TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP38_actual
WorldSkills International Secretariat Keizersgracht 62-64, 1015 CS Amsterdam, The Netherlands www.worldskills.org, Tel: +31 23 5311071, Fax: +31 23 5310816 WSC2015
TEST PROJECT MODULES There are Three (3) Modules to complete in the 20 hour competition.
A) Component Fabrication 13.5 Marks Time Allowed 3.0 Hrs B) Refrigeration System Installation and Commissioning 49 Marks Time Allowed 13.0 Hrs C) Air Conditioning System Fault Find, Repair and Commissioning 37.5 Marks Time Allowed 4.0 Hrs
TEST PROJECT DOCUMENTATION Section 1: Competitor Instructions – Competition Details
This contains all of the competition details, except for the specific information on the refrigeration and air conditioning systems to be used in the competition. This will be provided to all participating countries approximately six (6) months prior to the competition to enable it to be translated into the Competitor’s language and passed onto the Competitor. This document will be superseded by Section 4 prior to the competition.
Section 2: Competitor Instructions – Manufacturers, Equipment and Materials Manuals
This contains the full operating manuals, wiring diagrams and specifications of the major equipment to be used in the competition. This will be provided to all participating countries approximately three (3) months prior to the prior to the competition to enable it to be translated into the Competitor’s language and passed onto Competitors, all information will be available online via the WorldSkills Infrastructure List for competition
Section 3: Test Project Drawings
The drawings will be distributed with Section 1. The drawings may be altered as part of the 30% change to the project which will take place at the competition. The drawings are issued as a guide only and are finalized at the competition.
Section 4: Competition Instructions
This document supersedes Section 1 and will be provided to all Competitors at the Information Session prior to start of the competition and will include a 30% change to the test project described in Section 1, it will include or provide reference to:
• The Competitor’s competition timetable • Health, safety and environment requirements • Category competition rules and procedures • Refrigeration Competition Standards • Additional information
Section 5: Marking Scale
The marking summary will be distributed with Section 2 approximately three months prior to the competition. The marking scale detail will be finalized by the Experts prior to the competition dependent on the availability of materials and equipment supplied by the host nation and the 30% change to the Test Project.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 2 of 19
TIME ALLOWED FOR EACH MODULE To enable all Competitors complete the Modules they will carry out the work at the same time. The
Competition Time Table in the Competitors Instructions Section 4 must be followed. Where system pipe work is installed, the Competitor is free to work autonomously in a safe manner with all relevant assessment being completed outside of competition time, pressure transducers may be used to ensure minimum pressure test and evacuation requirements are met by the Competitors. Competitors MUST perform all electrical testing in the presence of an Expert prior to energizing the installation.
CHECK POINTS An important part of this competition are the procedures used to carry out various tasks. Therefore, at various points in this competition you must ask an Expert to observe and check your work. Once checked the Expert must place their initial in a progress box as per the example below.
Electrical Installation Testing Expert 1 Initials and Country CM AUS
Expert 2 Initials and Country MF UK
Expert 3 Initials and Country DO IE
INFORMATION CONCERNING SAFETY REQUIREMENTS During the competition, all Competitors MUST follow the safety rules listed below along with the local Health, Safety and Environment requirements of the host country.
SHOES • Fully enclosed work shoes or boots must be worn at all times.
CLOTHING • Legs must be covered at all times, by either long work trousers or overalls. • Upper body must be covered at all times. • Arms must be covered with long sleeves, when brazing and using refrigerant.
CLEAR SAFETY GLASSES • Must be worn when necessary to protect your eyes. • Must be worn when brazing, soldering, filing, reaming, hack-sawing, drilling, grinding and using refrigerant,
dry nitrogen and compressed air.
GLOVES
• Must be worn when brazing and using refrigerants
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 3 of 19
ELECTRICAL • Competitors must NOT switch on (apply power) to any electrical equipment until they receive permission
from an Expert, except for hand power tools.
Any Competitor that is identified as not wearing the correct safety attire or is engaging in any unsafe practice will be stopped and advised on the correct safety practice by an Expert. If the unsafe working practice is repeated the Expert may STOP the Competitor and report the issue to the chief or Deputy Chief Expert. The Competitor may not be allowed to continue until the safety issue is resolved. The Competitor will lose associated safety marks.
If the Competitor continues to ignore the safe working practice they may be removed from the competition area for a safety briefing for ten minute by the host country health, safety and environment representative, the time taken to complete the safety briefing will be considered to be a part of the Competitor’s competition time.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 4 of 19
COMPETITION DETAILS - MODULE A
COMPONENT FABRICATION
MAXIMUM TIME ALLOWED - 3 HOURS 13.5 MARKS
SCOPE The Competitors are required to fabricate a copper tubing circuit for the secondary refrigerant circuit that will form the ice rink surface, this coil will be incorporated into the design of the system at a later stage. The coil is constructed using 13 lengths of 1/2” copper tubing, fed by a 7/8” copper header as per supplied drawing. This entire unit will sit in the bottom of a tank and form the secondary refrigerant coil for the ice rink being installed in Module B.
TIMING Competitors are to all complete the ice rink piping at the same time in the morning of C1, this will allow for marking to take place in the afternoon, any Competitors that do not finish Module A in the allocated time will be required to submit the unfinished project for assessment. Competitors will receive additional points for completing this module in less than the allocated time (as defined in the marking summary) providing that the fabricated component does not leak when pressure tested.
ASSESSMENT Competitors will be assessed as per technical description, the marking scale will reflect dimensions and tolerances for assessment in addition to the quality of brazed joints. Fabricated component will be tested for leaks by pressure testing with dry nitrogen to ensure no leaks are present. Any Competitor who does not complete Module A in the required time (3 hours) will be allowed to complete it after it is assessed and handed back to them during Module B – no additional time will be allowed for either Module A or Module B for those who do not complete the fabrication in the allotted time.
DRAWINGS R.001 Coil of Ice Rink
COMPONENTS Components to be installed will include the following;
• Pre manufactured 7/8” header copper pipework
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 5 of 19
COMPETITION DETAILS - MODULE B
REFRIGERATION SYSTEM INSTALLATION AND COMMISSIONING
MAXIMUM TIME ALLOWED - 13 HOURS 49.0 MARKS
SCOPE Competitors are to install a refrigeration system to refrigerate a small scale ice rink, the system uses a secondary refrigerant to remove heat from the ice rink and mimics a small industrial plant commonly used to carry out a much larger duty.
The Competitors are required to use the supplied components along with the coil fabricated in Module A to form a low pressure flooded system that utilizes a brazed plate heat exchanger to refrigerate propylene glycol to remove heat from water to form the ice rink. A small condensing unit is used to draw vapour off the top of the vessel and compress and condense the refrigerant, an electric expansion valve is used to meter the refrigerant into the vessel. Two level switches are used to control the liquid level inside the vessel, a capacity control valve is used to ensure suction pressure does not drop below design. Refrigerant is R134a.
Secondary refrigerant circuit for ice rink is to be constructed using copper pipe, copper pipe will be used to form the secondary refrigerant pipe circuit joining heat exchanger, ice rink coil and glycol tank with a flexible hose connection used to connect the copper pipe to the circulating pump.
Competitors are required to connect all components to a prewired electrical panel
TIMING Competitors are to all complete the installation over C1, C2 and C3. The secondary refrigerant circuit (glycol) pipework must be completed by the end of C2 for assessment overnight, the entire installation will be completed by the end of C3 for assessment. The completed project with ice rink frozen may be left running and displayed on C4.
ASSESSMENT Competitors will be assessed as per technical description with particular weighting on the commissioning and operation of the project.
DRAWINGS R.002 Primary refrigerant flow circuit
R.003 Secondary refrigerant flow circuit
R.004 General Installation View
R.005 Glycol Tank and Ice Rink
R.006 Low Pressure Vessel
R.007 Electrical Control Panel
R.008 Electrical Control Diagram
R.009 Electrical Power Diagram
R.010 Electrical Terminal Connections
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 6 of 19
COMPONENTS Components to be installed will include the following;
• Basic air cooled condensing unit with liquid receiver ad oil separator • Low pressure vessel • Capacity control valve (Danfoss KVC) • Electric expansion valve (Danfoss AKV) • 2 x liquid level switches (Reed Switch) • Brazed plate heat exchanger (Danfoss) • Circulating pump (submersible type) • Electrical switchboard • Temperature controller (Danfoss) • Data logging pressure transducer (Siemens)
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 7 of 19
SYSTEM DESIGN SPECIFICATIONS The following system design specifications for the installation should be used for commissioning and control setting and are as follows:
SYSTEM SPECIFICATIONS • Primary refrigerant = R134a • Secondary refrigerant = Propylene Glycol (40% by volume) • Maximum ambient temperature = 35°C Db, 28°C Wb • Design saturated suction temperature = -15 °C • Suction line pressure drop = 1 K • Design Glycol temperature = -10°C supply to ice rink
CONTROL AND SAFETY SETTING
• Low Pressure Controller cut off 5K lower than design saturated suction temperature (SST). • Low Pressure Controller cut in at -10 °C saturated suction temperature • Capacity control valve to maintain -15 °C saturated suction temperature • High Pressure cut out the system when the Condensing temperature reaches 55 °C • Temperature controller cut out at -15 °C • Temperature controller cut in at -10 °C • Temperature sensor to be submerged in glycol tank
SYSTEM OPERATION
• Low level liquid level sensor to cycle on electric expansion valve • High level liquid level sensor to cycle off electric expansion valve • Temperature controller to cycle off expansion valve if glycol tank temperature falls below -15 °C • Temperature controller to cycle on expansion valve if glycol tank temperature rises above -10 °C • Capacity control valve set to maintain -15 °C saturated suction temperature and limit temperature cycling to
safety only (unit should run continually and not cycle on and off)
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 8 of 19
INSTALL AND COMMISSION REFRIGERATION SYSTEM All Competitors will be required to perform the following tasks to complete this module, task 6 has an Expert sign off sheet which needs to be filled in and signed prior to moving ahead on this task
1. INSTALL REFRIGERATION SYSTEM All Competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and WorldSkills International Standard for Refrigeration and Air Conditioning.
Refer to the following project drawings to assist to complete this task
R.002 Primary refrigerant flow circuit
R.003 Secondary refrigerant flow circuit
R.004 General Installation View
R.005 Glycol Tank and Ice Rink
R.006 Low Pressure Vessel
2. INSTALL ELECTRICAL SYSTEM All Competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and WorldSkills International Standard for Refrigeration and Air Conditioning.
All cabling to be installed in double insulated, flexible cable or single insulated cable protected by conduit, no single insulated cable is to be left without additional protection. All temperature probe cables to be protected by conduit.
Refer to the following project drawings to assist to complete this task
R.007 Electrical Control Panel
R.008 Electrical Control Diagram
R.009 Electrical Power Diagram
R.010 Electrical Terminal Connections
3. PRESSURE TEST SYSTEM Carry out a staged pressure test of the primary refrigeration system (R134a) to a value of 9.5 bar gauge (950kpa). The pressure test point should not drop from the starting point in the fifteen (15) minutes after the pressure test is isolated from the Nitrogen cylinder. If the pressure test has not been achieved, the Competitor can continue to fix the leak and achieve the pressure test, however the full mark for Pressure Test will be lost. The pressure test will be monitored remotely via a data logging process to ensure all Competitors achieve the required pressure and standing time.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 9 of 19
To be filled in by COMPETITORS
PRESSURE TEST ATTEMPT #1
Starting test pressure: __________________________□ kPa □ psi
Starting Time: __________________________ Test pressure after standing time: __________________________□ kPa □ psi
Finishing Time: __________________________
PRESSURE TEST ATTEMPT #2
Starting test pressure: __________________________□ kPa □ psi Starting Time: __________________________
Test pressure after standing time: __________________________□ kPa □ psi
Finishing Time: __________________________
4. EVACUATION Evacuate the primary refrigeration system (R134a) in accordance with manufacturer’s instructions and WorldSkills standards using the Deep Vacuum Method to hold a vacuum of at least 1000 microns (130Pa absolute) of mercury. The evacuation point should not rise to a value greater than 1000 microns in the Ten (10) minutes after the vacuum pump is isolated from the system under test.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 10 of 19
To be filled in by EXPERTS ONLY
EVACUATION TEST ATTEMPT #1
Starting evacuation level: __________________________□ microns
Starting Time: __________________________ Evacuation level after standing time: __________________________□ microns
Finishing Time: __________________________
EVACUATION TEST ATTEMPT #2
Starting evacuation level: __________________________□ microns Starting Time: __________________________
Evacuation level after standing time: __________________________□ microns
Finishing Time: __________________________
Comments:
Refrigeration Evacuation Test Expert 1 Initials & Country:
Expert 2 Initials & Country:
Expert 3 Initials & Country:
5. CHARGING WITH REFRIGERANT – PRIMARY CIRCUIT Charge the primary refrigeration system (R134a) with the required weight of refrigerant to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices.
To be filled in by EXPERTS ONLY
Bottle weight prior to charging: __________________________□ kg □ lb Bottle weight at completion of charging: __________________________□ kg □ lb
Comments:
6. CHARGING WITH REFRIGERANT – SECONDARY CIRCUIT Charge the secondary refrigeration system (propylene glycol) with the required quantity of glycol and water to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 11 of 19
To be filled in by EXPERTS ONLY
Bottle volume prior to charging: __________________________□ L □ fl oz Bottle volume at completion of charging: __________________________□ L □ fl oz
Comments:
7. ELECTRICAL TESTING Under the supervision of an Expert, perform all necessary safety checks to ensure the Test Project is safe to energize.
PLEASE FILL IN THE EXPERT CHECK POINT SHEET BELOW BEFORE PROCEEDING ANY FURTHER
To be filled in by EXPERTS ONLY
Competitor Name:
Competitor Country:
All wiring inspected by Expert prior to energizing: □ Yes
Electrical safety checks performed prior to energizing: □ Yes
Comments:
Refrigeration System Electrical Test
Expert 1 Initials & Country:
Expert 2 Initials & Country:
Expert 3 Initials & Country:
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 12 of 19
8. COMMISSION THE SYSTEM Competitors are to commission the system for operation in accordance with the design specifications supplied. Please fill out the following commissioning document with the system fully operational and as close to operating temperatures as possible. Please indicate units by checking appropriate boxes.
Ambient Temperature: _____________ □ Celsius □ Fahrenheit
Refrigerant Type: _____________ □
Mass of Refrigerant Charge: _____________ □ grams □ pounds
Suction Pressure: _____________ □ kPa □ psi
Discharge Pressure: _____________ □ kPa □ psi
Condenser Subcooling: _____________ □ Kelvin □ Fahrenheit Degrees
Total System Superheat: _____________ □ Kelvin □ Fahrenheit Degrees
LP Control Cut In: _____________ □ kPa □ psi
LP Control Cut Out: _____________ □ kPa □ psi
HP Control Cut Out: _____________ □ kPa □ psi
HP Control Cut In: _____________ □ kPa □ psi
Capacity regulator setting: _____________ □ Celsius □ Fahrenheit
Glycol supply to ice rink temp: _____________ □ Celcius □ Fahrenheit
Glycol return from ice rink temp: _____________ □ Celsius □ Fahrenheit
Condensing Unit Operating Current: _____________ □ Amps
Glycol Pump Operating Current: _____________ □ Amps
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 13 of 19
COMPETITION DETAILS - MODULE C
AIR CONDITIONING SYSTEM FAULT FIND, REPAIR & COMMISSIONING
MAXIMUM TIME ALLOWED - 4 HOURS 37.5 MARKS
SCOPE Competitors will be provided with an air conditioning system that has been leak tested and verified to have no leaks, pressure testing of the system is not required at any point in time. Competitors will be required to identify 1x electrical fault and 1x refrigeration system fault on the supplied air conditioning systems, once faults have been identified the Competitors will be required to repair the faults including full refrigerant recovery and recharging of refrigerant charge to manufacturer’s specifications. Competitors will then be required to commission the system and plot operating conditions on a psychometric chart.
TIMING Competitors are all to complete this module on C4 at the same time
ASSESSMENT Competitors will be assessed as per technical description with particular weighting on the fault finding and commissioning of the project.
DRAWINGS R.011 Cradle for AC Unit
R.012 Psychrometric chart (SI units)
R.013 Psychrometric chart (IP units)
1. FAULT FINDING All Competitors are required to identify 1 x electrical fault and 1 x refrigeration system fault with the operation of the unit, the root cause must be found and repaired. Once the fault is identified Competitors are to fill in this sheet of paper identifying what they believe to be the fault with the equipment. An Expert then needs to sign this sheet of paper.
All fault finding MUST be done with all relevant safety rules adhered to.
Once faults are found and recorded the Competitor is free to continue by running the unit and progressing to the next stage of the Module.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 14 of 19
ELECTRICAL SYSTEM FAULT Please write down what the fault with the equipment is and any supporting information that indicates what the fault was.
________________________________________________________________________________________________________________________
________________________________________________________________________________________________
____________________________________________________________________________________________________________
Please indicate what repairs need to be done to the system to return it to normal operation
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
____________________________________________________________________________________
REFRIGERATION SYSTEM FAULT Please write down what the fault with the equipment is and any supporting information that indicates what the fault was.
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
____________________________________________________________________________________
Please indicate what repairs need to be done to the system to return it to normal operation
________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
____________________________________________________________________________________
2. REPAIR SYSTEM All Competitors are required to repair the faults they have identified on the unit, refrigerant must be removed from the system to repair the refrigeration fault. All necessary materials will be provided to repair the equipment and return it to an operating state
All repairs MUST be done with all relevant safety rules adhered to.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 15 of 19
3. RECLAIM SYSTEM All Competitors are required to repair the fault they have identified on the unit, the refrigerant will need to be removed from the system to complete the repair then the system pressure tested, evacuated and recharged with refrigerant. All necessary materials will be provided to repair the equipment and return it to an operating state.
All repairs MUST be done with all relevant safety rules adhered to.
To be filled in by EXPERTS ONLY
Reclaim System
Reclaim bottle weight prior to reclaim: _____________________□ kg □ lb Reclaim bottle weight at completion of reclaim:_____________________□ kg □ lb
Comments:
4. EVACUATION Evacuate the refrigeration system in accordance with manufacturer’s instructions and WorldSkills standards using the Deep Vacuum Method to hold a vacuum of at least 1000 microns (130Pa absolute) of mercury. The evacuation point should not rise to a value greater than 1000 microns in the Ten (10) minutes after the vacuum pump is isolated from the system under test.
To be filled in by EXPERTS ONLY
Evacuation Test
Starting evacuation level: __________________________□ microns
Starting Time: __________________________ Evacuation level after standing time: __________________________□ microns
Finishing Time: __________________________
Comments:
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 16 of 19
Air Conditioning System Evacuation
Expert 1 Initials & Country:
Expert 2 Initials & Country:
Expert 3 Initials & Country:
5. CHARGING WITH REFRIGERANT Charge the refrigeration system with the required weight of refrigerant to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices.
To be filled in by EXPERTS ONLY
Refrigerant Charging
Bottle weight prior to charging: _____________________□ kg □ lb Bottle weight at completion of charging: _____________________□ kg □ lb
Comments:
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 17 of 19
6. COMMISSION THE SYSTEM Competitors are to commission the system for operation in accordance with the manufacturers specifications supplied. Please fill out the following commissioning document with the system fully operational, on “Cooling” mode, indoor fan on highest speed and as close to operating temperatures as possible. Please indicate units by checking appropriate boxes.
Ambient Temperature: _____________ □ Celsius □ Fahrenheit
Return Air Dry Bulb Temperature: _____________ □ Celsius □ Fahrenheit
Return Air Wet Bulb Temperature: _____________ □ Celsius □ Fahrenheit
Supply Air Dry Bulb Temperature: _____________ □ Celsius □ Fahrenheit
Supply Air Wet Bulb Temperature: _____________ □ Celsius □ Fahrenheit
Air Velocity of indoor unit: _____________ □ m/sec □ ft/sec
Air Volume of indoor unit: _____________ □ m3/sec □ cfm
Indoor Fan Speed: □ High □ Medium □ Low
Mode of Operation: □ Cooling □ Heating
Refrigerant Type: _____________ □
Mass of Refrigerant Charge: _____________ □ grams □ pounds
Suction Pressure: _____________ □ kPa □ psi
Total System Superheat: _____________ □ Kelvin □ Fahrenheit Degrees
Compressor Operating Current: _____________ □ Amps
Indoor Fan Operating Current: _____________ □ Amps
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 18 of 19
7. COOLING PROCESS Plot the supply and return air conditions as specified in your commissioning report on the psychrometric chart supplied. Join the supply and return conditions with a line as per below example.
WSC2015_TP38_actual Version: 3.0
Date: 9.08.15 19 of 19
Ø1/2"
Ø 1/2"
Ø 1/2"
Ø 7/8"
Ø 1/2"
30
0
50
50
533
Ø 7/8"
30
R001 - Coil of the Ice
Rink.dwg
COIL OF THE ICE RINK
42
0
Detail 1
R002 - Primary Refrigerant
Flow Circuit.dwg
Hermetic
Compressor
Oil Separator
TEE
3/8"x3/8"x3/8"
Condenser
Liquid Tank
Sight glass
Filter Dryer
Ball Valve
Electric
Expansion
Valve
Suction
Accumulator
Service
Valve
Dual Pressure
Switch
Low
Pressure
Vessel
Plate Heat
Exchanger
TEE
1/2"x1/2x1/4"
TEE
1/2"x1/2x1/2"
TEE 3/8"x3/8"x1/4"
Q1Q4
Q2Q3
PRIMARY REFRIGERANT FLOW CIRCUIT
Hot Gas
Bypass Regulator
Pressure
Transducer
3/8"
3/8"3/8"
3/8"
3/8"
3/8" 3/8" 3/8" 3/8" 1/2"
1/4"
1/4"
1/2"1/2" 1/2"
1/2"
1/2"1/2"
Sleeve
3/8" x 1/2"
7/8"
Sleeve
7/8"x1/2"
1/4"
TEE
1/2"x1/2x1/4"
Access
LP
HP
R003 - Secondary
Refrigerant Flow Circuit.dwg
Plate Heat
Exchanger
Q1Q4
Q2Q3
SECONDARY REFRIGERANT FLOW CIRCUIT
1/2"
1/2"
1/2"
5/8"
Ice Rink Tank
Water Pump
Coil of Ice Rink
Glycol Tank
5/8"
5/8" 1/2"
5/8" 1/2"
R004 - General Installation
View.dwg
CRADLE
Glycol Tank
Ice Rink Tank
Condensing Unit
1
0
0
5
0
30
3
0
150
3
0
0
6
0
0
4
5
0
100
Glycol Tank
Ice Rink Tank
R005 - Glycol_Ice Rink Tank.dwg
ICE RINK AND GLYCOL TANK
1
5
A ( 5 : 1 )DIN 509
B ( 5 : 1 )DIN 509
C ( 5 : 1 )DIN 509
D ( 5 : 1 )DIN 509
E ( 5 : 1 )DIN 471 F
( 5 : 1 )DIN 471
A ( 1 : 1 )
A
B C
D
EF
A
WorldSkills 2015
PROJETO:
NOME:
ESCALA:
UNIDADE:
DATA:
AUTORIZADO POR:
MATHEUS DIOMAR SOUZA LIMA
Evaporador Inundado1:2
mm
02/2015A3
PAULO VINÍCIUS
FOLHA:
1 /1
A A
B B
C C
D D
ISOMÉTRICO
NOTAS-TOLERÂNCIAS GERAIS PARA CONSTRUÇÕESSOLDADAS CONFORME DIN EN ISO 13920-B -INDICAÇÃO DE SOLDA CONFORME DIN 22553 -PROCESSO DE SOLDAGEM CONFORMEDIN EN ISO 4063
NOTAS-TOLERÂNCIAS GERAIS PARA DIMENSÕES CONFORME DIN ISO 2768-mk;-CHANFROS NÇAO ESPECIFICADOS ADOTAR -0,5x45°;-CANTOS SIMPLIFICADOS CONFORME DIN 6785 -RAIOS NÃO COTADOS ADOTAR - R2mm;-INDICAÇÃO DE ACABAMENTO SUPERFICIAL CONFORME DIN ISO 1302;-TOLERÂNCIA GEOMÉTRICA CONFORME DIN ISO 1101.
ENGRENAGEM SEM FIMMÓDULO (m):NÚMERO DE ENTRADAS (z):ÂNGULO DE PRESSÃO (a):DIÂMETRO EXTERNO (De):DIÂMETRO INTERNO (Di):DIÂMETRO PRIMITIVO (Dp):ÂNGULO DA HÉLICE (b):
ENGRENAGEMMÓDULO (m):NÚMERO DE ENTRADAS (z):ÂNGULO DE PRESSÃO (a):DIÂMETRO EXTERNO (De):DIÂMETRO INTERNO (Di):DIÂMETRO PRIMITIVO (Dp):ÂNGULO DA HÉLICE (b):
x
01
x01
= = =
x
y
z
Ra 3,2
Ra 1,6
Ra 0,8
DIN EN ISO 4063 -311DIN EN ISO 6947 - PBDIN EN ISO 12536
DIN EN ISO 4063 -111DIN EN ISO 6947 - PBDIN EN 499 - E35 2 C25
DIN EN ISO 4063 - 131DIN EN ISO 6947 - PBDIN EN 349 - l1DIN EN ISO 440 - G46 4 MG3Si1
DIN EN ISO 4063 - 135DIN EN ISO 6947 - PBDIN EN 439 - M21DIN EN 440 - G 46 4 M G3Si1DIN EN ISO 4063 - 141DIN EN ISO 6947 - PBDIN EN 439 - R1DIN EN 440 - G46 M G3Si1
DIN EN ISO 4063 - 136DIN EN ISO 6947 - PBDIN EN 439 - l1DIN EN 440 - G46 M G3Si1
FURO DE CENTROISO 6411A3,15/6,7
SAÍDA DE REBOLODIN 509 - E0,6 x 0,3
SAÍDA DE REBOLODIN 509 - F0,6 x 0,3
ANEL DE RETENÇÃODIN 472 - 20 x 1,3
ANEL DE RETENÇÃODIN 471 - 20 x 1,3
SAÍDA DE ROSCADIN 76-B - M10 x 1,5
EIXO OU CUBO RANHURADOCOM FLANGES RETOSISO 14 - LIGHT SERIES6d10 - 23f7 x 26a11
EIXO OU CUBO RANHURADOCOM FLANGES RETOSISO 14 - MEDIUM SERIES6d10 - 23f7 x 26a11
EIXO OU CUBO RANHURADOCOM FLANGES RETOSISO 14 - MEAVY SERIES6d10 - 23f7 x 26a11
EIXO DENTADO COM FLANGES ENVOLVENTES
ISO 4156 - Ø3,5x1,46z 0,5 x 30p - 7h/7H
0,3
0,02
15°
1°
8°
2,5 00,05+
0,6R 0,02
8°
2,5 00,05+
0,3
00,2
+
15°1°
0,6R 0,02
2,5 00,05+
0,6R 0,02
0,3
0,02
15°
1°
15°1°
0,3
2,5 00,05+
0,6R 0,02
2,7
1,8
2,7
1,8
y
y
y
y
y
y
y
yy
y
y
y
y
y
y
y
y
y
y
y
y
Ø0,05 A
Ø0,05 A
Ø0,05 A
Ø0,05 A
Ø0,05 A
Ø0,05 A
NOTAS-TOLERÂNCIA NÃO ESPECIFICADA CONFORME IS0 13920-A;-AJUSTE ISO CONFORME ISO 286-1;-CHANFROS NÃO ESPECIFICADOS Ch 0,5x45°;-RAIOS NÃO ESPECIFICADOS R0,5mm;-CANTOS SIMPLIFICADOS CONFORME ISO 13715 -TOLERÂNCIAS PARA SUPERFÍCIES FUNDIDAS - J14 / j14;-TOLERÂNCIAS GEOMÉTRICAS CONFORME ISO 1101;-ACABAMENTO DAS SUPERFÍCIES CONFORME ISO 1302;-SIMBOLOGIA DE SOLDAGEM CONFORME ISO 2553.
RECARTILHA PARALELA
DIN 82-RAA 1,0
RECARTILHA CRUZADA
DIN 82-RGE 1,0
73
120
53,63
12,75
91,7
SENSORES
13/16-20 UENF-
19,25
30
,75
30
,75
-TODAS AS SOLDAS DEVERÃO SER DO TIPO PRATA 45%
12,75 12,75
12,75
3/8"- 16G UNC
3/8"- 16G UNC
R007 - Electrical Control Panel.dwg
ELETRONIC TEMPERATURE CONTROLLER
60
29
72
100
100
100
115 85 85
40
40
40
85
20
DRILLING FOR THE ELETRONIC
TEMPERATURE CONTROLLER
FRONT VIEW DRILLING OF THE COVER MOUNTING PLATE
FIXING RAIL
FOR THE COMPONENTS
DIN 35mm
RIVET
400
500
ELECTRICAL CONTROL PANEL
R008 - Electrical Control Diagram.dwg
S2 - D
EF
RO
ST
IN
G P
RO
BE
SENSORS
S1 - T
EM
PE
RA
TU
RE
C
ON
TR
OL
L2(S)
X1
13
X1
14 15
L1(R)
SS3
13
96
A2
A1
K1
DPS
X1
11
HP
CD
A
X1
B
09
OR
95
98
X1
10
97
H5H4H2
14
13
14
LP
A2
A1
K3
HLS
22
21
K3
14
13
22
21
LLS
A2
A1
K2
X1
12
H3H1
K1SS2
13
14
SS1
X1
21
X1
20
X1
22
X1
23
RED 1mm²
PRETO 1mm²
22
21
D(S1) C(S2) B(S3) A(DI)
1 2 3 4 5
FA
N
DE
FR
OS
T
CO
MP
RE
SS
OR
TE
MP
ER
AT
UR
E
CO
NT
RO
L
DE
FR
OS
TIN
G
PR
OB
E
16
ELETRONIC REFRIGERATION CONTROLLER
DANFOSS ERC 102C
ELECTRICAL CONTROL DIAGRAM
R009 - Electrical Control Power Diagram.dwg
CONDENSING UNIT
OR
2 220V 60Hz~
RED 2,5mm²
A1
A2
2 220V 60Hz
PE
L1(R)
L2(S)
~
BLACK 2,5mm²
X1
04
X1
05
1 3
2 4
5
6
X1
06
Q1
K1
X1
X1
X1
03
01
02
1 3
2 4
5
6
Q2
L2(S)
L1(R)
1
2
3
4
GREEN 2,5mm²
1
2
3
4
RED 1mm²
BLACK 1mm²
A1
A2
X1
07
X1
08
K2
1 3
2 4
5
6
A1
A2
X1
17
X1
18
X1
19
K3
1 3
2 4
5
6
M
2 ~
GLYCOL PUMP AKV
ELECTRICAL CONTROL POWER DIAGRAM
R010 - Electrical Terminal Connection.dwg
L1(R) - PHASE
BLACK - BLACK FLEXIBLE CABLE
LEGEND
CONDENSING UNIT (R)
CONDENSING UNIT (S)
CONDENSING UNIT (PE)
GLYCOL PUMP (R)
GLYCOL PUMP (S)
DUAL PRESSURE SWITCH - A
DUAL PRESSURE SWITCH - B
DUAL PRESSURE SWITCH - C
DUAL PRESSURE SWITCH - D
S1 - TEMPERATURE CONTROL
S2 - DEFROSTING PROBE
AKV (R)
AKV (S)
AKV (PE)
HIGHER LIQUID LEVEL SWITCH
HIGHER LIQUID LEVEL SWITCH
LOW LIQUID LEVEL SWITCH
LOW LIQUID LEVEL SWITCH
L2(S) - PHASE
PE - EARTH
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
RED - RED FLEXIBLE CABLE
GREEN - GRREN FLEXIBLE CABLE
Q1 - BIPOLAR BREAKER FOR POWER CIRCUIT
Q2 - BIPOLAR BRAKER FOR COMMAND CIRCUIT
K1 - POWER CONTACTOR OF CONDENSING UNIT
K2 - CONTACTOR OF GLYCOL PUMP
K2 - CONTACTOR OF AKV EXPANSION VALVE
OR - OVERLOAD RELAY OF CONDENSING UNIT
AKV - COIL OF ELETRONIC EXPANSION VALVE
HLS - HIGHER LIQUID LEVEL SWITCH OF LOW PRESSURE VESSEL
LLS - LOWER LIQUID LEVEL SWITCH OF LOW PRESSURE VESSEL
SS3 - SELECTOR SWITCH OF AKV
H1 - DASH LAMP FOR "TURNED OFF CONDENSING UNIT"
H2 - DASH LAMP FOR "TURNED ON CONDENSING UNIT"
H3 - DASH LAMP FOR "HIGH PRESSURE"
H4 - DASH LAMP FOR "LOW PRESSURE"
H5 - DASH LAMP FOR "OVERLOAD CONDENSING UNIT"
DPS - DUAL PRESSURE SWITCH
SS1 - SELECTOR SWITCH OF CONDENSING UNIT
SS2 - SELECTOR SWITCH OF GLYCOL PUMP
23
S1 - TEMPERATURE CONTROL
S2 - DEFROSTING PROBE
ELECTRICAL TERMINAL CONNECTION
7
0
0
1900
1
1
0
0
3
0
0
3
0
0
3
0
0
3
0
0
300
300
1
/
8
"
7
/
8
"
7
/
8
"
R011 - Cradle for AC Unit.dwg
CRADLE FOR AC UNIT
2
0
0
0 5 10 15 20 25 30 35 40 45 50
DRY BULB TEMPERATURE - °C
5
10
15
20
25
30
15 20 25 30 35 40 45 50
55
60
65
70
75
80
85
90
95
100
105
110
110
115
115
120
120
125
125
130
EN
TH
ALP
Y -
KJ
PE
R K
G O
F D
RY
AIR
10
15
20
25
30
35
40 45
50
55
60
65
70
75
80
85
90
95
100
105
ENTH
ALPY
- KJ
PER K
G O
F D
RY
AIRSA
TUR
ATIO
N T
EMPE
RATU
RE
- °C
0
5
5
10
10
15
15
20
20
25
25
30 WET BULB TEMPERATURE - °C
30
10% RELATIVE HUMIDITY
20%
30%
40%
50%
60%
70%
80%
90%
.78
.80
.82
.84
.86
.88
.90 SP
EC
IFIC
VO
LUM
E m
³/kg OF
DR
Y A
IR
.92
.94
HU
MID
ITY
RA
TIO
- G
RA
MS
OF
MO
IST
UR
E P
ER
KIL
OG
RA
M O
F D
RY
AIR
PSYCHROMETRIC CHARTSea LevelBAROMETRIC PRESSURE 760 mm of Mercury
Linric Company Psychrometric Chart, www.linric.com
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
VA
PO
R P
RE
SS
UR
E -
MM
OF
ME
RC
UR
Y
-40
-20
-10
0
10
20
25
30
DE
W P
OIN
T -
°C
20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120
DRY BULB TEMPERATURE - °F
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
5 10 15 20 25 30
35
40
45
50
55
55
60
60
65
10
15
20
25
30
35
40
45
50
ENTH
ALPY
- BT
U P
ER P
OU
ND
OF
DR
Y AI
R
SATU
RAT
ION
TEM
PER
ATU
RE
- °F
20
25
2530
3035
3540
4045
45 50
50 55
55 60
6065
65
70
70
75
75
80
80
85 WET BULB TEMPERATURE - °F
85
90
10% RELATIVE HUMIDITY
20%
30%
40%
50%
60%
70%
80%
90%
12.5
13.0
13.5
14.0 SP
EC
IFIC
VO
LUM
E ft³/lb O
F D
RY
AIR
14.5
15.0
HU
MID
ITY
RA
TIO
- G
RA
INS
OF
MO
IST
UR
E P
ER
PO
UN
D O
F D
RY
AIR
PSYCHROMETRIC CHARTSea LevelBAROMETRIC PRESSURE 29.921 inches of Mercury
Linric Company Psychrometric Chart, www.linric.com
.1
.2
.3
.4
.5
.6
.7
.8
.9
1.0
1.1
1.2
1.3
VA
PO
R P
RE
SS
UR
E -
INC
HE
S O
F M
ER
CU
RY
-20 0
10
20
25
30
35
40
45
50
55
60
65
70
75
80
85
DE
W P
OIN
T -
°F