Test Plan Document Reusability Evaluation Model for OO Reusability Evaluation Model for OO Software Components Software Components Project Code: REMFOOSC-2013 Internal Advisor: Dr. Muhammad Ilyas External Advisor: Syeda Iffat Zahra Project Manager: Dr. Muhammad Ilyas Project Team: Shahnawaz (BSSE-F10-M-44) Shayan Shaukat (BSSE-F10-M-25) Rubab Javaid (BSSE-F10-M-62) Hira Noor (BSSE-F10-M-59)

Test Plan (Template)

Embed Size (px)

Citation preview

Test Plan Template

Test Plan Document

Reusability Evaluation Model for OO Software Components

Project Code:

REMFOOSC-2013

Internal Advisor: Dr. Muhammad Ilyas

External Advisor:

Syeda Iffat Zahra

Project Manager: Dr. Muhammad Ilyas

Project Team:

Shahnawaz (BSSE-F10-M-44)Shayan Shaukat (BSSE-F10-M-25)Rubab Javaid (BSSE-F10-M-62)Hira Noor (BSSE-F10-M-59)Submission Date:

April 29, 2014

_____________________

Project Managers Signature

Document InformationCategoryInformation

CustomerDepartment Of CS & IT

Project

DocumentTest Plan

Document Version1.0

IdentifierReMOOSC

StatusDraft

Author(s)

Approver(s)PM

Issue DateFeb. 25, 2014

Distribution1. Advisor

2. PM

3. Project Office

Definition of Terms, Acronyms and Abbreviations

TermDescription

PHPHypertext Preprocessor

TPTest Plan

MLMulti linear

OOObject Oriented

Table of Contents61.Introduction

61.1Purpose of Document

61.2Project Overview

72.Scope of Testing

73.Test Plan Strategy

94.Test Environment

105.Schedule

106.Control Activities

107.Functions to be Tested

108.Functions not to be Tested

119.Test Case Design and Description

1510. Traceability Matrix

1511. Major Deliverables

1512. Risks and Assumptions

1513. Exit Criteria

1614. References

1. Introduction

Software reusability is a prominent approach used to help in ensuring how software could be reusable or how to find out those artifacts from currently available software components to build a new system. The goal of reusability evaluation model for object oriented software component is to find the quality of software in terms of reusability. Our objective is to develop the reusability evaluation model for the object oriented components that will use CKs metrics suit as an input. These inputs will be processed by the regression algorithms. Our output which will be the reusability of object oriented component in percentile (%). 1.1. Purpose of Document

Everything is developed for the ease of human beings. Every industry builds products or projects for their intended audience or to assist its employee. We cant present a product for real time usage until we test that product. Testing actually justify either this product is meeting customer functional and non functional requirements like quality, robustness, performance, reusability, user friendly etc. Testing verify the all parameters which must be fulfill before its real time use. Testing verify the performance level of an application or a model. In short, a product is incomplete without testing process. Softwares crisis gave a new thinking to industry. Why we are not reusing our x-work? At the beginning, these jobs are very tough, but object oriented approach gave a light for betterment. IT professionals are the key assets of our industry. We tried to lessen their workload by developing this application. The intended audience of our system is software industry. By calculating reusability of x-work, he/she can confidently say that I have done x% of this product already. It will assist a project manager in project time estimation and will also boost the morale of working team. This model will help a lot to bring down softwares crisis.1.2. Project Overview

Software reusability is a prominent approach used to help in ensuring how software could be reusable or how to find out those artifacts from currently available software components to build a new system. There are number of attributes, which find out the quality of the software like understandability, maintainability, reusability, fault proneness etc. The requirement today is to find how different metrics can collectively determine the reusability of the software component. The aim of reusability evaluation of object oriented based software components is to predict the quality of these components in terms of reusability. So far different reusability evaluation models have been proposed by number of researchers. Comparative analysis of certain different machine learning regression techniques and finding the best machine learning algorithm for reusability evaluation model is still unexplored.

In this research based project we are going to develop an application for reusability calculation of OO based software components. Our project has three phases. In 1st phase, formulation of given four techniques and developing an application which is capable of calculating reusability for OO components. 2nd phase is based on comparison of these four regression techniques. In 3rd phase, we have to develop a generic algorithm which will contain the most dominant features of four regression techniques. We have developed our application which is very simple and easy to use. To evaluate any OO components you need to put CKs metric suit value. Final output of the system is displayed in percentile (%) in tabular format against the given input. Output is also shown in pie graph format. This application is also help in datas generation. Datas generation ultimately enhance the accuracy of results. This application will help out the industry to tackle the softwares crisis. Deadline is key factor in the success of any project, this application will also help to meet deadline by reducing effort, time and cost of project. In short, it will target software pyramid that contains Effort, Time and Cost. These three parameters definitely affect the quality of a product. 2. Scope of Testing

Research oriented project are mostly analysis based. Our project is statistics based. In scope we describe what is in and what is out in testing of this application. On following levels we require testing.

1. Checking data type of inputs

2. Data Scaling

3. Which parameter of CKs metrics affects overall reusability result dominantly and in which sense?

4. Matching of pie chart result with results in tabular format

5. Verification of output results

6. Testing the training results of ML algorithm.

Following things are out of our scope

1. Either provided inputs are correct or not.2. Just telling how much that component is reusable in percentile (%). Not telling how to reuse it.3. Test Plan Strategy

Planning leads us to right way and also warns about incoming risks. Outline of work save time, cost and effort. Strategy is basically informing us to define a clear cut path to accomplish the testing. Resources, procedures, testing types and environment are defined during planning for testing. We will do following tests according to our system perspective. 1. Unit Testing

2. Integration Testing

3. System Testing1. Unit Testing

Definition: Unit testing is the most basic type of testing. Unit testing involve variables, functions, classes, objects and complete package, module or component. All other tests are based upon unit testing. Unit tests give you the confidence to refactor your code to make it cleaner and more efficient.Participants: Shahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor. Methodology:

i. Set up all conditions for testing.

ii. Call the method (or Trigger) being tested.

iii. Verify that the results are correct.

iv. Clean up modified records.2. Integration TestingDefinition:. Integration testingfinds thebugs that occur when two or more models integrated. Main purpose ofIntegration testingis to identifying the functional, requirement and performance levelbugs. When modules not integrated, they perform as per requirement but when they integrated, functional requirement and performance related issues will occurs due to the integration. There are three different types ofintegration testingapproach in software testing.

i. Big Bang

ii. Top down

iii. Bottom up

Participants: Shahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor. Methodology:

i. Prepare

ii. Review

iii. Rework

iv. Baseline

3. System Testing: Definition: System testingof software or hardware is testing conducted on a complete, integrated system to evaluate the system's compliance with its specifiedrequirements. System testing has three further sub testing. i. Functional Testingii. Performance Testingiii. Acceptance TestingParticipants: Shahnawaz, Shayan Shaukat, Rubab Javaid and Hira Noor. Methodology:

i. Execute the test condition.

ii. Check the output against the expected results.

iii. Evaluate and document any unexpected results.iv. Make sure that any required corrections are migrated and re-tested.

v. Make sure that final testing components (conditions, input, and expected results) are accurate, complete and documented in such a way to make them repeatable and reusable.

vi. Review and obtain Acknowledgment of System Test results where appropriate (i.e. new functionality).

vii. Check system is following performance level required of given application

viii. Review system by end user to complete acceptance testing.

4. Test Environment

Test environment describes on what certain conditions testing has performed. It describes hardware and software specification and situation on which testing has performed. Since our system is not sensitive so no specific environmental conditions like temperature, humidity etc are required. Our application is platform independent. Minimum Hardware and software specifications are listed below.

a. Hardware Specifications:

i. 512 MB RAM.

ii. 2.00 GHz Processor

iii. HD 20GB

b. Software Requirements

i. All Browsers

ii. All text editors capable of handing files with .js, .php and .html extensions without letter casing sensitivity.

iii. Junit Tester

c. Infrastructure

i. An internet connection and browser oriented infrastructure.

No logistics support is required for testing from department and teachers. However result validation is evaluated by honourable Dr. Tehseen Zia, Syeda Iffat Zahra with the assistance of honourable Dr. Muhammad Ilyas.5. Schedule__________________________________________________________________________________________

Testing Activities

Begin

End Designing Test Cases

03-11-2014 10-12-2013

Executing Test Cases

12-02-2014 20-04-2014

Unit Testing

12-02-2014 31-04-2014

Integration Testing

01-05-2014 15-05-2014

System Testing

15-05-2014 22-05-2014

6. Control Activities

Our whole project team has participated in review meetings conducted with supervisor and the PM (project manager).These meetings have been conducted weekly and monthly. 7. Functions to be TestedR1: Checking data type of inputs

R2: Data ScalingR3: Which parameter of CKs metrics affects overall reusability result dominantly and in which sense?

R4: Matching of pie chart result with results in tabular format

R3: Verification of output resultsR4: Testing the training results of ML algo. USE Cases:

UC-1: Check Data Types UC-2: Scaling of Data

UC-3: Effect of CKs metrics

UC-4: Comparing of Result

UC-5: Verification of Result

UC-6: Testing of Result

8. Functions not to be Tested

Either provided inputs are correct or not.

Just telling how much that component is reusable in percentile (%). Not telling how to reuse it. 9. Test Case Design and Description< Check Data Type >

Test Case ID:T1Application Development TeamShahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor

Test Case Version:T1Reviewed ByTeam Lead

Test Date: 21-03-2014Use Case Reference(s)UC_1

Revision HistoryNO

ObjectiveType of entered CKs matrices is Real Number.

Product/Ver./ModuleRefer to next level for data scaling

Environment:Necessary and desired properties of the test environment. (hardware, software)

Assumptions:Provided inputs are correct

Pre-Requisite:Internet connection is required

Step No.Execution descriptionProcedure result

1.Fill all the input fields Values are entered.

2.Press the submit buttonForm validation has started

3.No error message found because all values were real NumbersForm submission has done successfully

Comments: No error was recorded in module. All team members are satisfied with the results

FORMCHECKBOX Passed FORMCHECKBOX Failed FORMCHECKBOX Not Executed

< Scaling of Data >

Test Case ID:T2Application Development TeamShahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor

Test Case Version:T2Reviewed ByTeam Lead

Test Date: 27-03-2014Use Case Reference(s)UC_2

Revision HistoryNO

ObjectiveAll entered values are properly scaled or not.

Product/Ver./ModuleRefer to next level for mathematical evaluation

Environment:Necessary and desired properties of the test environment. (hardware, software)

Assumptions:All values of type Real Numbers.

Pre-Requisite:Internet connection is required

Step No.Execution descriptionProcedure result

1.Press the submit buttonValues are forwarded to scaling function.

2.Scaling function is executedScaled values are displayed in tabular form

Comments:

No conflict was found during scaling. All team members are satisfied with the results

FORMCHECKBOX Passed FORMCHECKBOX Failed FORMCHECKBOX Not Executed

< Effects of CKs metrics >

Test Case ID:T3Application Development TeamShahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor

Test Case Version:T3Reviewed ByTeam Lead

Test Date: 28-03-2014Use Case Reference(s)UC_3

Revision HistoryNO

ObjectiveWhich parameter of Cks matrices affect final results

Product/Ver./ModuleRefer to final result of reusability evaluation model

Environment:Necessary and desired properties of the test environment. (hardware, software)

Assumptions:Form is submitted.

Pre-Requisite:Internet connection is required

Step No.Execution descriptionProcedure result

1.Form has submittedValues are forwarded to KNN algorithm.

2.Results displayed after processingFinal result is displayed against provide Cks matrices suit.

Comments:

All team members are satisfied with the results because results are according to our research work.

FORMCHECKBOX Passed FORMCHECKBOX Failed FORMCHECKBOX Not Executed

< Comparing of Result >

Test Case ID:T4Application Development TeamShahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor

Test Case Version:T4Reviewed ByTeam Lead

Test Date: 01-04-2014Use Case Reference(s)UC_4

Revision HistoryNO

ObjectiveGraphical and tabular results are same.

Product/Ver./ModuleRefer to final result of reusability evaluation model

Environment:Necessary and desired properties of the test environment. (hardware, software)

Assumptions:Form is submitted.

Pre-Requisite:Internet connection is required

Step No.Execution descriptionProcedure result

1.Form has submittedValues are forwarded to KNN algorithm.

2.Results displayed after processingResults in tabular and graphical model are displayed. Both results are same.

Comments:

No conflict was found during matching of graphical and tabular results. All team members are satisfied with the results

FORMCHECKBOX Passed FORMCHECKBOX Failed FORMCHECKBOX Not Executed

< Verification of Result >

Test Case ID:T5Application Development TeamShahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor

Test Case Version:T5Reviewed ByTeam Lead

Test Date: 02-04-2014Use Case Reference(s)UC_5

Revision HistoryNO

ObjectiveAccuracy of final result.

Product/Ver./ModuleRefer to final result of reusability evaluation model.

Environment:Necessary and desired properties of the test environment. (hardware, software)

Assumptions:Form is submitted.

Pre-Requisite:Internet connection is required

Step No.Execution descriptionProcedure result

1.Form has submittedValues are forwarded to KNN algorithm.

2.Results displayed after processingResults in tabular and graphical model are displayed.

Comments:

Final result is nearly to our approximation. All team members are satisfied with the results

FORMCHECKBOX Passed FORMCHECKBOX Failed FORMCHECKBOX Not Executed

< Testing of Result >

Test Case ID:T6Application Development TeamShahnawaz, Shayan Shaukat, Rubab Javaid, and Hira Noor

Test Case Version:T6Reviewed ByTeam Lead

Test Date: 04-04-2014Use Case Reference(s)UC_6

Revision HistoryNO

ObjectiveTraining of Multilinear Algorithm.

Product/Ver./ModuleRefer to data generation for this application.

Environment:Necessary and desired properties of the test environment. (hardware, software)

Assumptions:Training on different number of iterations.

Pre-Requisite:Internet connection is required

Step No.Execution descriptionProcedure result

1.Enter the values for training of ML algorithmValues are forwarded to ML algorithm.

2.Results displayed after processingAll results against each iteration is displayed.

3.Test data generation processResults are displayed

4.Check the difference between provided set of data and actually generated data.Result is displayed against each set of inputs.

Comments:

Finally ML is trained at 10,000 iterations at which accuracy level is 96%. All team members are satisfied with the results

FORMCHECKBOX Passed FORMCHECKBOX Failed FORMCHECKBOX Not Executed

10. Traceability MatrixSr. no.Requirement IDUse Case IDGUI IDTest case IDStatusDate Completed

1R1UC_1T1Complete 21-03-2014

2R2UC_2T2Complete27-03-2014

3R3UC_3T3Complete28-03-2014

4R4UC_4T4Complete01-04-2014

5R5UC_5T5Complete02-04-2014

6R6UC_6T6Complete04-04-2014

11. Major Deliverables

At the end of testing phase, we deliver:

i. Test plan document

ii. Test cases12. Risks and Assumptions

i. We have implemented first 2 algorithms of our project and we have done unit testing of both but our 3rd algorithm is in developing state .We have integrated first 2 but not the 3rd one thats why may be a chance of risk for us at the time of integration and system testing.

ii. Our all group members have creep knowledge about project and they all know about critical details of each aspect of our project. We can easily present our project to market, to end-user, to project manager. We are confident for our final year project so there is very low chance of riskiii. During working of application, we assumed that all provided inputs are accurate.

iv. Internet is available at the time of working.13. Exit Criteria

To exit the unit Testing phase 100% success rate must be achieved. Things that must be done on exit from the Integration Test stage:

i. The project coding is complete.

ii. All priority bugs have been fixed and closed

iii. Unit test has been passed.The integration Test Exit Criteria will rely on all the modules to be operational. To exit the Integration Testing phase 100% success rate must be achieved. Things that must be done on exit from the Integration Test stage:

i. All code bugs that are exposed are corrected.

ii. The entire module after integration performs functionality according to the System Specification Design.

iii. All Modules are ready for System Testing

iv. Black Box Testing is completed.

The system testing Exit Criteria must satisfy all the criteria listed below. This verifies that all elements of the project integrated properly. This is to make sure that all the system functions and performs according to the System Specification Document.

i. All Function Validation Testing is 100 percent successful.

ii. The Graphical User Interface performs to System Specification Requirements.

iii. All input fields on the Graphical User Interface are working correctly.

iv. Quality Assurance Plan approved.v. User satisfaction is approved.vi. Application is approved by end-user.14. References

Ref. No.Document TitleDate of Release/ PublicationDocument Source

REEFOCReusability Evaluation Model For OO Software Components10-04-2014Web Based Application

1Software Testing Fundamentals18-04-2014http://softwaretestingfundamentals.com/integration-testing/

212 Unit Testing Tips for Software Engineers

20-04-2014http://readwrite.com/2008/08/13/12_unit_testing_tips_for_software_engineers#awesm=~oC8WCLGsabxtM8

3How to Write Good Unit Tests

20-04-2014https://developer.salesforce.com/page/How_to_Write_Good_Unit_Tests

4Integration testing or integration and testing (I&T)

25-04-2014http://searchsoftwarequality.techtarget.com/definition/integration-testing

5Software testing tutorials and automation

25-04-2014http://software-testing-tutorials-automation.blogspot.com/2011/06/what-is-integrated-testing-in-software.html

6SRS25-04-2014

7Design Document25-04-2014

PAGE