Terms of References-TOR Annex G-1
Section: - WASH Work Description: -Rehabilitation of WASH Facilities in 3 Schools / Basra Governorate
ARTICLES OF AGREEMENT
THIS AGREEMENT made between
PART-1: the United Nations Children’s Fund (UNICEF-IRAQ) (hereinafter called the “UNICEF”,
which expression shall include his or its heirs, personal representatives, successors and permitted
assigns)
PART-2: (hereinafter called the “Contractor” which expression
shall include his or its heirs, personal representatives, successors and permitted assigns).
WHEREAS the Contractor is desirous to execute the whole works in WASH facilities in 3Schools as
mentioned in the Bill of Quantities in Basra Governorate (hereinafter referred to as the “Site”) and
has caused Drawings with accompanying Technical Specifications and Breakdown of Quantities
showing and describing the materials, equipment, and labor to be prepared and supplied.
** Basra Directorate of Education; hereinafter referred to as the “Directorate”
THE FOLLOWING IS AGREED:-
1. UNICEF and the Contractor agreed that the contents of the Terms and Conditions of Contract,
Contract Drawings, Technical specifications and Breakdown of Quantities, together with this
Articles of Agreement form the Contract and to abide by submitting themselves to and discharge
the requirements therein.
2. For the consideration hereinafter mentioned the Contractor will comply with and subject to the
said Terms and Conditions of Contract supply all requirements, materials, and labor to construct
as shown upon the Contract Drawings and Specifications, to complete the works within the
program schedule of 60 calendar days (including mobilization period) from the date of
commencement as specified hereinafter, this Articles of Agreement and Terms and Conditions
of Contract subject to extension of time under the said Conditions of Contract.
3. The Contractor shall perform its obligations under this Contract with due diligence and efficiency
and in conformity with sound professional, administrative and financial practices. The work shall
include provision of materials, equipment, labours and any other requirement to complete the tasks
within the agreed standard and timely. Though not detailed in the Bill of Quantities, it is agreed
that the contractor will ensure provision of all required complimentary items such as potable water,
sand, gravel, cement, washers, bolts, nuts, screws, lubricant oils, hydraulic oils, grease, welding,
cutting, grinding, cleaning, scraping, etc. and qualified labourers.
4. The contractors shall ensure all the activities related to the above work in terms of supplies,
installation, fixtures, connections, overhauling, repair, maintenance, test and operation of all parts,
equipment and operational units are as per the enclosed Bills of Quantities and drawings.
5. UNICEF will withhold 10% of the contract value or value of the completed works whichever is
less as the Retention Amount. This amount will be released after 30 calendar days upon
satisfactory completion of the warranty (maintenance) period.
6. The work includes provision of materials, equipment, labors, sanitary works also structural and
electrical, the rehabilitation and buildings of the above projects complete in every part which is
detailed in the Bill of Quantities.
7. The Bill of Quantities indicates the maximum amount of work approved under this contract. The
value of contract is calculated based on the attached Bill of Quantities. The actual value of the
contract and the amount of payment will be calculated based on the actual quantity of work
completed under this contract and the applicable rates as specified in the Bill of Quantities. Any
work carried out in excess of the Bill of Quantities will not be paid unless such work has been
specifically authorized in writing by UNICEF.
8. The contractor shall appoint a Qualified Engineer with at least five years of professional
experience to supervise the implementation of work during the contract and the warranty period
on full time basis.
9. The contractor and his Engineer should work closely with the Supervising Engineer nominated
by the Directorate and UNICEF appointed Engineer/staff to supervise these works. (Supervisor
Engineer refers to counterpart official engineers/committees and UNICEF appointed
Engineer/staff).
10. The contractor shall inform UNICEF in writing of his Authorised Representative within one week
from the date of signing the contract. The Authorised Representative shall be empowered with
unlimited delegated authority to supervise the works; issuing and signing letters, attend meetings,
discuss works related issues with UNICEF and the government, make decisions to enhance
workflow, etc. The Authorised Representative shall be responsible for ensuring full compliance
with the standards and specifications of materials in terms of quantity and quality, and
workmanship used in the work as defined by this agreement.
11. The contractor shall submit samples of the materials to be used in the project to the Supervising
Engineers and UNICEF for approval before using them in the work. The Supervising Engineer
may reject any material that does not comply with the specifications, in which case the
contractor without any extra cost should replace the rejected materials. The Supervising
Engineer can ask for any test to be carried out to ensure the quality of the material used and
works. Only approved materials and workmanship should be used.
12. The contractor shall prepare a detailed work plan and submit to the relevant government
authority and UNICEF within 2 weeks from the signing date of this contract. The contractor shall
also prepare periodic progress reports as requested by supervising Engineers and submit to the
relevant government authority and UNICEF.
13. The contractor must commence the contract works within a maximum period of 14 fourteen calendar days from the signing date of the contract. This period is for mobilization and covers
site preparation and all that is required to start the work. The contractor shall inform UNICEF of
any obstacle that may affect the commencement of works, and shall obtain UNICEF’s approval
on the extension of mobilization period. UNICEF has the right to terminate the contract if the
contractor did not commence the works within the original mobilization period plus any
approved extension.
14. The Contractor Shall ensure that all works, tests, samples, variations, extension of time,
verification of quality and quantity of the completed are certified by the Supervisor Engineer
before they are submitted to UNICEF for approval and payment.
15. The contractor by signing this contract he is ensuring that he visited the site before submitting his offer/prices & will bear responsibility for the non-priced Items and inaccurate
calculations in the submitted offer.
16. Payment should be based on the value of the actual work completed which is calculated based
on the physical measurement of completed works and the quoted rates as per the Bill of
Quantities. Except the final payment after completion of the warranty period, the payment under
this contract at any point of time should not exceed (90%) of the value of the completed works.
The retention amount (10%) shall be released by UNICEF after:
• Completion of works as per the Bill of Quantities and terms and conditions of this contract;
• Submission of Certificate of Handing-over and Adequate Maintenance during the warranty
period issued by the appropriate government authority/or committee.
The payments should be made as follows:
First Installment - 90% of contract value upon completion of works valued at not less than
100% of contract value,
Final Installment - 10% Retention Amount after completion of the Warranty Period.
17. UNICEF shall make payments in Iraqi Dinnars in Baghdad, Iraq. The contractor shall inform
UNICEF of the method of payment whether to collect a cheque or transfer the money to a bank,
in which case the contractor should provide the following:
a- In case of payment by cheque - the contractor shall provide UNICEF with a letter
authorizing an individual to receive the cheque in Baghdad. The letter should include full name
and ID number of the person.
a- In case of bank transfer: the contractor shall provide UNICEF with detail of bank account at
a bank in Iraq.
18. The contract is considered completed when a maintenance period completion certificate from
Government Directorate is delivered to UNICEF stating that the works have been completed and
maintained to their satisfaction.
19. If the contractor fails to complete the works within the time prescribed above, hereof or extended
time (approved by UNICEF), then the contractor shall pay to UNICEF the amount of US$100 per each delayed calendar day as liquidated damages for such default (with no limit). Without
prejudice to any other method of recovery UNICEF may deduct the amount of such damages from
any moneys in its hands due or which may become due to the contractor. The payment or
deduction of such damages shall not relieve the contractor from his obligation to complete the
works or from any other of his obligations and liabilities under the contract.
20. In the event of and as soon as possible after the occurrence of any cause constituting force majeure,
the Contractor shall give notice and full particulars in writing to UNICEF of such occurrence or
change if the Contractor is thereby rendered unable, wholly or in part, to perform its obligations
and meet its responsibilities under this Contract. The Contractor shall also notify UNICEF of any
other changes in conditions or the occurrence of any event that interferes or threatens to interfere
with its performance of the Contract. On receipt of the notice required under this Article, UNICEF
shall take such action as, in its sole discretion; it considers to be appropriate or necessary in the
circumstances, including the granting to the Contractor of a reasonable extension of time in which
to perform its obligations under the Contract.
21. If the Contractor fails to deliver any or all of the deliverables within the time period(s) specified in
the Contract, or fails to perform any of the terms, conditions, or obligations of the Contract, or
should the Contractor be adjudged bankrupt, or be liquidated or become insolvent, or should the
contractor make an assignment for the benefit of its creditors, or should a Receiver be appointed
on account of the insolvency of the contractor, UNICEF may, without prejudice to any other right
or remedy it may have under the terms of these conditions, terminate the Contract, forthwith, in
whole or in part, upon thirty (30) days notice to the Contractor.
22. UNICEF reserves the right to terminate without cause this Contract at any time upon thirty (30)
days prior written notice to the Contractor, in which case UNICEF shall reimburse the Contractor
for all reasonable costs incurred by the Contractor prior to receipt of the notice of termination.
23. In the event of any termination no payment shall be due from UNICEF to the Contractor except
for work and services satisfactorily performed in conformity with the express terms of this
Contract.
24. Upon the giving of such notice, the Contractor shall have no claim for any further payment, but
shall remain liable to UNICEF for reasonable loss or damage that may be suffered by UNICEF for
reason of the default. The Contractor shall not be liable for any loss or damage if the failure to
perform the contract arises out of force majeure.
25. Upon termination of the contract, UNICEF may require the Contractor to deliver any finished
work, which has not been delivered and accepted, prior to such termination and any materials, or
work-in-process related specifically to this Contract. Subject to the deduction of any claim
UNICEF may have arising out of this Contract or termination, UNICEF will pay the value of all
such finished work delivered and accepted by UNICEF.
26. If the Contractor is rendered permanently unable, wholly, or in part, by reason of force majeure to
perform its obligations and meet its responsibilities under this Contract, UNICEF shall have the
right to suspend or terminate this Contract on the same terms and conditions as are provided for in
Article 21 except that the period of notice shall be seven (7) days instead of thirty (30) days.
27. Force majeure as used in this Article means acts of God, war (whether declared or not), invasion,
revolution, insurrection or other acts of a similar nature or force.
28. UNICEF shall make any variation in the form of quality or quantity of the works that may in its
opinion be necessary and for that purpose or if for any other reason it shall have the power to order
the contractor to do and the contractor shall do any of the following:
a) Increase or decrease the quantity of any work included in the contract.
b) Omit any work included in the contract.
c) Change the character or quality or kind of any work included in the contract.
d) Execute additional work of any kind necessary for the completion of the works.
and no such variation shall in any way vitiate or invalidate the contract but the value (if any) of all
such variations shall be taken into account in ascertaining the amount of the contract price. No such
variation shall be made by the contractor without an order in writing by UNICEF who shall determine
the amount (if any) to be added to or deducted from the sum named in the tender in respect of any
extra or additional work done or work omitted by its order. All such work shall be valued as follows:
a) Where there are rates for comparable work in the Bill of Quantities such rates are to be used.
b) Where no such comparable rates are available from the bills of quantities UNICEF shall determine
such rates as it considers fair and reasonable, due allowance shall be made for the market value of
articles purchased, the intricacy and the location of the work involved and the current value of
similar work in other contracts.
29. Should the contractor fail to fulfil any of his obligations under the contract, UNICEF may in the
absence of any other remedy provided under the terms of the contract and after giving the
contractor seven days’ notice in writing of its intention so to do cause such obligations to be carried
out by other persons or contractors and deduct the costs incurred from the moneys due or payable
to the contractor or UNICEF may recover them as a debt from the contractor and in such case
UNICEF shall certify the reasonable costs incurred.
30. There will be no variation in the contract price as a result of any variation in the costs of materials
for permanent or temporary works or of consumable stores fuel or power or in the rates of wages
or allowances payable to or in respect of labour or as a result of any changes in the labour
employment conditions or as a result of the introduction or operation of any law statute or order.
31. The Contractor shall be responsible for the professional and technical competence of its
employees and will select, for work under this Contract, reliable individuals who will perform
effectively in the implementation of the Contract, respect the local customs and conform to a high
standard of moral and ethical conduct.
32. No modification or change in this Contract, no waiver of any of its provisions or any additional
contractual relationship of any kind with the Contractor shall be valid and enforceable against
UNICEF unless provided by an amendment to this Contract signed by the authorized official of
UNICEF.
33. UNICEF fully subscribes to the Convention on the Rights of the Child and draws the attention of
potential suppliers to Article 32 of the Convention which inter alia requires that a child shall be
protected from performing any work that is likely to be hazardous or to interfere with the child's
education, or to be harmful to the child's health or physical, mental, spiritual, moral or social
development.
34. UNICEF reserves the right to request the Contractor to replace the assigned personnel if they are
not performing to a level that UNICEF considers satisfactory. After written notification, the
Contractor will provide curriculum vitae of appropriate candidates within three (3) working days
for UNICEF review and approval. The Contractor must replace the unsatisfactory personnel
within seven (7) working days of UNICEF’s selection.
35. In the event the Contractor requires the services of subcontractors, the Contractor shall obtain the
prior written approval and clearance of UNICEF for all sub-contractors. The approval of
UNICEF of a sub-contractor shall not relieve the Contractor of any of its obligations under this
Contract. The terms of any sub-contract shall be subject to and in conformity with the provisions
of this Contract.
36. The Contractor shall indemnify, hold and save harmless and defend, at its own expense,
UNICEF, its officials, agents, servants and employees, from and against all suits, claims,
demands and liability of any nature or kind, including their costs and expenses, arising out of the
acts or omissions of the Contractor or its employees or sub-contractors in the performance of this
Contract. This provision shall extend, inter alia, to claims and liability in the nature of
workmen’s compensation, product liability and liability arising out of the use of patented
inventions or devices, copyrighted material or other intellectual property by the Contractor, its
employees, officers, agents, servants or sub-contractors. The obligations under this Article do
not lapse upon termination of this Contract.
37. The Contractor shall provide and thereafter maintain insurance against all risks in respect of its
property and any equipment used for the execution of this Contract.
(a) The Contractor shall provide and thereafter maintain all appropriate workmen’s
compensation and liability insurance, or its equivalent, with respect to its employees to cover
claims for death, bodily injury or damage to property arising from the execution of this Contract.
The Contractor represents that the liability insurance includes sub-contractors.
(b) The Contractor shall also provide and thereafter maintain liability insurance in an adequate
amount to cover third party claims for death or bodily injury, or loss of or damage to property,
arising from or in connection with the provision of work under this Contract or the operation of
any vehicles, boats, airplanes or other equipment owned or leased by the Contractor or its agents,
servants, employees or sub-contractors performing work or services in connection with this
Contract.
38. The Parties shall use their best efforts to settle amicably any dispute, controversy or claim arising
out of, or relating to this Contract or the breach, termination or invalidity thereof. Where the
parties wish to seek such an amicable settlement through conciliation, the conciliation shall take
place in accordance with the UNCITRAL Conciliation Rules then obtaining, or according to such
other procedure as may be agreed between the parties.
39. Any dispute, controversy or claim between the Parties arising out of this Contract or the breach,
termination or invalidity thereof, unless settled amicably under the preceding paragraph of this
Article within sixty (60) days after receipt by one Party or the other Party’s request for such
amicable settlement, shall be referred by either Party to arbitration in accordance with the
UNCITRAL Arbitration Rules then obtaining. The arbitral tribunal shall have no authority to
award punitive damages. In addition, the arbitral tribunal shall have no authority to award interest
in excess of six percent (6%) and any such interest shall be simple interest only. The Parties shall
be bound by any arbitration award rendered as a result of such arbitration as the final
adjudication of any such controversy, claim or dispute.
40. UNICEF supports an international ban on the manufacture of anti-personnel mines. Anti-
personnel mines have killed and maimed thousands of people, of whom a large proportion are
children and women. Anti-personnel mines present a serious obstacle to the return of
populations displaced from their residences by fighting around their villages and homes.
UNICEF has, therefore, decided not to purchase products from companies that sell or
manufacture anti-personnel mines or their components.
GENERAL NOTES ON THE BILLS OF QUANTITIES
1. The contractor shall be deemed to have visited the site of works and to have acquainted himself with the type
and scope of work required to be carried out. UNICEF shall accept no excuse or claim whatsoever from the
Contractor for not knowing or being able to properly evaluate and assess the condition of the equipment and
works that should be carried out.
2. The contractor shall also be deemed to have read and examined the terms of reference, specification, drawing
and all other relevant documents before completing the Bill of Quantities.
3. Unless otherwise indicated, the prices and rates entered in the following bills of quantities shall be deemed to
cover and include provision by the contractor of all equipment, materials and labour and shall allow for all and
every expense and for all work not specifically described or which may be incidental, contingent or deemed
necessary by the contractor for completing and maintaining the works in strict conformity with the terms of
reference, specification, drawing and other terms of contract.
4. Quoted prices for all pipes, steel work, iron works and any other required parts or materials necessary for the
contract implementation, shall include transportation fees, on–site handling of materials (including unloading
from trucks) and storing.
5. Unless otherwise directed by the supervising engineer, the dismantled parts (not in use any longer) shall be
delivered by the contractor to Government Ministry / Directorate.
6. No alterations or modifications shall be allowed without the written approval of Government Ministry / directorate and UNICEF. In case such approval is granted, it will not relieve the contractor from his
responsibilities under the contract.
7. All works should include provision of all required complementary supplies and works (not necessarily
mentioned in the bills of quantities) such as sand, gravel, cement, washers, bolts, nuts, screws, welding, etc.
and labourers.
8. The contractor shall be considered:
a) Responsible for defects and damages due to the use of poor materials or due to improper workmanship,
electrical shorts, etc.
b) Not responsible for works and damages due to misuse, user's negligence, theft, deliberate destruction of
materials or components, vandalism and inappropriate or unjustified acts or behaviours, wear due to normal
use of materials, equipment and components, or damages due to military conflicts; natural
catastrophes…etc.
9. The Bill of Quantities indicates the maximum amount of work approved under this contract. The value of
contract is calculated based on the attached Bill of Quantities. The actual value of the contract and the amount
of payment will be calculated based on the actual quantity of work completed under this contract and the
applicable rates as specified in the Bill of Quantities. Any work carried out in excess of the Bill of Quantities
will not be paid unless such work has been specifically authorised in writing by UNICEF.
ELECTRICAL WORK
• Samples of all the electrical equipment provided should be submitted to the engineer before any
portion of the work is carried out for approval. The contractor without any extra cost may replace
any materials provided which do not comply with the specifications. All the supplied materials
shall be West European or Japanese made.
• Circuit breakers of capacity from 10-100Amp. should be replaced by air moulded case circuit
breaker 4 poles M.C.C.B., 380V, 50Hz, 3-phase with thermal overload, magnetic, short circuit and
for circuit breakers of a capacity below 10Amp must be miniature switch type except for the low
tension motors the circuit breaker shall be 4 poles, 11 KV, 3.3kV, 50Hz, 3-phase with thermal
overload.
• Star delta starters of a capacity from 5kW and above must contain the following:
a) Main isolating switch with main fuse.
b) Three contactors.
c) One overload relay.
d) One Phase failure.
e) One Timer.
f) Three indicating lamp, push buttons, ammeter with selector switch, voltmeter with selector
switch all fixed at the front door of Cabinet Ip56.
• DOL starter of a capacity below 5kW must contain the same components as above but with one
contactor.
• Wiring system for the pump station shall be drown in a P.V.C. conduit pipes of diameter decided
by the engineer depending on the number and size of the wires inside the conduit pipes, the type
and size of the wires shall be decided by the engineer depending on the type of the equipment and
machine.
• Wiring system for the operator rooms and the bathroom shall be under plastering type (siemens)
2×1.5 for normal lighting and ceiling fan, 2×2.5 for switch plugs and cable 2×4 for heaters.
PVC PIPES & FITTINGS TECHNICAL SPECIFICATION
UPVC pipes & fittings shall comply with DIN 8061, and 19532 Standard Specification.
UPVC Pipes shall be of socket-spigot connection and 6m long.
UPVC Fittings shall be of socket connection from all sides.
UPVC pipes connection to Valves shall be of spigot connection from all sides.
UPVC Pipes and fittings for pipelines under pressure shall be10 bar pressure rating.
Testing shall be twice the working pressure.
General properties Specific Gravity: 1.42
Flammability: Will not support combustion
Mechanical properties :
Ultimate tensile strength 527 kg /cm2
Compressive strength 688 kg /cm2
Flexural strength 950 kg /cm2
Modulus of elasticity 3.2 x 104 kg /cm2
Impact strength: 4.75-5.42 joules
Water absorption <4mg/ cm2
Thermal properties
Softening point V.S.P. 5 kg 80o c
Coefficient of linear expansion 5.0 x10-5/ºC
Specific heat 0.25 Cal /ºC
Thermal conductivity 0.13 K Cal/cm.hºC
Electric properties Volume resistivity 1014 Ohm /cm
Dielectric strength < 40 kv /mm
Hydraulic Properties Friction Co-efficient 135-150 Hazen Williams
Chemical Resistance conforms to the requirements of DIN 16929
Civil Works (General Specification)- To be observed during works construction
• All materials used shall be of the best quality and free from defects likely to undermine the strength
and the period of service of the work, samples of the supplied materials shall be subjected to Lab.
test in a governmental Lab. or private Lab. agreed by the supervising engineer.
• Termite treatment shall be applied, when constructing masonry rooms or buildings, by supplying
and applying Chemical materials such as “Chloredene” or “Dorespan” or equivalent materials
approved by the Supervising Engineer and to be applied according to the instructions of the
manufacturer. It should be applied before the back filling (at a depth not less than 70cm.) and for
each layer of the back filling (each 20cm.), as well as under the mosaic tiles.
• Bulk and trench excavations shall be carried out in accordance with the dimensions shown on the
drawings and the directions of the supervising engineer. Excavations shall be carried out in any
material and in type of soil. The contractor shall provide and operate suitable mechanical excavators
for the work. The excavated material shall be laid in piles at ground level away from the excavations
and at a distance of not less than 100 cm from the excavation edge. After using the selected
excavated material for backfilling purposes, then the surplus excavated material shall be disposed
of to locations as directed by Supervising Engineer.
• Dewatering of excavations shall be carried out using Well-Point system or deep wells or grip
channels with submersible pumps in pits or, any other approved methods for dewatering pipeline
trenches and bulk excavations. Water removed from the excavations shall be disposed in such a
manner as will not endanger portions of work under constructions or completed and will cause no
inconvenience to the Authority or to others working near the site and finally will comply with the
stipulations and conditions of required permits for disposal of the ground water.
• Steel sheet piling or other approved methods shall be used to support the pipeline trenches and the
bulk excavation sides according to the Supervising Engineer’s directions and according to the
specifications of the water or sewerage authorities, to prevent soil collapse and not endanger the
nearby buildings and structures.
• Backfilling of excavations shall be carried out using selected excavated material according to the
Supervising Engineer’s directions. The selected excavated material shall be placed in layers not
exceeding 20cm thick. Each layer shall be compacted (by suitable approved mechanical equipment)
to not less than 90% of max. density obtained at optimum moisture content(will be specified in
BoQ). All the backfilling of the excavated area and the filling must be of good approved materials.
If backfilling is required with selected granular material (sub–base) the filling material shall be of
the best quality well graded, free from trash, lumber, organic materials and other debris, etc. and the
backfilling shall be well compacted (not less than 90% of max. density obtained at optimum
moisture content) and in layers not exceeding 20cm thickness.
• Cement must be of the best Portland cement, Sulphate resisting cement must be used for all concrete
works in contact with soil or water, both types of cements shall comply with the requirements of
B.S 4027 or ASTM C 150. Ordinary Portland cement to be used for part of the structure above
ground level while type V Sulphate resisting cement should be used in all concrete work below
ground level.
• Gravel (coarse aggregate) must be crushed, well graded (passing the sieves 19mm. and retaining on
sieve 4.75mm.) according to the standard technical specifications, clean, hard, strong, resistant to
weathering action, free from salts or vegetable matter and shall not contain more than 0.25% by
weight of sulphate as SO3 (BS 1377 test No. 10) nor more than 0.5% by weight of clay lumps and
contains no impurities un-coated particles and clay, dirt of any kind.
• Sand (fine aggregate) must be well graded (passing sieve 4.75mm and retaining sieve 0.075mm)
good and clean, hard, strong, resistant to weather action, free from salts or vegetable matter and shall
not contain more than 0.25% by weight of sulphate as SO3 (BS 1377 test No. 10) nor more than
0.5% by weight of clay lumps and contains no impurities contain no impurities un coated particles
and clay, dirt of any kind.
• Water used in mixing the concrete or mortar must be fresh, clean and free from harmful matter and
free from injurious amounts of acids, alkaline, salts, and organic matter, test should be in accordance
with the requirements of BS. 3148.
• Clay bricks must be of the best quality from approved sources, machine made, wire cut and of
uniform standard size, sound, tough, well burnt, and shall conform to the appropriate clauses of the
Iraqi standard specification No. 25.
• Concrete masonry units shall be of standard sizes and shapes regular prism shape and perpendicular
edges.
• The Contractor shall take all measures to ensure the safety of surrounding structures and utilities
and will bear responsibility for any damage happens to them.
• The minimum clear concrete cover over the reinforcement shall be 40mm for footings, 30mm for
walls, 25mm for slabs.
• All steel reinforcement shall be deformed, grade 60, complying with ASTM A615 or equivalent.
• Steel bars reinforcement shall be bent cold to the forms and dimensions shown on the Drawings.
The lap joints length shall be not less than 40 times the larger bar diameter. Intersecting bars shall
be firmly fixed with tying wire. All the reinforcing steel bars shall be supported from the formwork
or other construction by pre-cast blocks or rings, and in no circumstances will the use of pieces of
steel or wood blocks for this purpose be allowed.
• Concrete tests shall be carried out on 150mm standard cubes at the age of 7 days and 28 days. The
concrete strength for the various mixes shown in the Table of “Concrete Mixes & Strengths” shall
be observed. The following requirements shall be taken into consideration during concreting :
− All surfaces of R.C. members in direct contact with soil should be given two layers of approved
quality of bituminous protection.
− All exposed surfaces of R.C. members to be made fair face, true to the required levels and
vertical and horizontal lines.
− Special precautions to be taken when concreting during hot and very cold weathers.
• Rubber or PVC water stops should be resistive to deterioration through aging, mechanical abrasion
and attack by water, domestic sewage, seawater& natural salts.
• External water stops, if used, should be PVC complete with four ribs, ailing flanges and grout
checks, all junctions should be factory made.
• Centrally placed PVC water stops should have a web thickness of at least 10mm.
• An approved hot knife welding technique to be used in making joints for PVC water stops.
• Spacing of reinforcement within a member is preferred to be staggered with a minimum overlap as
shown in the attached drawings.
• Brick masonry units shall be of standard sizes and shapes regular prism shape and perpendicular
edges.
• Unless otherwise stated in the Bill of Quantities the steel windows should be made of standard
sections according to the instructions of the supervising engineer. Glass thickness is 6mm to be fixed
with good quality putty. Windows to be provided with good quality galvanized fly mesh and good
quality handles.
• Unless otherwise stated all steel and metal works shall be painted with one coat of anti-corrosion
paint (red lead) followed by three layers of oil paint
• The specification and requirements of the asphalt pavement for the roads and the sidewalks shall be
as follows:
a. The sidewalks and the branch roads pavements shall consist of: Two equal layers, a Binder
course of 3.5 cm followed by the surface course of 3.5 cm also.
b. The main roads pavements shall consist of: Three layers, a Stabilizer course of 5.0 cm followed
by the Binder course of 3.5 cm, then the Surface course of 3.5 cm also.
c. The prime coat has to be laid between the earth surface and the first layer of the asphalt course.
d. The Tack coat layer has to be laid between the asphalt layers.
• The proportions of materials in concrete mixes for the various classes of concrete and the
corresponding permissible test cubes strengths are as shown in the below table. Tests on concrete are
to be carried out in accordance with the relevant Iraqi Organization for Standards (IOS) Specification:
Table of Concrete Mixes & Strengths
Class
of
Mix
Nominal
Mix
By Volume
Aggregate
Volume
Per 100 kg
Cement
(m3)
Permissible Average Test Cube
Strength
(kg/cm2)
Min. Permissible
Strength
of Individual Test
Cube
(kg/cm2 )
Fine Coarse 7 days 28 days 7 days 28 days
A 1 : 1 : 2 0.069 0.139 257 387 211 317
B 1 : 1 ½ : 3 0.104 0.209 222 334 176 264
C 1 : 2 : 4 0.139 0.278 187 281 141 211
D 1 : 3 : 6 0.209 0.418 141 211 95 141
TECHNICAL EVALUATION
All BIDs will be technically evaluated according to below criteria, considering;
1- Minimum passing score should be 60.
2- All bidders are required to submit enough evidence of the proof of skills/expertise and their
capacity and capability to execute the assignment. All documents related to below should be sent
with the fully filled Vendor Profile Form.
Rehabilitation of PHCCs WASH facilities in Governorates
Technical Evaluation
No. Criteria Weight
(i) Company Background 36
Years of Company Experience (if > 10 years :12, 7-10 years :9, 3-6 :6, 1-2 :3, < 1 years: 0)
12
Familiarity with area of intervention - Work kind (Familiar 12, Semi Familiar 9, Satisfactory-6, Limited -3, None -0)
12
Familiarity with targeted geographical area(s) (Familiar 12, Semi Familiar 9, Satisfactory-6, Limited -3)
12
(ii) Work Experience 36
Similar type of assignment performed in the past (considerable experience:12, reasonable experience:8, limited experience:4)
12
Experience with international entities/ UN Agencies (considerable
experience:12, reasonable experience:8, limited experience:4) 12
Experience with Government and Private Sector (considerable
experience:12, reasonable experience:8, limited experience:4) 12
(iii) Company Key Staff 20
Number of key staff 4
Experience of key staff (if > 15 years - 8, 10-15 years - 5, other -3) 8
Experience of Technical Staff (if > 15 years - 8, 10-15 years - 5, other -3) 8
(vi) Submitted documentation 8
Quality of submitted offer (Good-4, Satisfactory-2) 4
Presentation of the proposal & Company Background (Good-4,
Satisfactory-2) 4
Total 100
X Technical evaluation : Minimum passing score is 60 points / 100 points
* Award will be made in the favor of the bidder who will be technically qualified
and have submitted the lowest price for the requirements
S.NDescription
Unit QTYUnit Price
IQD
Total price
IQDت
Civil Works المدنية األعمال
Provision of materials/works for the
items described below, and all that is
required to make the job complete in
every part and detail as per the
instruction of the supervisor engineer.
يتطلب ما كل مع والعدد والعمال المواد تجهيز
المواصفات بموجب أدناه العمل فقرات إلنجاز
المهندس وتوجيهات التنفيذية والمخططات
المواد تجهيز تشمل أدناه الفقرات جميع). المشرف
.(وعمل
1.1
Supply materials and works, to remove
the old existing roofing and apply an
(Isogam : 4 mm thick Bituminous
material layer with a reflector sheet from
aluminum ) after cleaning and washing
thoroughly the roofs and filling the halls
in the roofs with cement mortar mixed
with non shrink additives (Neto bond)
and all that required to make a perfect
job in every part and detail. The work
include casting 10 cm mortar cement
with good leveling to the drain for
M2 20
وتركيب القديم التسطيح وقلع والعمال تجهيزمواد
مغلفة القيرية المواد من ملم 4 بسمك ايزوكام طبقة
والغسل التنظيف بعد االلمنيوم من عاكسة بطبقة
بالمواد والفتحات الشقوق مأل للسقوف الجيد
لالنكماش مضادة مضافة مواد اضافة بعد السمنتية
والرمل السمنت بمونة الصب ويشمل. والتقلص
.المعلمات لصحيات المرازيب بأتجاه والتسليط
1.1
1.2
Installing new Ceramic tiles for student
latrines and fountain floor with
dimensions 30*30 cm new ceramic tiles
by using cement mortar (3: 1) and filling
joints with white cement mortar (1:1), as
per the instruction of the supervisor
engineer.
M2 35
الرضية الجديد السيراميك بالكاشي التطبيق
و سم 30*30 قياس والجابية الطالب حمامات
أبيض سمنت بمونة وتشربت ( 1 :3 ) السمنت مونة
. المشرف المهندس توجيهات وحسب (1:1)
1.2
Bill of quantity for rehabilitation WASH facilities in Shat Al Arab primary school for Girls in Shat Al Arab -Basra Governorate
Annex (G-1A)
1 1
1.3Supply & Install vertical plastic pipes in
Dia (100) mm to drain rain water Ml 6
(100)تجهيز و نصب أنابيب شاقولية بالستك قطر
ملم لمياه المطر تثبت على الجدران بواسطة مسامير
و يشمل السعر" مغلونه و تكون شاقولية مستقيمة تماما
العكوس أو التقاسيم عند اتصالها بالسطح و الكعوب في
نهايتها السفلى و الصبغ قبل التركيب و بعده وعمل
.التسريح الالزم عند اتصال األنبوب في السطح
1.3
Repair plaster of ceiling and inside walls
upon ceramic with outside frontage of
teachers and student latrines and
fountain , Paint after cleaning and
repairing with two coats of oil paint for
inner walls and with three coats of
emulsion paint of good quality approved
by the engineer.
M2 170
اسفل الجدران و الداخل من السقف وصبغ تصليح
المجموعة واجهة مع السيراميك لغاية السقف
يكون ان على والمعالجة التنظيف بعد الصحية
بطبقتين والصبغ السيراميك ارتفاع مع متناسق
بثالثة و الداخلية للجدران الدهني الطالء من
الواجهة لجدران المستحلب الطالء من طبقات
المعلمات لصحيات جيدة نوعية ومن الخارجية
المهندس توجيهات وحسب والجابية والتالميذ
.المشرف
Total Cost الكلي المجموع
Doors and windows والشبابيك األبواب
Provision of materials/works for the
items described below, and all that is
required to make the job complete in
every part and detail as per the
instruction of the supervisor engineer, to
يتطلب ما كل مع والعدد والعمل المواد تجهيز
المواصفات بموجب أدناه العمل فقرات إلنجاز
المهندس وتوجيهات التنفيذية والمخططات
المواد تجهيز تشمل أدناه الفقرات جميع). المشرف
.(وعمل
2 2
1.4 1.4
2.1
Rehabilitate and repair steel ventilation
windows by fixing frame, locks, handles,
insect screens, glass, protection steel
bars and painting with 2 cots of oil paint
all students and teachers latrines and
student fountain as per the instruction of
the supervisor engineer .
LS 1
التالميذ مرافق وهوائيات شبابيك جميع تأهيل
واليدات األطار وتصليح والجابية والمعلمات
الصبغ مع والزجاج الذباب مانع وسلك واالقفال
إلنجاز يلزم ما كل مع لّماع دهني طالء طبقتين
.المشرف المهندس توجيهات وحسب متكامل عمل
2.1
2.2
Repair & maintenance wooden and iron
Door in teachers latriens and supply,
install locks, keys and handles and paint
with two coats of good oil paint as per
the instruction of the supervisor
engineer .
No 11
مع والحديد الخشب ابواب وتأهيل وصيانة تصليح
بالدهان الصبغ و" كامال اليدات و االقفال اضافة
لمرافق المناسب باللون و بطبقتين الجيد النوع من
توجيهات وحسب والجابية والتالميذ المعلمات
.المشرف المهندس
2.2
Total Cost الكلي المجموع
Electrical works الكهربائية األعمال
3
Provision of materials/works, and all that
is required to make the job complete in
every part and detail, as per the
instruction of the supervisor engineer.
Wiring must be in plastic pipes.
والعدد والعمل المواد تجهيز تشمل أدناه الفقرات كل
التفاصيل بموجب الفقرة إلنجاز يتطلب ما كل مع
المهندس وتوجيهات والمخططات والمواصفات
بوري باستعمال دفن للبناية التسليك يكون المشرف
. بالستك
3
3.1
Supply and installed of circular electrical
exhaust fans with 6" size to be fixed on
window glass with wiring accessories and
all that is required to complete the job
and as directed by the supervising
engineer for teachers and student
latrines.
No 4
قياس الشكل دائرية هواء مفرغات ونصب تجهيز
التأسيسات كافة مع الشباك زجاج مع تربط" 6
توجيهات وحسب العمل يتطلبه ما وكل الكهربائية
والتالميذ المعلمات لصحيات المشرف المهندس
3.1
3.2
Supply Install and operate a wall type
economic lamp 60 W of (Students &
Teachers , fountain), of a good quality
with all wiring system (2x2.5mm) and
switches, as per the approval of the
supervisor engineer.
No 8
عبارة إنارة نقطة وتشغيل وفحص وتركيب تجهيز
جيدة نوعية من واط 60 أقتصادي مصباح عن
كافة مع بالجدار مثبت والمعلمين الطالب لصحيات
. التشغيل ومفتاح 2x2.5mm بأسالك التسليك
لصحيات. المشرف المهندس توجيهات وحسب
والجابية والمعلمين الطالب
3.2
3.3
Supply & Install and operate a water
pump 3/4", 2 bar fixed on concrete base
with all necessary galvanized incoming
and outgoing pipes, fittings, valves,
protection steel cage with shade, pad
lock and electric source, Wiring, switch
and all needed for a complete job for
teachers and student latrines.
No 2
،" ¾ ماء مضخة وتشغيل وفحص وتأسيس تركيب
والخارجة الداخلة األنابيب كافة مع ضغط، بار 2
الحماية وقفص األخرى والملحقات المغلونة
قاعدة على والتثبيت والقفل السقيفة مع الحديدي
األسالك كافة و الكهربائي المأخذ مع خرسانية
لصحيات يلزم ما كل مع ظاهري نوع الموصلة
.والتالميذ المعلمات
3.3
Total Cost الكلي المجموع
Water supply and plumbing systems :والمجاري الصحية األعمال
4
Provision of materials/works for the
items described below, and all that is
required to make the job complete in
every part and detail as per the
instruction of the supervisor engineer, to
يتطلب ما كل مع والعدد والعمل المواد تجهيز
المواصفات بموجب أدناه العمل فقرات إلنجاز
المهندس وتوجيهات التنفيذية والمخططات
المواد تجهيز تشمل أدناه الفقرات جميع). المشرف
.(وعمل
4
4.1
Remove old seats & reinstall water
closets including new flushing tanks of
the standard type vitreous China pan
with trap and 4” diameter PVC pipe of
standard quality with suitable length to
the manhole. for facilities of Students
and teachers.
No 7
فرفوري شرقي مقعد تركيب و القديمة المقاعد قلع
و الشطف خزان مع كامل الجيد النوع من قياسي
بطول" 4 قطر بالستك التصريف وأنبوب الكلي
إلنجاز يلزم ما كل مع ألمانهول إلى إليصاله كافي
.والمعلمات الطالب لصحيات ومتكامل جيد عمل
4.1
4.2
Supply, install and fix complete Ceramic
sitting pans for teachers latrines of best
quality with all needed pipe connections
accessories. No 1
اضافي قياسي فرفوري غربي مقعد تركيب
الكلي مع كامل ( جيدة نوعية) المعلمات لصحيات
كافي بطول" 4 قطر بالستك التصريف وأنبوب
عمل إلنجاز يلزم ما كل مع ألمانهول إلى إليصاله
.ومتكامل جيد
4.2
4.3
Supply and Install and fix white vitreous
china wash basin with pedestal
approximately 45x60 cm in size ,
complete with all necessary fittings,
water supply (hot and cold) PP pipes,
control valve, 30 mm trap, stopper,
chain, and chromium plated mixer .
(Works include install of trap and 4” PVC
pipe of suitable length to outside
manhole and septic tank for WC of
No 1
تقريبية بأبعاد فرفوري مغسلة تركيب و تجهيز
وكافة القاعدة مع كاملة جيدة نوعية سم 60×45
للربط الالزمة الضرورية والملحقات األنابيب
بالماء الخاصة والصوندات األقفال مع والتوصيل
جيدة، نوعية كروم خالط مع التصريف وصوندة وأنبوب ارضي تصريف كلي تثبيت السعر شامالً
الخارجي المانهول مع وربطه PVC" 4 التصريف
. المعلمات لحمامات التعفين وخزان
4.3
4.4
Repair the steel structure towers existed
for teachers and students, including cast
the bases and renovation the steel
structures, painting with anti-rust and 3
coats of oil paint and all water works
with any other accessories needs
according to engineer supervisor
instructions.
No 2
والحامل الموجود الحديدي للبرج الهيكل تصليح
صب ويشمل والطالب للمعلمين المياه لخزانات
الصبغ مع الحديدي للهيكل والتقوية القواعد
المائية والتاسيسات طبقات 3 والبوية بالرادليت
المهندس توجيهات وحسب العمل مايتطلبه وكل
.المشرف
4.4
4.5
Supply and connecting plastic water
tanks of size 1M3 and install it on
suitable base up on the existing tower
after painting the tower with two coats
of suitable oil paint, with valves,
overflow, floating valves, drain inlets and
outlets galvanized pipes with all
necessary fittings . The work include
connect the old existing water tanks.
no 1
متر1 حجم بالستك ماء خزان ونصب تجهيز
مع الموجود البرج فوق ونصبها 1 عدد مكعب
و الجيد الدهني الصبغ من بطبقتين البرج صبغ
العمل يشمل و بالمنظمة الخاصة التصاميم حسب
فوق لها مناسبة قاعدة وعمل الخزانات تجهيز
األقفال من للربط الالزمة المواد كافة مع البرج
الطفح وأنبوب المغلونة والخارجة الداخلة واألنابيب
إلنجاز يلزم ما كل مع الطوافات و التنظيف وقفل
الخزانين ربط العمل ويشمل. ومتكامل جيد عمل
.أيضآ الموجودين
4.5
4.6
Supply chrome water tabs of best quality
with chrome flexible pipe for rinsing
Western Origin for teachers and
students.
No 8
انبوب مع الكروم من حنفيات نصب و تجهيز
الطالب لمرافق الجيد النوع من و الشطاف
. والمعلمين
4.6
4.7
Reinstall all water pipes and fittings for
students latrines with all necessary
fittings and benefit from good old
materials, as per the instruction of the
supervisor engineer
L.S 1
انابيب من وملحقاتها المائية التأسيسات تسليك اعادة
والجابية الطالب لصحيات وتوصيالت هوزات
ويشمل الصحية المجموعة جميع الى الخزانات من
من واالستفادة المواد جميع تجهيزونصب العمل
وحسب جيدة بحالة تكون التي القديمة المواد
المشرف المهندس توجيهات
4.7
4.8
Rehabilitate, repair and clean all
students latrines manholes ,sewer pipes
and septic tank as per the instruction of
the supervisor engineer.l.s 1
منهوالت جميع وتسليك وتنظيف واصالح تأهيل
الطالب لمرافق التعفين وخزان المجاري وانابيب
وحسب متكامل عمل إلنجاز يلزم ما كل مع
. المشرف المهندس توجيهات
4.8
4.9
supply , lay and connect 50 m long
plastic PP water pipe of 3/4" diameter to
connect the student WC with the water
source inside the school and work
include ground excavating of 30CM
under NGL and back filling with all
needed work to complete the job
according to specifications and as
directed by the supervising engineer.
L.S 1
انج طول3/4 قطر PPتجهيز ومد انبوب ماء
متر من انبوب االسالة الرئيسي داخل المدرسة50
والى خزانات ماء مرافق التالميذ وكل ما يتطلبه
العمل من حفر واعادة دفن ومد االنبوب إلنجاز
عمل جيد ومتكامل وحسب المواصفات الفنية
.وتوجيهات المهندس المشرف
4.9
4.10Supply and fixing manholes cover PVC.
With variase dimensions.No 6
المقوى البالستك من منهول غطاء وتثبيت تجهيز
.الموجودة القياسات وحسب4.10
4.11Supply chrome water tabs of best quality
for students fountains.No 10
الماء لجابيات الكروم من حنفيات نصب و تجهيز
. الجيد النوع ومن للطالب4.1
Total Cost الكلي المجموع
Total cost االجمالي المبلغ
S.NDescription
Unit QTYUnit Price
IQD
Total price
IQDت
Civil Works المدنية األعمال
Provision of materials/works for the items described
below, and all that is required to make the job
complete in every part and detail as per the
instruction of the supervisor engineer.
العمل فقرات إلنجاز يتطلب ما كل مع والعدد والعمال المواد تجهيز
المهندس وتوجيهات التنفيذية والمخططات المواصفات بموجب أدناه
.(وعمل المواد تجهيز تشمل أدناه الفقرات جميع).المشرف
1.1
Remove damaged tiles for teachers and student
latrines and fountain floor and recovered with 30*30
cm new ceramic tiles and cement mortar (3: 1) and
filling joints with white cement mortar (1:1), as per
the instruction of the supervisor engineer.
M2 30
بعد والجابية والتالميذ المعلمات حمامات الرضية الكاشي تبديل
قياس الجديد بالسيراميك والتطبيق المتضرر القديم الكاشي ازالة
3) السمنت مونة و سم 30*30:1) سمنت بمونة وتشربت
المشرف المهندس توجيهات وحسب(1:1) أبيض.
1.1
1.2Supply & Install vertical plastic pipes in Dia (100) mm
to drain rain water Ml 6
ملم لمياه المطر (100)تجهيز و نصب أنابيب شاقولية بالستك قطر
تثبت على الجدران بواسطة مسامير مغلونه و تكون شاقولية مستقيمة
و يشمل السعر العكوس أو التقاسيم عند اتصالها بالسطح و" تماما
الكعوب في نهايتها السفلى و عمل المفاصل بالرصاص و الصبغ قبل
.التركيب و بعده وعمل التسريح الالزم عند اتصال األنبوب في السطح
1.2
Repair plaster of ceiling and inside walls upon
ceramic with outside frontage of teachers and
student latrines and fountain , Paint after cleaning
and repairing with two coats of oil paint for inner
walls and with three coats of emulsion paint of good
quality approved by the engineer.
M2 250
لغاية السقف اسفل الجدران و الداخل من السقف وصبغ تصليح
والمعالجة التنظيف بعد الصحية المجموعة واجهة مع السيراميك
من بطبقتين والصبغ السيراميك ارتفاع مع متناسق يكون ان على
الطالء من طبقات بثالثة و الداخلية للجدران الدهني الطالء
لصحيات جيدة نوعية ومن الخارجية الواجهة لجدران المستحلب
.المشرف المهندس توجيهات وحسب والجابية والتالميذ المعلمات
Total Cost الكلي المجموع
Doors and windows والشبابيك األبواب
Bill of quantity for rehabilitation WASH facilities in Al Jana'en primary school for Girls in Shat Al Arab -Basra Governorate
Annex (G-1B)
1 1
2 2
1.31.3
S.NDescription
Unit QTYUnit Price
IQD
Total price
IQDت
Provision of materials/works for the items described
below, and all that is required to make the job
complete in every part and detail as per the
instruction of the supervisor engineer, to
العمل فقرات إلنجاز يتطلب ما كل مع والعدد والعمل المواد تجهيز
المهندس وتوجيهات التنفيذية والمخططات المواصفات بموجب أدناه
.(وعمل المواد تجهيز تشمل أدناه الفقرات جميع).المشرف
2.1
Rehabilitate and repair steel ventilation windows by
fixing frame, locks, handles, insect screens, glass,
protection steel bars and painting with 2 cots of oil
paint all students and teachers latrines and student
fountain as per the instruction of the supervisor
engineer .
LS 1
والجابية والمعلمات التالميذ مرافق وهوائيات شبابيك جميع تأهيل
مع والزجاج الذباب مانع وسلك واالقفال واليدات األطار وتصليح
عمل إلنجاز يلزم ما كل مع لّماع دهني طالء طبقتين الصبغ
.المشرف المهندس توجيهات وحسب متكامل
2.1
2.2
Repair & maintenance wooden and iron Door in
teachers latriens and supply, install locks, keys and
handles and paint with two coats of good oil paint as
per the instruction of the supervisor engineer .No 10
و االقفال اضافة مع والحديد الخشب ابواب وتأهيل وصيانة تصليح
باللون و بطبقتين الجيد النوع من بالدهان الصبغ و"كامال اليدات
توجيهات وحسب والجابية والتالميذ المعلمات لمرافق المناسب
.المشرف المهندس
2.2
2.3
Supply and fixing wooden door with painting, lock
and all accessories (2*2.1)m. For external Fountain
building.
No 1
وجميع والكيلون الصبغ مع كاملة خشب باب فردة وتركيب تجهيز
.للجابية العمل متطلبات2.3
Total Cost الكلي المجموع
Electrical works الكهربائية األعمال
3
Provision of materials/works, and all that is required
to make the job complete in every part and detail, as
per the instruction of the supervisor engineer. Wiring
must be in plastic pipes.
ما كل مع والعدد والعمل المواد تجهيز تشمل أدناه الفقرات كل
والمخططات والمواصفات التفاصيل بموجب الفقرة إلنجاز يتطلب
باستعمال دفن للبناية التسليك يكون المشرف المهندس وتوجيهات
. بالستك بوري
3
2 2
S.NDescription
Unit QTYUnit Price
IQD
Total price
IQDت
3.1
Supply and installed of circular electrical exhaust fans
with 6" size to be fixed on window glass with wiring
accessories and all that is required to complete the
job and as directed by the supervising engineer for
teachers and student latrines.
No 4
مع تربط"6 قياس الشكل دائرية هواء مفرغات ونصب تجهيز
العمل يتطلبه ما وكل الكهربائية التأسيسات كافة مع الشباك زجاج
والتالميذ المعلمات لصحيات المشرف المهندس توجيهات وحسب
3.1
3.2
Supply Install and operate a wall type economic lamp
60 W of (Students & Teachers , fountain), of a good
quality with all wiring system (2x2.5mm) and
switches, as per the approval of the supervisor
engineer.
No 8
مصباح عن عبارة إنارة نقطة وتشغيل وفحص وتركيب تجهيز
والمعلمين الطالب لصحيات جيدة نوعية من واط 60 أقتصادي
ومفتاح 2x2.5mm بأسالك التسليك كافة مع بالجدار مثبت
الطالب لصحيات.المشرف المهندس توجيهات وحسب.التشغيل
والجابية والمعلمين
3.2
3.3
Supply & Install and operate a water pump 3/4", 2 bar
fixed on concrete base with all necessary galvanized
incoming and outgoing pipes, fittings, valves,
protection steel cage with shade, pad lock and
electric source, Wiring, switch and all needed for a
complete job for teachers and student latrines.
No 2
ضغط، بار 2 ،"¾ ماء مضخة وتشغيل وفحص وتأسيس تركيب
األخرى والملحقات المغلونة والخارجة الداخلة األنابيب كافة مع
قاعدة على والتثبيت والقفل السقيفة مع الحديدي الحماية وقفص
نوع الموصلة األسالك كافة و الكهربائي المأخذ مع خرسانية
والتالميذ المعلمات لصحيات يلزم ما كل مع ظاهري.
3.3
Total Cost الكلي المجموع
Water supply and plumbing systems :والمجاري الصحية األعمال
4
Provision of materials/works for the items described
below, and all that is required to make the job
complete in every part and detail as per the
instruction of the supervisor engineer, to
العمل فقرات إلنجاز يتطلب ما كل مع والعدد والعمل المواد تجهيز
المهندس وتوجيهات التنفيذية والمخططات المواصفات بموجب أدناه
.(وعمل المواد تجهيز تشمل أدناه الفقرات جميع). المشرف4
S.NDescription
Unit QTYUnit Price
IQD
Total price
IQDت
4.1
Remove old seats & reinstall water closets including
new flushing tanks of the standard type vitreous
China pan with trap and 4” diameter PVC pipe of
standard quality with suitable length to the manhole.
for facilities of Students and teachers.
No 7
النوع من قياسي فرفوري شرقي مقعد تركيب و القديمة المقاعد قلع
بالستك التصريف وأنبوب الكلي و الشطف خزان مع كامل الجيد
4 قطر إلنجاز يلزم ما كل مع ألمانهول إلى إليصاله كافي بطول"
.والمعلمات الطالب لصحيات ومتكامل جيد عمل
4.1
4.2
Supply, install and fix complete Ceramic sitting pans
for teachers latrines of best quality with all needed
pipe connections accessories. No 1
المعلمات لصحيات اضافي قياسي فرفوري غربي مقعد تركيب
4 قطر بالستك التصريف وأنبوب الكلي مع كامل( جيدة نوعية)"
جيد عمل إلنجاز يلزم ما كل مع ألمانهول إلى إليصاله كافي بطول
.ومتكامل
4.2
4.3
Construct manholes 60x60 cm in size with the
required cast New HDPE good Plastic covers, with
brick walls and 10cm concrete bottom benched up to
form channels facilitating flow inside manholes, inside
faces shall be rendered with (1:3) cement mortar,
incoming and out going pipes shall be built into the
walls for teachers sitting pan.
No 1
من بغطاء محكمة سم60×سم60 بأبعاد(تفتيش حوض) مانهول بناء
بسمك خرسانية أرضية مع الطابوق من بجدار مبني البالستك،
األوجه لبخ مع داخلها االنسياب يسهل مجرى لتشكيل سم10
والخارجة الداخلة األنابيب وربط ،3:1 السمنت بمونة الداخلية
.الغربي المعلمات لمرافق التعفين وخزان المانهول بجدران
4.3
4.4
Supply and Install and fix white vitreous china wash
basin with pedestal approximately 45x60 cm in size ,
complete with all necessary fittings, water supply (hot
and cold) PP pipes, control valve, 30 mm trap,
stopper, chain, and chromium plated mixer . (Works
include install of trap and 4” PVC pipe of suitable
length to outside manhole and septic tank for WC of
teachers.
No 1
نوعية سم 60×45 تقريبية بأبعاد فرفوري مغسلة تركيب و تجهيز
الضرورية والملحقات األنابيب وكافة القاعدة مع كاملة جيدة
بالماء الخاصة والصوندات األقفال مع والتوصيل للربط الالزمة
السعر شامالً جيدة، نوعية كروم خالط مع التصريف وصوندة
4 التصريف وأنبوب ارضي تصريف كلي تثبيت"PVC مع وربطه
المعلمات لحمامات التعفين وخزان الخارجي المانهول.
4.4
4.5Supply and fixing manholes cover PVC. With variase
dimensions.No 6
القياسات وحسب المقوى البالستك من منهول غطاء وتثبيت تجهيز
.الموجودة4.5
S.NDescription
Unit QTYUnit Price
IQD
Total price
IQDت
4.6
Repair the steel structure towers existed for teachers
and students, including cast the bases and renovation
the steel structures, painting with anti-rust and two
coats of oil paint and all water works with any other
accessories needs according to engineer supervisor
instructions.
No 2
المياه لخزانات والحامل الموجود الحديدي للبرج الهيكل تصليح
الحديدي للهيكل والتقوية القواعد صب ويشمل والطالب للمعلمين
وكل المائية والتاسيسات طبقتين والبوية بالرادليت الصبغ مع
.المشرف المهندس توجيهات وحسب العمل مايتطلبه
4.6
4.7
Supply chrome water tabs of best quality with
chrome flexible pipe for rinsing Western Origin for
teachers and students.
No 8من و الشطاف انبوب مع الكروم من حنفيات نصب و تجهيز
. والمعلمين الطالب لمرافق الجيد النوع4.7
4.8
Reinstall all water pipes and fittings for teacher and
students latrines and fountain with all necessary
fittings and benefit from good old materials, as per
the instruction of the supervisor engineer L.S 1
وهوزات انابيب من وملحقاتها المائية التأسيسات تسليك اعادة
جميع الى الخزانات من والمعلمين الطالب لصحيات وتوصيالت
جميع تجهيزونصب العمل ويشمل والجابية الصحية المجموعة
وحسب جيدة بحالة تكون التي القديمة المواد من واالستفادة المواد
المشرف المهندس توجيهات
4.8
4.9
Rehabilitate, repair and clean all students latrines
manholes ,sewer pipes and septic tank as per the
instruction of the supervisor engineer. l.s 1
المجاري وانابيب منهوالت جميع وتسليك وتنظيف واصالح تأهيل
متكامل عمل إلنجاز يلزم ما كل مع الطالب لمرافق التعفين وخزان
المشرف المهندس توجيهات وحسب.
4.9
4.1
Supply and Install and fix chromium plated water
mixer for wash basin , complete with all necessary
fittings, water supply (hot and cold) and control
valves.
No 2
األنابيب كافة مع كامل جيدة نوعية كروم خالط تركيب و تجهيز
األقفال مع والتوصيل للربط الالزمة الضرورية والملحقات
المعلمين لحمامات. بالماء الخاصة والصوندات
4.10
4.11Supply chrome water tabs of best quality for students
fountains.No 6
ومن للطالب الماء لجابيات الكروم من حنفيات نصب و تجهيز
الجيد النوع.4.11
Total Cost الكلي المجموع
Total cost االجمالي المبلغ
S.NDescription
Unit QTYUnit Price
US$
Total price
US$ت
Civil Works المدنية األعمال
Provision of materials/works for the
items described below, and all that is
required to make the job complete in
every part and detail as per the
instruction of the supervisor engineer.
إلنجاز يتطلب ما كل مع والعدد والعمال المواد تجهيز
والمخططات المواصفات بموجب أدناه العمل فقرات
الفقرات جميع). المشرف المهندس وتوجيهات التنفيذية
.(وعمل المواد تجهيز تشمل أدناه
1.1
Supply materials and works, to
remove the old existing roofing and
apply an (Isogam : 4 mm thick
Bituminous material layer with a
reflector sheet from aluminum ) after
cleaning and washing thoroughly the
roofs and filling the halls in the roofs
with cement mortar mixed with non
shrink additives (Neto bond) and all
that required to make a perfect job in
every part and detail. The work
include casting 10 cm mortar cement
M2 40
طبقة وتركيب القديم التسطيح وقلع والعمال تجهيزمواد
بطبقة مغلفة القيرية المواد من ملم 4 بسمك ايزوكام
للسقوف الجيد والغسل التنظيف بعد االلمنيوم من عاكسة
مواد اضافة بعد السمنتية بالمواد والفتحات الشقوق مأل
بمونة الصب ويشمل والتقلص لالنكماش مضادة مضافة
لصحيات, المرازيب بأتجاه والتسليط والرمل السمنت
.التالميذ
1.1
1.2
Installing new Ceramic tiles for
Teachers latrines floor with
dimensions 30*30 cm new ceramic
tiles by using cement mortar (3: 1) and
filling joints with white cement mortar
(1:1), as per the instruction of the
supervisor engineer.
M2 15
حمامات الرضية الجديد السيراميك بالكاشي التطبيق
السمنت مونة باستخدام و سم 30*30 بقياس و المعلمين
وحسب (1:1) أبيض سمنت بمونة وتشربت ( 1 :3 )
. المشرف المهندس توجيهات
1.2
Bill of quantity for rehabilitation WASH facilities in Al Merbad primary school for boys in Basra City -Basra Governorate
Annex (G-1C)
1 1
1.3
Installing new Ceramic tiles
forTeachers Latrines walls with
dimensions 40*25 cm new ceramic
tiles by using cement mortar (3: 1) and
filling joints with white cement mortar
(1:1), as per the instruction of the
supervisor engineer.
M2 50
سم 40*25 قياس الجديد السيراميك بالكاشي التطبيق
3 ) السمنت مونة باستخدام و المعلمين حمامات لجدران
وحسب( 1:1) أبيض سمنت بمونة وتشربت ( 1:
. المشرف المهندس توجيهات 1.3
1.4
Supply and install new water proof ,
heat insulated sandwich panel for
teachers WC, by using drilling screw
for fixing on roof steel construction
and after removing old galvanized roof
steel sheets as per specifications and
instruction of the supervisor engineer.
m2 15
مادة من المعلمين لمرافق جديد سقف وتركيب تجهيز
باستخدام و للمياه وصامدة حراريا المعزولة بنل السندويج
لتثبيت الحديدي الهيكل تركيب مع للتثبيت الثاقبة البراغي
صفائح ازالة بعد وذلك الخارج الى% 5 وبميل السقف
المهندس وتوجيهات المواصفات وحسب القديمة السقف
.المشرف
1.4
1.5
Brick construction for wall partition
24CM thick for teachers WC of
dimensions (15*0.8*0.24) M with
cement and sand mortar (3: 1) than
Plastering wall surfaces with cement
mortar (1:3) and clean sand and
construct two ventilation opening
l.s 1
المعلمين جدارحمامات طول على تعلية وبناء تجهيز
بالبناء سم24 وسمك سم 80 متروبارتفاع 15 وبطول
اللبخ مع (3:1) الرمل و السمنت مونة و بالطابوق
السمنت باستعمال االعلى وسطحه الجدار لجانبي الصقيل
عمل مع (3: 1) النظيف الناعم الرمل مع االعتيادي
المواصفات بموجب و سم 50*50 قياس تهوية فتحتي
.المشرف المهندس إرشادات و الفنية
1.5
1.6
Constructing water fountain
2.5 m length and 0.6m hight from
bricks and rendering with ceramic tiles
with the needed water and drainage
installments (pipes, elbows and any
needed fittings) including fixing Qty
(10 ) taps. the fountain installment to
be connected to tank water
installations and to the nearest
manhole or drain, with all
the required work and as directed
by the supervising engineer, the price
L.S 1
م0.6 وبارتفاع م 2.5 بطول للغسل خارجية جابية عمل
تاسيسات جميع مع بالسيراميك التغليف مع الطابوق من
كل مع, عكس, انبوب) الالزمة والتصريف الماء
وربطها حنفيات 10 وربط وتجهيز (الالزمة التقفيالت
المانهول الى التصريف فتحة وربط وتاسيس الماء بخزان
وحسب العمل يتطلبه ما كل مع التعفين خزان او القريب
ازالة السعر ويشمل المشرف المهندس توجيهات
افضل من المستخدمة المواد جميع وتكون, االنقاض
.المحلية باالسواق المتوفرة والنوعيات المناشىء
1.6
1.7
Supply & Install vertical plastic pipes in
Dia (100) mm to drain rain water of
good quality approved by supervised
engineer.
Ml 12
ملم لمياه (100)تجهيز و نصب أنابيب شاقولية بالستك قطر
المطر تثبت على الجدران بواسطة مسامير مغلونه و تكون
و يشمل السعر العكوس أو التقاسيم عند" شاقولية مستقيمة تماما
اتصالها بالسطح و الكعوب في نهايتها السفلى و عمل المفاصل
بالرصاص و الصبغ قبل التركيب و بعده وعمل التسريح الالزم
1.7
Repair plaster of ceiling and walls
upon ceramic with frontage of WC,
Paint after cleaning and repairing with
three coats of oil paint of good quality
approved by the engineer.
M2 90
اسفل الجدران و الداخل من السقف وصبغ تصليح
التنظيف بعد الصحية المجموعة واجهة مع السقف
السيراميك ارتفاع مع متناسق يكون ان على والمعالجة
نوعية ومن الدهني الطالء من طبقات بثالثة والصبغ
توجيهات وحسب والتالميذ المعلمين لصحيات جيدة
. المشرف المهندسTotal Cost الكلي المجموع
Doors and windows والشبابيك األبوابProvision of materials/works for the
items described below, and all that is
required to make the job complete in
every part and detail as per the
instruction of the supervisor engineer,
to
إلنجاز يتطلب ما كل مع والعدد والعمل المواد تجهيز
والمخططات المواصفات بموجب أدناه العمل فقرات
الفقرات جميع). المشرف المهندس وتوجيهات التنفيذية
.(وعمل المواد تجهيز تشمل أدناه
2.1
Supply and fixing PVC ventelation
window 50*50CM with glass and 6"
exhosht fan fixed on glass and with all
accessoriesFor teachers latrine
building.
No 2
مع سم 50*50 قياس PVC تهوية شباك وتركيب تجهيز
الزجاج في انج 6 قياس الهواء ومفرغة الزجاج تركيب
.المعلمين لصحيات العمل متطلبات جميع مع 2.1
2.2
Rehabilitate and repair all teachers
and students latrines doors, by fixing
frame, locks, handles, glasses, mish
iron and painting with 2 cots of oil
paint, as per the instruction of the
supervisor engineer .
L.S 1
التالميذ مرافق وشبابيك وهوائيات ابواب جميع تأهيل
والزجاج واالقفال واليدات األطار وتركيب والمعلمين
كل مع لّماع دهني طالء طبقتين الصبغ مع الذباب ومانع
المهندس توجيهات وحسب متكامل عمل إلنجاز يلزم ما
.المشرف
2.2
Total Cost الكلي المجموع
Electrical works الكهربائية األعمال
2 2
1.8 1.8
3
Provision of materials/works, and all
that is required to make the job
complete in every part and detail, as
per the instruction of the supervisor
engineer. Wiring must be in plastic
pipes.
مع والعدد والعمل المواد تجهيز تشمل أدناه الفقرات كل
التفاصيل بموجب الفقرة إلنجاز يتطلب ما كل
المشرف المهندس وتوجيهات والمخططات والمواصفات
. بالستك بوري باستعمال دفن للبناية التسليك يكون3
3.1
Supply and installed of circular
electrical exhaust fans with 6" size to
be fixed on window glass with wiring
accessories and all that is required to
complete the job and as directed
by the supervising engineer
No 3
" 6 قياس الشكل دائرية هواء مفرغات ونصب تجهيز
الكهربائية التأسيسات كافة مع الشباك زجاج مع تربط
المشرف المهندس توجيهات وحسب العمل يتطلبه ما وكل
.التالميذ لصحيات
3.1
3.2
Supply Install and operate a wall type
economic lamp 60 W of (Students &
Teachers), of a good quality with all
wiring system (2x2.5mm+E2.5mm2)
and switches, as per the approval of
the supervisor engineer.
No 10
عن عبارة إنارة نقطة وتشغيل وفحص وتركيب تجهيز
لصحيات جيدة نوعية من واط 60 أقتصادي مصباح
بأسالك التسليك كافة مع بالجدار مثبت والمعلمين الطالب
2x2.5mm, 2.5 االرضي وmm التشغيل ومفتاح .
الطالب لصحيات. المشرف المهندس توجيهات وحسب
.والمعلمين
3.2
3.3
Supply & Install and operate a water
pump 3/4", 2 bar fixed on concrete
base with all necessary galvanized
incoming and outgoing pipes, fittings,
valves, protection steel cage with
shade, pad lock and electric source, ,
Wiring, switch and all needed for a
complete job.
No 2
بار 2 ،" ¾ ماء مضخة وتشغيل وفحص وتأسيس تركيب
المغلونة والخارجة الداخلة األنابيب كافة مع ضغط،
السقيفة مع الحديدي الحماية وقفص األخرى والملحقات
الكهربائي المأخذ مع خرسانية قاعدة على والتثبيت والقفل
. يلزم ما كل مع ظاهري نوع الموصلة األسالك كافة و
.والمعلمين الطالب لصحيات
3.3
Total Cost الكلي المجموع
Water supply and plumbing systems :والمجاري الصحية األعمال0
4
Provision of materials/works for the
items described below, and all that is
required to make the job complete in
every part and detail as per the
instruction of the supervisor engineer,
to
إلنجاز يتطلب ما كل مع والعدد والعمل المواد تجهيز
والمخططات المواصفات بموجب أدناه العمل فقرات
الفقرات جميع). المشرف المهندس وتوجيهات التنفيذية
.(وعمل المواد تجهيز تشمل أدناه
4
4.1
Remove old seats & reinstall water
closets including new flushing tanks of
the standard type vitreous China pan
with trap and 4” diameter PVC pipe of
standard quality with suitable length
to the manhole. for facilities of
Students.
No 6
قياسي فرفوري شرقي مقعد تركيب و القديمة المقاعد قلع
الصوندة مع الشطف خزان مع كامل الجيد النوع من
" 4 قطر بالستك التصريف وأنبوب الكلي و والقفل
إلنجاز يلزم ما كل مع ألمانهول إلى إليصاله كافي بطول
الطالب لصحيات. ومتكامل جيد عمل
4.1
4.2Supply and fixing manholes cover PVC.
With variase dimentions.No 4
وحسب المقوى البالستك من منهول غطاء وتثبيت تجهيز
.الموجودة القياسات4.2
4.3
Supply chrome water tabs of best
quality with chrome flexible pipe for
rinsing Western Origin for teachers
and students.
No 7و الشطاف انبوب مع الكروم من حنفيات نصب و تجهيز
. والمعلمين الطالب لمرافق الجيد النوع من4.3
4.4
Reinstall all water pipes and fittings for
students latrines with all necessary
fittings and benefit from good old
materials, as per the instruction of the
supervisor engineer
L.S 1
انابيب من وملحقاتها المائية التأسيسات تسليك اعادة
من الطالب لصحيات وتوصيالت و وحنفيات هوزات
العمل ويشمل الصحية المجموعة جميع الى الخزانات
القديمة المواد من واالستفادة المواد جميع تجهيزونصب
المشرف المهندس توجيهات وحسب جيدة بحالة تكون التي
4.4
4.5
Supply materials & build Elevated steel
structure tower for carrying two
plastic water tanks of size 1M3
according to the drawings. The work
include supplying and connecting the
two plastic tanks , casting of the
foundation & the paint the entire
structure with anti-corrosion paint.
The last layer of paint will have
L.S 2
قياس الزاوية او المربع حديد من حديدي برج هيكل أنشاء
عدد مكعب متر1 حجم بالستك ماء خزان لحمل أنج 3
و بالمنظمة الخاصة التصاميم حسب و البرج فوق 2
انشاء مع واالنابيب الخزانات ربط و تجهيز العمل يشمل
و صدأ مانع طبقات بثالث الصبغ و الكونكريتي االساس
ما كل مع المنظمة تحدده لون ذات االخيرة الطبقة تكون
المعلمين لصحيات ومتكامل جيد عمل إلنجاز يلزم
.والتالميذ
4.5
4.6
Rehabilitate, repair and clean all
students latrines manholes ,sewer
pipes and septic tank as per the
instruction of the supervisor engineer.
l.s 1
وانابيب منهوالت جميع وتسليك وتنظيف واصالح تأهيل
يلزم ما كل مع الطالب لمرافق التعفين وخزان المجاري
.المشرف المهندس توجيهات وحسب متكامل عمل إلنجاز 4.6
4.7
Supply and install flushing tanks for
teachers latrins and to connected with
upper tanks water pipe and all that it
takes to complete the work and as
directed by the supervising engineer
no 1
المعلمين لمرافق الشطف خزانات وتركيب تجهيز
ما كل ومع العلوية الخزانات من النازل باالنبوب وربطها
المشرف المهندس توجيهات وحسب العمل يتطلبه
.المعلمين لصحيات
4.7
4.8
Supply P-Trap of best quality made of
steel. Installation shall include
covering by concrete thickness 15 cm
at all directions with all PVC needed
pipes.
No 1
قطر البالستك من (كلي) ارضي سيفون ونصب تجهيز
باألنابيب والتوصيل الحفر مع الثقيل النوع من ملم (100)
15 ) بسمك بالخرسانة" جيدا التغليف و التعفين خزان مع
يثبت الكروم من معدني مشبك مع الجهات جميع من سم (
مانعه مادة تستعمل و الكاشي بمستوى أالرضية في
انابيب مع السيفونات لتغليف الخرسانة في الرطوبة
4.8
4.9
supply , lay and connect 100 m long
plastic PP water pipe of 3/4" diameter
to connect the student WC with the
water source inside the school and
work include ground excavating of
30CM under NGL and back filling with
all needed work to complete the job
according to specifications and as
directed by the supervising engineer.
L.S 1
100 انج طول 3/4 قطر PPتجهيز ومد انبوب ماء
متر من انبوب االسالة الرئيسي داخل المدرسة والى
خزانات ماء مرافق المعلمين وكل ما يتطلبه العمل من
حفر واعادة دفن ومد االنبوب إلنجاز عمل جيد ومتكامل
. وحسب المواصفات الفنية وتوجيهات المهندس المشرف
4.9
4.10
Supply and Iinstall and fix chromium
plated water mixer for wash basin ,
complete with all necessary fittings,
water supply (hot and cold) and
control valves.
No 3
كافة مع كامل جيدة نوعية كروم خالط تركيب و تجهيز
والتوصيل للربط الالزمة الضرورية والملحقات األنابيب
لحمامات. بالماء الخاصة والصوندات األقفال مع
والتالميذ المعلمين
4.10
4.11Supply chrome water tabs of best
quality for students fountains.No 3
المعلمين لصحيات الكروم من حنفيات نصب و تجهيز
. الجيد النوع ومن والطالب4.11
Total Cost الكلي المجموع
Total cost االجمالي المبلغ