR = 1.57Kms. on DN road bet. kin.
990.50 -991.64 and. 992.07 -992.50 in BINA-JHS
section.
Through Sleeper Renewal
494 06`OZ.3115... casualsleeper Renewal(Primary)for Kin.1276(DN)
and Kin.1277 (DN) in TDL -GZB Section
Through Sleeper Renewal
495 06.02.31.15.3, Casual sleeper Renewal (Primary) for Kin.1278 (DN)
and I(in.1279 (DN) in TDL -GZB Section
Through Sleeper Renewal
496 06.023l.1S.3. Casual sleeper Renewal (Primary) for Kin.1280 (DN)
and Kin.1281 (DN) in TDL ` GZB Section
T1`rough steel)er Rer`ewal
497 06.0231153. Casual sleeperRenewal (Primary)for Kin.1282(DN)Sl.°°4 and Kin. 1283 (DN) in TDL -GZB section
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-catton Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
TRACK RENEWALS
Through Sleeper Renewal
498 06,0231,15.3. Casual sleeper Renewal (Primary) for Kin.1284 (DN)51.069 and Kin. 1285 (DN) in TDL -GZB sectlon
Through Sleeper Renewal
499 0602.31.1S.3 Casual sleeper Renewal (Primary) for I(in.1286 (DN)51,074 and Kin. 1287 (DN) in TDL -GZB section
Throngli Sleeper Renewal
5oo ce.023l.153 Casua|Sleeper Renewal (Primary)forKm.1288(DN)
and Kin.1289 (DN) in TDL -GZB Section
Through Sleeper Renewal
Sol 06.OZ31,1S 3. Casual sleeper Renewal (Primary) for I(in.1290 (DN)
and Kin.1291 (DN) in TDL -GZB Sect.lan
Through Sleeper Renewal
5o2 06.0231,153 Casua|S|eeper Renewal (Primary)forKm.1292 (DN)
Through Sleeper Renewal
5o3 06.023l.1S.3. Casual sleeper Renewal (Primary) for I(in.1293 (DN)•in TDL - GZB Section
Thiough Sleeper Renewal
so4 06.02 3l.rs.3. Tund|a -Ghaziabad : Scatterred sleeper Renewal51.OS4 (primary) on up Line in ADEN / AUN section
Through Sleeper Renewal
5o5 0602 31.1S.3. Tundla -Ghaziabad : Scatterred sleeper Renewal51055 (primary) on DN Line in ADEN / ALJN section
Through Sleei)er Renewal
5o6 06.02.31.113. Through sleeper renewal of points & Crossings on
main line in ALD -CND Section
Through Sleeper Renewal
5o7 06.0331.113 jhansi D.ivision :-TSR (S) 1.540 Kms. w`ith s/H PSC52 a" sleepers from Kin. 1229.000 to l230.S40 on AIT-KNH
section
Through Sleeper Renewal
5o8 060331`11.3. TSR(S)2.4cO Kms. with s/H PScsleepersfrom Kin.S2.016 1217.ooo to i2ig.400 on AIT-KNH section
Through Sleeper Renewal
5og 06.033l.11.3, TSR(s) 2.4coKms. withs/H PScsleepersfrom Kin.52.°cO i2ig.4oo to 1221.goo on AIT-KNH section
Through sleeper Renewal
5|o 06`02,.1163. Shikohabad-Farrukhabad : Through steel channel5`.°°. sleeper Renewal on Girder Bridge no. 94,149 & 71
Throilgh Sleeper Renowal
ceesJ1.19.6, sTL|_DHo Section TBTR=273 Nos. replacement of52 col channel sleepers oil girder bridge no.1217/1 UP&DN.
QRSK 84,3S
P. 2,1S
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs EachNORTH CENTRAL RAILWAY
PAGE NO : 38
(F`igures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cat.ton Anticipated Outlay Outlay Balanceto
Cost expected` 2020-21 complete
to end of work2019-20
TRACK RENEWALS
Ballast
o€o3 31.16 2. Bina _ Dhaulpur : TFR = 27.055 kms52 002
Ballast
513 06.03`31.16.2. Manikpur-Naini. : TOR = 5.63 Kms.51.001
Ballast
514 a602 31.12`3. A||ahabad Division :-Through ballast renewal ofS1.012 loop lines and T/outs in the section of sr. DEN /
'V / ALD
Ballast
515 06.02.31.12`3` Through ballast renewal of loop lines and T/outs
in the section of Sr. DEN / V / ALD
Ballast
516 06.02,31.12.3. Through Ballast Renewal of up Main Line from Kin.
Ballast
517 0602..1.123. Through Ballast Renewal of up Main Line from I(in.
Ba''ast
518 06J)Z.]1.12J, Through Ballast renewal of Main Line in different
yards in MGS - ALD Section
Ballast
5ig 06`03.3l.12 3 B|NA-AGRA : Raising cushion of loop lines of AGD,
KOA, DUA, JLN, JRO, & LAR
Ba„ast
52o 06.02.J1.15.3. Mughalsarai-AIIahabad ; Through Fitting Renewal of
Girder Bridge no. 10
Ballast
521 06,03 3l.i.,3 BINA-Agra: TBR =2.977 kms. on DN & Up road at
platform between BINA -LAR.
Oa''ast
522 06.02.3l.15.3. Mughalsarai-Allahabad : Through Fitting Renewal of
Girder Bridges in the Section of ADEN/CAR
Ballast
523 06.02J1.15 3 Mughalsarai-Allahabad : Through Fitting Renewal of
Girder Bridge no. 487, 503, 514, 518a & 530
Ballast
524 06,02 3l.S 3 Mughalsaral-Allahabad : Through Fitting Renewal of
Girder Bridge no. 5
Ba''ast
52S 06.023115.3` A||ahabad-Kanpur:Through Fitting Renewalof
Girder Bridges
list of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 39
(Figures in thousands of rupees)
Item ProjectlD
No.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TTtAck RENEWALS
Ballast
526 ce`02J1.1S 3 Chunar-Chopan : Through F.itting Renewal of Girder
Bridge no.131,2,28,35,40,403,46,48 & 81
Ballast
527 06.OZ.31.15J. Chunar-Chopan : Through Fitting Renewal of Girder
Bridge no. 399
Ballast
528 06`02.31.15`3` Shikohabad -Farrukhabad : Through Fitting Renewal
of Girder Bridges
Ballast
529 06.02,31.15.3, Mughalsarai-Allahabad ; Deepscreening of Loop
Lines at Ji8na & Manda Road Station
Ba''ast
53o 06.02jl`1S 3 Mughalsarai-AIIahabad : Deepscreening of Loop
Lines at Mirzapur Station
Ballast
531 06.02.3l.15.3. Mughalsara.I-Allahabad : Deepsereening of Loop
Lines atJhigura, Vindhyachal & Berohi Station
Ballast
532 06.02.3l.".a. Mughalsarai-Allahabad : Deepscreening of Loop
Lines at Meja Road & Uchdih Station
Ballast
533 06,02`31.15.3. A||ahabad -Kanpur : Deepscreening of Loop Lines
at Subedarganj, Bamhrauli, & Manoharganj Station
Ballast
534 06J)2.3115.3 Allahabad-I(anpur: Deepscreeningofloop lines
Ballast
535 06.02.}1.15.3. A||ahabad -Kanpur : Deepscreenin8 of Loop Lines
at Sujatpur & Saiyadsarawan Station
Ballast
s36 06.02.31.153. Allahabad -Kanpur : DeepscreeningofLoopLines
at Kanwar & Katoghan Station
Ballast
537 ce.02 3115.3. Allahabad -Kanpur : Deepscreening of Loop Lines
at S`irathu & Kha8a Station
Ba''ast
538 0602.31`15.3. A||ahabad -Kanpur : Deepscreening of loop lines
at Satnaraini & Sarsaul Station
Ballast
539 0602,31.153. Kanpur-Tundla : DeepscreeningofLoop Linesat
Balrai and Bhadan Station
List of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 40
(Figures in thousands of rupees)
Item ProjectlD
No.
Particu la rs of works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRAcx RENOwArs
Ba''ast
54o 06.02.3l.15.3. Kanpur-Tundla : Deepscreening of Loop Lines at
Jaswantnagar and Kaurara Station
Ba„ast
541 06,02`31.15 3 Kanpur-Tundla : Deepscreening of Loop Lines at
Sarai Bhoopat & Shamoh
Ballast
542 060231.15 3 Tund|a -Ghaziabad : Deepscreening of Loop Lines
at Mitawali & Jalesar Road Station
Ba''ast
543 a602311S 3 Tundla -Ghaziabad : Deepscreening of Loop Lines
at Ajaibpur, Chola, Danwar & Khurja Station
Ballast
544 06.0231,153 Tundla. Ghaziabad : Deepscreening of Loop Lines
at Sikandarpur, Somna, Wair & Maripat Station
Ballast
545 06.0231.15J, Tundla -Ghaz`iabad : Deepscreening of Loop lines
at Dadri & Dankaur Station
Ba''ast
546 0602J1.153. Shikohabad -Farrukhabad : Deepscreening of Loop
Lines at Nibkarori, Mota and Mainpuri Station
Ballast
547 06.03.3l.15.3. Bina-Agra cantt. Section: TOR =3.125 kms. of Goods
line 1 to3 and MKP siding 2 to 5 in Jhansi Yard
Ballast
548 06.a...115.3. Bina-Agra cantt. Section: TBR =3.517 kms. of
Marshll`ing line no.1 to 6 in Jhansi Yard
Ballast
549 06.03.}1.15J, Bina-Agra cantt. Section: TBR =3.315 kms. of
Marshlling line no. 7 to 11, Dead End sdg and Fuel
Sdg. in Jhansi Yard
Ballast
55o 06.0331.1S.3. 8ina-Agracantt. Section:TBR=3.83 kms. of up
Dep.1,UP Dep.2 , UP Dep.3, ON Dep.1 & DN Dep.2
lines in Jhansi Yard.
Ballast
s5i 06OuJ1.10.3. Jhansi yard -TBR in busy loop line of 5.5 Trkm
length
Ba''ast
552 06.OZ.31.11.3. Through ballast renewal of loop lines and T/outs51.°°. in the section of sr. DEN / ll / ALD
Ballast
553 06.02,3l`11.3. Through ballast renewal of loop lines and T/outs51`°°5 in the section of sr. DEN / VI /ALD
RRsk 78,05
R. ' 10
L.ist of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL RAllwAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Part.icu la I.s of Works Allo-cation Antic'ipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
~RENEWALSBa''ast
554 0603.Sill.3. A|T-KONCH sect.Ion: TBR = 8.340 Kms from
Ballast
555 06.03.31.13.3. BINA-AGC: Raising cushion of loop lines of DWA,
JHA, BJA, TBT, MZX, BZY, DAB, KHJ & BJl on
BINA-JHS section.
Ballast
556 06.0331.13J. BINA-Agra: Raising cushion of loop lines of KRQ,
DAA, SOR, KTRA, DBA, AEH & ARl on JHS-GWL section.
Ballast
557 06.O...1.133. BINA-Agra: : TBR = 4.139 kms. on DN & Up road at
platform between LAR -JHS.
Ballast
558 06,03.3l.13.., BINA-Agra: TBR = 4.856 kms. on DN & Up road at
platform between JHS -STLl.
8a„ast
559 06.03.31.13.3 jhansi: TBR =2.90 kms. of up Middle Line, DN
Middle une, CNB L`ine & MKP Llnein Jhansi Yard
Ballast
56o 06.0331.13.3. |hansi: TBR =3.6 kms. of BP-1, BP-2, BP--3, RD-1 &
RD-2 Lines in Jhansi Yard
points & Cro§slngs
561 :%33"" #r'nao::V;-#ia2-::;Wna:sS.;:i.°:nR8::':]C;I:s|;w°,fth
60k8
Points a Crossings
562 06.cO31.163. Bina-Sithauli section: TTR(CMSC)=27 Nos.(1inl2)52.°°' from station AGD to TBT on up & DN road ofJhansi
division.
Po.nts & Cressings
563 06.03.31.163. Bina-Sithauli section : TTR(CMSC)=27 Nos. ( 1in 12)S2`°°7 from station |Hs to ARl on up & DN road ofJhansi
division.
Points & Crosslngs
564 0€.03.3l.16 3 Bina-Sitt`auli section: TTR(CMSC)=27 Nos.(1inl2)52.°°8 from station Bzv to jHS on up & DN road ofJhansi
division.
points a crossings
565 ce.013l.17 6 MTj-AWR section-Switch Renewal 1 in 12 (15 Mos.)5ooou & iin8.5 (13 NOS.)
Points & Crosslngs
566 06.OZ,31.17`6 Tundla -Ghaziabad : Through curved switch 45 Nos.S|.0,8
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Pa rticu la rs of works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRAck l`ENEWAIS
Pot nts & Crossings
567 06-OZ,3l.17.6-Tundla -Ghaziabad : Through crossing Renewal 75
Points & Crosslngs
568 0602 3l.17 6 Kanpui -Rurah : Through curved switch 45 Nos.S1.031
points & Crossings
569 ::::;]1176. Kanpur-Rurah. Through crossing Renewal80 Nos.
polnts & Crossings
57o 06-OZ.31.17.6. Rurah. Tundla : Through curved switch Renewal 45
Points & Crossings
571 06-02,3l.17.6 Rurali -Tundla : Through crossing Renewal 75 Mos.51.02S
Polnts & Crossln8s
572 060231,17.6. Allahabad-Kanpur :Through curved switch Renewal
Points a Crossings
573 06,OZ.31.17.6. Allahabad -Kanpur : ThroughcrossingRenewal 75
Points & Crosslngs
574 060231.17.6. Mughalsarai -AIIahabad :Through crossing Renewal
Points a Cros§Ings
575 06023l.17.6 Mughalsarai-Allahabad :Through curved swltch
Renewal 45 Nos.
Polnts & Crossings
576 060331.15.3. KID-BZM SECTloN-CTR(P)=0.530 Kms. on KID-BZM
points & Crossings
577 06.03.31,13.3 B|NA-Agra: iTR(CS)=38 Mos, 60 Kg. on BINA-STLl
polnts & Crosslngs
578 06-03.311S3. jhansi-Kanpursect.lan: Through ReplacementofofS2-°°2 28 nos 1:12 & 2 nos 1:8.5 CMS crossings of T/Out.
Paints & Crossings
579 06.03.3l`lo.3 Khairar-Bhimsen -TTR-05 mos.1 in 8.Sat BSZ52'°2° yard inconnection with 30 kmptl speed of loop line
I]olnts a Crossing$
58o 06.03.3l.lo.i. Khairar-Bhimsen -lTR-05 nos.1 in 8.5 atJSB,52.023 HAR , GTM yard inconnection with 30 kmph speed of
loop line.
Polnts & Crosslngs
581 06.03.31.lo,.. I(hairar-Bhimsen -lTR-05 nos.1 in 8.5 at BSZ,5Z`°22 KTRR, & pTREyard inconnection with 30 kmph speed
of loop line.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures ln thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Antlcipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
~K F`ENEWAIS
polnts & Crossings
582 06.es31`1lJ). B.Lr|a Nagar-Bhind section ofJhansi Divislon :
Throiigh Turn out / Derailing Switch Renewal at
Bhind & Gohad Road Yards . (Bhind Yard : -1 in
12 T/out =2 no., 1 in 8.5 T/out = 1 nos. & D.
switch = 1 no. Gohad Road yard :-Dera`iling
points a Crossings
s83 060331.113 TTR (P) = 0| no. Scissors cross over 1 in 8.5 at
BAB Defence yard
holnts & Crossings
584 06.03.]1.1l.3. |hansi :-ITR (P)=05 nos. (1 in 8.5) HP-24 to
HP-26 and HP-27 and 28 (DSS) at A.C. loco shed
Jhansi
Points & Crossings
585 06.03.31.1l... jhansi Division Through Turnout Renewal (lTR) of
Scissor I:ross over point no.128 A & 8,129 A & a
at Gwalior Yard.
Points & Crossings
586 06.03.3l.lz.3. TTR(P) =6 Nos.(1 in 8.5) HP13 to HP18 at A. C.
Loco Shed Jhansi
Points & Crossings
s87 06`02 31.18.3. Manikpur -Naini : Through switch F(enewal = 40
Others
588 06.03.31.13.2. Bina-Agra section-TFR20.3Tr.kmson uproad.52 001
Others
589 0601.31.17.2. Mathura-Palwal -Through Fitting Renewal 47.108 KinS0 COL
0the,s
59o ce.0331,12`3 TWRof |3cO Nos. I(inky/Cupped/Misall8n weld
Joints with Mob`ile Flash Butt Welding on JHS-CNB
Sections
Others
591 06.01.3l`16,3. Agra fort-Bandikui-Renewal of SEJ (Modified) 28
Nos & Glued Joint 10 Mos
CIther$
592 06.Ol.3l.16,. ldgah-Bayana-Renewalof SEJ (Modifled) 20 Nos &
Glued Joint 22 Nos
Others
593 06.OZ.3l`16.a Mughalsarai-AIlahabad : Through Fitting Renewal of5[.°°] Steel channel sleepers of up Line at Yamuna Bridge
No. 30.
Others
594 06.01.3l.16... Agra Division-Dholpur-Agracantt-Renewal of Thick
Web switch 8 Nos
List of Approved Works Costing less Than f`upees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particula rs of Works AIIo-cation Ant`icipated Outlay Olitlav Balanceto
Cost expected 2020-21 complete
to end of work2019-20
Tack liiENOwALs
Others
59s 06`01`31.16.3. Agra Division-Dholpur-Agra cantt-Reconditioning of
CMS X-in8
Others
596 06.01.31.17.3. Dhaulpur-Agra cantt section-fteplacement of
fittings of Channel Sleeper 873 Nos.
Others
597 06.Ou.31,17.3. B|NA-STLl-sectionTBTR=556 Nos. th roilgh channel52Jro' sleepers renewal on bridge no.1050/1 UP,1050/1DN,
977/1, 986/1,1003/1 of UP & DN road and on Br. No.
1027/1 on UP road of BINA-LAR section
orhers
598 06-03.3l.17.3 BINA-STLI section: TBTR channel = 430 Nos.Through
Channel Sleeper Renewal on Br. No.
1108/1UP,1112/1DN,1112/1UP,1105/1DN ,1105/1UP,
1039/2,1044/1Up & Dn of BINA-LAR section.
Cthe,$
599 0603.31.17,3, BINA-STLI section: TBTR channel =517 Nos.Through52°°2 channel sleeper Renewal on Br. Noll60/1UP,1164/1
UP & DN,1061/2DN,1065/2
UP&DN,1076/1UP&DN,&1076/2UP& DN,
1189/2UP&PDN,1208/1 DN of BINA-lAR section.
Othe,s
6oo 06JB..1,17J. Sitho|i -Dholpur. Section: TBTR channel(Fittings)52.cO4 = 2326 Nos.Through channel Fittings Renewal on
various bridges of UP & DN road under ADEN Gwalior
jurisdiction.
Others
6oi ee.02,3l.12 3` Through fitting renewal of points & Crossings on
main line in CNB -TDL Section
Othe,i
6o2 0609.31.17.6, TFR= |6|(M from kin 1372.00to 1388.00in Banda -
Manikpur section.
Others
6o3 060131.17.3, MathL|ra-Palwal section-Renewal of SEJ (Modified)
70 Nos. & Glued Joints 70 Nos.
Others
6o4 06.0331.17,6, jhansi-Kanpursection:TFR= 20.800 Kmsfrom Kin5Z.ol2 i2o4.ooo to Kin 1224.800
Others
6o5 06`O..31.17.6. Banda-Manikpur:TFR= 12 KM from kin 1392.coto
Others
06.0231.17 6. Kanpur _ Tundla : Through Fitting Renewal -24.327S1021 Kms.SSE/P-Way/CN B-I I
List of Approved Works Costing less Than Rupees Two Crore Fifty lakhs Each
Nol`TH CENTRAL RAllwAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works AIlo-cation Anticipated Oiltlay Outlay Balanceto
Cost expected 2020~21 complete
to end of work2019-20
TRACK RENEWALS
Others
6o7 06`02`31.17,6 Mughalsarai -Allahabad : Through Fitting Renewal
-28 Kms. in the section of under ADEN / Chunar
Others
6o8 0602 3l.17 6 Mughalsarai -Allahabad : Through Fitting Renewal-9.93 Kms. in the section of under ADEN /
Mirzapur
Others
6og 06.02.3117 6 Kanpur -Tundla : Through Fittin8 Renewal -21.56
Kms. on UP Main Line iri the section of
SSE/P.Way/Shikohabad
Others
6io 06.0231.17 6 Kanpur -Tundla : Through Fitting Renewal -27.27
Kms. on DN Main Line in the section of
SSE/P.Way/Sh'ikohabad
Ott'ers
611 06.02.3117.6, Kanpur -Tundla : Through Fitting Renewal -25.27
Kms. on Main Line in the section of
SSE/P.Way/Firozabad
Others
612 06.02..1.17.6. Tundla -Ghaziabad: Through Fitting l}enewal -51°3S 26.63Kms.onMainLineinthesectiono[ADEN/
AUN
0the,s
613 06023117.6. Tundla. Ghaziabad : Through Fitting Renewal -285`.037 Kms. on Main Line in the section of ADEN / T/ TDL
Others
614 06.02.31.19J, CND -RRH : Through Fitting Renewal ofsteel51`°°1 channel sleepers on Girder Bridges
Others
615 06.03.3l.1S.., Bina-Agra canttsection :TRR(P) =0.620 Kmson52.053 up road from Kin 1143.720 to Kin 1144.340
Others
616 06`01,31.17 3. Raja Ki Mandi-Agra city-Provision of Ballast less
track 0.74 kin UP & DN Road
Othe,a
617 06`03.3l.17,6. jhansi-Manikpur :-Dhasan Bridge replacement ofS2.021 old cha nne| sleepers.(TBTR)
Others
ce.01.3l.17.6. Agra Ca ntt.Palwal section -Th rough Fitting Renewal
Others
o6.ol31,17 6 Agra Cantt-Dholpur section -Through Fitting
Renewal 22.600 Kin
List of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Pa rticu lars of works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20TRACK RENEWALS
Others
62o 0603 31.17 6 jhansi-Banda section:-Replacement of channel
sleepers on major bridges.tTBTR) in between kin.
1226 to 1319.
Cwhers
621 06.03.3117.6, |hansi-Manikpur :-Betwa Bridge replacement of
old channel sleepers.(TBTR)
Others
622 06 0] 3117.6 jhansi-Banda section:-Replacement of channel
sleepers on major bridges.(TBTR) in between kin.
1127 to 1226.
Others
623 06.03J1.17.6` jhansi-Manikpur :-Ken Bridge replacement of old
cha nnel sleepers.(TBTR)
Ott'ers
624 06`03.31,17 6 Banda-Manikpur :-Replacement of old channel
sleepers of Bagain & Paisuni important Bridges
.(TBTR)
Others
625 ce.03.3l.17.6, I(lD-BZM section:-Replacement of channel sleepers
on major bridges.(TB")
Others
626 06.ce.3l.15.3. Bina-Agra cantt section: TBTR=347 No5.-S2.°54 Replacement of existing steel channel sleepers
with new steel channel sleepers over Br. No.
1217/1 of UP & DN road and 1218/1A of UP & DN
road between Sithouli-Gwalior stations.
Others
627 06.03,31.15`3 Bina-Agra cantt. Section: TBTR channel(Fitt.ings) =52`°52 7ig Nos.Through channel Fittlngs Renewal on
various br.idges of DN road OF BINA-AGC sectioii.
Others
628 06.03.3l`173 jhansi-I(anpur& Bhimsen -lngohtasec :-490nos.S2 0°5 Replacement of channel sleepers
Othe,a
629 06`O..3115.3, Bina-Agra cantt. Section: TBTR channel(Fittings) =52.055 75o Mos.Through channel Fittings Renewal on
various bridges of UP road of BINA-AGC section.
Others
63o 06,02J]l.1].3. Chopan-Agori :Throughweld Renewalwith mobile51021 flush butt welding
Others
631 0602,31.133. Rasulabad-Chandari (RUB-CNBl):-Scatter sleeper5].018 ,enewa| of broken sleeper w.ith new one in the
section of ADEN/Fatehpu r.
List of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL RAILWAy
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Antlcipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRrm R"OwALs
Othe,i
o6.o2 31.13`3 standarization of cess from Kin.1066.cO toS` Ore Kin.ii7o.oo in the section of ADEN / Etawah
(UP-85.cO kin & DN-85.cO kin)
Others
o6o2 31.13.3. Tund|a -Ghaziabad from Kin.1246.50 to Kin.1324.00
and Barhan -Etah from Kin. 0.00 to Kin. 59.00 :
Standarization of Cess as per LWR profile iinder
ADEN / TnDL
Others
634 0€03.31,13.3. Birlanagar-Bh`indsec.: Conversion ofswB into LWR52-029 aiongwith iwR of SKV welds by Mobile Flash Butt
Welding from Kms.1283.525 to kin 1291.525.
Others
635 0603.31.15.3. BIN-AGC section: TFR = 9.091 Kms on DN M/l from Kin
1193.100 to Kin 1212.191
Others
636 06cO..115J, B|NA-AGC section: TFR = 8.69 Kms on up M/Lfrom52.074 i2o7.45o to Km|2||.300 and from Kin l211B.goo to I(in
1`215.600.
Others
637 06.03.}1.15`3 B|NA-AGCsectton:TFR= 8.300 Kmson DN M/Lfrom52.072 Kin gg3.7oo to Kin 1002.OO0
Others
638 06.03311S.3. B|NA-AGCsection:TFR=9.000Kmson DN M/Lfrom
Kin 1002.000 to I(in 1011.000
Othe,s
639 06.0].3l.ls3. BINA-AGCsection:TFR=7.000 Kmson DN M/Lfrom
I(in 1075.000 to Kin 1082.000
Others
64o 06.03311S.3. B|NA-AGCsectiori:TFR= 8.800 Kmson DN M/Lfrom52 059 Kin io66.ZOO to Kin 1075.000
Others
641 0G.03.3l.15`3. BINA.AGCsection:TFR=8.940l(mson up M/LfromS2,cO Kin iooo.o60 to Kin l009.OOO
Others
642 06.03`31.153. B|NA-AGCsection:TFR=9.000Kmson DN M/Lfrom52.Ou Kin logo.o00 to Kin 1099.000
Others
643 06.co.3l.15,3 B|NA-AGCsection: TFR=9.000 Kmson DN M/Lfrom52.065 Kin logo.o00 to Kin 1108.000
Others
644 06.a..3115J, BINA-AGCsection:TFR=9.000 Kmson up M/Lfrom52.051 Kin ioog.oo0 to Kin lo18.000.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(F`igures in thousands of rupees)
Item ProiectlD
No.
Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
T"K F`€NEWALS
Others
645 06.03.3115.3. B|NA-AGC section: TFR = 9.500 Kms on DN M/L from
Cithers
646 06 03 31.15.3, B|NA-AGC section: TFR = 9.500 Kms on DN M/L from
Others
647 06.03.3l.15,3 Bina.Agra cantt. Section: TFR = 6.330 Kms on up
M/L from Kin 1076.670 to Kin 1083.000
Others
648 06J)331.15.3. Bina-Agra cantt. Section: TFR = 9.ZOO Kms on up
M/l from Kin 1018.000 to Kin 1027.200
Others
649 0602 3l.15.3. Mu8halsarai.AIlahabad : Conversion offishplated
track into lwR of Loop Lines at Jhigura, Mirzapur,
Vindya¢hal, Beroh`i, Gaipura & Jigna Stat.ion
Others
65o 06.OZ31,15 3 Mugha|sarai-AIIahabad : Conversion offishplated5]°8° track into LWR of Loop Lines at Mandha, Uchdih,
Meja, Bheerpiir, Karchana, Chheoki & Naini Stat.Lan
Others
651 06.OZ.3l.ls,3. Allahabad-Kanpur : Conversion of fishplated track51.°81 into LWR of Loop Lines at Bamhrauli, Manauri,
Saiydsarawan, Manoharganj, Bharwari, Bidanpur &
Sujatpur Stations
Others
652 ce.02.31.1S.3. Allahabad-Kanpur : Conversion offishplated trackS1.082 into LWR of loop Lines at sirathu, Athsarai,
Kanwar, Kathoghan, Khaga & Sathnrain'i Stations
Others
653 es 02.31.15.3. A||ahabad-Kanpur : Conversion of fishplated trackS1,OC3 i,`to LWR of loop Lines at Rasulabad, Fazullapur,
Ramva, Fatehpur, Kurastikalan, Malwan & I(anspur
G ugau li Stations
Others
654 0602.31.ls3. Kanpur-Tundla : Conversion offishplated track51.084 into iwR of Loop lines at Ambiapur, Jinjhak,
Kanchausi, Phaphund, Pata & Achldha Stations
Others
655 0602.31`15.3. Kanpur-Tundla : Conversion of fishplated track5lJrss into LWR of Loop Lines at samohan, Bharthana,
Ekdil, Etawah & Sarai Bhoopat Stations
Others
656 06.02.31,15 3 Tundla-Ghaziabad : Conversion of fishplated track51.°68 into LWR of Loop Lines at Mitawali, Chamraula,
Jalesar, Pora, Sasni, Mandrak, Daudkhan & Hathras
Stations
list of Approved Works Costing Less Than Rupees Two Crore F.Iffy Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Anticipated Outlay Outlay 8alanceto
Cost expected 2020-21 complete
to end of work2019-20
TRACK RENEWALS
Others
657 06.02.}1.15.3. Standar.ization of cess in the section of51.008 SSE/p.Way/ Firozabad under ADEN/ Firozabad.
Othe,$
658 06.02.31rs3 ThroughsEJ renewal.Lnthe secttonof
ADEN/Line/Kanpur
Others
659 0602.31.15.3. Through sEl renewal in the Section of ADEN/Etawah51.058
others
66o 060231.rs.3. ThroughsEJ renewatinthe sect'ion of
ADEN/Firozabad
Others
661 0602J1.15.3` Through sEj renewal inthesection ofADENnrack
Others
662 06.02.31.1S.3. Through sEj renewal in the section of ADEN/AligarhS|.062
Others
663 06J)a.31.15j. Bina-Agra cantt. Section: TBTR channel(F.ittings)52.°°1 = 856 Nos.Through channel Fittings Renewal on
various bridges of UP & DN road OF BINA-AGC
section.
Others
664 06,03.3l.1S.3. Bina-Agra caiitt section : TBTR=360 Nos.-5Z.°'° Rep|acementofexistingsteel channelsleepers
with new steel channel sleepers over Br. No.
1282/1 of DN road between Hetampur-Dholpur
stations.
Others
66S 06.03.31.lo`3. Bina -A8ra-Through Gluedjoint Renewalon
Hetempur & Bhandai station.
Others
666 06.0331.103 jhans| I)ivisioon -Conversion 60.00 Track kms52.°18 through replacement of main line rubber pad
Others
667 06.03`3llo.3. Manikpur-Naini-Conversion ofswR/ FPTrack51.°2' into LWR of loop I.ine under pwl/ MKP & SRJ section
excluing MKp yard .inconnection with 30 kmph of
loop line between MKP -NVN section ( 11 Loops)
Ott'ers
668 06.03.91103. Manikpur -Naini-Conversion ofswR/ FP Track into51'°26 iwR of loop line under pwl/ NYN section excluin8
NYN yard inconnect.lan with 30 kmph of loop line
between MKP - NVN section ( 10 Loops)
list of Approved Works Cost`ing Less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works AIIo-cation Anticipated outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRACK RENEWALS
Others
o6,03 31.10 i |hansi -Kanpur Section -convertion of SWF` track
into LWR of loop lines inconnection with 30 kmph
speed on loop line ( 12 loops)
Others
06.01.31.10.., Angra Division - Welding of rail Joints for
conversion of SWR to LWR
Othe,s
671 06,Ol.3l.103 Raja ki Mandi-Arga city-Provisionofballast
less track at UP track in Agra city tunnel.
Others
672 06,0231lo.3. Chunar-Chopan section-Convertion of03 Rail51'°°4 panne| / F.,sh plated Track into LWR on Main line
between CAR - RBGJ station
Others
673 06.0231.103 chunar-Chopansection -Convertion of03 Rail51.cos pannei / Fish plated Track into LWR on Main line
between RBGJ- CAR station
Othe,s
674 06.0331.11.3. Conversion of SWR/Fp track in to LWR of 12 nos52 °`5 Looi) lines under SSE (P.WAY) GHATAMPUR & SSE
(P.WAY) BANDA section in connection withincreasing of speed from 15 Kmph to 30 Kmph of
Loop lines between KHAIRAR-BHIMSEN section
Others
675 06.03.3l.1l... Conversion of SWR/Fp track in to LWR of 7 mos LoopS2.010 lines under SSE(P.WAY)Banda & Manikpur section
in connection with increasing speed from 15 Kmph
to 30 Kmph of Loop lines between
Khairar-Manikpur section.
Others
676 06.03.3l`11.. Conversion of SWR/I:P track in to LW8 of 10 nos52.009 Loop lines under SSE (P.WAY) Chitrkut Dham Karvi
section in connection with increasing speed from
15 Kmph to 30 Kmph of Loop lines between
Khairar-Manikpur section
Others
677 06.03.31.133 B|NA-Agra: TFR=9.90 Kms. on DN road 'in BINA-JHS
section.
Others
678 06.cO.3113.3. B|NA-Agra: ThroughsEJ Renewal (49Nos, 60 Kg.)on
BI NA-STLl section.
679 06.OO.31,203 Works costing below DRM's Power00 999
TOTAL-wORrs iN pROGREss
RRSK 9,00,00 9,00,00
RRSK .` S3,cO,OO
list of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item P'OjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
a - New Works
Through Rall Renewal
680 06.03,31`ZO.3. Bina-jhansi section: TRR(P) = 2.18 kms from Kin
1088.00 to 1089.600 and from Kin 1078.170 to Kin
1078.750 on Bina-Jhansi UP Road section .
Through Rail Renewal
681 O€,03 31.203. Bina -Sithouli section: TRR(P) = 1.115 kms at52.°°3 various locations on Bina -Sithouli up and DN R0ad
section .
Through Rall Renewal
682 06.03,.1,203. Bina-|hansi section: TRR(P) = 1.491 kms from kin5Z.°°Z io82.886 _ kin |o84.377 on up Road on Bina-Jhansi
section.
Through Sleeper Renewal
683 0602.31.ZO.3. Kanpur-Tundla :Throughsleeperrenewal (P)from
1137.5 to LC No. 21C = 1.6 Kms
Through Sleeper Rene`^/al
684 06.023l.20.3. Kanpur-Tundla : Through sleeper renewal (P)from
1139.1 to 1141.250 = 2.15 Kms
Through Sleeper Rene`A/al
685 ce.02..1203, A||ahabad -Kanpur :-Casual sleeper Renewal51.003
Ballast
686 06.0331.20.3 jhansi-Sithouri section : Through Ballast52 cO6 Recoupment = 6.65 Kms from kin 1164.950 to kin
1171.600 on Jhansi-Sithouli DN Road sect.ion.
Ballast
687 06.03.31.20,., jhansi-Sithouli section : Through Ballast52.cO4 ftecoupment = 6.65 Kms from kin 1171.600 to kin
1178.250 on Jhansi-Sithouli DN Road section.
Ballast
688 06,03`3l.20 .... hansi-Sithouli sect.ion : Through Ballast52.°°7 Recoupment = 6.663 Kms at various locations on
JhansLsithoul.I DN Road section.
Othe,s
689 06.013120.3, |DH-BXN section -Through Fitting Renewal -
Others
69o 06.01.3l.203. |DH-Bxn sec. Replacement of steel channel sleepers50.003 of Bridge No.3 wlth fittings
Ott'ers
691 06J)1.31.20j. AGC-PWL, AGC-lDH, lDH-JAB, BKM-JAB & JAB-ETUEsO.°°S section _Through Fitting Renewal (only Rubber pad)
• 67.892 Kin
Llst of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Anticipated Outlay outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TRACK RENEWALS
Others
o6.ol`31203. AGc.DHo, BHA-ETW, IDH-BKI sec. -Renewal of Rubber
Others
693 06-OZ.31.20.i. Atlahabad -Kanpur : Through Fitting Renewal -
Others
694 0602 31`203. A||ahabad -Kanpur : Through Fitting Renewal -26
Others
695 06.03.31.20.3. Bina.Sithouli section : Through Replacement ofS2.°°. Rubber pads at various locations between kin 977
to 1215.600 on Bina-Sithouli section.
Others
696 0601.31203. MT|-AWR section: Through channel sleeper renewal50.001 of bridge no.1487/1 and 1513/1
Others
697 06,02.3l.203. CAR _ CPU : Prov.ision of Track Machine siding at
CIthers
698 06.OZ.31`ZO.3` CAR -CPU : Provision of Ballast siding at Lusa
699 0600.31.20.3. Workscosting below DRM's Power00.999
TOTAL-NEW WORKS
TOTAL,TrackRenewal§
BRIDGE woRrs
A -Works in Progress
7oo 06,02,3217.2. Replacement of corroded bottom flange plate, Main11.col angles, bracing angles of bottom boom, bottom cross
girder and strengthening of other members of Br.No. 30 (UP &DN) line between Naini-Allahabad
section on ALD division.
7oi 060132-04.Z, Agra cantt.: Provision/repl. of6.1m spangirdersO'°°' bridge by Rcc slab bridge No. 23, 85, 90,115,137
& 160.
7o2 060132.1l`3 Etmadpur-Kuberpur section: Strengthening of Br.50`0°1 No. 4 (3xg.14 in) span Arch bridge under the
jurisdiction of ADEN/HQ/ Agra.
7o3 06,02 32".3. Kanpur-Tundla:-Replacement of existing girder51.col Bridge No. 55 at Kin 1166 / 13-15 by provlding psc
Slab. .
RRSK 2,26,65
R 13,92
RRSX 27.00.00
RRSK
RRSK
27,00.00
.. 45,00,00
.. 98,00,00
List of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated outlay
Cost expectedto end of2019-20
Oiitlay Balanceto
2020-21 complete
work
BRIDGE woRrs
7o4 06.013Z.15`3. Agra -Pa|wal see.:-Replacement of exixting
girder of Bridge of span 7.62 in of bridge no.1364/2 at KM.1364/26-1365/2 DN road by PSC slab.
7o5 06J)2J2.16.3` Tu ndla-Ghazia bad :,Rebuild ing of syphon br.ldge51.cO2 No.22o at Kin.1419/25-27 in block section
Dadri-Maripat.
7o6 060lJ2.17.3. Agradivision: Regirdiringof6.10M steelgirder50col on Bridge no. 1372/1 UP @Km 1372/19-21 having
span 3xl2.2m +2x 6.1m span on Agra-Palwal section
and provision of side pathway on Bridge no. 3 &
Bridge No. 74 in Tundla-Bayana section:
707 06`02.32.19,3 Replacement of deck plates with its memeber of Br.
No. 30 (Yamuna) UP &DN line between
Allahabad-Nai ni stations.
7o8 06.03.321SJ. Bina.jhansi see: Epoxy grouting and pointing of52cO3 old cracked piers/bed blocks of various bridges.
7og 0€.03.32.16.3. jhansi division -Prov.ision of pedestria n pathwayS2.°°' ono3 |mp& major Bridges ( 1. BrNo.1086/1 UP
(18x24.4) 2.Br No 1386/1 (4x30.48) 3.Br No 1334/2
(3x30.5) in Banda-I(anpur section}
7io ee.03`3Z 17.a jhansi-Manikpur section:-Strenghtheing andS2.°°3 realignment of bridge no.1256/1,1259/1,1311/1,
1376/I.
711 06.01`32.lB.a, Agra Divn-Protection of h.igh bank bv providingsO.001 toe wall / ballast retaining wall in Agra cantt-
Raja Ki Mandi and Jamuna Bridge -Etmadpur Section.
712 060232.19,3 Rep|acementofdeck plateswith itsmemeberof8r.`` °°2 No. o5 (Tonse) Up line between MJA-BEP stations of
Allahabad division.
713 0G.03`32.14.3. jhansi-Kanpur section-Replacement of steel girderS2.°°3 by psc slab of Br. No.1338/2, Span 5X6.10M & Br.
No. 1308/3 Span lx6.1M
714 06.03.32.15`3, |hansi-Kanpur & Bhimsen-Ingohta section :-52.°°2 Replacement of steel girclers by psc slabs of
bridge No` 1305/3 (span 1/610m) ,Br.Ld8e No.
1323/2(span2/6.Ion) in Jhansi-I(anpur section and
Bridge No.1406/2( span 3/3.35m) in
715 06.01`32,16 i Agra Divis`ion-Yamuna Bridge-Raja ki Mandi-50.°°2 strengthening of 15 nos. Arches by epoxy
grouting in the approach of streachy bridge No.167
716 06.03 32.19,3, Bina-|hansi-section Rehabilitation of various52.°°5 stone slab bridges of span < 2.00 M under
jurisdiction of ADEN/LAF( Jurisdiction.
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works AIlo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
BRIDGE WORKS
717 06.03.32.19.3, Provision of pedestrian pathway on 02 NoS11.°°] Important Bridge on on Gwalior-Udi mod section of
Jhansi D.iv.ision.( Br No.1313/1 Koari Span 8x45.7
M & Br No.1326/1 chambal bridge span 9x76.2 M)
718 06.02.]216 3. A||ahabad -Mughalsarai:-Rebullding of Hume pipe51.Col bridge no.466 at kin. 677/21-23 with RCc box.
7ig 0602 32.17 3 A||ahabed Division; Provision of Man refuges on
various bridges (13 mos).
72o es,0332193. B.ina-Sithauli :Replacementofguard railsat5Z °°8 different bridges under ADEN /LAR & ADEN/L/JHS
Jurisdiction.
721 %%,32.1" #ar:d?:;:::ann;:ae:i::ao:r|:gneo-s:aAarckjes by
jacketing in the approach of streachy bridgeNo.167
722 06.OZ`32.17.3. Sh.ikohabad-Farrukha bad :-Providirig a nd laying51col p.,tching with stone boulders at bridge No. 94,169
& 136 .
723 06.0232.19`3 Kanpur-Rura : Replacementofarch/slab bridges51.°°4 having span up to 9.10 in with RCc box.
724 06.OZ.32.19... Kanpur-aura :-Replacement of damaged/crackedS£.°°` slabs & other repairs works of minor/major bridges
in Kanpur-Rura section.
725 06.03.]2.193. Bina-Sithaun: Rehabilitation of various archS2JsO6 bridges of span < 2.oom underjurisdiction of
ADEN/LAR &ADEN/L.ine/JHS (28 Nos bridges)
726 ee.03.32.17,. |hansi division:Provision of inspection steps NameS2.°°2 Boards, return wall in Jhansi-Manikpur Br NO.
1172/1,1278/1,1305/1 & in Khairar-lngotha
section Br. No. 1311/2,1335/1.
727 06.03.32.19.., Bina-Dholpur ln.Provsion of pedestrain pathway to11.ace various major plate girder bridge on Bina-Dholpur
Section. (Bndge no. 986/1, 992/1, 996/1,1003/1,1027/1, 1034/1, 1039/1, 1044/1, 1050/1, 1061/2,1065/2, 1076/1, 1076/2, 1078/1, 1078/3, 1105/1,
728 06.a.,.219.I. STLl-DHOsection :-Heavy repairsoflMP52002 bridge(chambal bridge) No.1282/1 UP & DN at kin
1282-26-1283/42 between H ET-OHO stations
729 06.023Z.183. Mughalsarai-Allahabad:Provision of Box Jacketing5l.cos of Arch Bridge , Bridge No.467 Kin.679/3-5,Bridge
No.493 Kin.712/17-19 and bridge No488 Kin.708/23-25.
73o 06.0332.19 I. |hansi Divn. Provision of pedestrian pathway to11`°°1 various major plate girder bridges on
Jhansi-Manikpur section, Jhansi-Kanpur Section,
Khairar-Bhimsen section and Gwalior-Bhind section.
List of Approved Works Costing less Than Riipees Two Crore Fifty lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 55
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
BRIDGE wOF`rs
731 06.0332.193 )hansi D.iv.ReplacementofbearlngofBridge no.11.cO7 1141/1, 1316/1, 1376/1,1386/1,1406/1 ln
Jhansi-Manikpur section and 1334/2 in
Khairar-Bh.imsen section of Jhansi DMsion.
732 06.02J2.18.3. Chunar-Chopan:-Improvement to retaining wall,catch51.°°Z water drain,end wire sources of boulders in
Lusa,Saketeshgarah, Chilrk, and Aghorikhas at
Kml57-159,161-162 &216-218 .
733 06.03.32`19.3. |hansi Division-Replacement of bea ring of Bridge11.cO4 no. ico6/1 up road,1006/1 DN road,1176/1 DN
road,1176/1 UP Road,1251/1 UP road,1258/1 UP
road,1267/1 UP road,1282/1 DN road in
Bina-Dholpur section..
734 06.a..2193. Bhimsen-lngota section;-Construction of damaged5Z.°°2 side drain/catch water drain from Kin.1366/4 to
1367/6 (lHS sicle & RHS side) for protection of
Yamuna bridge.
735 06.02.32.18.3, Mughalsarai-AIIahabad:-Provision for strengthing5l col of Bridge No.531,533,535,1&28 by Groutin8.
736 06.a...2193. Proposed conversion ofold girder bridge no.52.009 1327/1 & 1392/1 to RCC Box bridge in
Jhansi-Manikpur section
737 0€.02 32.18.3. A|lahabad: Providing c.C. Crib for SSE/Br./AID &11.°°4 CNB in connection with restoration work.
738 06`O},.2183. |HANsl-SITHOULl section :-Jacketing of various old' 52.°°] bridges i.e. bridge no.1160/2 Up of span 1/6.1 M
at kin 1160/17-19&1160/1 UP at kin.1161/1A/31.33 of
span 3/6.10m between DAA-SOR stations under
ADEN/L/JHsjurisdiction
739 06.09.32`18.3` jHANS|-S|THOULl section :-Jacketing of various old52cO2 br,dges i.e. bridge no.1165/1 DN span 2/3.66 M at
kin 1165/10-12,1168/1DN at kmll68/10-12 of span1/12.19M &1170/1 DN at kmll70/24~26 Of span 1/6.1m
between SOR-KTRA stations under ADEN/l/JHS
74o 0603 3Z,18,3, |HANS|-SITHOULl section :-Jacketing of various old5Z.°°3 bridges i.e. bridge no.1183/1 DN span 1/6.1 M at
kin 1183/28-30,1186/2 DN at kin.1186/24-26 of span
2/6.1 M &1194/1DN at kmll94/24-26 of span 2/3.66M between DBA-STML&AEH-ARl stations under
741 06`01.3Z.OO,. A|war-Mathurasection : RepairofbankofA8ra5°.°°` canne| and water lagged area at Kin.1417 and
providing face wall on existing RCC hume pipe.
(JP/S/00ro1)
742 06.03.32,02.. B|N-jHS-Replacementof7 spansof6.10mforGB52.°°' Nos.iogi/1,iog6/1,|1o7/1 a 1114/1 by psc slab.
list of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works AIIo-cation Anticipated Outlay
Cost expectedto end of2019-20
Outlay Balanceto
2020-21 complete
work
BRIDGE WORl(S
743 06 03 ]2 02.3. jHS-MKP -Replacement of 7 spans of 6.10m for GB52.°ca Nos.1 155/1, 1159/1, |250/3,1253/1 & 1263/1 bv psc
stab.
744 0603 32.08`3 chitrakoot: Rehabilitation of weak bridges by
plac'ing/pushing RCC home pipe in ex.Lsting
/seperate opening.
745 06,0l..2 09.3. Etmadpur-Agra Fort: Replecement of Arch bridge no.
5 & 7 of 6.1 M. span by RCC box culvert.
746 06.02.32.09,a. pahara-Oagmagpur: Prov`ision of box culvert of
bridge no.494 (3x6.096 in) at kin.713/5-7, 713/8-6.
747 060132.09 3. Etmadpur-Agra Fort: Replacement of Arch. Bridge
No.12 of 9.15 mtr. span by RCC box culvert.
748 06.02.)2.10.3. Kanpur-Allahabad : Rehabilitation of Br. No 112
(Arch lx6.10m) by providing RCC slab.
749 06.01.32`lo.3. Agra cantt-Palwal:Replacement of girder Br. No.
1398/1 UP (1x9.14m) by 18.30m girder.
750 ::%33"°.3 #::3C;:;i-;aj#9::4PLa;:T:::3°ofm8'::redre:."
751 #%23"0 3 ::;ag/:nuttp-:±a:;.all;#;C[e8T3eon:g::rddeerr:r. N°.
752 06.0132103 Agracantt-Palwal: ReplacementgirderBr. No.11.col 1399/2 DN (|x9.|4m) by 18.30m girder.
753 06.01.32.lo.i. Raja-I(I-Mandi-yamuna Br: : F`eplacement ofsO.°°9 existing girders Br No.1349/9 (1x9.14m)& 166
(1x9.14m) with PSC slab.
754 060132.10.3. Idgah-Agra Fort: Replacement of existing girders50,007 Br No. 159 (ixg.14m) with psc slab,
755 06.023210.i. Tundla-AligarhJn: Rebuildingofbridge No.13151.cog (Arch bridge |xo.6|m) & 133 (Arch lxo.91m) by RCC
slab bridge.
7s6 ee.03 32 lo.3` jhansi-Kanpur: Rehabilitation of brid8e No.1275/152.cO2 by Rcc slab up to 3.o5 mtr span between pNH1-DBR
section.
757 oui,03J!2.1S.3. |hansi Division: Provision of pedestrian pathway52.°°4 at Dhasan Bridge, Bridge No.1206/1 at kin rlo
120S/8-1206/3 in Mauranipur-Harpalpur section and
at Bagain Bridge, Bridge No. 1361/1 at kin no
1361/3`4 in Bada usa-Bharatkoop section
758 060032.20`3. workscostingbelow DRM'sPower00.999
list of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(F`Lgures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020L21 complete
to end of work2019-20
8 -New Works
759 06.0132.20J. Heavy Repairing of Bridges in lDH-BKl and AGC-OHO
76o 06".32.20.3, Works costing below DRM.s Power00 999
TOTAL-NEW WORKS
TOTAL-Brldge Works
s & T woRrs
A - Works in Progress
761 06.01..315 2. Agra Division : Upgradation of El system from warm
standby mode to hot standby mode at 17 stations .
762 cO013317.2` Agra-Dhaulpur section ofAgra Division : Provision
of independent opei.ation and detection features in
point control and detection circuits in Siemenstype installations (4 stations).
763 06.023..15J. Centralised Monitoring system for various
signalling system like power supply, battery,
track feed battery charger, pt. macliine health
monitoring system at six stations of Mughalsarai -
Kanpur section at divisional HQAIlahabad.
764 06.02.33.16.3, Mughal sarai -Ghaziabad : Air conditioning ofS].°°' Equipment/Relay Roomsat El statlonshaving more
than 100 routes.
765 o6.o3.33,17 6.hansi Division: Ftedundancy to old aged axle52J']] counter for reriability improvement of lBH in
KOTRA- DHO section .
766 06.01.33.18,3 Strengthenipgof Quad cable inAF-BKI, IDH-BXN &S°.°°` BHA_uDi section ofAgra Division of N.C.Railway.
767 06.01.33.18.6. Strengthening of Quacl cable in remaining sectlon50.Oar iDH_BXN & AF -BKi of Agra Div'ision of N.C.Railway
768 06,0233.19.3. Mughalsarai-Allahabad:Provision of diversity in12.°°6 system design for track sections on Allahabad
Division.
769 0602.33.19.3` A||ahabad-Kanpur : Replacement of existing panel51.°°3 Interlocking by Electronic I nterlocking at Kanspur
Gu8auli station on ALD Div.
77o 0€,03`33.17.6. jhansi Division: Redundancy to old aged axle52 cog counter for reriability improvement of lBH in
KOTRA-JHS section .
Cap.
DRF
RRSK
RFtsK 79,6S
RRSX 24,00
RRSK
Cap'
DRF
RRSK
1,00,00
50,00
50,cO
\6.o0 6.fo5
24,00
40,00
1,00,00
50,00
90'00
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 58
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
S a T WORKS
o6`Ol`33.186 TDL_JAB : Upgradation of 03 EI stations(KBP, CHLR
& ETUE) from warm to hot standby including
provision of Dual VDU.
o6.o3.33.19.3 Kotra(Exc.)-Dhoulpur(Exc.) :-Provision of Dual
Detection of Track circuit with axle counter .in
Kotra(Exc.)-Dhoulpur(Exc.) section over Jhansi
Diy.
773 06.02..319.3. Provision of Fire detection and Alarm system ln
the Relay Room at balance stations in DDU-GZB
section over Allahabad Divisiori.
774 06.02.33`16... AIIahabad station: Prov.ision of two tail cables51.0°2 for NKR, Ri(R of points of Allahabad RRl.
775 06.03.i.,173 jhansi division:-Provision of Fuse monitoring
alal.in system w.ith standby fuses in F`elav room at
stations,18 and LC gates of Jhansi-Bina &
Jhansi-Dholpur section of Jhansi Division.
776 06`03.33.17,6 |hansi Div.|sion: Reliability.Improvement by52 007 providing optical F.iber cable in lBH in
JHANsl-BINA section of Jhansi division.
777 06.OZ`33.lB.6, Al|ahabad DMsion: Fuse Alarm system with AutoS1`°°7 Fuse change over in the Mughalsarai-Kanpur
section.
778 ce,0133.19.3. Mathura -PALWAL section :Provision of Multi50.°°4 section digital axle counter for Dual Detection at
7 stations over Agra Division.
779 0602.33`19.6` Earth work and bridge extension in connection with5]`°°] E| works at SBDR, LUSA & KHRY station ln CAR-CPU
section
78o 06.02 33.1S.3. Networking of data loggers at divisional HQ & NCRS` a°] HQ as per RDSo scheme with El connectivity from
each station.
781 06.03.33.16,3. jhansi, Provision of Dual Tail cable for point52.°°1 machine and NKR/RKR to improve safety in 6Walior
ya,d.
782 06.03.39.17 3. Strengthening of signaling gears in Matatila-Bina52 col section(13 stations) and Larltpur-Khajuraho
section (14 stations) in Jhansi division.
783 06.03 33.17.6. jhansi D`ivision: Rellability improvement by52.005 providing optical Fiber cable in lBH in
JHANsl-DHOLPUR section of Jhansi division.
06.01.33.18.6. Replacement of overa8ed point machines in AF -BKl50.col & |DH_BXN sections : Agra Divis.Ion
ust of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020L21 complete
to end of work2019-20
S & T WORKS
785 06.0133193. AGRA D|V|S|ON: Provision of Multi section Digital
Axle Counter at important stations with water
lagging
786 0602 3319.6. Pi.ov.ision of overrun in connection with El work at
787 06.03.33.17.6. Replacement of defective signalling and Telecom.
cables in JHANsl-BINA section of Jhansi division
to improve reliability & safety of Signalling
System.
788 06J)1.33.1B.6. Raja Ki Mandi (RKM) station : Provision ofMSDAC
in poor drainage and flood prone area of Raja Ki
Mandi area.
789 06,02.3319.6. Track works in connection w.ith El work at SBDR
station in CAR-CPU section
79o 0602 33.18.6. Prov.ision of diversLty in system design for track
sections at JJK,E1`^/ stations on AIIahabad.
Division.
791 060233193. Mughalsarai-Ghaziabad:Provision of air51.cos conditioning in Relay rooms of stations on 'A'
route of Allahabad division.
792 06.02.33.19,6. Track works in connection with El works at
I(hairahi station .in CAR-CPU section
793 06,02 33.18.3. A||ahabad Division: Reliability improvement of LCPS1.a°2 operating system at EI stations in panki-Tundla
section of Allahabad Division.
794 06.013.,186 Agra Division-Provision of smoke,fire5°cO3 detection, alarm & suppression system at different
stations.
795 06J]3.33.13.3. jhansi-Agra :-Replacement of old Analog Axle52.°°2 counters by high availibility slngle section
digital Axle counters .
796 06.02.33`186. Provision of diversity in system design for track5'.019 sections at SKB,HRS stations on Allahabad
Division.
797 06,0133.19.3. Dholpur -Mathura :Section :Prov.ision ofMulti5°°°` section digital axle counter for Dual Detection at
10 stations over Agra Division.
798 06.02.33193. A||ahabad-Fatehpur: Provis.ion of diversity in12.Ou system design for track sections on Allahabad
D`lvision.
06.09.33.17.6. Replacement of Signalling and Telecom cables in52.008 iHANsi.DHOLpuR section of JHANsl division to
improve reriability & safety of Signalling System.
ust of Approved Works Costing Less Than Rupees Two Crore Fifty Lekhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20S a T WORKS
8oo 06.ce`33.18.3` Replacement of defective signalling and Telecom
cables in JHS-CNB, JHS-MKP and I(lD-BZM section of
Jhansi division
8oi 06.01.33.18.6. jamuna Bridge (JAB) -Tundala(TDl) section :
Rel.Iabilfty improvement of BPAC by provision of
axle counter ln redundancy
8o2 06.02.33.18 6. A||ahabad Divis.Ion : Provision of Fire detection
and suppression system at Juhi Station.
8o3 06.0233.19.3. Replacement of copper cable with oFc between OFC
hut to TSS, FP, SP and SSP over Allahabad
division.
8o4 0603.33.17.3. |hans.i division ( BINA -OHO section):-Provlsion
of dual Fuse monitoring alarm system in location
boxes"
8o5 06.0133.17 6 Agra Division :Elimination of Token less BIock
Instruments with block panel in MTJ -PWL 3rd
line & lDH-BXN section Of Agra division.
8o6 o6.Ol,33.ae.6 jamuna Bridge(JAB)-Raja Ki Mandi(RKM) &
Rupbas (RBS)-Bayana (BXN)sections : Reliability
improvement of BPAC by provision of axle counter
in redundancy
8o7 06.0133.19.3` Agra Division : Elimination of Token Block
Instruments with block panels for in Bhandai -
Udi section of Agra division
8o8 06.03.33,17 6. ihansi Division: Reliability improvement of52.cO6 sign;a iiing gears in |a|itpu r-Khajuraho section of
Jhansi Division.
809 o602.3318.6. provision of ccrv cameras at miscreant prone LC
gates, stations, mid station sect'ions overAlla ha bad division.
8io 060333.19.3. Provis'ion of Earth Leakage Detector in remaining5Z.°°1 stations„iBH,Lc gates over Jhansi division.
811 06.02 3318.6. A||ahabad: Provlsion of divers.ity in system designSL.°°' for track sections at ALD station on Allahabad
Division.
812 06.Ol.33.17.6. Provision of ELD on stations, Auto Relay Huts &5o.oou |BH in Agra divis.lan.
813 ce.02 3..18`6. A|Iahabad Divis.iori.. Provision of Earth leakageS1 °°6 Detectors over balance stations / LSCS/RH.
06.01.3317 6. Strengthriing of earthing system for Various S&T50.001 equipments over Agra Division.
llst of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
Nol}TH CENTRAL RAILWAY
PAGE NO : 61
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars Of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
s a T woRrs
815 06,02.33.le.6, Allahabad: Provision of diversity in system design
for track sections at ACol station on Allahabad
Division.
816 06.02.33.18,6. Prov`ision of diversity in system design for track
817 0602 33.18 6 Provision of diversity in system design for track
sections at CND station on Allahabad Division.
818 060233.186. Kanpur-Ghaziabad : Provision of AFTC side
connections replacement due to heavy sulphation of
bonds and lead wires in section provided with
AFTC.
8ig 06`02J..186 Mughalsarai-Kanpur : Provis.iorl of AFTC side
connections replacement due to heavy sulphation
and provision of ring supply at selected stations.
82o 06`02`33.186 Monitoring of Track feed battery chargers, power
supply equipment and point machines in the
section Kaurara-Chipiyana Buzurg.
821 060233`18.6. provision of Intercom in Divisiori & HQfor
communicating pred ictive maintena nce and event
analysis at Allahabad & Subedarganj.
822 06-02..3.18.6. Mon itoring of Track feed battery chargers, power
supply equipment and point machines in the
section Sirsaul-Bhadan.
823 06`02.33.18.6. Monitoring of Track feed battery cha r8ers, power
supply equipment and point machines in the
section Mu8ha lsarai-Ka rchana..
824 06 0233.18.6. Provision of Isolation Transformers at5` °'8 stations/Auto Stations in Mughalsara i-Ka npu r
section.
825 06.OZ.)3.18.6. Provision of redundancy in system design of track51.°2° circuit in failure prone AFTc areas in the section
unchdih - Bheerpur.
826 06.02,33.18.6. Monitoring of Track feed battery chargers, powerS'" supp|yequipmentandpointmachines inthe
section Saiyed Sarawan-Prempur.
827 06,02 33.18.6. Monitoring of Track feed battery chargers, PowerSl cos supply equ.,pment and point machines in the
sect.Ion Cheoki-Manauri.
828 0€.01.33.13.3. Replacement of lps at 7 stations in Bharatpur-50.001 Bandikui section in Agra Division.
829 06J)i,3317.6. Jhansi division: Improvement in earthin852.°°2 arrangement of s&T gears as per RDSO specification
at Jhansi-Bina section in Jhansi division.
List of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works AIlo-catlon Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
s&TwoRrs
83o 06.02.3317.6. A||ahabad Div:-Signaling work for reliability
improvement in Mughalsarai -Allahabad section of
Allahabad Div.
831 0602 33.17`6 ALD division: Provision of dual vDu and redundaney
to El systems at 06 stations ( Karchana, Meja
road, Link junction, lradatganj, Jasra & Madraha
stations) to improve reliability, safety and
mobility in train operations.
832 0602.33.17.6. ALD division: Provision of dual vDu and redundancy
to El systems at 05 stations ( Lohgara
Shankar8arh, Majhiari, Bargarh & Manikpur
stations) to improve reliability, safety and
mobility in train operations.
833 a¢.OZ 33.17 6 A||ahabad Division: Provision of ssBPAc ln Link
Jn. -Lohgara sect`ron.
834 ce03.33.17.6. |hnasi Division: Provision of optical fiber cable
from Mahoba to Khajuraho in Mahoba-Lal'itpur
section of Jhansi Division.
835 0603.33.17.6-jhnasi Division: Provision of optical fiber cable
from Mawai to Udaypura in Lalitpur-Khajuraho
section of Jhansi Division.
836 a.,0033.203 works costing below DRM's Power00.999
TOTAL-WORKS IN PROGRESS
a - Now Works
837 06ce 33`20.3. Reliability improvemerit work of media changeover
over signalling gears of Jhansi divison.
838 06.03.33.20.1. |hansi:Prov.ision of panel Interlock.lng over due in
Datia and Kotra staion over Jhansi d.ivision.
839 06`02.33.20,1. Provision of LAN wiring to various activityS` Col centres, sub.divisional offices, field offices a nd
SSE depots of all department over AIIahabad
divisiol1.
84o 06ce33.20.I. Provision of Automatlc Fire Detection and Alarm52 col system at various stations of BINA-DHOIPUR section
of Jhansi division.
841 06,0133.20.3, Agra Division -Provision of smoke, fireS°.°°' detection, alarm & suppression system at dlfferent
stations.
842 06,00.93.203. Works costing below DRM's PowercO.999
1,50,00
4,54,13
1,50,cO
45,28,37
40,00 I,79,69
list of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAllwAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works AIIo-cation Anticipated Outlay Outlav Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TOTAL-N Ew woRrs
TOTAL-S a T Works
OTIIER EIECTRICAI WORKS, INCI TRD
A -Works in Progress
843 06.03.36.12.2. |hansi division: Adjustment of OHE profile by
replacement of cantilever.(phase 11 )
844 06.Ol.36,16`2` Agracantt& Mathura: Provisionof
precooling/charging facilities
845 06.0236.17 2 A||ahabad: Rei)Iacement of conventional luminaries
by Energy Efficient LED based Lumlnaries in GM
office.
846 06.02.36.17.2. Mu8ha|sarai-Ghaziabad:-Replacement ofconventional
MH/HPSV luminaries of existing high mast by LED
luminaries of Allahabad Division(110 High Masts).
847 060...6 lz.2. |hansi:-Augmentation of 2x500 KVA substation
outdoor type /indoor type at S/S East colony &west colony
848 ce.02.36.10.2. North central Railway: Use of renewable energy
sources for Improving energy efficiency & enerev
conservation. (Part of PB 2010-11 item No.264 of
CR)
849 06.OZ.36.10.2. Kanpur: Electrifietionof25 KVOHEatARME siding
at Kanpur.
850 06.0036.19.1 North central Railway-Augmentation, up8radation &
modification of power supply installations for
electrical general servlce incl. SCADA and other
works ( Umbrella Work 2019-20)(PB#452/2019-20/SE R)
851 06.02.36.14.., Allahabad & Kanpur: Renovation of battery charging
facility.
852 06.cO37.17.6. iha ns| division-Replacement of convent.iona I type
number plates provided in main line by retro
reflective number platesin Jhansi dMsion.
853 06.03.36`18.3. jhansi Division:-Provision of lED lighting.ln
Railway residential q ua rters.
854 06.OZ.36.18J, Kanpur. : Upgradation and modification of central
Substations at Kanpur and including civil engg
works at Jamuniya Bagh and MTC sub stations.
06.02.37.18.3. A||ahabad Division: Replacement/Upgradation of 132
KV Potential Transformers at Aligarh Switchii`g
station and khurja station and other associated
works
30,00
4,00,00
1,sO,00
.. ®9,28,37
List of Approved Works Costing Less Than Rupees Two Crore I:ifty Lakhs Each
NORTH CENTRAL RAI LWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Pa rticu lars of works Allo-cation Antic.tpated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 completework
OTtim EiECTRlcAi wORKs, INci TRD
856 0601.37.18 3 Agra Divis.ion-Improvement of sectioningsO.°°3 arrangement and up gradation of PSI system of
between Agra Cantt -Palwal section
857 06,03,36`14.3` ihansi div.ision :-F`ewir.ing of Rly.stationS2.°°l buildings and replacement of existing da maged
poles including removal and replacement of LT overlines in circulating area by LT UG cable.(45
stations)
858 06.02.36.17.6. Mughalsarai-Ghaziabad:-Provision of the one-time51.°°1 LED lights in Railway residential quarters.
859 es.Ol.37.17,6 Replacement of normal enameled number plates bysO.°°] providing retro reflective number plates in Agra
Division
86o 06.0337.18,3, Bina-Dho|pur :Replacementofl32 KV/and 25 KVS2.°°1 circuite breaker in Traction substation Jhansi
division.
861 06.02.36`19.3. A||ahabad Dlv.ision: for Improvement in the5l'col reliability of OHE due to critical implantation
862 ro%.3"" #;aroDj::':::Do::LP:,raJnnt.a~tj:an':fa;SHe:tL°:s:s having
single OHE
863 06.01.37,18.3 Agra Division-Up8raclation & augmentation of oversOcO2 aged equipment of Kuberpur -Bayana section.
864 0603.36.193. |HS Division: Replacement of critical mast having52.Oa2 less imp|antat|on ( single OHE).
865 06,013600.a. |HS(GS): Provision of33 KV/llKV,1500 KVAstand50.°°' by transformer at sub-station No.1 ofAGC(OOT).
866 06.03.36.08.3` |hansi: provision of Automatic power factor52.°°[ co,rection panel with super duty capacitor bank
for improvement of PF 0.6 to 0.99 of LT 415 V
supply capac`ity 498 KVAR and repl. of defective
panels.
867 06.OZ,36.09J. Tund|a: Provision of new 11/a.4 KVsub station for5[.°]S better supply arrangement to guard running room
lobby & officer rest house, railway colony south
side.
868 06.02 36.10... Allahabad: Augmentation of 121 No. traffic colonyS1.Oar substation by providing 2x750 Kva tra nsformers.
869 060236.10.3` A||ahabad : provision of solar based securitySl.002 light in Rai|gaon colony and HQ office at
subedarganj.
List of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work
2019-20C"ER EIECTRICAI WORKS, INCL TRD
87o o6.03.36,193..HS Divn : Replacement of rusty cantilever in JHS
871 060036 20.3 Works costing below DRM's PowercO 999
TOTAL-WORKS IN PROGRESS
8 - New Works
872 06.0136.20.3. Improvement of profile of OHE at curve locations
over Agra Division
873 06.cOJ6.20.3. Works costing below DRM.s PowercO 999
TOTAlothe. Electrlcal Works,
'l,a TRD
WORXsl.OPS IN€Lul)ING Pus
A - Wocks ln Progress
874 0602i4216.Z. A||ahabad-Replacement of damaged cat walk and al\
sti.ucture elements of washing line No 20 &21 at
Allahabad..
875 06.02.4Z..2 2 I(anpur-Provision ofcovered shed for stabling of
140 ton 8.D. Crane at I(anpur
876 06,02.42.17.2 Kanpur-Provision of premium end toend (PEE)
examination facilities on additional lines in GMC
yard.
877 06.02.4215.2. A||ahabad-Extension of existing shed by size 30 x5[m] 15 mtrs with 10 ton EOT crane at cpoH Workshop.
878 0603A2.17.2. |HANS| -Extension of CNB-2 and CNB-6 pit line52.Onl siding at jHs and improvement in their condition.
879 06.02.42.01.2. Kani]ur: Development and enhencement of testing
facilities of Electric Loco shed.
88o 06,0142.10.2. Agra cantt.: Provision of l40 Ton oisel crane
Maintena nce facilities.
60,00
36,00
24,00
2,70,00
60,00
36,00
24,00
3,90,00
88,cO
89,00
22,03
1
64,17
10,60'00
DF(3) l,42j. 1,42,33
RRSX 7,67 7,67
list of Approved Works Costing Less Than l`upees Two Crore Fifty Lakhs Each
Nof(TH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
WORKSIJOPS INCLUDING PUS
881 0600.4216.2. Water treatment and recyclin8 plants at coaching
Depot Kanpur
882 06.02.42.18,a. Provision of other end maintena nee facilities at
Kanpur centi.a I station.
883 06.ou.4219.3. CMLR jhansi: -Provision of liquid oxygen storage
tank and DA Gas Manifold with oxygen DA & C02 Gas
Pipeline in Body Repair Shop CMIR Jhansi.
884 06OuJ12193. |hansi workshop: -Up-gradat.Ion ofAirbrake
Facilities in wagon repair workshop Jhansi.
885 06.04.42.18J]. jhansi workshop: -Prov.ision of Fire-Fighting
system for Wagon Repa.ir Workshop Jhansi.
886 06.03.42.06.3 Workshopjhansi: ReplacementofLTcable 300sq.mm
3.5 core Al. conductor steel armored and MDB of
BSS shop and replacement of 3xl80sq.mm Al. cond
XLPE HT cable.
887 ac.03.42.08... jhansi workshop: Provision of a utomatic power
factor controllers of various su bstatlon to
improve PF lip to 0.99
888 06.03.42.093. jhansi workshop: Augmentation of training
facilities in STC/JHS.
889 06.01.42.09J. Agra, Mathura ln., Agra Fort, Bad: Provision of
Rolling in Rolling out Light and Huts.
89o 06.OZA2.ll.a. Allahabad-Provision of diesel loco service centre
near old electric loco shed.
891 06.04 4218.3 jh@nsi workshop: -Industrial flooring in shed A,
a, C in Jhansi Workshop.
892 06.OulAZ.1a.3. ihansi workshop: Upgradation of broken AC/Gl
sheets by pre coated 8alvanized iron profile sheet
in shed A, 8, C and other including painting in
wagon repair workshop, Jhansi.
893 06Ou.42`183. CMLR |hansi: -Extension of shed in between pa.lnt
& furnisliing+shop.
894 06.OZ.42.18.3. Kanpur-Up-gradation of new coaching complex for
high speed rolling stock maintenance
895 06.OZ.4Z.183. Allahabad D.ivision-Up-gradat`iori of rolling in
examination facilities on ALD Division
896 06.0142.18.3` AGC_Design, supply and installation of AutomaticsO.°°' coach washing plant at coaching depot, Agra cantt
897 06.0..42.19.3. |hansi workshop: -Balance work of replacement of71.006 Ac/Gi sheets in shed 'B..
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated outlay outlay 8alanceto
Cost expected 2020-21 completeto end of work2019-20
WORKsl10PS INCLUDING Pus
898 06.04A2.19J. |hansi workshop: -Extension of NIWs shop Bay No.
1, 2 & 3 in Jhansi Workshop.
899 06.04.42.19.3. CMLR |hansi: -Up gradation of Exiting yard lines
(total 06 nos.) at CMIR workshop for higher outturn capacity
9oo 0604`4219 3 |hansi wor|(shop: -Balance work of lndustr'ial
flooring in shed A & l}ehab Shop in Wagon Repair
WorkshopJhansi.
9oi 06`04A2193. |hansi workshop: -Digitalization in millwright
through centralized CNC monitoring system, digital
torque wrench, lock bolt plants, mtcroprocessor
based computerized SWTR for wagon air brake
testing.
902 06.02A2.19.3. Provision of Hot Box Detector systems on up trunk
route of Allahabad division
9o3 0602.42.19.3. I)esign, supply, installatton and commissionin8 of
automatic coach waslling plant at Subedarganj
9o4 06 04.42.19.3. RSK/STLI-Up-gradation of existing infrastructl.re &71 a04 safety fac`|lity at RSK/STLl
9o5 06.02A2,191. Development of mandatory fac'irities for Disaster
Management Assets at AID & TDL.
9o6 06`02..2.19,1 I(anpur central-Up-gradatlon& Augmentation of3° °°' Electric Locomotive of ELS/CND for maintenance
facil'lties
9o7 06.02..2.19,3 Provision of catwalk lights in old washing lines
at Kanpur
9o8 06.coA2 20.3` Works costing below DRM's PowercO.999
a - Now Works
909 #:;" 2". :auci:.:enst,antj::a°cfhcc°aarceh:ne8n:rt:,C,khrnas!,ntenance
9|o 06.Ol.42.20,3 Fabrication, erection & commissioning of coveredS°.°°l shed at sick|ine in Tank wagon depot, Baad.
911 06".42.20.., |hansi workshop: -Provision of Industrial71.Ou Flooring along with track behind BSs shop.
06 aeA2.20.I. Augmentation of Coaching Stock Maintenance7` °°] Facii.ities in coach care centre, Gwalior
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAllwAV
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particu lars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 completeto end of work
2019-20WORKSHOF'S INCIUDING PUS
913 06.044220.3 |hansiworkshop: ,Automatic weldingofwagon and
its components of wagons
914 06,04..2.20.3. CMLR lhansi: -Automation in
working, inspection,record keepi ng a nd record
transmission in CMLR workshops by 'supply &
installation of 01 NX CAD software, 17 PC sets,
network.ing/wifi at shop floor offices, Pollution
915 06.02.42.20.1. Construction of cleaning shed, POH shed for
FRM/BCM, store ward, camping coach shed and
calibration track with inspection pit at CPOH
shop,Subedarganj
916 06.03 42.201 Diesel loco shed, Jliansi -Creation of
infrastructure and test setup at Diesel Shed, for
homing of electric locomotives.
917 06.04,42 20.1 RSK/STLl-Automation of phosphating plant and
Installation & commissioning of Powder coating
Paint Plant, at Rail Spring Karkhana sithouli
Gwalior.
918 06.02A2.20.i. Metric weight of 50 Kg for Loading in test wagons'
919 06.04.42.20,1. RSK/ST|l-Automation of Machinery for post coiling
procedu res,automatic handling ,Spring measuring atRail s|.r`ing Karkhana sithouli, Gwalior.
92o 06ou.42.20.3. RSK/STLl-Automation for loT & Industry 4.O
standards at Rail Spring Karl(hana sithouli
Gwalior.
921 06.03`42.20.1. Up_gradation and augmentation of Electric & Diesel
Locomotive maintenance and prod uction facilit'ies.
922 06.cOA2.20.., Works costing below DRM's PowercO.999
list of Approved Works Costing Less Than Rupees Two Crore F`ifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
AIIo,cation Anticipated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
work
STAFF WE LFARE
A -Works ln I.regress
923 06015216 Z. Agra cantt:-Improvement to staff quarters in
South colony.
924 060152.15,2 Agracantt ReplacementofACsheet roof by RCC
roof .in J,G, and MA type Qtrs.( J-48 Nos., G-10
nos., & MA-37 mos. = total 95 Nos Qtrs.)
925 06es.51.17.2..hansi Division :-Provision of 24 unit RB -II
quarters for gang staff at yamuna South Bank,llamirpur and Kathara Road for Gang staff & two
mos RB -lv for SSE/Pway. at Ghatampur on
replacement account.
926 06.03.52.17.2, jhansi D.ivision :-Construction of RCC over headS2.°°' tankatpatara & provisienofdeeptubewellwith
pump house at Bhimsen, Ait, Chirgaon ln 8himsen-Baiida section.
927 06.03.S2.16.2. jhansi:--Replacement of MH/CFL fittings of street
light by LED street light fittings in west railway
colony.
928 060151.1S.2 A8ra cantt-: Replacement of 26 units old I( Type
quarters by std type 11 quarters.
929 06.02.52.OS.2. Kanpur: Conversion of existing Bio laterine into
Flush laterine & laying of sewer line in different
colonies to connect nagar nigam storm water
drainage at CNB.
93o 060152`06.2. Agra-Mathura-Replacement of tiled roof ofvartous
quarters by RCC slab. (B.C.G.HJ, MA & MAP type)
931 0603`52.082 |hansi division: F`ewiring of staff quarters. (1500
unit).
932 06.0151.09`2` Agra cantt: Provis.Ion of 5 unit type v qtrs 5 unit50col type ov qtrs for divi5ional officers.
933 0602.52102. A||ahabad: Seamless operation Theatre.30.002
934 ceco 52.12.2. jhansi:.Construction of sports complex at Jhansi.52.001
935 06,03 51.1S 3. Datia & Dabra:Replacement of 10 units 'k' typeS2.°°] quarters by type-|| quarters at Datia & Dabra
stations.
936 06".5Z.183. |hansi :-Lay.ing300mmdia water pipelinefrom52JsO3 Lai Kurti to Ground tank near station for supply
Of fitter wiiter from Jal Nigam.
5,72,Z9
S4,00
94,10
" 10,50,00
DF(2) 2,00,00 1,92,Z6
DRF 99,90 80,99
List of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL RAI LWAY
(Figures in thousands of rupees)
Item ProjectloNO.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
STAFF WELFARE
937 06.02S2.15 3. A|lahabad :Provision of 15 No's Automatic
Chlorination Plants at various Pumps.
938 06.025115.a. Dadri: Provisionof05 unitstype-lvqtrs(G+2).51.col
939 06`0151.16J). Agra Division.-ldgah-Fieplacement of police line
old double storey quartei.s by std. type 11
quarters.(12 units)
940 %.%,5"9 3 #:art:ar::y-::dp;CpeeT,e:'u:fit:-rs7(3]4&u::,s:I:nK type
north colony.
941 06.0151.15.3. chata :-Provision ofl2 unitstype ll quarters
for gang staff in lieu of ' K' type qtr.
942 %:%,S2.'8`3 #:aseD:Vj: -p:peep,',anceetmoeanutg°:::trew:te:i :;tphp:yu,:P
ldgah colony and Improvement to toilet,bathrooms
and kitlil:hen in qtrs witli drainage system and
prov.Of individual PVC tanks in qtrs.
943 060152.183` Idgah,Replacementofold roofofquarterno.1n
and 2ft into RCC roof & improvement to
toilets,bath & kitclien.
944 06.015l.18,a. Agra Division:-Replacement of old Type I Qtrs for
track men into new type 11 (30 units) qtrs. in
ldgah-Baya na sec.
945 06.0352,1S.3. |hansi: East: Augmentation of water supply and
replacement of corrugated pipe line in East
colony.
946 06.03.52.15.3. GWL:Replacement of existing water supply pipe line
for Administrative building and staff Qtrs. At
lRCAMTECH & Provision of chlorinators a var'ious
pumps at GWL
947 06.03S2.153, | hansi:West: Provision of flocculator and
coagulation tank including replacement of filter
media at filter house Jhansi.
948 06.01.51,183 Agra Division.-Replacement of old I( type gang
quarters by std type 11 quarters(10 units) in KosiKalan and (10 units) in Vnndaban Ftoad station
949 06.01.52.15.3, Agra cantt-Replacement of manglore tiles roof in
D & F type Qtrs.
95o 06.03.S2.15.3. jhansi (East)-Replai:ement of maglore tiled roof
with R.C.C. slab / Gl sheeting in C,D,E & F Type
Quarters in east Railway colony.
951 06.0]S2.183. Jhansi-Replacementof450mm dia cl pipeline
between JHS-Naughat pumping station.
I)F(2) 59,63 SS,Z6
ust of Approved Works Costing Less Than Rupees Two Crore F`ifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
STAFF WE LFARE
952 06.02.52.153. Kanpur: Improvement in street lights of colonies
of Kanpur.
953 06.02.S2.15-3, Kani)ur:-Replai:ement of sewerage net work in Goy
& Nirala Nagar colony.
954 06.03.S2.153. Dabra: Provision of sewerage system in Dabra
railway colony,
955 06.Ou52.ls3. Manikpur:-Augmentation of water supply
arrangement.
956 060151.183 Agra cantt:-Provision of 9 units type -IV (Spl.)
quarters for officer's .
957 060152153. Agra cantt:-Improvement to staff quarters in
North & west colony.
958 06.On.5l.193. |hansi-Replacement of steel twin tank at TRs area
and Dhyanchand tank at east colony by F`CC over
head water storgae tanks having. 50000
gallons(225000 ltrs) capacity with pipe linenetwork.
959 060251,03 3. ALD Divo.: Provision of 6 units type-Ill qtrs. for
PWM (CAR=1, PRE=1, KYT=1, ASCE=1, KTCE=1, SNIE=1)
& 6 units type-I S/S qtrs. for Mates ( PRE=1,
KyT=1, KRW=1, ASCE=1,KTCE=1, SNIE=1).
96o cO0151.07.3. AGC: Construction of single storey ol no. type-V
Bunglaw of standard plingth area for DRM in
replacement of existing Bun8low.
961 #%25[.0" #:epp|::c::nes::uocft:a,: :::5d::::d-::enddq°u2aTrtYepr:"
near I(eta siding at Kanpur & at other locat.Ions
for creating circulating area for parcel handl`ing.
962 06`01.5107J. |DH-BXN: Provision of type,ll quarter for p.Way
supervisors at BR. BIQ, RBS and MIQ stations.
963 %%;S2 ce3. #nrave::;Si:|t:y::P::Ceer;e:te::r2:y°°ei::tsr:iic meter
w.ith meter box etc.
964 06,01`5l.0913. Mathu ra-Alwar: Provision of eight n umbers Type-ll50.002 (GDo.2, DEEG-2, GVH-2, RAH-2) Quarters with
electrification work for Opreating staff.
965 06.02.5lco.3` Tundla: Provision of 3 mos type lv and 1 no. type
V quarters in officers colony.
966 06.03.5l.10.3, Banda-Manikpur-Chheoki section: Repl.of 18 unit51,002 old Ktype qtrs of gang staff by std type-ll qtrs.
oi:(2) 59,4o a8,78 7,oo 1.,62
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
STAFF WELFARE
967 06,Oa.51.103, Oral: Repl. ofl8unitold Ktypeqtrsofgang
staff by std type-ll qtrs.
968 0601.51,lo.]. Etmadpur: provis'ionofo8unittype-n qtrsfor
Gang.
969 06.01S2.103. ADEN(line) /Agra Jurisdiction: Replacement of
doors with G.I. sheet doors in WC, kitchen & back
doors of staff quarters
970 06.03.52,10.3. jhansi Division Replacement of back side doors
bathroom/ lavatory doors with galvanised door.
(8coqtrs)
971 06J)2.52.Ill. A||ahabad:Supply and installation of20nos
automatic chlorination plants for various pumps at
Allahabad under ADEN/HQ/I/ and ADEN/HQ/ll/ALD
972 06.0252.17.6 Subedarganj : Modification of officer's club at
Railgaon Colony.
973 a€.03 52.183 |hansi I)ivision :-Replacement of lift at
Divisional Railway Hospital at Jhansi.
974 06.0252.18.3. ALD:-Replacementofold cltank ( capacity
56870 gallons ) with new RCC tank of 50000 gallons
& Pump house and improvement to water siipply
pipe line in NYN- ACol colony & water supply toKumbh mela pilgrimages.
975 ##52.183. Kanpur-Augmentation of loco hospital at Kanpur
976 06.0251.183 Tundla:-Replacement of staff quarters type-Ill -
02 nos & type-ll-14 nos. at Tundla.
977 06.02.52.lB`3. Tund|a:-Replacement of old & worn out water pipe
line at Tundla
978 06.02 52 ae.3` Rura-Tundla:-Replacement of old roof by RCc roof
in staff quarters between F(RH (excluding) & TDl
(excluding)
979 06.OZ.51.1BJ. Naini-Manikpur: Provision of 18 nos Type 2 staff
quarters for 8angman at Katiyadandi, Dabhaura &Majhihari stations.
98o 06.02.51183. Naini-Manikpur: Type-3 quarters for Juniour
Engineers |7 nos) & Type 2 quarter for gangman( 6
nos) at Bargarh station.
981 06.02.51.18,3 ALD : Replacement of 24 No;s TYPE ll with TYPE
Ill quarters (G+2 )at Malgodown colony colony at
Allahabad.
982 06.OZ51.183 ALD: Replacementofl2 No;s TYPE ll withrvpE
lH quarters (G+2 )at Balai pur colony at
AIIahabad.
O1:(2) i,00,7S 14,50
DRF i,48,04
List of Approved Works Costing Less Than Rupees Two Crore F.ifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
sTAFFwEunEo€.02.51.18,3, ALD : Replacement of 12 No;s lYPE 11 with TYPE
111 quarters (G+2 )at Loco a colony at
Allahabad.
984 06.02.51.18.3. ALD : Replacementofl2 No;s TYPE llwith lYPE
Ill quarters (G+2 )at Ghanshyam Nagar colony at
Allahabad.
985 06J)252.183. Re-wiring of l400 Nos staff Quarters in CNB zone
of Allahabad Division.
986 06.025l.183 Allahabad : Constructionof04 unitofTypev
officer's quarter for officers of AILAHABAD
Division.
987 0602S1193. Allahabad: Renovation of operation theater &
Surgical Ward in central hospital N C railway
988 06.0251.19.3. Improvement of coral club by replacement of Roof
and improvement to Toilets.
989 06.02.Sl.19... Subedarganj: Replacement of overhead tank at
subedarganj colony no.1
99o 06cO.Sl.20.3. workscostingbelowDRM's Power00.999
TOTAL-WORKS IN PROGRESS
8 - New Works
991 06.03,5l.20.3. jHS /East: Replacement and Improvement of Manglore
tiled roof in East colony area, Jhansi.
992 06cO`Sl.20.3` Works costing below DRM's Power00.999
TOTAL-NEWWORKS
pAssENGER AMENmEs
A - Works in Progress
993 06.02 53.17.2. Vindhyachal :Development of circulating area with
provision of shelter in circulating area .
994 06.09 S3.16.2. La|itpur: Provision of washable Apron at pF No.1
at Lalitpur station.
995 06.03S3.17.2. |hansi : Provision of 2 Nos. Ramps to 6.1 mt widellm] newFOBat pF 1 &2/3 atJhansistation
6,18,42
ca,00
2,77,26
7,64,21
4,80,00
4,99,36
20,00
List of Approved Works Costing less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAYPAGE NO : 74
(Figures in thousands of rllpees)
Item ProjectlD
NO.
Particula rs of Works AIIo-cation Anticipatecl Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
work
pAssENGER ArviENITIEs
996 %%:3ce2 :grpa.Cantt: ProvisionofKota stoneflooringunder
997 06.OZ.S3.09,2. Panki: Extension of platforms to accommodte 243o.0o5 coaches.
998 06.03.53.09.2. |hansi division: Extension of platforms for
handling 23/24 coaches trains at Dhaura, Basai and
Talbehat stations.
999 06.es53.09 2 jhansi division: Provision/increase of pF shelter.
(14 stations)
loco %:;;53cO.2, #o::Cantt: Provision ofwashable apron on pF
loot 06.01.53.10.2. Mathurajn: Provision offull copon 2 PFs(PF5o o01 No.1&2)
|oo2 0€.Ol,53.10.2. Mathura Jn: Provision for Extension of Ramp FOB
connecting PF 2/3 & 1/6 with PF 7, 8/9.
|oo3 06.02S3.12.3. Govindpuri: Provision of hydrant pipe line for
train watering at GOV.
ioo4 06.OZ,S3.16.3. Vindhyachal: Provision of facilities at
Vindhyachal station as per Adarsh Station norms.
loos a€,035],18.3. jhansi Divisio" Extension of platforms for
handling 24/26 coach trains and raising level
he'ights of platforms to high level with leo sq
meter platform shelter at Stations as per attachedlist.
ioo6 ce 02 5..18,3. provision of FOB at Karbi8wan, Jaswant Nagar,
Bhadan, Kaurara & Hiram Gaon Stations (05 Nos.).
ioo7 06.0353.183. |hansi Diviion: Provis'ion of additional FOOT OVER
BRIDGE with ramp at lalitpur station at BINA end.
ioo8 o6.02.S3`18.3. A||ahabad-Development/Imp.Of civil line side/City
side circulating area & other passenger amenities
on station/platform as per Master Plan.
ioog 06.03S3.18.3. ihansi / East :-Construction of new pRs near
|o|o 06.02,53.19.., Manikpur -Provision of new hydrant pipe line
between PF No.1 & 2 (Up & Dn main line) at
Manikpur railway station
loll 06.03.S315.3. jhansi :-Provis.iori of water re-cycling plant at
Jhansi station near CNB washing siding.
|o|2 %%:3.153. A8ra cantt:-Extension ofpF-2withcop.
I)I:( 1) 1,SO,40 1,37,32
DF(1) 2,29,81 1,10,12 42,00 77,69
DF(I) 2,08,57 1,40,27 I,00 67.30
I)f( 1) 1.55,32 I,38,21
Df(1) l,cO,72 1,27,33
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures ln thousands of rupees)
Item ProjectlD
NO.
Particula rs of Works Allo-cation Anticipated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
work
PASSENGEF` AM(NITIES
ioi3 06-02S3.15.3 Karchana: ReplacementofExisting damaged FOB.51J'1Z
ioi4 06.03,53.173. jhansi Division:-Electrification of railway
station buildings and other electrical work as per
MEA.
ioi5 06.03S3.1a.3. |hansi Division : Provision of cover over shed at
Jhansi, Morena ,Datia, Sonagir & Dabra stations.
io|6 06015..183 |dgahAgra & Kosil(alan -Provision by6 meterwide
existing foot over bridge with ramps at ldgah &Kosikalan stations of Agra Division to replace
existing 2.40 meter old FOB.
|o|7 0602.53183. Allahabad Drvision: Provision of 8 Nos Lifts at
NSG2, NSG3 & pilgrim stations (Phaphund,
Subedarganj, Chheoki and Allahabad.
|o|8 06.OIS].18.3. A8ra Division-Mathura Jn.-Redevelopment of 2nd &
3,.d entry.
ioig ce03.S316.. |hansi DMsion: Development of Khajuraho station
io2o 06.01.53.173. Agra Division :-provision offacilities for
person with disabilities.
io2i 06.OZ.53.183. provision of cover shed on existing FOB (HWH end)
io22 06.01.53.18.3. Raja ki Mandi :-Improvement to coach guidance and
train timing display systems with RDSO approved
integrated passenger informat.len system.
io23 06.02`5..13 3 Cheoki: Development of circulating area and
provision of stn bldg ,& other connected works atCol station.
io24 06.ce.S3.15.3. Ku|PAHAR: Development of Kulpahar as Adarsh
io25 06.02.53.17.6` A||ahabad division : Extension of Foot over
Bridge(FOB) at Ahraura Road Station and Provision
Of cover shed on on ex.lsting FOB at Ahraura Road &
Chunar of Allahabad division.
io26 o6.0153`19.3 Agra cantt:-Construction of washable apron with
hydrai`t line on PF-6 & saloon siding & Khatia
siding.
io27 06.02.53.12,3 Mirzapur:-ExtentionofpFno.1, 2 &3to
accommodate 24 coaches, PF shed, Platform benches,
station name board etc.
|o28 06.OZ5..153. Fatehpur-Expansion of terminal facil.rties at
Fatehpur Goods shed.
DRf i,34,13 61,80
0F( 1) i,54,70
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAYPAGE NO : 76
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particu lars of Works Allo-cation Anticipated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
work
pASSENGEF` AMENrrlEs
io29 06.02.S3.163. Phaphund: Provision of civil & Electrical
facilities at Phaphund station as per Adarsh
station norm.
io3o 06.01.S3.17.3. AF:-Provision of Train & Coach ind.icator boards50 lx'Z
|o3| 06.0253,17.6. Mirzapur: Beautification and Facade Improvement ofS]°°' station bu,|dingand Entrancegateand shastrl
Udyan park at Mirzapur station.
io32 ac0353.19.3. |ipp&BNDA-Provision of2 Nos RCcareover head
water storage tanks, Cap. 2,25000 litre capacity
within pipe line & bore wells.
io33 0601.53.18.3. Mathura|n:-Raisingof pFs-7from medium level
to liigh Level with Provision of full COP &
Toilet
io34 06.0153.183. Mathura |n.:-Provision of new 6.1 mts. wide foot
over l}ridge with stairs and ramp landing on PF 1
2/3, 4/5.( Phase-1)
io35 06ou531.3. |HS Div: Provision of facilities for handicapped52°°' passengersatA|,A, & B categoryof stationsas
per specification of RDSO / LK0
io36 06.03.S3.19.a. MBA& RGU -Provisionof2 Nos RCcareoverhead
water storgae tanks, Cap. 2,25000 litre capacitywithin pipe line & bore wells.
|o37 06.02.S3.16.3. HathrasJunction: Provision offacilities at
Hathras Junction station as per Adarsh station
norm.
io38 060153.183. Mathura|n:-Provision ofFull copon pF4/5with
granite seati n8 a rra ngements.
1039 06.02.S3.16.3. Bamhrau|i: Provision of facillt`ies at Bamh rau li5"" station as per Aclarsh station n6rm.
06.02.53.19.3. provisjon of coach lnd.Lcator Display boards at all51°02 piatformsat KanpurAnvergunj stations.
|o4| 06.02.S3.13.a. Provision of new F0Batchheoki ( Col )station.11.003
io42 06.02.S3.16.i. Etawah: Provision of civil & Electrical facirities
at Etawah station as per Adarsh station norm.
io43 06`0153.183 Agra division-Improvement of platform surface
flooring at Agra fort , Raja ki mandi , ldgah ,
Dholpur , Achhnera , Kherli , Mahwa Mundawar road
& Nadbai statioris.
io44 06.01.S3.18... Provision of 3 meter wide FOB with ramp at 'NSG-6'
category stations Pathaul`i, Mirhakur, Bansi
paharpur and Bandh Bareta in Agra-Bayana section.
DF(1) 1,14,23 46,S7
DF(I) 1,79,48 1,45,84
DF|1) 90,cO 86,62
DF(1) 1,01,00 89,54
Of( 1) 1,99,84 1,89,02
DF(l) 1,20,61 1,14,73
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Pa rticu lars of works Allo-cation Anticipated Outlay Outlay Balance to
Cost expected 2020-21 complete
to end of work2019-20
PASSENGER AMENITIES
1045 =°ck2S"8''` :£r:n:{'::S`::a-rva:::::::np:°fraodLA+hea: i::1::e:-to
High Level with Provision of Toilet ,Cover over
platform.
io46 06J)3.5318.a. AMBABAl-Provision of FOBI i 007
|o47 06.0153.163 fatehpursikri:-Construction of 575xl0 mts
l]F-2 with 50xlo mts COP , toilet & other
amenities.
io48 06.02.S3.18.3, Manikpur : Provision ofwashableapron on up & DN51005 MainLtne(RehdaTYpe)
|o49 0G.02 53.16.3. Ch|ieoki :Extension of station building , provisionS1.015 ofparking& developmentofcirculatlngarea at
Chheoki station.
io5o 06.02.53.183 Provision of6.1M wide new FOBatc0l stations.11.col
1051 06J)2.S3.19.9. Govindpuri: Provision of one No.RCC over head tank
10cOOO gallons capacity & tube well for watering
at Govindpuri station.
io52 ee.03.S3.16.3. jhansi Division:Replacement of train indication
board and autoannoucement system at GWLinetgrated with coach indication and NTES with
sln8Ie key functioning system.
io53 0€.02.53.18,3. Fatehpur~Kanpur centrarprovision of FOB at
I(urastikalan, Malwah, Kanspur Gugauli, Aung,
Prempur, Sirsaul, Rooma, Chakeri stations (08
Nos.).
io54 06.Ol.53.18J. Agra cantt:-Provision of llnd entry with
circulating area, Booking office , toilet &
approach road.
1055 06.01.53.18.3. Mathura-Alwar section-Provision of 3 meter wide
Foot over bridge with ramp at Vahej station and
raising of platform from Medium Level to high
level at Vahej, Oeeg , Bedam, Brij Nagar,
Govindgarh, Jadoli ka bas Stations
io56 06.02.53.18.3. CPA: Provision ofnewhydrantpipe line on pF
No.1, rehabil'itation of hydrants at PF-Z&3 at
Anwa rganj station.
io57 06`0253.16.3. Robertsganj: Provision of one additional high
level platform at Robertsganj station.
io58 06.03.53.18,3. jhansi Division: Provision of First FOB with ramp
at Karari, Dhaura,,Orcha, Barwasagar, ,Khairar,
Singpurdumra,Khurand, & additional FOB with ramp
atJhansi station(only 8 stns).
Of( 1) 1,99,96 I.20,15 10 79,71
DF( 1) 1,84,18 1,74,60 9,S8
List of Approved Works Costing less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL BAILWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Allo-cation Anticipated Outlay Outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
pAssENGER AlviENm[s
io59 ce.02.5316,3. Kanwar: Replacement of Existing FOB with stair.510,,
|060 06.0153.183 Provision of FOB with ramp at Kuberpur,chhalesar11`°" inAgrafort-Tundla,Agracity station inRa|a
Ki Mandi-Yamuna Bridge section and raising of
platform from RL/ML to high level atEtmadpur,Kuberpur,chhalesar,Vamuna bridge(
1061 06.0153.18.3. Agra cantt:-Provision of02 Borewelland02over
head tank of 225 KL capacity with booster piimps &
new pipe line and improvement to circulating area
with sewerage ancl drainage.
|o62 0€.Ol.53.183 BAAD-Raising & extension of existing RL50.003 platform(pF_2/3)to high level platform.
1063 % %;S"83 :sg;ad:;:|S':tna-tfo°nv:ryd:::;-d:eryveJ::,mh::: :efvset,a:jF:n
bore well, pump house, Over head tank & waterbooth, toilet. Circulatii`8 area, approach road &
COP 640 Sqm on PF-1 + 320 Sqm PF-2
io64 es.0l.53.18.3. Agra Division :-Provision of bore well to provide
drinking water by pipeline in ldgah-Bandlkui
section (Biwai ,Karanpura ,Kherli
Helak,Chiksana ) & ldgah-Bayana Section
(Pathauli, Midakur &Kirawali).
io65 0€.03.S3.18.3. jhansi Division: Pro. of short term fac.Llities for
handicapped persons at D and E category
stations.
io66 06.02.53,183. Chunar-Provision of new FOB wide 6.I M.11011
io67 060353.183 jhansi/East:-Improvementto station area at
Jhansi Station.
io68 06.02.53.15.3. Allahabad Division: Cheoki station : Provision of
01 No. (2.4M wide) Ramp and 01 No. Stair at FOB
(HWH end).
io69 06.0253.18,3` sirathu: Raising & extens.loo of platform no. 2
upto high level with other miscllaneous works.
io7o 06.02.53.ne... Khurja station: Provision of Foot over Bridge
(FOB) by 6.1M width by new FOB.
|o7| 06.01`53.19J. |dgah-Bayana section-Provision of 2nd platform at
Pathauli, Mirhakur, Bansi paharpur,Bandh Bareta (E
category stations) and raising Of platform from
ML/Rl high level at Pathauli, Mirhakur, Bansi
paharpur,Bandh Bareta stations
io72 0€ 02 53.18.3. A|igarh: Provision of new foot over bridge wide
List of Approved Works Costii`g Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAI LWAY
PAGE NO : 79
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works AIIo-cation Anticipated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
work
PASSENGER AMENITIES
1073 %.%S"9 3 :::rp::;-dp:::jks,i::e°pft5ugw:,i,':°unmc; :aocj:: R&CC
associatecl pipe line at Kanpur Anwarganj
io74 06035.18.3. |hansi/ East:-Improvement ofFACADE ofJhansi
ra.ilwaystat.ion.
|075 06.02.53.18.3. Manikpur: Raisingofplatform no land 2/3ofManikpur station from medium level to high level
for development as Adarsh Station.
io76 ce.03J53.18.3. |hansi / East:-Shifting of existing pRs to
Develop Executive lounge at Jhansi railway
station.
io77 06.a..53.18.3. jhansi / East:--Development of chamber for
Station Director at Jhansi railway station.
io78 06.03.53`183. |hansi / East:-Mod.ification of upper class,
Second class and ladies waiting room at Jhansi
railwaystation
io79 06.0353.18.3. |hansi / East :-Provision of cover over platform
at platform No. 1 from new foot over bridge toParcel gate.
|o8o 06.0253.18.3, Tund|a-Ghaziabad:-Provision/Extension/Raising of
High level platform in Tundla-Ghaziabad section.
io8i 06,03.53.18.3. |hansi /East :-Improvement to under ground
drainage system at Jhansi station.
io82 06.OZS3.18.I. Chheoki: I.rovision of quick watering system at
io83 06J)Z.53.18.3, Etawah: Provision of a new 6.1M wide FOB at
Etawah station of Allahabad Division.
io84 06.03.53.col. jhansi : |mprovementto pFsurfaceofpF no5 &7.5Z col
io85 06.0353.OO.3. |hansi: Improvement to platform surface of pF
io86 es.03`53.043 GWL: Development of circulating area ( west side)
and extension of FOB upto circulating area.
1087 :::]53.08.3 Agra Fort: Improvement of pF No.1 surface.
|o88 06.OZ.S3.09.3. A||ahabad: Provision of ol no. escalator at pF
No.4&6.
io89 06.O..S3.093. jhansi: Provision of ol no. escalator at pF
No.4&5.
logo o6.cO53.09`3. Gwa|ior: provision of ol no. escalator at pF No.152.col
DRF 14,cO Z,3Z 11,68
0Ftf 14,00 3,44 1056
Of( 1) 43,02 22,80
I)i( 1) 83,8S 6,42
list of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAllwAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cat`ion Anticipated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
wo,k
I>ASSEusER AMENITIES
iogi O€.03.53,09.3. Gwa|ior: Provision ofol no. escalator at pF No.2
iog2 06.015309.3. Agra cantt: Provision ofol no. escalatoratpF
iog3 06.02.S3 093. Hathras: provision of public FOB ( 2.44m wide).||.ee
iog4 ce.Ol.5310.3. Mathura|n: Prov`ision ofpl: shelteron pF No. 8/9.50.cO2
logs 0€.0253.10.3. Kanpur: Precoolingpointson pF No.1,2/3, 4/Sand
6/7.
|og6 06.a..S3.10,3. jhansi Division : Electrification of 20 nos. non-electrified Railway stations by providing solar
power pack system.
iog7 #:::9103 Phaphund: ReplacementofFOB.
|og8 a€.015].10.3. Mathuraln: Provision of Escalators on pF No.1 &
2/3.
logs 06,0253.12.3. ALLAHABAD:-Relocation of diesel loco shed in
iioo 06.02`53.12.3 A||ahabad: Prov.iston of electric loco shed in
iioi 06J]Z.53.14.3. Kanpur-Tundla section:-Provision of minimum
passenger amenities at stations in Kanpur-Tundlasection.
||o2 06.02.5].14.3. ||athras :-Provision of50000 gallons capacity RCC
over head tank along with deep tube well,pumphoiise & associated pipe line at Hathras.
iio3 06.02.53.15.3` Rurah;-Provision for development offacilities
for Adarsh station at Rurah.
iio4 0€.03.53.15.3 |hansi:-Replacement of old AC sheet ,Valley guter
& down take p.ipes by galvino / pre painted sheet
along with damaged portion of COP (CSTM END)on
Platform No. 1& 2/3 .
||05 06.03.S3.15.3. Datia,Dabra,Babina & Talbahat:Construction of RCC
over head tank `insteed of old steel tank at
Datia,Dabra,Babina & Talbahat stations.
iio6 06.03 53`15.3 Manikpur-Proposed Augmentation of water supply5'.°°7 arrangement at Manikpur by providing New borewells
& pipepline.
||o7 06.Ol.53.15.., Mathura Jn.:-Extension of FOB from pF 8/9 towards50.002 3rd entry side with provision of ramp.
OF( 1) 77,66 SO,78
OF(1) 89,01 21,00
DF(i) 1,72,03 I,16,14
DF(1) 95,20 81,18
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Anticipated Outlay Outlay Balanceto
Cost exi.ected 2020-21 complete
to end of work2019-20
i|o8 06.OZ,S3.as,3. Tundla: f`eplacement of existing damaged washable
apron at Pf No.4 at Tundla station
i|og 06.O}.53.15.3. |hansi : Provisionof Rampsto 6.1 mt wide new
FOB at PF 4/5 atJhansi statlon including
dismantling of old FOB (2.4 mt wide connecting PF
1, 2/3 & 4/5)
iiio 06.02,53.18,3. xanpur central:-Improvement of platform surface,
Platform shed & circulat.ing area of city and cant
side of Kanpur central station.
1111 Ou.02.53.183 A||ahabad: Improvement of pF-7/8, resurfacing of5"" pF 1, 2/3, 4/6, & replacem€ntofleaky8utteron
PF 1 & 2/3 etc.
1112 06.0253.183. Naini: Improvement of platform surface of pF 1/2
at Naini station for Kumbh Mela 2019.
1113 06.0353.183 KUR|.Provision of watering facil`ities at pf no 1
with 2.25 lacks ltrs RCC high service tank and
other works at Khajuraho station.
1114 ce.a.,S3.18.3. jhansi Division: Provision of Divyang Friendly
Toilets at 65 no stations.
1115 es02531e... Provision of computer based reservation charting
display system at Allahabad and Kanpur stations.
1116 060153.18`3` Upgradation and Redevelopment ofAgra cantt
station by improvement of facade and extension of
porch , provision of green patches , fountain ,
granite flooring of platform etc.
1117 06.01,5319... Agra cantt-Setting up of Quick watering
ai.rangement at A8ra cantt station.
1118 06`03.5..191, jHS Division:Provision of 6.1m 2nd FOB with ramp
at Chitrakoot Dham Karvi Station with exit to
circulating area
1119 06.02.5..19.3 Kanpur: Improvementofsurface ofF0B'sat Kanpur
Central.
ii2o 06,02.5..19 3 Kanpur central~~Aligarh~Provision of coach
gu.idance display system and train timing displayboards at Aligarh, Etawah, Jhinjhak, Tundla &
Phuphund.
1121 06.03.53,19.3. Jhansl divison: Up8radation of pA system at 72
stations to eliminate the defic.iency in MEA.
1122 06.cO.S3.ZO`3. Works costing below DRM.s PowercO.999
3,lsJcO „ 3.15,cO
559,81 5,59,81
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
N0l`TH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Pa rticu la rs of works Allo-cation Anticii]ated Outlay Outlay Balanceto
Cost expected 2020`21 complete
to end of work2019-20
TOTAL-P8§senger Amenltles
O"ER spEciFIED wORrs
A - Wads in Progress
1123 06.03 6"6.I. Gwalior-Provision of water re-cycling plant at52.co2 Gwalior,
1124 96.?: 64.17,2. Agra-Construction of top floor on new DRM office
to provide proper accommodation to staff Ofoperating, S&T, Engg & Personnel deptt.
1125 06.03.6416.2. jhansi workshop:-Augmentation of hostel capacity71.Col in STC Jhansi.
1126 cO,Ol.64.16.2. A8ra I:ort :-Provision of 60 bedded lTEs and sr.
subordinate rest house .
1127 #3;;64032 Kanpur:Civil EngineeringTrainingcentre.
1128 g%,ca.co2. ,¥c:Pmu:tivp:::o°useb:ef:rh:eo:jinn:cua?.°f three phase
1129 06.03.64.07.2. jhansi: Construction of model room of loo beds
capacity.
ii3o as.0164.082. New Delhi : Prov`ision of passenger carrying lift
for 6 stories TTE running room for NCR.
1131 ce.01.64.16.2. Provision of Integrated Emergency Response
Management System (Video Surveillance System) at
04 railway stations viz. Agra Fort, Raja ki Mandi,
Dhaulpur & Morena
1132 06.03.64`16.2. Provision of Integrated Emergency Response
Management System (Video Surveillance System) at
06 railway stations viz. Gwalior, Dabra, Datia,
Babina, Lalitpur & Oral.
1133 06.a3,64.16.Z, Provision of Integrated Emergency Response
Management System (Video Surveillance System) at
06 railway stations viz. Banda, Manikpur,
Chitrakut , Mahoba, Khajuraho & Atarra
1134 06.02 6416.2 Provision of Integrated Emergency Response
Management System (Video Surveilla nce System) at
05 railway stations viz. Aligarh, Firozabad,
Shikohabad, Fatehpur and Phaphund.
1135 06.02.64,16.2. Provision of Integrated Emergency Response
Management System (Video Surveillance System) at 0
4 railway stations viz. Tundla, Mirzapur,
Vindhyechal & Etawah.
•. 28,00,00
8,00,00
.. 14,44,51
. 69,25,86
•' 28,00,00
8,00,00
.. 14,44,51
'' 69,25,86
DRF 31,03 12,S9
SRSF 1 3,78 3,78
DF(3) 2,47,95 95,32
Llst of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAI LWAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works Allo-cation Anticipated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
wo,k
O" I R SPECI FI El) WORKS
1136 0601.64,193. Construction of05 nos. rooms(2 bad/room +
Letbath) at Running Room ldgah.
1137 06.Ol.64193. Construction of 12 nos. rooms(2 bad/room +
Letbath) at Running Room Agra Cantt.
1138 % %ca.18 3. ::::.B''::S,i;unr-sce°ctn.,Sot:u::'o°unp?;,br°ouu::auT :a;'tn
(73.7Km)
1139 %:%2ca`'8.3 ;i:::-tBhaentdr:kcu; ::C:-hce°:::rhuscjt::: :;tbh°eutnr::krytowa''
prevent tresspassing&encroachment( 10km)
1140 06.Ol.64193. Agra cantt-Provision of additional barrack with
other facilities for RPF staff
1141 06.Ol.G4.19.3 Mathura Jn-Provision of additional barrack room &
female barrack with other facillties for RPF staff
1142 06.02 64 ae.3. AIIahabad Division -Construction of new crew
running Room at I(anpur.
1143 06.02.64.18J, Allahabad Divis.lan -Construction of new crew
running room at. Mughalsarai.
1144 0602.64.18`3. Allahabad Division -Construction of new crew
running room at ALD.
1145 0€.Ol.64.18.3. Agra Division -lclgah-Bayana sec-Construction of
boundary wall along the track to prevent
tresspassing & encrochment( 10km)
1146 06.02.G4.183. A||a|iabad -Mughalsarai: Provision of Air
Conditioning arrangements in Running Room at New
Running Room Allahabad & Mughalsarai.
1147 06.OZ.64.183, Kanpur: Provision of Air conditioning arrangements
in New & Old Running Rooms at CNB-Central and
Drivers & Guard Running Rooms at GMC-CNB.
1148 06.Ol.GJ..04.3. AGC: Construction of new centra lised General
stores depot.
1149 06,02.64.Ou.3. CNB: Construction of new ward and shed in ETD/CND.51.004
ii5o 06.03.64.073 jhansi/ Diesel shed: Provision of hostel for
tra inees of DTC/J HS.
1151 a:.%364fl7 3 Agra: Provision of subordinate rest house.
1152 06.02`64.093 A|Iahabad: Provis.Lonof02 nos. Iiftsin new
building at Central Hospital Allahabad.
1153 06.02.64.09,3. AIIahabad: Provision of Elevators in driver &
Guard running room.
Cap, 19,87 19,68
DF(I) 35,4S .5,45
DF(2) 21.3Z
DF(3) 77,47
List of Approved Works Costing Less Than Rupees Two Crore Fifty lakhs Each
NORTH CENTRAL RAILWAY
(Figures in thousands of rupees)
Item ProjectlD
No.
Particulars of Works Allo-cation Antic.ipated Outlay
Cost expected
to end of2019-20
Outlay Balanceto
2020-21 complete
work
1154 06,Ol.64.1l.3. Agra cantt-Improvement of station and yard drain
for disposal of waste water.
1155 06.02.64.12.3 Dadri:-Provision of RPF barrack office at Dadi.i.51.001
1156 06-a.,64.lz.3. Chitrakut Dham Karvi 15 beds, Khajuraho 10
beds,Ghatampur 10 beds, Bhimsem 10 beds and Dabra
10 beds (Total 55 beds)Construction of new RPF
barrack, with Kitchen, recreation room, Dining
hall and Lat-bath facilities.
1157 a602.64,143` Kanpur:-F(placementofold stonetiles&jackarch
roof in CETA School buHding including main hall
domes
1158 06,01.64.15.3. Agra Division:-Provision of RPF out post at
Kherli & Idgah stat`ion
1159 060l.6415... Agra :-Provision of Track machine maintenance
Shed at Agra.
ii6o 06.02.64.17.6. A||ahabad:-Modification of central office of
NCRES at 464-8 Nawab Yusuf Road at AIIahabad.
1161 es03.G4.18.3 B|NA-OHO & |HS -CNB section: Provision of
boundary wall along the track to preventencroachment, trespassing & CF`0.
1162 06JIZ.64.183. Rura-Tundla:-Construction of f`Cc boundary wall to
prevent CRO & Tress passing.
1163 06J)2,64.183, Tundla-Ghaziabad: Construction of RCc boundary
wall to prevent CRO & Tress
passing. (Tund la-G haziabad section )
1164 06.OZ.64.18.3. Kanpur-Ghaziabad: Construction of RCc boundary
wall to prevent CRO & Tress passing in Kanpur Area
& Kanpur-Rura section.
1165 06.02.64.18.3. Mughalsarai-Allahabd: Construction of RCc boundary
wall to prevent CRO & Tress passing in Mughal
Sarai-Alla habad section.
1166 0€0264.1a`3 Tundla-Aligarh-Khurja: Provision of Air
Conditioning arrangements in New & Old Running
Rooms at TDL and Aligarh & Khurja.
1167 06.02.64.18.3. AIIahabad DMsion: Provis.lan of Air cond.ltioning
arrangements .in Diesel Drivers running room at
MKP, ACol, ALD, CPA.
1168 tK)03.64.18.3. |hansi division;-Air conditioning of Running
rooms at JHANsl and BANDA.
1169 06.Ol.64.18.3. New delh'i~~NDLS: Air conditioning of MSRR/NDLS
(with 10096 power backup)
DF(2) 91,66 42,47 35,00 14,19
DF(2) 72,70 72,45 Z5
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAllwAY
(Figures in thousands of rupees)
Item ProjectlD
NO.
Allo-cation Ant`icipated Outlay outlay Balanceto
Cost expected 2020-21 completeto end of work2019-20
0"ERs.EclFiEDwORrs
ii7o 06".64.19.9. Astroturf pitch replacement, improvement of
visitors gallery & players hostel in Railway
Hockey stadium at Gwalior.
1171 06.02,64.19J, A||ahabad-Division:-Construction/replacement of
RPF/RPSF barrack,offices, post/tha na at
Chunar,Vindhyachal,Phaphund and Hathras station.
1172 06.03.64.19.6. jhansi Division: Improvement works ofTMC sidings
1173 06.OO.ca.203 Workscostingbelow DRM.s Power00.999
8 -New Works
1174 06.OZ,64.203, Kanpur-Tundla:-Improvement of SSE/P.Way office &
Store between I(a npu r-Tund la.
1175 06J)I.64 203. Extension and lmprovennent of existing control
office Of DRM office Agra.
1176 0601.64.203. Agra cantt R8ilway station -Extension of Existing
Rpf Office building of Divisional Quarter Master,
Train Escorting (Admin Post), Public Prosecutor
and SIB office First Floor at AGC
1177 0€.OO.64`20,3, Works costing below DRM's PowercO.999
TOTAL-NEWWORKS
ORf cO,00
DF(2) 1,cO,1o
List of Approved Works Costing Less Than Riipees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
PAGE NO : 86
(Figures in thousands of rupees)
Item ProjectlD
NO.
Particulars of Works AIIo-cation Anticipated Outlay outlay Balanceto
Cost expected 2020-21 complete
to end of work2019-20
TOTALener Speclfled Works Cap'
CaplNlrb)
DRF
DF(1)
DF(2)
DF(3)
RRSK
TRAINING/HRD
A - Works in Progress
1178 06.02.6S.". Subedarganj: Construction of RCc boundary wall and RRSK 37,005l.col prov,sion oftoitetsandshed in RPF paradeground
Subdegarsanj.
1179 0602 65.19,3. Allahabad Division:Improvement to lRTMTC campus by51cO2 providingtwo lecture halland onedininghall etc.
ii8o 06006S.ZO.3. workscostingbelow DBM's PowercO 999
TOTAL-wORrs IN pROGREss
a - New Works
1181 06.cO.6S.20.3. Works costing below DRM's Powercro.999
TOTAL-NEw woRrs
TOTAL-Tialnlng/HRl)
TOTAL-woftrs iN pROGREss
25,00 3,24,62
80,00
1,00,00
80,00
1,SO,00
30,00
30.cO
30,00
30,00
1,10,00
1,80,00
46,98,44
6,25,00
14,94,69
1S,59,99
6,59,81
1,05,S4
27,79
16,90,00
246,69,32
S,09,80
2,78,01
i,cO,00
9,90
1,89,01
54,00
I,10,00
59,,a.00
52,08,24
6,2S,00
17,72,70
16,67,99
6,99.71
2,94,55
81,79
18,00,00
306fi332