Upload
uma-katari
View
214
Download
0
Embed Size (px)
Citation preview
8/18/2019 Test 9 First
http://slidepdf.com/reader/full/test-9-first 1/3
1. Deliverables of test design phase include all the following except (Testing
artifacts)
a) Test data
b) Test data planc) Test summary report
d) Test procedure plan
2. Which of the following is not decided in the testplanning phase! (Testing
artifacts)
a) "chedules and deliverables
b) #ardware and software
c) $ntry and exit criteria
d) Types of test cases
%. Typical defects that are easier to &nd in reviews than in dynamic testing are'
. deviations from standards
*.re+uirement defects
,.design defects
D.insu-cient maintainability and incorrect interface speci&cations.
$.ll of the above.
. /oad Testing Tools (0er. Testing)
a) reduces the time spent by the testers
b) reduces the resources spent (hardware)
c) mostly used in web testing
d) all of the above
. eviews static analysis and dynamic testing have the same ob3ective 4
.identifying defects.
*. &xing defects.
,. 1 and 2
D. 5one
6. Defect arrival rate curve'
. "hows the number of newly discovered defects per unit time
*. "hows the number of open defects per unit time.
,. "hows the cumulative total number of defects found up to this time.
D. ny of these depending on the company.
8/18/2019 Test 9 First
http://slidepdf.com/reader/full/test-9-first 2/3
7. What are the 2 ma3or components ta8en into consideration with ris8 analysis!
(Test 9gmt)
a) The probability the negative event will occur
b) The potential loss or impact associated with the eventc) *oth a and b
d) 5either a nor b
:. We can achieve complete statement coverage but still miss bugs because'
. The failure occurs only if you reach a statement ta8ing the T;$ branch of an
<=
statement and you got to the statement with a test that passed through the
=/"$
branch.
*. The failure depends on the program>s inability to handle speci&c data values
rather than on the program>s ?ow of control.
,. *oth and *
D. We are not re+uired to test code that customers are unli8ely to execute.
@. Who is responsible for conducting test readiness review! (0erforming
Test)
a. Test manager
b. Test engineer
c. both A *
d. 0ro3ect 9anager
1B. What if the pro3ect isn>t big enough to 3ustify extensive testing! (Test 9gmt)
a) ;se ris8 based analysis to &nd out which areas need to be tested
b) ;se automation tool for testing
c) a and b
d) 5one of the above
11. What are the 8ey features to be concentrated upon when doing a testing for
world wide web sites (Test $xecution)
a) <nteraction between html pages
b) 0erformance on the client side
c) "ecurity aspectsd) ll of the above
8/18/2019 Test 9 First
http://slidepdf.com/reader/full/test-9-first 3/3
12. What can be done if re+uirements are changing continuously! (Test 9gmt)
a) Wor8 with the pro3ect>s sta8eholders early on to understand how
re+uirements might change so that alternate test plans and strategies
can be wor8ed out in advance if possible.b) 5egotiate to allow only easilyimplemented new re+uirements into the
pro3ect while moving more di-cult new re+uirements into future
versions of the application
c) *oth a and b
d) 5one of the above
1%. The selection of test cases for regression testing (Testing artifacts)
a) e+uires 8nowledge on the bug &xes and how it aCect the system
b) <ncludes the area of fre+uent defects
c) <ncludes the area which has undergone manyrecent code changes
d) ll of the above