Upload
shaunakbatra
View
219
Download
0
Embed Size (px)
Citation preview
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 1/21
IndianOil¶sProject Manthan
Made by: Group 3Aaditya Tanwar 2009SMF6627
Sanjiv Yadav 2009SMF6679
Shaunak Batra 2009SMF6537
Business Systems Analysis and Design
Term Paper
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 2/21
IT in IndianOil: 1996
Islands of information Heterogeneous platforms in Hardware, Software and
Networks
Multiple databases and hence multiple data entries
Lack of concurrent updated data
Common information not available across organisation
Data transfer through floppies/modems
Negligible use of Intranet / Extranet / Internet
Real time plant information & business systems not linked
M anagement by Judgement ( Intuition / Experience )
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 3/21
IT Re-engineering in IndianOil
The organisation embarked upon a major project of Re-engineering encompassing therein the bestpractices benchmarked to world standards so as toprovide online information to decision-makers, anddevelop itself into a knowledge-based learningorganisation and
± Achieve better, faster and cost-competitive businessprocesses
± Simplify and standardise forms, procedures andworkflows
± Facilitate automatic data capturing, transfer andanalysis
± Realise the goal of integrated business solutions
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 4/21
Major Project Components
Implementation of ERP Software± SAP R/3 (4.0B), IS-OIL (4.0), CIN (2.2B)
± Migration to SAP R/3 4.6c
Installation, Customisation and Implementation of
Add-On Software Packages Development of Standardised, Identified, Stand-alone
Packages and their Interface with SAP
Procurement and Installation of Infrastructure
± Hardware, i.e., Servers, Storage Systems, PCs, etc.
± Communication Networks, WAN, MAN & LAN
Transition Management, including Training
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 5/21
(SAP + Add-Ons)
Total IT Solution under Manthan
Material
Mgt.HR
Finance & Controlling
PM
Project
Systems
Sales &
Distribution
Production
Planning(Lubes ± PP-PI)
Crude Selection,
Ref. Plg.
Refinery
Operations
Monitoring
Data Recon. &
Yield Accounting
LIMSPayroll/
PF/PDSDSS + KM
Distribution
Planning
Transport
Scheduling(Rail, Road, Ppl,
Tankers)
Advance Plg &
Scheduling(Lubes)
Real Time
Database
Transport
Scheduling
(Crude) EDMSMS Project/
PrimaVera
EmployeePayment System
QM
TAS Demand
Forecasting
CRM
&
eBiz
Data
Warehousing
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 6/21
VSAT Network
DOT has allocated 18 MHZ of space segment onINSAT-3B Satellite (¼ transponder in Ku band)
License for installation and operation of Captive
CUG data-cum-voice private VSAT
(Ku band) network granted by DOT.
First and largest Ku band network in Corporate
Sector in the country.
Support for Voice and Data at all locations
Installation of 224 VSATs in two phases.
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 7/21
IIPM
NRO
DSO
HO
(MKTG)
Bijwasan
Palam Depot
Palam AFS
NITC Palam
Palam Tarmac
Palam ± BPC Office
R & D
ASAOT
I
DELHI + HARYANA LINKS
Tikrikalan BP
Gurgaon BP
Madanpur Khadar BP
Shakurbasti Term
Hissar Depot
Ambala Term Ambala AFS
PANIPAT
REFINER
Y
KBPL,
PPT
PANIPAT MKTG
COMPLEX
REWAR I
2 M LL
64 K LL
ISDN
RADIO
LANOFC
SCOPE
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 8/21
State
Offices
Corporate
Data
Communication
Centre,
Gurgaon
NOTE: ALL UNMARKED LINES ARE 2 MBPS
LPG
& Lube
Plants
R&D
Centre,
Faridabad
Pipelines
Division HO,
NOIDA
Marketing
Division HO,
Mumbai
Corporate
Office,
Sadiq Nagar
Haldia
Refinery
Panipat
Refinery
BarauniRefinery
Guwahati
Refinery
Mathura
Refinery
Koyali
Refinery
Digboi
Refinery
Subsi-
diaries
(OFC Network)
1 x 64KBPS or
2 x 64 KBPS
Terminals
& Depots
Divisional
& Area
Offices
Regional
Offices
Refineries
Division HQ,
New Delhi
2 x 6 4K B P S
Pipelines
Units
Terrestrial Network Plan (Illustrative)
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 9/21
Hardware
� Centralised architecture with Database Server and
all Application Servers installed at the Central Site
at IIPM
�Users from various sites shall log into the applicationservers and database server at Central Site
� Minimum software maintenance required at remote
sites
� Remote client software will be downloaded from
Central Site
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 10/21
Main Production System Configuration
DB CI
Redundant I/O Paths
Private Cluster
Heartbeat LAN
Public Network 2 ± Server LAN
Public Network 1± User LAN
P-Vol
Copy
Enterprise Disk Storage
Tape
Library
FC/
SCSI Bridge
Application
ServersSAN Switches
P-Vol
Copy
Primary Storage
Backup
Server
Standby Storage
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 11/21
Transition Management
Identification and finalisation of
� Business Process Owners: Functional Heads inDivisions to facilitate the project as BPOs
� Location Owners: Locations In-Charge will be the
overall owners; Functional Heads in units will be theowners of individual modules at respective unit
� Change Agents: Composite group of officers andstaff to act as Change Agents
� Extended Functional Team : Facilitate SAPimplementation
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 12/21
Communication thro¶ IT Channels
ITIT
Manthan sites launched on Intranets atDivisional HQs
CD on Project ManthanCD on Project Manthan developed indeveloped in--househouse
and launched on Divisional Intranets,and launched on Divisional Intranets,
shared with unit heads,shared with unit heads,IndianOil News: Structured communication campaign
through Corporate house journal to update the IndianOil
family about the various facets of the project on a
continuous basis
Manthan Infokit: Cost-effective bulletins brought out in-
house to share major project milestones with senior and
middle management cadres
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 13/21
Present Status
As on 1st August 2003, more 85 units including allRefineries, R&D, all locations of Delhi State Office,Punjab State Office, IOBL Mumbai, IOBL Kolkata,Refineries HQ and Corporate are using SAP for on-line business transactions.
Centralised architecture with Database Server,Application Servers and Storage Device installed atthe Central Site at IIPM. More than 1000 users arelogging to Central Server concurrently.
First and largest Ku band based VSAT network inCorporate Sector in the country. Central Hub inoperation at Data Communication Centre, IIPMGurgaon. Out of total 324 VSATs planned, 224 will beoperational by September 2003.
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 14/21
Integrated IT Solution
Enterprise Resource Planning (ERP)Software
Supply Chain Management Solutions
Integrated captive communication network
Centralised server technology
Data Warehousing
Groupware / Workflow Applications
Internet / Intranets / Extranets e-Commerce / e-Business
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 15/21
Why Transition Management
� Large employee strength (33,615 as on 31.3.02)
� Large no. of distinctive locations (>450)
� Project Manthan ± a long duration project
� Transition management ± a core competency to be
developed within the organisation
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 16/21
SAP R/3 Modules in IndianOil
Abbreviation ModuleFICO Finance & Controlling
SD Sales & Distribution
MM Materials Management
PM Plant Maintenance
QM Quality Management
PS Project Systems
HR Human Resources
PP Production Planning
IS-Oil Industry Solution ± Oil
CIN Country India Version
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 17/21
Complexities of Configuration
More than 2,300 business processes
About 180 µGaps¶ to be resolved through
Workarounds / Enhancements
More than 350 modifications identified in Standard
Configuration during intra-module / Integrated testing
Material Master to have over 3 lakh records
Vendor Master to have approx. 50,000 records
Customer master to have approx. 1,25,000 records
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 18/21
Terrestrial Network Plan
µHub-and-spoke topology¶ adopted, with the four Divisional HQs, Refineries, Regional Offices andState Offices directly connected to Central Hubat IIPM by means of high-speed PAMA links
Connectivity being provided between IIPM and
120 Marketing locations All refineries connected to IIPM in a Star network
Link up with existing leased line and captivecommunication network (OFC/UHF) in Pipelines
Division Provides data/voice connectivity on the same
channel using latest technology (voice over IP)
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 19/21
Disaster Recovery Solution
WANPrimary
Storage
StandbyRead-Only
Mode
ESCON-WANConverters
ESCON-WANConverters
CI
DB
Primary Database Server Standby Database Server
Data Centre (A) Data Centre (B)
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 20/21
References
www.iocl.com 20th
April 2010. Indian Oil Corporate Information Systems Office- 20th
April 2010.
Plant Robert; Willcocks Leslie. Critical Success
Factors In International Erp Implementations: A Case
Research Approach. Journal of Computer Information
Systems. 2007.
Maya Daneva; Roel Wieringa. Cost estimation for
cross-organizational ERP projects:research
perspectives. 2008. ERP End-User Business Productivity: A Field Study of
SAP & Microsoft. 2007.
8/7/2019 Term Paper_Group 3
http://slidepdf.com/reader/full/term-papergroup-3 21/21
Thank You