10
Test beam with Pixel modules

Test beam with Pixel modules

  • Upload
    kort

  • View
    37

  • Download
    0

Embed Size (px)

DESCRIPTION

Test beam with Pixel modules. Aims. 2 Modules: 3 GEMs with 8 Timepix chip 8 InGrids Readout is SRS based Possibly with water cooling Production started in January, first parts were delivered in February But central parts had to be diffusion welded at external workshop. - PowerPoint PPT Presentation

Citation preview

Page 1: Test beam with Pixel modules

Test beam with Pixel modules

Page 2: Test beam with Pixel modules

2 Modules: • 3 GEMs with 8 Timepix chip• 8 InGridsReadout is SRS basedPossibly with water cooling

Production started in January, first parts were delivered in FebruaryBut central parts had to be diffusion welded at external workshop. This took longer than expected and there were some problems. We got the last part (for the InGrid module) only 3 days before the test beam.

Aims

Page 3: Test beam with Pixel modules

GEM-Module

2 Oktoboards with bare Timepix chips produced and tested Modules is assembledGEMs tested (500 V @ N2 -> 0.7 nA leakage current) 380 V @ Ar:iButane 95:5 stands for ~30 min.

Page 4: Test beam with Pixel modules

What happend to the InGrid Module

Page 5: Test beam with Pixel modules

Assembley of InGrid Module

Page 6: Test beam with Pixel modules

Inserting the module in LP

Everything went well, so we decided to leave the InGrid module in and test it first.

Page 7: Test beam with Pixel modules

Schedules sofar

21.4. Inserted InGrid module in LP, starting to flash gas (T2K)22.4. everything set up, started to learn how to handle beam/PCMAG -> killed power supply of readout electronics (too close to magnet)23.4. replaced power supply, saw first tracks24.4. equalizing the chips (problems with chip 7 and 8)25.4. finishing euqalization, adjusting beam, placing SRS at better position26.4. started data taking (voltage scan)

Page 8: Test beam with Pixel modules

Position of SRS

Page 9: Test beam with Pixel modules

Events

Page 10: Test beam with Pixel modules

Thanks to everyone who was helping!