Q1. In which level of CMMI, each project can measure the rate at which software issues are resolved. a.) Level 3 b.) Level 4 c.) Level 5 d.) Level 2 Q2. Apart from processes, for whom CMMI applies to a.) It applies to work groups, people, rules, teams and projects b.) Project Management c.) Quality Management d.) Engineering Q3. Which of the following is a multi – level certification of an organizations software process, where better. a.) ISO 9000 Series b.) ISI 9000 – 2 c.) TSP d.) CMMi Q4. What are the “Process Characteristics” of Maturity level “Managed”? a) Process is measured and controlled. b) Process is characterized for the organization and is proactive. c) Process is characterized for projects and is often reactive. d) Process is unpredictable, poorly controlled and reactive. Q5. Capability Level & Maturity Level are a) Both give similar meaning. b) Both are similar, but not often rely upon each other. c) Both these metrics are closely related, and often rely upon each other. d) None of the above. Q6. Level 0 of CMMi? a) Incomplete. b) Initial level.

Testing Doc

Embed Size (px)

DESCRIPTION

dfdd

Citation preview

Page 1: Testing Doc

Q1. In which level of CMMI, each project can measure the rate at which software issues are resolved.

a.) Level 3b.) Level 4c.) Level 5d.) Level 2

Q2. Apart from processes, for whom CMMI applies to

a.) It applies to work groups, people, rules, teams and projectsb.) Project Managementc.) Quality Managementd.) Engineering

Q3. Which of the following is a multi – level certification of an organizations software process, where better.

a.) ISO 9000 Seriesb.) ISI 9000 – 2c.) TSPd.) CMMi

Q4. What are the “Process Characteristics” of Maturity level “Managed”?

a) Process is measured and controlled.b) Process is characterized for the organization and is proactive.c) Process is characterized for projects and is often reactive.d) Process is unpredictable, poorly controlled and reactive.

Q5. Capability Level & Maturity Level are

a) Both give similar meaning.b) Both are similar, but not often rely upon each other.c) Both these metrics are closely related, and often rely upon each other.d) None of the above.

Q6. Level 0 of CMMi?

a) Incomplete.b) Initial level.c) Performed.d) Requirements.

Q7. Once risk have been identified and unused, all techniques to manage the risk fall into one or more

a) Avoidance.b) Reduction.

Page 2: Testing Doc

c) Sharing.d) All of the above.

Q8. Identifying and implementing the best Defect Prevention techniques

a) Should be high priority in any defect management program.b) Should be medium priority.c) Should be low priority.d) Should be very High priority.

Q9. Major Steps of RCA:

a) Data Collection.b) Causal Factor Charting.c) A&Bd) Not A &B.

Q10. RCA is a class of ----- methods aimed at identifying the root causes of problems or event.

a) Problem Finding.b) Problem Solving.c) Behaviourism.d) Problem Shaping.

Q11. RCA helps in

a) Understand causes of Customer dissatisfaction.b) Reduce Expensive work.c) Identify process weaknessd) A, B & C.

Q12. ----fits with typical Defect Life Cycle Process

a) RCAb) Effective Problem Solving Skill.c) Defect Management.d) Risk Based Testing.

Q13. Which model can be performed on a design, or a process, and is used to prompt actions to improve design or process

a) FMEAb) Riskc) Severityd) Failure Mode

Q14. FMEA is used when

a) If the product comeback, customer will notb) FMEA checks if the product meets the requirements be for Tape Out or Delivery.

Page 3: Testing Doc

c) Saves R&D costs and on redesign.d) All of the above

Q15. Consequences of Failure Mode is called

a) Riskb) Severityc) Failure Moded) All of the above

Q16. Test Planning Phase involves

a) Define Test Strategyb) Define Test Scriptsc) Define Test & Requirement Coveraged) All of the above.

Q17. A Test Set is a group of tests designed to achieve specific testing goals

a) Trueb) False

Q18. What are the options available in Tools menus of common Toolbar

a) Change Project, Customize, Defectsb) Clear History, Document Generatorc) Excel Report, Generator and Dashboardd) All of the above

Q19. You can use Unified Resource Locator to a Quality Center record as an attachment

a) Trueb) False

Q20. Follow Up alerts can be created on outstanding issues in which module

a) Test Labb) Requirementc) Defectd) Test Plan

Q21. You can search for a particular requirement in the requirement tree or in the requirement grid using ---command

a) Searchb) Findc) Search Alld) Find All

Q22. The requirement---- view enables you to display requirements in a flat non-hierarchical view

Page 4: Testing Doc

a) File; Fileb) Hierarchical; Hierarchyc) Gird; Gridd) Both B & C

Q23. Operator that performs the logical Conjunction of the two expressions

a) ANDb) ORc) NOTd) NOR

Q24. Which statement associated a procedure with a test object Class?

a) Register Functionb) RegisterUserfunctionc) AssociateFunctiond) None of the above

Q25. The InstrRev function returns the numeric position of the first occurrence of a specified substring with a specific of the string

a) Trueb) False

Q26. In VbScript, variable name must not exceeded

a) 126b) 56c) 256d) 190

Q27. What is the output of the following:

DatePart(“W”,”1/1/2000, VBTUESDAY)

a) 7b) 6c) 5d) None

Q28. Risk is

a) Knowing what will happen in terms of damage, failure loss.b) You know the probability of failurec) You don’t know what will happen, but you know the probabilityd) You know what will happen, but you don’t know the probability

Q29. Sgn(0) returns

Page 5: Testing Doc

a) 1b) -1c) 0d) None of the above

Q30. Len(“VBSCRIPT”) returns

a) 7b) 5c) 9d) None of the above

Q31. The function that returns current system date and time

a) Dateb) Nowc) Both A & Bd) None of the above.

Q32. Status of Project and Quality can be monitor through

a) SDLCb) Risk Managementc) Test Resultsd) B and c

Q33. Defect Prevention Process

a) Identify Critical Risksb) Estimate Expected Impactc) Minimized Expected Impactd) All of the above

Q34. Risk Mitigation refers to

a) Minimizing risks once they ariseb) Maximizing risks once they arisec) Risk Mitigation is a form of Damage controld) A & C

Q35. These methods consist of the following elements, performed, more or less, in the following order

a) Identify , characterize threatsb) Assess the vulnerability of critical assets to specific threatsc) A, Bd) Undetermine the risk

Page 6: Testing Doc

Answers:

1. B2. A3. D4. C5. B6. A7. D8. A9. C10. A11. D (Not sure)12. A (Not Sure)13. A14. A15. B16. D17. A18. D19. A20. C21. A22. C23. A24. B (Not sure)25. A26. C27. A28. C29. C30. A31. B32. A33. D34. D35. C