SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT 1 10104412 SEAL; PISTON ROD HPBP TCV, P#6021 U#1/2 NAME:PISTON ROD SEAL FOR HP BYPASS TCV HYDRAULIC ACTUATOR, U#1/2 PART NO: 6021 ACTUATOR TYPE: ASM 100-10 DRAWING NO: 0-103.151.312.200 MAKE: SULZER COUNTRY OF ORIGN:SWITZERLAND 2 EA 2 10114660 O'RING; HPBP PCV ACTUATOR P#6027 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 240.67x7, Part # 6027, Actuator Type: ASM 250-12, Make: Sulzer Switzerland. 6 EA 3 10114661 O'RING; HPBP PCV ACTUATOR P#6028 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 91.67x3.53, Part # 6028, Actuator Type: ASM 250-12, Make: Sulzer Switzerland. 6 EA 4 10114662 O'RING; HPBP PCV ACTUATOR P#6080 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 75.8x3.53, Part # 6080, Actuator Type: ASM 250-12, Make: Sulzer Switzerland. 6 EA 5 10114663 O'RING; HPBP PCV ACTUATOR P#6113 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 240.67x7, Part # 6113, Actuator Type: ASM 250-12, Make: Sulzer Switzerland. 6 EA 6 10114666 O'RING; LPBP TCV ACTUATOR P#6027 U#1/2 O’ring for LPBP TCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 304.17x7, Part # 6027, Actuator Type: ASM 320-121, Make: Sulzer Switzerland. 6 EA 7 10114667 O'RING; LPBP TCV ACTUATOR P#6028 U#1/2 O’ring for LPBP TCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 113.89x3.53, Part # 6028, Actuator Type: ASM 320-121, Make: Sulzer Switzerland. 6 EA PROCUREMENT OF SPARES FOR HP & LP BYPASS PCV & TCV HYDRAULIC ACTUATORS, UNIT 1-2, BQPS-1 (llI) PR# 1400024958, FG1310/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019 TENDER NOTICE K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below; Collection of Tenders as follows : Monday - 09:00 AM to 03:00 PM Friday - 09:00 AM to 02:00 PM

TENDER NOTICE - 26.08.2019 - K-E

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10104412

SEAL; PISTON ROD HPBP TCV, P#6021 U#1/2 NAME:PISTON ROD SEAL FOR HP BYPASS TCV HYDRAULIC ACTUATOR, U#1/2 PART NO: 6021 ACTUATOR TYPE: ASM 100-10 DRAWING NO:0-103.151.312.200 MAKE: SULZER COUNTRY OF ORIGN:SWITZERLAND

2 EA

2 10114660

O'RING; HPBP PCV ACTUATOR P#6027 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 240.67x7, Part # 6027, Actuator Type: ASM250-12, Make: Sulzer Switzerland.

6 EA

3 10114661

O'RING; HPBP PCV ACTUATOR P#6028 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 91.67x3.53, Part # 6028, Actuator Type: ASM250-12, Make: Sulzer Switzerland.

6 EA

4 10114662

O'RING; HPBP PCV ACTUATOR P#6080 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 75.8x3.53, Part # 6080, Actuator Type: ASM250-12, Make: Sulzer Switzerland.

6 EA

5 10114663

O'RING; HPBP PCV ACTUATOR P#6113 U#1/2 O'ring for HPBP PCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 240.67x7, Part # 6113, Actuator Type: ASM250-12, Make: Sulzer Switzerland.

6 EA

6 10114666

O'RING; LPBP TCV ACTUATOR P#6027 U#1/2 O’ring for LPBP TCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 304.17x7, Part # 6027, Actuator Type: ASM320-121, Make: Sulzer Switzerland.

6 EA

7 10114667

O'RING; LPBP TCV ACTUATOR P#6028 U#1/2 O’ring for LPBP TCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 113.89x3.53, Part # 6028, Actuator Type: ASM320-121, Make: Sulzer Switzerland.

6 EA

PROCUREMENT OF SPARES FOR HP & LP BYPASS PCV & TCV HYDRAULIC ACTUATORS, UNIT 1-2, BQPS-1 (llI)PR# 1400024958, FG1310/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

TENDER NOTICE

K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below;

Collection of Tenders as follows :

Monday - 09:00 AM to 03:00 PMFriday - 09:00 AM to 02:00 PM

8 10114668

O'RING; LPBP TCV ACTUATOR P#6080 U#1/2 O’ring for LPBP TCV Hydraulic Actuator, Unit # 01-02, BQPS1. SPECIFICATION: Size: 98.02x3.53, Part # 6080, Actuator Type: ASM320-121, Make: Sulzer Switzerland.

6 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10008629

SHAFT; GUN METAL DIA I"NAME; GUN METAL SHAFTSIZE: 1 INCH DIALENGTH: 1 METER MINIMUMMTC REQUIRED FOR CONFIRMATION OF MATERIAL COMPOSITION

200 KG

2 10001711

BAR; BRASS HEXAGONAL BAR 1 INCHNAME; HEXGONAL BRASS BARSIZE: 1 INCHSUPPLY: SUBJECT TO PRIOR APPROVAL OF SAMPLE.

200 KG

3 10013340 BAR; BRASS BAR HEXAGONAL 1-1/2" 150 KG

4 10037332

BAR; TEFLON DIA: 20MMNAME; TEFLON BARSIZE: DIA. 20 MM

SUPPLY SUBJECT TO PRIOR APPROVAL OF SAMPLE

20 KG

5 10037335

BAR; TEFLON DIA: 55MMNAME; TEFLON BAR:SIZE: DIA. 55 MM

SUPPLY SUBJECT TO PRIOR APPROVAL OF SAMPLE

20 KG

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

HIRING OF SERVICE FOR INSTALLATION,HIRING OF SERVICE FOR INSTALLATION, TESTING AND COMMISSIONING OF NUMERICAL BASED GENERATOR PROTECTION SCHEME AT U#6 BQPS-1.

PR# 1400024323, FG1312/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

HIRING OF SERVICE FOR INSTALLATION, TESTING AND COMMISSIONING OFNUMERICAL BASED GENERATOR PROTECTION SCHEME AT U#6 BQPS-1.

PR# 1300042152, FG1313/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

PROCUREMENT OF GUN METAL, BRASS HEXAGONAL BAR & TEFLON BAR FOR W&S, BQPS-1

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:i. Permit to Work systemii. Risk assessment

3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

HIRING OF SERVICE FOR INSTALLATION,

1. TECHNICAL SPECIFICATIONS

1.1 GENERATOR DATA;

CAPACITY : 248.3 MVA (3 -PHASE AC GENERATOR ONE SET)TYPE : TFLQQ-KD (TOTALLY ENCLOSED FORCED VENTILATED, FORCED LUBRICATED SOLID ROTOR TURBINE GENERATOR).HYDROGEN PRESSURE : 3.10 BARG AT 248.3 MVA, 0.85, 211.055MWRATING : CONTINUOUSTERMINAL VOLTAGE : 18KVNO. OF POLES : 02 - POLESPOWER FACTOR : 0.85 (LAG)REVOLUTION SPEED : 3000 RPMNEUTRAL POINT : TRANSFORMER GROUNDINGEXCITATION VOLTAGE : 350 VDCCONNECTIONS : STAR TYPECOOLING METHOD : STATOR: INDIRECT HYDROGEN COOLINGROTOR : DIRECT HYDROGEN COOLING

1 1 AU

1.2 GENERATOR TRANSFORMER DATA;

RATED POWER : 250MVAPRIMARY : 18KVSECONDARY : 220KVMAKE : FUJI JAPAN

1.3 AUXILIARY TRANSFORMER DATA;

RATED POWER : 36MVAPRIMARY : 18KVSECONDARY LV1 : 6.6KVSECONDARY LV2 : 6.6KVMAKE : FUJI JAPAN

2. GENERAL TERMS & CONDITIONS:

1. THE BIDDER FOR INSTALLATION OF GENERATOR PROTECTION SHOULD BE OEM'S DIRECT REPRESENTATIVE OF OEM ITSELF.

2. UNLESS OTHERWISE SPECIFIED ELSEWHERE IN THIS SPECIFICATION, ALL EQUIPMENT AND MATERIALS SHALL BE DESIGNED, MANUFACTURED AND TESTED IN ACCORDANCE WITH THE INTERNATIONAL ELECTRO-TECHNICAL COMMISSION (IEC).

3. THE DETAIL SHOULD BE FINALIZED DURING THE ENGINEERING STAGE BY THE SUCCESSFUL BIDDER AFTER GETTING APPROVAL FROM GM (ELECT).

4. AS THE INSTALLATION SITE IS BACKSIDE CONTROL ROOM THEREFORE ALL DOORS AND REMOVABLE COVERS SHALL BE GASKETED ALL ROUND WITH NEOPRENE GASKETS, VENTILATING LOUVERS WITH SCREEN AND FILTERS.

5. IF ANY MODIFICATION IS NECESSARILY REQUIRED IN WIRINGS OR IN OUTPUT RELAYS, SAME WILL BE CLEARLY INFORMED TO SITE ENGINEER. AND IT IS VENDOR'S RESPONSIBILITY TO MAKE RED MARK DRAWINGS FOR FURTHER APPROVAL.

6. THE PANEL SHOULD BE COMPLETELY WIRED AND TO BE FIXED WITH ALL ACCESSORIES LIKE RELAYS, AUXILIARY RELAYS, TBS, ( DISCONNECTING TYPE TBS WITH SHORTING ARRANGEMENT FOR CT, PT), EARTHING BUS, TERMINAL CONNECTION FOR CT - PT CABLES, SWITCHES, ILLUMINATION, SPACE HEATERS, POWER SOCKETS, ETHERNET SWITCH, LAPTOPS ETC.

7. THE AVAILABLE AUXILIARY SUPPLIES AT PLANT ARE 220VAC 50 HZ, 24VDC & 220VDC.

8. ALL WIRING SHALL BE CARRIED OUT WITH 1100V GRATE SINGLE CORE MULTI STAND FLEXIBLE COPPER CONDUCTOR WIRES WITH HRPVC INSULATION AND SHALL BE FLAME RETARDANT, VERMIN AND RODENT PROOF.

1.1 1 JOB

9. THE CURRENT CARRYING CAPACITY OF WIRES SHALL BE ADEQUATE FOR THE DUTY ASSIGNED TO IT CONSIDERING SHORT CIRCUIT CONDITION AND SHALL HAVE SUFFICIENT FLEXIBILITY TO FACILITATE PROPER TERMINATION ANT ANY LOCATION. COLOR CODED WIRES (RED, YELLOW, BLUE, BLACK) SHALL BE USED FOR CT, VT AND CVT SECONDARY CONNECTIONS. THE COPPER CONDUCTOR USED FOR INTERNAL WIRING BE AS FOLLOWS:

a. ALL CIRCUITS EXCEPT INSTRUMENT TRANSFORMER CIRCUIT OF 1.5 SQ MM PER LEADb. CT CIRCUIT - ONE 4 SQ MM PER LEAD.c. VT CIRCUITS ONE 2.5 SQ MM PER LEAD.

10. THE WIRE NUMBERS SHOWN IN THE WIRING DIAGRAM SHALL BE IN ACCORDANCE WITH IEC STANDARDS.

11. ALL WIRES DIRECTLY CONNECTED TO TRIP CIRCUIT BREAKER OR DEVICES SHALL BE DISTINGUISHED BY ADDITION OF A RED COLORED OR LETTERED FERRULE. NUMBER 6 AND 9 SHALL NOT BE USED.

12. PANEL WIRING SHALL BE SECURELY SUPPORTED, NEATLY INSTALLED BY LACING AND TYING, READILY ACCESSIBLE AND CONNECTED TO EQUIPMENT TERMINAL AND TERMINAL BLOCKS. FLAME RETARDANT, PLASTIC WIRING CHANNELS/TROUGHS WITH STRAP ON PLASTIC COVERS SHALL BE USED FOR THIS PURPOSE. SUFFICIENT SPACE IN CHANNEL FOR MODIFICATION OF WIRING SHALL BE DEPT.

13. TRANSPORTATION OF MATERIAL AND THEIR STAFF WILL BE THE RESPONSIBILITY OF CONTRACTOR.

14. ANY MODIFICATION / REROUTING REQUIRED IN THE EXISTING POWER / CONTROL WIRING SHALL BE MADE BY THE CONTRACTOR.

15. ANY CIVIL / MECHANICAL WORK REQUIRED TO EXECUTE THE JOB, WILL BE THE RESPONSIBILITY OF CONTRACTOR.

16. THE OLD RELAYS AND PARTS WILL BE THE PROPERTY OF KE AND TO BE HAND OVER THE SAME TO THE AUTHORIZED PERSON.

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1

SERVICES FOR UNIT # 3 BOILER DUCTS ANDSERVICES FOR UNIT # 3 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

1 AU

PR# 1300042249, FG1314/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019SERVICES FOR UNIT # 3 BOILER DUCTS AND BELLOWS INSPECTION AND REPAIRING AT BQPS-1

Pre-outage check list

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

1.1 7200581

INSPECTION FOR REPAIRING OF DUCTSSCOPE OF INSPECTION OF DUCT CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

1,100 M2

1.2 7200582

INSPECTION FOR REPAIRING OF BELLOWSSCOPE OF INSPECTION OF BELLOWS CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" CUTTING OF SLIDING PLATES" CLEANING OF BELLOWS FROM DEPOSITED ASH & SOOT." INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER FOR L X B ONLY.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

1,100 JOB

1.3 7200583

FABRICATION OF BELLOWS

" 2MM SUS 304 SHEET WILL BE USED FOR BELLOW REPLACEMENT AND BIDDER WILL BE RESPONSIBLE FOR FABRICATION OF BELLOWS." BIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMED.ESTIMATED WEIGHT OF 2MM SUS 304 SHEET FOR BELLOWS REPLACEMENT ARE GIVEN IN ROWS (UNIT WISE)

1,000 JOB

1.4 7200584

WELDING OF BELLOWSWELDING WILL BE APPLIED FOR REPAIRING OF BELLOWS" WELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF BELLOW REPAIRED" ESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

750 JOB

1.5 7200585

FABRICATION OF DUCT6mm M.S SHEET WILL BE USED FOR DUCT REPLACEMENTBIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMEDESTIMATED WEIGHT OF 6 MM M.S SHEET FOR DUCTS REPLACEMENT ARE GIVEN IN ROWS ( UNIT WISE)"

1,200 JOB

REPAIRING OF DUCTWELDING WILL BE APPLIED FOR REPAIRING OF DUCTSWELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF DUCT REPAIREDESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

NOTE:PRICES GIVEN ABOVE ARE IN PKR.THE PAYMENT WILL BE ON ACTUAL BASIS FOR ALL WORK PERFORMED.THE COMPLETE DETAILS ARE IN ANNEXURE "A".ALL QUANTITIES ARE AS PER APPROX. MAY BE WORK WILL INCREASE AFTER INSPECTION.

ANNEXURE A

A. CONTRACTORS OBLIGATIONS

1. FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE BOILER FOR INSPECTION/REPAIR/REPLACEMENT OF THE ENTIRE BELLOW & DUCT.

2. REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND REMOVAL OF PROTECTIVE SHEET FROM INSIDE OF THE EXPANSION BELLOW.

3. THOROUGH JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND KE CONCERNED ENGINEERS OF EXPANSION BELLOW AND TO ASSESS THE EXTENT OF DAMAGE TO THE BELLOWS.

4. BEFORE JOINT INSPECTION, CLEANING WORK OF DUCTS AND BELLOWS SHOULD BE COMPLETED BY THE VENDOR.

5. THOROUGH JOINT INSPECTION TO BE CARRIED OUT THE CONTRACTOR & KE CONCERNED ENGINEERS FROM INSIDE OF THE DUCT AND TO ASSESS THE EXTENT OF DAMAGE OF DUCTS.

6. FABRICATION OF COMPLETE BELLOWS/PIECES OF BELLOWS ON SITE (MATERIAL SS 304 OF REQUIRED THICKNESS)

7. COMPLETE REPLACEMENT OF MAJOR DAMAGED BELLOWS WITH LOCALLY FABRICATED BELLOWS.

8. REPAIR OF BELLOWS WITH MINOR DAMAGES.

9. REPLACEMENT OF THE DETERIORATED PORTION OF DUCT BY M. S SHEET OF REQUIRED THICKNESS.

10. SATISFACTORY PERFORMANCE OF AIR LEAK TEST.

11. RE-FIXING OF INSULATION, ALUMINIUM CLADDING AND PROTECTIVE SHEET.

12. REMOVAL OF SCAFFOLDING. SHIFTING OF DAMAGED BELLOWS AT PROPER PLACE INDICATED BY KE CONCERNED ENGINEER.

13. AREA CLEANING AND SHIFTING OF SCRAPE /DEBRIS TO THE SCRAPE / DUMP YARD OR TO ANY OTHER AREA WITH IN THE BQPS-1 PREMISES DECIDED BY GM (M) OR HIS AUTHORISED ENGINEER.

14. WORKING AREA WILL BE CLEANED ON DAILY BASIS.

15. REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF GM(M), WHICH WILL BE ESSENTIALLY REQUIRED TO MAKE THE ACCESS TO THE AREA OF WORK AND THEN RE- FIXING THESE AFTER THE COMPLETION OF JOB FREE OF COST.

16. ANY WORK NOT INDICATED ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF REPLACEMENT/REPAIR WORK OF EXPANSION BELLOWS OF FLUE GAS DUCTS SHOULD BE CLAIMED TO BE INCLUDED IN THE SCOPE OF WORK.

B. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

C. OTHER SPECIFIC TERMS & CONDITIONS

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF D.G.M (BOILER) OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. THE WORK WILL BE CARRIED IN A SPECIFIED TIME GIVEN UNDER THE HEADING OF "COMPLETION PERIOD" WITH FULL STRENGTH OF HIGHLY SKILLED, EXPERIENCED AND QUALIFIED WORKERS UP TO THE ENTIRE SATISFACTION OF KESC ENGINEERS.

3. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING AS WELL AS MATERIAL HANDLING EQUIPMENTS AND SCAFFOLDING ETC. WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR.

4. ALL MATERIAL RELATED TO INSULATION& CLADDING WILL BE THE RESPONSIBILITY OF KE.

5. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY KE FREE OF COST. TO USE ELECTRICITY, WATER, AIR, THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, PIPES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

6. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

7. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

8. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

9. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

10. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS. NO COMPENSATION WILL BE PAID BY KE IN CASE OF FAILURE.

7200586 1,200 JOB1.6

11. PROPER PPES AND SAFE WORKING PROCEDURES ARE COMPLETE RESPONSIBILITY OF THE CONTRACTORS.

12. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

13. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

14. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

15. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS.

16. MOBILIZATION PERIOD MUST NOT EXCEED 48 HRS. AS INSTRUCTED BY G.M. (MAINTENANCE)

17. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE.

18. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

19. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

20. OBTAINING THE SECURITY PERMISSION FROM KE SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

21. CREDENTIAL OF WELDERS, FABRICATORS, RIGGERS AND OTHER WORKERS WILL BE VETTED BY KE ENGINEER.

22. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

23. QUALIFIED SAFETY SUPERVISOR WILL BE THE RESPONSIBILITY OF VENDOR, IF WORK WILL BE CARRIED OUT ROUND THE CLOCK, SO IT IS MANDATORY THE DEPUTATION OF SEPARATE SAFETY SUPERVISOR DAY AND NIGHT

D. COMPLETION PERIOD

THE ENTIRE JOB, INCLUDING CLEANING, DISMANTLING, REPAIRING AND ERECTION IS TO BE COMPLETED WITHIN 25 DAYS FOR EACH UNIT. IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME, WORK WILL BE CARRIED OUT IN DAY AND NIGHT SHIFTS ON DAILY BASIS IF REQUIRED; THE WORK SHALL HAVE TO BE CONTINUED ON SUNDAYS & HOLIDAYS AS WELL, WITH THE PERMISSION OF GM (M)/DGM (BOILER).

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1

HIRING SERVICES OF TECHNICAL ADVISOR FORHIRING SERVICES OF TECHNICAL ADVISOR FOR MAJOR OVERHAULING OF 247.3 MVA GENERATOR FOR BQPS-I UNIT NO.6

1 AU

1.1 7200130Normal Working Days - Technical Advisor.HIRING SERVICES OF TECHNICAL ADVISOR FOR MAJOR OVERHAULING OF 247.3 MVA GENERATOR FOR BQPS-I UNIT NO.6

15 DAY

1.2 7200130 Normal Working Days - Technical Advisor OVERTIME 4 DAY1.3 01 x TA NORMAL NIGHT SHIFT 1 DAY1.4 01 x TA OVERTIME ON NORMAL NIGHT SHIFT 1 HR1.5 7200133 Holiday Working Days -Technical Advisor for LP Rotor Shroud Cover 1 DAY1.6 7200133 Holiday Working Days -Technical Advisor OVERTIME 1 DAY

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNITHIRING THE SERVICES OF LOCAL QUALIFIED

1. VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE;a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USERb. A LIST OF TOOLS WITH CERTIFICATION PROOFc. MOBILIZATION PLANd. JOB EXECUTION PLAN INCLUDING MILE STONES2. VENDORS ARE BOUND TO;a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN POb. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE KNOWLEDGE OF:

HIRING SERVICES OF TECHNICAL ADVISOR FOR MAJOR OVERHAULING OF 247.3 MVAGENERATOR FOR BQPS-I UNIT NO.6

PR# 1300042267, FG1315/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

HIRING THE SERVICES OF LOCAL QUALIFIED CONTRACTOR / COMPANY FOR HP JET LANCING / CLEANING OF CONDENSER TUBES, UNIT # 01-06, BQPS1.

PR# 1300042397, FG1316/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

i. PERMIT TO WORK SYSTEMii. RISK ASSESSMENT3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONSi. NONCONFORMANCE OF PPESii. NONCONFORMANCE OF HOUSE KEEPINGiii. WORKING WITHOUT WORK PERMITiv. UNSAFE ACTS4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ;a. SITE FACILITY WITH REST ROOMSb. TOOL FACILITYc. LUNCH FACILITYd. WATER FACILITYe. TOILET FACILITY

1.1 7200670

HP JET LANCING / CLEANING OF CONDENSER, UNIT#01.SPECIFICATION OF CONDENSER TUBES:NO. OF TUBES: 23078INSIDE DIAMETER OF TUBES: 17.05MMLENGTH OF TUBES: 9.9M, THICKNESS OF TUBES: 1MM,MATERIAL OF TUBES: COPPER NICKEL

1 JOB

1.2 7200670

HP JET LANCING / CLEANING OF CONDENSER, UNIT #02SPECIFICATION OF CONDENSER TUBES:NO. OF TUBES: 23078INSIDE DIAMETER OF TUBES: 17.05MMLENGTH OF TUBES: 9.9M, THICKNESS OF TUBES: 1MM,MATERIAL OF TUBES: COPPER NICKEL

1 JOB

1.3 7200670

HP JET LANCING / CLEANING OF CONDENSER, UNIT #03.SPECIFICATION OF CONDENSER TUBES:NO. OF TUBES: 18202INSIDE DIAMETER OF TUBES: 19.7MMLENGTH OF TUBES: 9.4M, THICKNESS OF TUBES: 1.24MM,MATERIAL OF TUBES: COPPER NICKEL

1 JOB

1.4 7200670

HP JET LANCING / CLEANING OF CONDENSER, UNIT #04.SPECIFICATION OF CONDENSER TUBES:NO. OF TUBES: 18202INSIDE DIAMETER OF TUBES: 19.7MMLENGTH OF TUBES: 9.4M, THICKNESS OF TUBES: 1.24MM,MATERIAL OF TUBES: COPPER NICKEL

1 JOB

1 1 AU

1.5 7200670

HP JET LANCING / CLEANING OF CONDENSER,UNIT #05.SPECIFICATION OF CONDENSER TUBES:NO. OF TUBES: 21092INSIDE DIAMETER OF TUBES: 17.05MMLENGTH OF TUBES: 9.88M, THICKNESS OF TUBES: 1.0MM,MATERIAL OF TUBES: COPPER NICKEL

1 JOB

HP JET LANCING / CLEANING OF CONDENSER, UNIT #06.SPECIFICATION OF CONDENSER TUBES:NO. OF TUBES: 16948INSIDE DIAMETER OF TUBES: 19.7MMLENGTH OF TUBES: 9.88M, THICKNESS OF TUBES: 1.24MM,MATERIAL OF TUBES: COPPER NICKEL

WORK SCOPE FOR UNIT # 01-06 CONDENSER HP JET WASHING/LANCING/CLEANING:1. HARD SCALE REMOVAL OF CONDENSER TUBES.2. CONDENSER TUBES CLEANING/LANCING WILL BE REQUIRED AT 350 BARS.3. THE LANCING TIME PER TUBE WILL BE CARRIED OUT ACCORDING TO SATISFACTORILY LEVEL OF KE ENGINEER.4. ALL ACCESSORIES INCLUDING HIGH PRESSURE JET MACHINE, LANCES, NOZZLES, ETC. WILL BE RESPONSIBILITY OF VENDOR.5. THE WORK WILL BE COMPLETED IN SPECIFIED TIME.6. LANCING WILL BE CARRIED OUT THROUGH ROTATING NOZZLE TIP.7. THE VENDOR WILL ENSURE AVAILABILITY/RELIABILITY OF HIGH PRESSURE MACHINE AND ITS ACCESSORIES FOR COMPLETION OF JOB WITHIN SPECIFIED TIME.8. PLUGGED/BLOCKED TUBES WILL BE EXCLUDED.9. THE MANPOWER SHOULD BE SKILLED AND EXPERIENCED FOR SUCH HIGH PRESSURE JET LANCING/SHOOTING.10. THE WORK WILL BE CARRIED OUT IN DAY & NIGHT SHIFTS.

11. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE CONTRACTOR'S RESPONSIBILITY. KE WOULD NOT BE RESPONSIBLE FOR ANY REMEDIAL MEASURE/COMPENSATION IN CASE OF ANY ACCIDENT OF ITS EMPLOYEE DURING EXECUTION OF JOB.12. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL DISCIPLINARY MATTERS REGARDING THE MAN-POWER DEPUTED BY THEM FOR THE EXECUTION OF THE SUBJECT WORKS AND SHALL BEAR ALL THE DAMAGE / LOSSES INCURRED BY KE OR OTHERS DUE TO NEGLIGENCE / MISCONDUCT OF THEIR MANPOWER. FURTHER THE CONTRACTOR WILL BE LIABLE TO PAY AT ACTUAL THE AMOUNT CLAIMED BY THE USER DEPARTMENT OF KE TOWARDS LOSSES/DAMAGES TO MEN/MATERIAL/PROPERTY OF KE BY THEIR MANPOWER. IN CASE OF FAILURE OF THE CONTRACTOR TO PAY THE AMOUNT CLAIMED BY USER DEPARTMENT OF KE, THE SAME SHALL BE DEDUCTED AUTOMATICALLY FROM THE CONTRACTOR'S BILL, SECURITY DEPOSIT, PERFORMANCE BOND OR ANY OTHER AMOUNT PAYABLE TO THEM BY KE ON

72006701.6 1 JOB

ANY ACCOUNT.13. PRE AND POST CLEANING OF CONDENSER TUBES AND INSIDE CONDENSER CLEANING WILL BE THE RESPONSIBILITY OF VENDOR.14. ALL PPE'S AND HIGH PRESSURE JET WASHING/LANCING SUIT WILL BE RESPONSIBILITY OF VENDOR.15. WATER AND ELECTRICITY WILL BE THE RESPONSIBILITY OF K-ELECTRIC.16. THE WORK WILL BE CARRIED BETWEEN NOVEMBER 2019 TO MAY 2020.17. MOBILIZATION PERIOD/ NOTICE PERIOD IS 03 DAYS.18. ALL TAXES WILL BE APPLICABLE.NOTE: THE PAYMENT WILL BE MADE ON ACTUAL WORK COMPLETION PER JOB BASIS AND PARTIAL PAYMENT WILL BE ALLOWED.

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICES OF SPECIALIST FOR BOILER FEEDWATER PUMP OVERHAULING (01Nos.),U#05, BQPS-I

1. VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE;a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USERb. A LIST OF TOOLS WITH CERTIFICATION PROOFc. MOBILIZATION PLANd. JOB EXECUTION PLAN INCLUDING MILE STONES2. VENDORS ARE BOUND TO;a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN POb. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE KNOWLEDGE OF:

i. PERMIT TO WORK SYSTEMii. RISK ASSESSMENT3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONSi. NONCONFORMANCE OF PPESii. NONCONFORMANCE OF HOUSE KEEPINGiii. WORKING WITHOUT WORK PERMITiv. UNSAFE ACTS4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ;a. SITE FACILITY WITH REST ROOMSb. TOOL FACILITYc. LUNCH FACILITYd. WATER FACILITYe. TOILET FACILITY

SERVICES OF SPECIALIST FOR BOILER FEED WATER PUMP OVERHAULING (01Nos.),U#05, BQPS-IPR# 1300042784, FG1317/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

Services1 1 AU

1.1 7200285

Overhauling of Boiler Feed Pump (BFP)SCOPE OF WORK:

- PREPARATION- DISMANTLING- INSPECTION / ASSEMBLY- ALIGNMENT / COMMISSIONING- REPORT SUBMISSION- DISPATCH OF ONE SPECIALISTS FOR MAIN BOILER FEED WATER OVERHAULING (01 NOS. BFP'S).- 20 DAYS FOR ONE BFP FOR ONE SPECIALIST- 02 travel DAYS FOR ONE SPECIALIST

20 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICES FOR UNIT # 2 BOILER DUCTS ANDSERVICES FOR UNIT # 2 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

Pre-outage check list

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

SERVICES FOR UNIT # 2 BOILER DUCTS AND BELLOWS INSPECTION AND REPAIRING AT BQPS-1PR# 1300042260, FG1300/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

1 1 AU

1.1 7200581

INSPECTION FOR REPAIRING OF DUCTSSCOPE OF INSPECTION OF DUCT CONSISTS OF

" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

600 M2

1.2 7200582

INSPECTION FOR REPAIRING OF BELLOWSSCOPE OF INSPECTION OF BELLOWS CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" CUTTING OF SLIDING PLATES" CLEANING OF BELLOWS FROM DEPOSITED ASH & SOOT." INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER FOR L X B ONLY.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

600 JOB

1.3 7200583

FABRICATION OF BELLOWSWITH MATERIAL

" 2MM SUS 304 SHEET WILL BE USED FOR BELLOW REPLACEMENT AND BIDDER WILL BE RESPONSIBLE FOR FABRICATION OF BELLOWS." BIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMED.ESTIMATED WEIGHT OF 2MM SUS 304 SHEET FOR BELLOWS REPLACEMENT ARE GIVEN IN ROWS (UNIT WISE)

800 JOB

1.4 7200584

WELDING OF BELLOWS" WELDING WILL BE APPLIED FOR REPAIRING OF BELLOWS" WELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF BELLOW REPAIRED" ESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

500 JOB

1.5 7200585

FABRICATION OF DUCTWITH MATERIAL

6mm M.S SHEET WILL BE USED FOR DUCT REPLACEMENTBIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMEDESTIMATED WEIGHT OF 6 MM M.S SHEET FOR DUCTS REPLACEMENT ARE GIVEN IN ROWS ( UNIT WISE)"

600 JOB

1.6 7200586

REPAIRING OF DUCTWELDING WILL BE APPLIED FOR REPAIRING OF DUCTSWELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF DUCT REPAIREDESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

NOTE:

PRICES GIVEN ABOVE ARE IN PKR.THE PAYMENT WILL BE ON ACTUAL BASIS FOR ALL WORK PERFORMED.THE COMPLETE DETAILS ARE IN ANNEXURE "A".ALL QUANTITIES ARE AS PER APPROX. MAY BE WORK WILL INCREASE AFTER INSPECTION.

ANNEXURE A

A. CONTRACTORS OBLIGATIONS

1. FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE BOILER FOR INSPECTION/REPAIR/REPLACEMENT OF THE ENTIRE BELLOW & DUCT.

2. REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND REMOVAL OF PROTECTIVE SHEET FROM INSIDE OF THE EXPANSION BELLOW.

3. THOROUGH JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND KE CONCERNED ENGINEERS OF EXPANSION BELLOW AND TO ASSESS THE EXTENT OF DAMAGE TO THE BELLOWS.

4. BEFORE JOINT INSPECTION, CLEANING WORK OF DUCTS AND BELLOWS SHOULD BE COMPLETED BY THE VENDOR.

5. THOROUGH JOINT INSPECTION TO BE CARRIED OUT THE CONTRACTOR & KE CONCERNED ENGINEERS FROM INSIDE OF THE DUCT AND TO ASSESS THE EXTENT OF DAMAGE OF DUCTS.

6. FABRICATION OF COMPLETE BELLOWS/PIECES OF BELLOWS ON SITE (MATERIAL SS 304 OF REQUIRED THICKNESS)

7. COMPLETE REPLACEMENT OF MAJOR DAMAGED BELLOWS WITH LOCALLY FABRICATED BELLOWS.

8. REPAIR OF BELLOWS WITH MINOR DAMAGES.

9. REPLACEMENT OF THE DETERIORATED PORTION OF DUCT BY M. S SHEET OF REQUIRED THICKNESS.

10. SATISFACTORY PERFORMANCE OF AIR LEAK TEST.

11. RE-FIXING OF INSULATION, ALUMINIUM CLADDING AND PROTECTIVE SHEET.

12. REMOVAL OF SCAFFOLDING. SHIFTING OF DAMAGED BELLOWS AT PROPER PLACE INDICATED BY KE CONCERNED ENGINEER.

13. AREA CLEANING AND SHIFTING OF SCRAPE /DEBRIS TO THE SCRAPE / DUMP YARD OR TO ANY OTHER AREA WITH IN THE BQPS-1 PREMISES DECIDED BY GM (M) OR HIS AUTHORISED ENGINEER.

14. WORKING AREA WILL BE CLEANED ON DAILY BASIS.

15. REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF GM(M), WHICH WILL BE ESSENTIALLY REQUIRED TO MAKE THE ACCESS TO THE AREA OF WORK AND THEN RE- FIXING THESE AFTER THE COMPLETION OF JOB FREE OF COST.

16. ANY WORK NOT INDICATED ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF REPLACEMENT/REPAIR WORK OF EXPANSION BELLOWS OF FLUE GAS DUCTS SHOULD BE CLAIMED TO BE INCLUDED IN THE SCOPE OF WORK.

B. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

C. OTHER SPECIFIC TERMS & CONDITIONS

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF D.G.M (BOILER) OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. THE WORK WILL BE CARRIED IN A SPECIFIED TIME GIVEN UNDER THE HEADING OF "COMPLETION PERIOD" WITH FULL STRENGTH OF HIGHLY SKILLED, EXPERIENCED AND QUALIFIED WORKERS UP TO THE ENTIRE SATISFACTION OF KESC ENGINEERS.

3. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING AS WELL AS MATERIAL HANDLING EQUIPMENTS AND SCAFFOLDING ETC. WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR. 600 JOB

4. ALL MATERIAL RELATED TO INSULATION& CLADDING WILL BE THE RESPONSIBILITY OF KE.

5. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY KE FREE OF COST. TO USE ELECTRICITY, WATER, AIR, THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, PIPES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

6. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

7. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

8. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

9. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

10. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS. NO COMPENSATION WILL BE PAID BY KE IN CASE OF FAILURE.

11. PROPER PPES AND SAFE WORKING PROCEDURES ARE COMPLETE RESPONSIBILITY OF THE CONTRACTORS.

12. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

13. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

14. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

15. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS.

16. MOBILIZATION PERIOD MUST NOT EXCEED 48 HRS. AS INSTRUCTED BY G.M. (MAINTENANCE)

17. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE

18. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

19. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

20. OBTAINING THE SECURITY PERMISSION FROM KE SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

21. CREDENTIAL OF WELDERS, FABRICATORS, RIGGERS AND OTHER WORKERS WILL BE VETTED BY KE ENGINEER.

22. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

23. QUALIFIED SAFETY SUPERVISOR WILL BE THE RESPONSIBILITY OF VENDOR, IF WORK WILL BE CARRIED OUT ROUND THE CLOCK, SO IT IS MANDATORY THE DEPUTATION OF SEPARATE SAFETY SUPERVISOR DAY AND NIGHT

D. COMPLETION PERIOD

THE ENTIRE JOB, INCLUDING CLEANING, DISMANTLING, REPAIRING AND ERECTION IS TO BE COMPLETED WITHIN 25 DAYS FOR EACH UNIT. IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME, WORK WILL BE CARRIED OUT IN DAY AND NIGHT SHIFTS ON DAILY BASIS IF REQUIRED; THE WORK SHALL HAVE TO BE CONTINUED ON SUNDAYS & HOLIDAYS AS WELL, WITH THE PERMISSION OF GM (M)/DGM (BOILER).

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

SERVICES FOR UNIT # 4 BOILER DUCTS AND BELLOWS INSPECTION AND REPAIRING AT BQPS-1PR# 1300042262, FG1301/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

SERVICES FOR UNIT # 4 BOILER DUCTS ANDSERVICES FOR UNIT # 4 BOILER DUCTS AND BELLOWS INSPECTION ANDREPAIRING AT BQPS-1

Pre-outage check list

1. Vendors are to submit following, at least 2 weeks before commencement of outage;a. A list of skilled manpower for review of userb. A list of tools with certification proofc. Mobilization pland. Job execution plan including Mile Stones2. Vendors are bound to;a. Conduct Daily House Keeping, failing which they should be penalized in monitoring terms reflecting in POb. To appoint Safety Inspector for a group of 20 worker or above. The Safety Inspector should have an experience of 3 years and to be certified by Safety Department of BQPS-1 and must have knowledge of:

i. Permit to Work systemii. Risk assessment3. LDs on vendors shall be implemented due to following Safety violationsi. Nonconformance of PPEsii. Nonconformance of House Keepingiii. Working without Work Permitiv. Unsafe Acts4. For a group of 100 workers or more, vendors shall be bound to have their own arrangement of ;a. Site facility with Rest Roomsb. Tool facilityc. Lunch facilityd. Water facilitye. Toilet facility

1.1 7200581

INSPECTION FOR REPAIRING OF DUCTSSCOPE OF INSPECTION OF DUCT CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

600 M2

1.2 7200582

INSPECTION FOR REPAIRING OF BELLOWSSCOPE OF INSPECTION OF BELLOWS CONSISTS OF" REMOVAL OF CLADDING SHEETS" REMOVAL OF INSULATION" ERECTION OF SCAFFOLDING IF REQUIRED" CUTTING OF SLIDING PLATES" CLEANING OF BELLOWS FROM DEPOSITED ASH & SOOT." INSPECTION & CLEANING WILL BE MEASURED IN SQUARE METER FOR L X B ONLY.ESTIMATED AREAS OF DUCTS ARE GIVEN IN ROWS (UNIT WISE)

600 JOB

1 1 AU

1.3 7200583

FABRICATION OF BELLOWS

" 2MM SUS 304 SHEET WILL BE USED FOR BELLOW REPLACEMENT AND BIDDER WILL BE RESPONSIBLE FOR FABRICATION OF BELLOWS." BIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMED.ESTIMATED WEIGHT OF 2MM SUS 304 SHEET FOR BELLOWS REPLACEMENT ARE GIVEN IN ROWS (UNIT WISE)

800 JOB

1.4 7200584

WELDING OF BELLOWSWELDING WILL BE APPLIED FOR REPAIRING OF BELLOWS" WELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF BELLOW REPAIRED" ESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

500 JOB

1.5 7200585

FABRICATION OF DUCT6mm M.S SHEET WILL BE USED FOR DUCT REPLACEMENTBIDDER WILL BE PAID FOR THE WEIGHT OF SHEET CONSUMEDESTIMATED WEIGHT OF 6 MM M.S SHEET FOR DUCTS REPLACEMENT ARE GIVEN IN ROWS ( UNIT WISE)"

600 JOB

REPAIRING OF DUCTWELDING WILL BE APPLIED FOR REPAIRING OF DUCTSWELDING WILL BE MEASURED IN RUNNING METER OF THE PORTION OF DUCT REPAIREDESTIMATED RUNNING METER OF WELDING FOR REPAIRING OF BELLOWS ARE GIVEN IN ROWS (UNIT WISE)

NOTE:

PRICES GIVEN ABOVE ARE IN PKR.THE PAYMENT WILL BE ON ACTUAL BASIS FOR ALL WORK PERFORMED.THE COMPLETE DETAILS ARE IN ANNEXURE "A".ALL QUANTITIES ARE AS PER APPROX. MAY BE WORK WILL INCREASE AFTER INSPECTION.

ANNEXURE A

A. CONTRACTORS OBLIGATIONS

1. FITTING OF SCAFFOLDING FROM INSIDE AND OUTSIDE OF THE BOILER FOR INSPECTION/REPAIR/REPLACEMENT OF THE ENTIRE BELLOW & DUCT.

2. REMOVAL OF ALUMINIUM CLADDING & INSULATION FROM OUTSIDE AND REMOVAL OF PROTECTIVE SHEET FROM INSIDE OF THE EXPANSION BELLOW.

3. THOROUGH JOINT INSPECTION WILL BE CARRIED OUT BY CONTRACTOR AND KE CONCERNED ENGINEERS OF EXPANSION BELLOW AND TO ASSESS THE EXTENT OF DAMAGE TO THE BELLOWS.

4. BEFORE JOINT INSPECTION, CLEANING WORK OF DUCTS AND BELLOWS SHOULD BE COMPLETED BY THE VENDOR.

5. THOROUGH JOINT INSPECTION TO BE CARRIED OUT THE CONTRACTOR & KE CONCERNED ENGINEERS FROM INSIDE OF THE DUCT AND TO ASSESS THE EXTENT OF DAMAGE OF DUCTS.

6. FABRICATION OF COMPLETE BELLOWS/PIECES OF BELLOWS ON SITE (MATERIAL SS 304 OF REQUIRED THICKNESS)

7. COMPLETE REPLACEMENT OF MAJOR DAMAGED BELLOWS WITH LOCALLY FABRICATED BELLOWS.

8. REPAIR OF BELLOWS WITH MINOR DAMAGES.

9. REPLACEMENT OF THE DETERIORATED PORTION OF DUCT BY M. S SHEET OF REQUIRED THICKNESS.

10. SATISFACTORY PERFORMANCE OF AIR LEAK TEST.

11. RE-FIXING OF INSULATION, ALUMINIUM CLADDING AND PROTECTIVE SHEET.

12. REMOVAL OF SCAFFOLDING. SHIFTING OF DAMAGED BELLOWS AT PROPER PLACE INDICATED BY KE CONCERNED ENGINEER.

13. AREA CLEANING AND SHIFTING OF SCRAPE /DEBRIS TO THE SCRAPE / DUMP YARD OR TO ANY OTHER AREA WITH IN THE BQPS-1 PREMISES DECIDED BY GM (M) OR HIS AUTHORISED ENGINEER.

14. WORKING AREA WILL BE CLEANED ON DAILY BASIS.

15. REMOVAL OF OBSTRUCTION IF ANY, WITH THE PERMISSION OF GM(M), WHICH WILL BE ESSENTIALLY REQUIRED TO MAKE THE ACCESS TO THE AREA OF WORK AND THEN RE- FIXING THESE AFTER THE COMPLETION OF JOB FREE OF COST.

16. ANY WORK NOT INDICATED ABOVE, BUT REASONABLY REQUIRED FOR COMPLETION OF REPLACEMENT/REPAIR WORK OF EXPANSION BELLOWS OF FLUE GAS DUCTS SHOULD BE CLAIMED TO BE INCLUDED IN THE SCOPE OF WORK.

B. PRE-QUALIFICATION CONDITIONS OF THE BIDDERS

1. COPY OF VALID LICENSE FROM PAKISTAN ENGINEERING COUNCIL IN THE CATEGORY CORRESPONDING BOTH TECHNICALLY AND FINANCIALLY WITH RESPECT TO THE SUBJECT JOB.

2. THE BIDDER SHOULD HAVE 10 YEARS' EXPERIENCE OF MAINTENANCE AND REPLACEMENT WORK OF SIMILAR TYPE OF BOILER AT LEAST OF THE SAME CAPACITY. THE BIDDER SHOULD SUBMIT THE RELEVANT EXPERIENCE CERTIFICATES.

3. TITLE OF THE COMPANY WITH LOCATION OF REGISTERED OFFICE, ADDRESS OF THE OWNERS & DIRECTORS AND LIST OF ENGINEER AND OTHER TECHNICAL PERSONAL REQUIRED FOR THE ABOVE JOB ARE TO BE PROVIDED BY THE CONTRACTOR.

4. ALL COMMERCIAL TERMS & CONDITIONS FOR PREQUALIFICATION MAY BE ADDED BY THE PURCHASE DEPARTMENT AS PER PRACTICE AT THEIR OWN.

C. OTHER SPECIFIC TERMS & CONDITIONS

1. THE WORK WILL BE CARRIED OUT UNDER THE SUPERVISION OF D.G.M (BOILER) OF BQPS AND UP TO THE ENTIRE SATISFACTION OF THE AUTHORISED ENGINEER & G.M. MAINTENANCE.

2. THE WORK WILL BE CARRIED IN A SPECIFIED TIME GIVEN UNDER THE HEADING OF "COMPLETION PERIOD" WITH FULL STRENGTH OF HIGHLY SKILLED, EXPERIENCED AND QUALIFIED WORKERS UP TO THE ENTIRE SATISFACTION OF KESC ENGINEERS.

3. ALL TOOLS/FIXTURES WELDING PLANT AND CONSUMABLE APPROVED WELDING ELECTRODES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL RIGGING TOOLS, MATERIAL HANDLING AS WELL AS MATERIAL HANDLING EQUIPMENTS AND SCAFFOLDING ETC. WILL ALSO BE RESPONSIBILITY OF THE CONTRACTOR.

4. ALL MATERIAL RELATED TO INSULATION& CLADDING WILL BE THE RESPONSIBILITY OF KE.

5. ELECTRIC POWERS AND WATER & EXISTING SERVICE AIR, WHEREVER REQUIRED SHALL BE SUPPLIED BY KE FREE OF COST. TO USE ELECTRICITY, WATER, AIR, THE CONTRACTOR WILL MAKE HIS OWN ARRANGEMENTS OF CABLES, PIPES, FITTINGS, SWITCHES, CIRCUIT BREAKERS AND FUSES ETC, UNDER THE SUPERVISION OF A LICENSED ELECTRICIAN.

6. THE JOB WILL BE CARRIED OUT AS PER INSTRUCTIONS AND GUIDANCE OF D.G.M BOILER OR THROUGH HIS AUTHORIZED ENGINEER AND WILL BE COMPLETED TO HIS ENTIRE SATISFACTION.

72005861.6 600 JOB

7. THE CONTRACTOR SHALL SUBMIT WORKING PROCEDURES AND A SCHEDULE OF WORK SHOWING DURATION OF ALL ACTIVITIES TO BE CARRIED OUT AT SITE. THESE PROCEDURES AND SCHEDULE SHALL BE SUBMITTED BEFORE THE COMMENCEMENT OF WORK AND THEIR APPROVAL WILL BE OBTAINED FROM BQPS AUTHORITIES. THE REPAIR WORK SHALL BE DONE STRICTLY IN ACCORDANCE WITH THE APPROVED PROCEDURES AND SCHEDULE.

8. THE PROGRESS OF WORK SHALL BE CHECKED ON DAY-TO-DAY BASIS AS PER DAILY WORK SCHEDULE SUBMITTED BY THE CONTRACTOR.

9. CONTRACTOR SHOULD TAKE CARE OF EXISTING PIPING SYSTEM/EQUIPMENT IN THE VICINITY OF BOILER IN CASE OF ANY DAMAGE & SUBSEQUENT LOSS OF ANY PART OR EQUIPMENT, THE CONTRACTOR SHALL BE HELD RESPONSIBLE AND ANY SUCH LOSSES SHALL BE RECOVERED FROM THE CONTRACTOR'S BILL.

10. SAFETY OF THE PERSONNEL EMPLOYED BY THE CONTRACTOR WILL BE RESPONSIBILITY OF THE CONTRACTOR STANDARD SAFE WORKING PRACTICES SHALL BE FOLLOWED AND THE AUTHORIZED ENGINEER OF BQPS WILL CHECK THIS. NO COMPENSATION WILL BE PAID BY KE IN CASE OF FAILURE.

11. PROPER PPES AND SAFE WORKING PROCEDURES ARE COMPLETE RESPONSIBILITY OF THE CONTRACTORS.

12. SAFETY OF ANY MATERIAL/ EQUIPMENT HANDED OVER TO THE CONTRACTOR FOR THE ERECTION WORK SHALL BE HIS RESPONSIBILITY.

13. THE SAFETY AND SECURITY OF ALL THE EQUIPMENT PARTS AND MATERIAL ETC. BROUGHT BY THE CONTRACTOR AT BQPS SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

14. THE QUALITY AND THE QUANTITY OF ALL THE MATERIAL TOOLS AND FIXTURES TO BE USED FOR CARRYING OUT THE JOB WHEN BROUGHT ON SITE, SHALL BE CHECKED AND CERTIFIED IN WRITING BY THE AUTHORIZED ENGINEER OF BQPS.

15. PROPER QUALIFIED SITE ENGINEER/SUPERVISOR SHALL HAVE TO BE DEPUTED BY THE CONTRACTOR TO SUPERVISE THE WORK AND COORDINATE ALL SITE ACTIVITIES WITH THE RESPONSIBLE ENGINEER OF BQPS. PROPER SAFETY ENGINEER/SUPERVISOR HAS TO BE DEPUTED BY THE CONTRACTOR TO MONITOR THE SAFETY MEASURES DURING THE WORKS.

16. MOBILIZATION PERIOD MUST NOT EXCEED 48 HRS. AS INSTRUCTED BY G.M. (MAINTENANCE)

17. ANY WORK ON SUNDAY, HOLIDAYS OR OVER AND ABOVE THE PRESCRIBED DAILY WORKING HOURS, SHALL ONLY BE DONE WITH THE PRIOR APPROVAL OF G.M. MAINTENANCE.

18. THE FINAL BILL SUBMITTED BY THE CONTRACTOR SHALL ONLY BE CLEARED AFTER THE SATISFACTORILY COMPLETION OF THE ENTIRE WORK.

19. ALL THE BIDDERS SHALL HAVE TO VISIT THE SITE BEFORE SUBMITTING THEIR QUOTATION SO THAT THEY MAY HAVE AN IDEA OF THE PREVAILING SIT CONDITIONS AND THE EXACT NATURE OF WORK INVOLVED.

20. OBTAINING THE SECURITY PERMISSION FROM KE SECURITY DEPARTMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY.

21. CREDENTIAL OF WELDERS, FABRICATORS, RIGGERS AND OTHER WORKERS WILL BE VETTED BY KE ENGINEER.

22. ANY REASONABLE TERMS/CONDITIONS NOT FORESEEN AT THIS STAGE MAY BE ADDED WHEN THE CASE IS UNDER TECHNICAL EVALUATION.

23. QUALIFIED SAFETY SUPERVISOR WILL BE THE RESPONSIBILITY OF VENDOR, IF WORK WILL BE CARRIED OUT ROUND THE CLOCK, SO IT IS MANDATORY THE DEPUTATION OF SEPARATE SAFETY SUPERVISOR DAY AND NIGHT

D. COMPLETION PERIOD

THE ENTIRE JOB, INCLUDING CLEANING, DISMANTLING, REPAIRING AND ERECTION IS TO BE COMPLETED WITHIN 25 DAYS FOR EACH UNIT. IN ORDER TO COMPLETE THE ENTIRE JOB WITHIN SPECIFIED TIME, WORK WILL BE CARRIED OUT IN DAY AND NIGHT SHIFTS ON DAILY BASIS IF REQUIRED; THE WORK SHALL HAVE TO BE CONTINUED ON SUNDAYS & HOLIDAYS AS WELL, WITH THE PERMISSION OF GM (M)/DGM (BOILER).

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10031087

WALL; REAR, TYPE:SE-ER-8ENAME; REAR WALLTYPE: SE-ER-8E MAKE: ABB ALSTOM (FORMERLY TECNOMASIO ITALIANO BROWN BOVERI) ITALY

12 EA

2 10031077

LINK; FLEXIBLE W/MOVING CONTACT, 70 MM 2NAME: FLEXIBLE LINK WITH MOVING CONTACTSIZE: 16E & 24E, (SIZE: 70MM2)MAKE: ABB ALSTOM (FORMERLY TECNOMASIO ITALIANO BROWN BOVERI) ITALY

36 EA

QUOTATION WILL NOT BE ACCEPTED AFTER THE GIVEN DEADLINE DATE

Tender document containing detailed scope of work, terms and conditions may be obtained on payment of tender fee (non-refundable) from theundersigned.KE reserves the right to reject any or all the bids and to annul the bidding process at any time without thereby incurring any

Note:− Quote with the reference of the RFQ serial number and men on specs accordingly

PR# 1400024073, FG1309/BQ1, Tender Cost Rs. 2000/- To Be Opened on 26.08.2019

Payment Term: Delivery Period:Validation: 120 DaysIncoterm: Ex-works/ FOB / CFR Karachi / FOR Plant Site

PROCUREMENT OF 0.4KV SWITCHGEAR SPARES FOR UNIT 03, BQPS-1

− Quote with the reference of the RFQ serial number and men on specs accordingly− Detailed relevant Technical literature (English) must be submi ed with bid.− Quote original make & origin of all above items.− Incomplete quota ons shall not be considered for technical evalua on.− Vendors interested to par cipate in the aforesaid tender may obtain RFQ by purchasing the tender document from 1st Floor, Procurement Division (Support Building), Block-J, Elander Road (Power House) Complex, Karachi, Pakistan

General Manager (Procurement Supply Chain)

[email protected] Floor, Procurement Division (Support Building), Block-J,

Elander Road (Power House) Complex, Karachi, Pakistanwww.ke.com.pk