Clause Details Query/ Suggestion/Clarification RECL
Reply/Clarifications
1 84 Manpower Database 1 Maintain employee information
including:Employee number
Headcount by category and division on the basis of employee headount Yes
2 87 Training 1 Capability of undertaking training
need analysis for various units for
creating a training plan using
multiple tools e.g. performance
management, competency
management, training needs /
employee development part of
appraisal forms in PMS module,
succession planning, self
nomination (with approval through
proper channel) etc.
Are all employees trainees or is there specific categoy of employees who undergo training. Also
are there any addiotnal resources outside RECL who will be getting trained
Yes all employees are trainees. No external participant data to be maintained in ERP.
3 90 Employee Self Service 1 Capability to empower employees
to enter / view/ edit predefined
data regarding self e.g. updating
of personal records like Bank
details, marital status, salary
details with last employer, leave
balance, leave approval status ,
Salary details, loan etc. taken
from REC, declare investments
for tax calculation purpose,
Property returns, Leased
accommodation data, Medical
information etc. With capability of
classifying information on basis of
whether these can be not viewed
or only viewed or both viewed and
edited / entered by employees.
The console shall be in English
and Hindi.
Should manager be able to see basic details and information of employee reporting into him/her. Some fields to be allowed for viewing access to Controlling Officer. Fields to be firmed up in consultation with HR Division.
4 91 Leave Management and
Time management
1 Capability to mark attendance on-
line though the HRMS .
System to be linked to Time
management system of REC.
Summary of the exisitng time management system available at different locations Biometric Attendance system currently exists in only one or two location ; manual attendance system used in other locations
5 8 Eligibility Criteria / Pre-
qualification
1.4 We recommend the proposed ERP - HRMS product including payroll should have been
interfaced / itegrated with oracle 11i or 12i at atleast two organization to ensure that there is no
risk to RECL because of integaration issues
No Change proposed.
6 42 Evaluation &
Comparision of bids
4.14 We understand that RECL is looking for ERP - HRMS and payroll software product on the same
platform. We recommend that for financial evaluation of bid total cost of ownership including
license & integration cost should be considered
No Change proposed.
7 41 Evaluation of Technical
Bid
4.12 Is there any marks for techincal evaluation. Please clarify Refer Clause 4.12 Evaluation of Technical Bid sub clause III ; The technical evaluation committee (TEC) will evolve internal mechanishm including
marking for technical shortlisting of bidders.The bidder is required to make detailed presentation with solution demonstration before the TEC. The
TEC will also visit at least one live client installation of the proposed solution, preferably in NCR, as a part of Technical Evaluation. The scoring
detail and cut-off marks will be fixed during technical evaluation. To be informed to pre-qualified eligible bidders.
8 41 Evaluation of Technical
Bid
4.12 If there is any scoring for technical evaluation, please clarfiy would be cut-off for technical
qualification. Please clarify
Refer Clause 4.12 Evaluation of Technical Bid sub clause III ; The technical evaluation committee will evolve internal mechanishm including
marking for technical shortlisting of bidders. The scoring detail and cut-off marks will be fixed during technical evaluation. To be informed to pre-
qualified eligible bidders.
9 42 Evaluation &
Comparision of bids
4.14 Would there be any weightage given to technical scoring along with commercial in final
evaluation
Refer Clause 4.14 Evaluation and Comparison of Bids of the tender document
10 75 Annexure -E (Financial
Bid)
Table -1 We understand that RDBMS / database software to be quoted has to be full use without any
restrictions
Annexure-E : Price Schedule Table - I HRMS Software & Related Components, item no 9 & 10:
RDBMS Enterprise Edition should be read as RDBMS Enterprise Edition Full Use
11 General Would it be possible to use existing infrastructure like hardware / database / middle-ware Not Relevant
12 7 1.3 -O Provide training to IT/ ERP
Technical and support team and
other IT professionals as required
by RECL for……..
Is RECL looking at product OEM training to be provided by OEM or by bidder The bidder to provide trainings as per industry standards and as specified in the tender document. The certification training to be given by
authorized training institutes for the relevant certification.
13 15 Table – II (B) :
Broad
Components of
Work - A2
Insurance: The equipments are to
covered under transit insurance till
transfer of ownership to RECL
When tranfer of ownership will happen ?? On Acceptance of Solution by RECL
Pre-Bid Clarifications/ Addendums/ Corrigendums
TENDER NO: REC/IT/ERP(HRMS)/117/2012/8
Date: 29.01.2013
14 77 TABLE – II:
Cost of
Hardware
Type -2 Server (data base
servers)
1) How many Database server (out of 3) will be deployed in Primary and DR Site respectively.
Does the primary site deployment will have oracle RAC deployment?
One Server (Type 2: Database) to be deployed at DC / Primary Site and One Server ((Type 3: Others with single processor) at DR Site.
15 77 TABLE – II:
Cost of
Hardware
Type -2 Server (data base
servers)
How many server (out of 3-servers) will be used to host database for Test/Dev/Training
environments?
The bidder has to make complete solution with all standard instances using the servers. The solution is to be presented during the technical
presentation
16 105 C.
Specifications
of Server Type
2
CPU Speed
Intel® Xeon® E5-4640 2.4GHz,
20MB cache, 8.0 GT/s QPI,
Turbo, HT, 8Core 95W or Better
We would like to provide Intel Xeon E-2690 ; 2.9 GHz, 20 MB catche, , 8.0 GT/s QIP, Turbo, , 8
core, 135W or better. This will offer following benefits over E5-4640…..a) Better clock speed of
2.9GHz for better payroll processing ; b) TDP of 135 will provide more protection while running ;
c) E-2690 is less costlier than E-4640;
No Change proposed.
17 105 C.
Specifications
of Server Type
2
Memory Maximum - The System
has to support a maximum
Memory of 1.5TB or Higher
This should be 256GB or more No Change proposed.
18 105 C.
Specifications
of Server Type
2
HDD Required - The System
Should be Supplied with 5 Nos of
SAS 6G 15K RPM 300GB HDD to
be configured in RAID-5
4 x 300 GB 10,000 RPM Disks No Change proposed.
19 106 C.
Specifications
of Server Type
2
22. OS Certification We would like to propose Oracle Linux 5.0, Solaris OS also. No Change proposed.
20 110 F.
Specifications
of Storage
System
22. OEM vendor must meet the
following -
The implementation and on-site
support services for the duration
of the contract shall be provided
by the principle OEM responsible
for the solution
We would like to understand following …. A) Is implementation & on site support to be provided
by OEM of storage or by bidder?? B) If support is required by OEM ; is it required to be 24X7
support during entire duration of implementation or RECL would like to suggest fixed man day
OEM support (eg - 50 man day OEM support for entire duration of project.
A) OEM/ SI to implement & provide on-site Support
B) OEM to provide solution integration and Quality review services
21 110 F.
Specifications
of Storage
System
19
OS/Host support -
Industry leading Operating
System platforms including:
Windows Server® 2003, Windows
Server® 2008, RHEL-6®,
VMware®, Hyper-V®.
Should include Solaris OS also No Change proposed.
22 With respect to the RFP , We request that Oracle Linux Support to be included so that the
Partners have a freedom to quote the best Product and enable RECL to get the best product at
the lowest price
Annexure F: technical Specifications B, C, D Item 23 i.e. Operating System to be read as :
Pre-Installed with Media : Red Hat Enterprise Linux latest version with 3 Years Support / MS Windows Server 2008 Enterprise or Latest
Server Operating System / Oracle Linux latest Enterprise Server Edition
23 With respect to the RFP , Do you Need hot Patching (Patching of Kernel without Reboot which
helps in availability and security of OS layer) ?
Hot Patching is a desirable Feature
24 84 Manpower Database 1 Maintain employee information
including:Employee number
Headcount by category and division on the basis of employee headount Refer Sl No. 1 of the clarifications above
25 87 Training 1 Capability of undertaking training
need analysis for various units for
creating a training plan using
multiple tools e.g. performance
management, competency
management, training needs /
employee development part of
appraisal forms in PMS module,
succession planning, self
nomination (with approval through
proper channel) etc.
Are all employees trainees or is there specific categoy of employees who undergo training. Alos
are there any addiotnal resources outside RECL who will be getting trained
Refer Sl. No. 2 of the clarifications above
26 90 Employee Self Service 1 Capability to empower employees
to enter / view/ edit predefined
data regarding self e.g. updating
of personal records like Bank
details, marital status, salary
details with last employer, leave
balance, leave approval status ,
Salary details, loan etc. taken
from REC, declare investments
for tax calculation purpose,
Property returns, Leased
accommodation data, Medical
information etc. With capability of
classifying information on basis of
whether these can be not viewed
or only viewed or both viewed and
edited / entered by employees.
The console shall be in English
and Hindi.
Should manager be able to see basic details and information of employee reporting into him/her. Refer Sl. No. 3 of the clarifications above
27 90 The ERP application access is planned via intranet. Are there any users who would access the
application from external internet?
The application should be able to provide access to the employee through Internet Public Network
28 Does RECL have any employee/ plans to have any employee whose payroll is processed
outside Indian rules and regulations.
No
29 What is the present payroll system which is being used at RECL? Is this system also Oracle
system or provided by some other vendor?
Refer Chapter 1 of tender document
30 If the current system is payroll provided by Oracle, how are the HR transactions maintained
without the core HR module?
Centralized database created with Employee number & Name
31 Is there any present HRMS system in use at RECL? If so, is data migration part of scope of
work? If yes, kindly elaborate on the system to plan for data migration.
HR functions in manual mode with some data in MS-Word/Ms-Excel. Data Migration from manual records/ MS-excel/MS- word is in scope of work of
bidder, however data entry work will be carried out by REC. Other phases are responsibility of the bidder with assistance from REC. It is bidders
responsibility to prepare a comprehensive Data Migration strategy which REC will approve.
32 If there is no HRMS system in use, kindly elaborate if there are any data digitization/ data entry
requirement within the scope of the implementation vendor.
Scope explained above
33 RFP is silent on the name on which the tender procurement draft has to be drawn. Tender cost / Application cost of Rs 10,000/- (Rupees Ten Thousand Only) should be in the form of a Demand Draft/Banker’s cheque drawn on a
Scheduled commercial bank in the favor of ‘Rural Electrification Corporation Limited’ payable at New Delhi. Cheques, Money orders or Cash etc.
shall not be accepted and bid shall be rejected outright.
34 Kindly state the email id/ fax number for the official communication/ submission pertaining to the
tender.
35 9 Eligibility Criteria 1.4 h The bidder must be having an ISO
9001:2008 or ISO 27001:2005
and CMM/CMMi level 5
certification during any of the last
five years.
There is a vast difference between the CMM & CMMi (integrated) model of evaluation. Keeping
the quality concerns we would request you to consider bids from vendors holding valid CMMi
level bids.
No Change proposed.
36 103 Page 103, Technical
Specifications For
Server Type 1
(APPLICATION)
The system should support at
least 8 Nos of 2.5 / 3.5 inch Hot
Plug Hard Disks or Higher
Request you to kindly mention the same as For server type 1 - HDD bays should be
mentioned as 8 x 2.5" / 6 x 3.5".
No Change proposed.
37 105 Page 105, Technical
Specifications For
Server Type 2
(DATABASE)
Form Factor Rack 2U or less Form factor should be mentioned as "4U or lower" as the requirement is for 5 HDDs & 5 HDD
bays only, there will be no scope for future up gradation. Min. 8 HDD bays should be asked.
No Change proposed.
38 56 Payment Schedule 5.9 The section details the payment
schedule.
The payment schedules suggests the first payment to be scheduled after the successful testing
of the system.
However the SI would be incurring heavy costs on mainly on three counts
1. Hardware Procurement (as per specification of tender).
2. ERP license. (as per specifications of tender document)
3. ERP customization.
We would request you to modify payment terms so that the SI can recieve payments for third
party procurement after inspection of respective deliverables by RECL (namely point 1 & 2
above).
Refer Sl No. 211 of the clarifications.
39 64 Liablities to Bidder 5.18 Liabilities to Bidder RFP is ambiguous at places on the liability of the bidder in event of termination of the contract.
We would humbly request you to clarify that liability of the bidder under the contract would be
capped at contract value.
Refer Clause 5.8 : Warranty Maintainence sub clause IX Viz: "IX. The total penalty will not exceed total value of the order….."
40 84 Manpower Database 1 Maintain employee information
including:Employee number
Headcount by category and division on the basis of employee headount Refer Sl No. 1 of the clarifications above
41 87 Training 1 Capability of undertaking training
need analysis for various units for
creating a training plan using
multiple tools e.g. performance
management, competency
management, training needs /
employee development part of
appraisal forms in PMS module,
succession planning, self
nomination (with approval through
proper channel) etc.
Are all employees trainees or is there specific categoy of employees who undergo training. Alos
are there any addiotnal resources outside RECL who will be getting trained
Refer Sl. No. 2 of the clarifications above
42 90 Employee Self Service 1 Capability to empower employees
to enter / view/ edit predefined
data regarding self e.g. updating
of personal records like Bank
details, marital status, salary
details with last employer, leave
balance, leave approval status ,
Salary details, loan etc. taken
from REC, declare investments
for tax calculation purpose,
Property returns, Leased
accommodation data, Medical
information etc. With capability of
classifying information on basis of
whether these can be not viewed
or only viewed or both viewed and
edited / entered by employees.
The console shall be in English
and Hindi.
Should manager be able to see basic details and information of employee reporting into him/her. Refer Sl. No. 3 of the clarifications above
43 91 Leave Management and
Time management
1 Capability to mark attendance on-
line though the HRMS .
System to be linked to Time
management system of REC.
Summary of the exisitng time management system available at different locations Refer Sl. No. 4 of the clarifications above
44 9 Eligibility Criteria/ Pre-
qualification
g The bidder must have
successfully executed the
following ERP-HRMS software
projects for Government/ Semi
Government/ Autonomous
Organizations/ Public Sector
Utilities/ Private Sector in India as
main contractor during the last
Seven financial years ending last
day of previous month of bid
submission(Attach copy of
purchase/ work order and
successful completion certificate
from the client/ customer):
1. at least One Project of a value
of Rs 300 Lac during the last
seven financial years; OR
2. at least Two Projects of a value
of Rs 190 Lac each during the last
seven financial years;
3. at least Three Projects of a
value of Rs 150 Lac each during
the last seven financial years.
We have implemented number of end-to-end ERP projects that included HRMS as one of the
implemented modules. We would request you to please also consider such expereince relevant
against this pre-qualification criteria of the RFP. It may not be possible for us to quote
independent HRMS implementation experience.
Secondly, our implemented projects spam over global offices (including India offices) of our
customers. We would request you to please amend this criteria to allow global experience to be
quoted under the eligibility criteria.
The bidder must have successfully executed an ERP software project(s) (ERP software project(s) should include HR-ERP solution)/ERP-
HRMS for Government/ Semi Government/ Autonomous Organizations/ Public Sector Utilities/ Private Sector in India as main contractor during the
last Seven financial years as on last day of previous month of bid submission of following value(Attach copy of purchase/ work order and
successful completion certificate from the client/ customer):
1. at least One Project of a value of Rs 300 Lac during the last seven financial years; OR
2. at least Two Projects of a value of Rs 190 Lac each during the last seven financial years;OR
3. at least Three Projects of a value of Rs 150 Lac each during the last seven financial years.
45 We recommend the proposed ERP HRMS product should have been interfaced with oracle 11i
or 12i at atleast in two plant organization to ensure that there is no risk to RECL
No Change proposed.
46 6 Section 1.3 (d)
and Section 1.2
(d) (i)
DC namely ERP-DC and ERP-DR are already in place and operational, is our assumption
correct along with the certification?
ERP-DC & ERP-DR are both in place & operational. For further details refer chapter-1
47 6 Section 1.3 (d)
and Section 1.2
(d) (i)
Provide DC details in NCR/Delhi and Hyderabad.
Secondly, please advice how many local offices in Delhi/NCR would inter-connect and the mode
of connection (leased line/MPLS/etc).
Refer Chapter 1
3 offices viz: DC, CO & CO Annex via MPLS VPN Lines
48 4 Section 1.2 (d)
(ii)
WAN connectivity setup would not exceed the below locations:
o Corporate Office at Core-4, SCOPE Complex, 7 Lodi Road, New Delhi 110003, India
o Palika Bhavan annex at R K Puram, New Delhi, India
o 18 Zonal/Project Offices
o 1 Training institute (Hyderabad)
Not Relevant
49 4 Section 1.2 (d)
(v)
Tape Library - how many robotic arms does the tape library have?
What is the expected backup time frame for EBS-HRMS application/database
Would the system state backup be a part of the present server management vendor , or would it
be in preview of this RFP
T53310 Tape Library (3576-L5B)
Expected time frame of 4-6 hours however as reuired in line with latest REC Backup Policy
Under the scope of present RFP
50 4 Section 1.2 (d)
(v)
What is the tape retention policy? Expected time frame of 4-6 hours however as reuired in line with latest REC Backup Policy.
51 4 Section 1.2 (d)
(v)
What entities would be backed up ,kindly provide details , also elaborate on “etc”? Backup/Recovery includes ERP-HRMS data, ERP Payroll(Optional) data, Operating Systems, Tools, Logs,applications, etc implemented by the
bidder
52 4 Section 1.2 (d)
(v)
Backup & recovery scripts would need to be created only for EBS-HRMS , is our assumption
correct , hence test run for DR would only need to be confirmed for EBS-HRMS.
ERP-HRMS
ERP-Payroll (Optional)
53 4 Section 1.2 (d)
(vi)
Kindly suggest the helpdesk scope of work and also provide confirmation on what ticket type
would be accepted by helpdesk team ,along with the escalation matirx for technical issues
Refer Chapter 2 Table II point number 9
REC is using CA Unicentre TNG Helpdesk module
54 4 Section 1.2 (d)
(vi)
Our assumption is to provide support for L1,L2,L3 type incidents only or the HRMS instance on
EBS,if yes , provide details on the vendors for other applications and their SLA
Bidder to provide on-site application and software support during warranty maintainence period as specified in the tender document. Scope of
support as per present RFP scope.
55 4 Section 1.2 (d)
(vi)
Kindly provide incident/ticket details for the last year for non EBS related issues including
infrastructure
Not Relevant
56 4 Section 1.2 (d)
(vii)
What is the mail format/software being used? Please provide the architecture. REC presently use e-Mail Services Provided by National Informatics Centre, GOI.
57 4 Section 1.2 (d)
(vii)
Is Internet Services ,limited to bandwidth and internet availability only? Please confirm. Refer clause 1.2 sub clause (d) of the tender document
58 4 Section 1.2 (d)
(vii)
Kindly provide list of legacy systems , along with hardware and architecture details. Not Relevant
59 4 Section 1.2 (d)
(vii)
Kindly elaborate on "etc" Not Relevant
60 4 Section 1.2 (d) I Would there be a overlap on task with existing vendor , since TCS/HCL/Bharti are currently
executing Helpdesk & ERP activities , how are the task executions and ownership segregated?
Through OLA agreement with existing vendors. Also the ITSM implementation at REC follows ITILv3 model.
61 4 Section 1.2 (d) I What are the current SLA by service with each of the present vendors? Not Relevant
62 7 Section 1.3 (j) Cabling would be in scope only for the servers housing ERP-HRMS , is our assumption correct? Cabling to be done for the equipments supplied by the bidder & to connect to REC Network.
63 7 Section 1.3 (j) What are the current cabling standards being followed? Kindly provide details. EIA/ Industry cabling standards (eg T568a and T568b etc)
64 7 section 1.3 (o) Kindly provide number of members to whom training has to be provided to To all employees with a batch size of 15-20.
65 13 Section 2.1
Table II(A) (6)
Do you have any internal tools for security, vulnerability and penetration testing Bidder to use their own tools for carrying out periodic security, vulnerability and penetration testing
66 47 Section 4.16.18 What is the preferred anti-virus software currently in use? Present Anti-Virus Solution in use in REC is Trend Micro AV Enterprise.
67 Generic Tape management would not be part of scope ,is this assumption correct? No. Backup has to be taken by the bidder as per backup policy including tape management.
68 47 Section 4.16.17 All license management would be in preview of RECL,is our assumption correct? AS specified in clause 4.16.17 & clause 5.15
69 53 Section 5.5.X Since there is a penalty as well, How would we calculate risk and reward? See clause 5.5 sub clause X
70 25 Section 3.1 (d)
(vii) (xv)
What are the RPO & RTO windows for EBS-HRMS As per REC Policy.
Present values for existing ERP are:
Recovery Point Objective (RPO) : 30 minutes (Office hours), 4 hours (non office hours)
Recovery Time Objective (RTO): 1 hour 30 minutes
71 12 Section 2.1
Table I (8)
Is bi-lingual end user interface, screens and report a mandatory feature? Yes as per requirement of Department of Official Languages/ Rajbhasha, GOI.
72 Generic Please advice what is meant by "Payroll (if opted by RECL)"? Are we supposed to submit two
separate technical and financial bids? One including Payroll and the other without Payroll?
The cost of optional payroll to be specified in Annexure E: Price Schedule Table VII
73 85 Annexure F (A)
(1) Manpower
Database
How many year's historical data should be converted into new HRMS system? Data inputs since inception (last 43 years). Data input is our responsibility.
74 Generic Is current HRMS system capable of producing data extract in prescribed format for data
migration?
Present HR system is manual mode and data is in Excel/Word etc.
75 96 Annexure F (A)
(2) Payroll
Administration
How is payroll run in RECL? Is there any interface built from current Payroll system to Oracle
GL?
Existing integrated ERP System
76 Generic Do all employees use computer? All Employees have been provided with desktop/ laptop
77 87/88 Annexure F (A)
(1)Training
How are the trainings conducted? Are they online trainings or instructor based trainings? Do you
hire external trainers?
Mainly instructor based. We hire external trainers. We need a provision for online training for future use.
78 87/88 Annexure F (A)
(1) Training
Should the training module interface with payables/GL for transferring training costs? Yes
79 91 Annexure F (A)
(1) Leave
Management
and Time
management
Do you currently use in/out-time capturing devices? Yes
80 89 Annexure F (A)
(1) Promotions,
Performance
and
Competency
Management
How many appraisal cycles does RECL have? What are different types of appraisals? 1) Annual Performance Appraisal - Annual; with provision of a Mid Year Review or another review in case of transfer/ promotion. 2) Special
Performance Report - In case of probation Clearance. There are about 10-12 differnt formats for appraisals.
81 7 RFP Document
Page 7
Point (G)
Training Kindly share the locations where SI need to provide training. Will it be only at central location i.e.
Delhi or it will be across all the 9 zonal office
Please refer Annexure E: Price Schedule Table V for outstation training and payment
82 7 RFP Document
Page 7
Point (O-H)
Training Please share the composition in which OEM certification training is to be provided i.e. the no of
person to be certified for PMP, DBA, CISA, etc.
As per Annexure E : Price Schedule Table IV
83 8 RFP Document
Page 8
Point (1.4)
Eligibility
Criteria/ Pre-
qualification
Kindly allow the consortium and Experience of any consortium partner should be considered in
eligibility points of the eligibility criteria
No Change proposed.
84 13 RFP Document
Page 13
Point (9)
Helpdesk Call
Management
Please confirm:
SI will be using exiting Call Management Software.
SI will be using Existing Helpdesk Infrastructure
Si will only provide qualified resources to manage the helpdesk for new ERP-HRMS and Payroll
(Optional) module
Exisiting CA Unicentre : Helpdesk to be used
Existing helpdesk will assign all HRMS related tickets to SI
85 14 RFP Document
Page 14
Point (10)
Undertake the
following
Access Control
activities
(indicative):
Can SI use existing Directory Server. If yes, then please share the details of existing Directory
Server
Yes. LDAP is in use.
IBM (Intel Xeon)
86 14 RFP Document
Page 14
Point (13)
Undertake the
following server
administrator
activities
Can SI use existing EMS Server. If yes,then please share the details of existing EMS Server Yes. Intel Xeon - IBM X-Series
87 Miscellaneous After going through the Functional Specifications given in RFP document, we feel that following
functionality is missing in HRMS/Payment
Module:
A. Retirement module
B. Resignation module
C. Termination module
D. Officiating module
E. Increment module
F. Performance link lump sum incentives (PLLI) distribution and calculation module
H. Employees ACR/ Service Book
I. Payroll Integration with pension and
J. LOP process and integration with leave module
A to C are covered under Separation. Officiating charge should be added under the categaory of transfers and should also have a provision
under the overall organnizational structure for calculating persons reporting etc. As far as the Increment and the PLI
Module are concerned, they form a part of the Pay Module. Same is true for the Pension module. Leave, ACR
88 Retirement
Module
features
1.Functionality required in the system to alert/notify HRD when an employee is due for
retirement.
2.Option required to create an office note with retirement benefits and send the same for
approval
3.Provision required to send retirement benefit form and create a work item to accounts, payroll
and pension departments
4.Provision required to create office note and work item to admin, IT and accounts department
to collect no dues certificate
5.Option required to create work item to employee to collect required forms before retirement
date
6.Provision required to generate a covering letter to the employee along with the cheque
received from accounts/pension
7.Provision required in the system to submit the resignation online to his/her reporting manager
incase if an employee wishes to opt for pre-mature retirement
8.Option required to create a work item to HRD if someone opts for pre-mature retirement and
HRD sends for approval to take decision to the respective authority
9.Provision required in the system to update the ex-employee status as expired and work item to
be created to HRD to send the required forms to his/her spouse or dependent
10. Provision required to create a work item to pension department and send the collected forms
from employees dependents
These features shall form a part of the functional scope of HR ERP
89
1.Provision required in the system to submit the resignation online to his/her reporting manager
incase if an employee wishes to resign from the organization
2.Option required to a create work item to HRD and HRD send for approval to the competent
authority to take a decision
3.Option required to create an office note with resignation benefits and send the same for
approval
4.Provision required to send resignation benefit form and create a work item to accounts, payroll
and pension departments
5.Provision required to create office note and work item to admin, IT and accounts department
to collect no dues certificate
6.Provision required to generate a covering letter to the employee along with the cheque
received from accounts/pension department
7.Option required in the system to withdraw the resignation within 3 month from the date of
resignation
8.Provision required to capture notice period waiver details in the system and send for approval
for waiver
9.Provision required in the system to collect recovery amount from employee and generate
receipt for the same, if required
10.Option required to create a office note and send to accounts, admin, PF and pension
departments
These features shall form a part of the functional scope of HR ERP
90 Termination
Module
1.Provision required to create a termination/dismissal notice from the system and send for
approval
2.Option required to create a work item to all departments when an employee is terminated from
the services
3.Option required to create an office note with resignation benefits and send the same for
approval
4.Provision required to send resignation benefit form and create a work item to accounts, payroll
and pension departments
5.Provision required to create office note and work item to admin, IT and accounts department
to collect no dues certificate
6.Provision required to generate a covering letter to the employee along with the cheque
received from accounts/pension department
7.Option required in the system to withdraw the resignation within 3 month from the date of
resignation
8.Provision required to capture notice period waiver details in the system and send for approval
for waiver
9.Provision required in the system to collect recovery amount from employee and generate
receipt for the same, if required
10.Option required to create a office note and send to accounts, admin, PF and pension
departments
These features shall form a part of the functional scope of HR ERP
91 Officiating
Module
1.Functionality required in the system to create officiating request while applying/requesting for
leave
2.Provision required to create an office note and send for approval to the respective competent
authority
3.Provision required in the system to create a work item to HRD to change the DOP and
designation with effective dates
4.Functionality required to create an office order and intimate to all employees about the
officiating
5.Provision required to the employee to reduce or extend the officiating period through
employee portal or thru email to the respective BM/RM/HOD
6.Option required to the processing officer, BM and RM to reduce or extend the officiating period
7.Provision required to create a work item to HRD to change the DOP and designation with new
dates
8.Provision required to revoke the DOP and send notification to respective employees at the
end of officiating period
9.Option required in the system officiating for a designation/ rank/ role including or excluding
financial powers (technical inputs required)
10.Functionality required to officiate multiple employees for a same position
These features shall form a part of the functional scope of HR ERP
92 PLLI
distribution and
calculation
Module
1.Functionality required in the system to process Performance link lump sum incentives (PLLI)
for employees
2.Provision required for MOU to initiate the PLLI process by entering the score
3.Provision required in the system to capture the score (provisional and final) given by MOU for
the previous year
4.Provision required to maintain the rating (range) in the system to compare with the score to
find PLLI percentage
5.Provision required to maintain the provisional and final PLLI amount, calculated by accounts
6.Process may be required for board approval
7.Provision required to employees to print undertaking forms online
This shall form a part of functional scope of Pay module of New Payroll (Optional)
93 General General Are Payroll and CPF related functionality being taken care in Oracle 11i. Yes
94 General General What are the key pain areas with the current Payroll implementation No major challenges
95 General General Does RECL has Core HR in 11i as fully implemented or as shared mode (in shared mode, Core
HR will have minimum number of functionalities)?
HRMS is not implemented presently
96 General General Does RECL want the HRMS modules of 11i to be replaced by R12 (Upgrade) or Only new
modules (such as SSHR, Learning Management etc.) to be implemented in R12 with the
integration with 11i HRMS modules?
Present ERP in REC is Oracle Ebusiness Suite 11i
Proposed HR ERP : Latest version of quoted product.
97 General General Require more details on CPF module that has been implemented in 11i Standard CPF as per Government of India Directives
98 General General Please provide details on retirement benefits such as pension contribution, gratuity etc. Pension, Gratuity, PF, Leave Encashment, Post Retirement Medical, Group Insurance at different scales/ rates.
99 General General Please provide details on requirements of Data Migration: Volume of Data to be migrated, any
Data Digitization envisaged, Only Open Transactions to be migrated or some Historical
Migration also required.
Refer sl no. 31, 73 & Section 1.1 Chapter 1
100 General General During the support of ERP for one Year can the bidder propose onsite-offshore model No Change proposed.
101 General General The bidder can do the training through "Train the Trainer" approach and these trainers(RECL
employees) can give training to End users of RECL, Is this approach acceptable to RECL
No Change proposed.
102 General General What are the expected number of new reports to be developed as part of this engagement Refer to Chapter 3 clause 1. Project Specific Terms & Conditions of the tender document
103 General General Is there any scenario of transferring electronically the pension fund between different entities? Yes.
104 General General How will the SLA's be imposed / governed in case of failure of any Transaction / Interface /
Component / due to issue in existing ERP system ?
Through OLA agreement.
105 General General Please specify the existing Hardware being used with No. of ERP Users and the Data Volume.
This would help us size the Interfacing and Support requirements.
IBM p-5550
Approximately 335 users
106 Page 5,
Point c
Page 5, Point c We assume that all the existing Implementation documents will be readily made available to the
Vendor. Please confirm.
REC will facilitate availability of existing documents
107 General General Does RECL envision having a single, consolidated ERP + HRMS system in the future ? Not Relevant
108 General General Does RECL necessarily want a separate Application, different from the existing Oracle ERP or
can the HR modules be implemented keeping in view the existing ERP setup with Hardware
Augmentation / Hardware Upgrade (with existing seamless Integration)?
Please refer to Functional Requirement & Integration Requirement section
109 General General Is SaaS mode of Software procurement an option under consideration? No
110 Page. 7,
Point h)
and Page
8, Point f)
Page. 7, Point h) and Page 8,
Point f)
We assume that all Boarding and Lodging will be absorbed by the Vendor. However, Traveling
Expenses for the Outstation training will be borne by RECL. Please confirm.
Please refer Annexure E: Price Schedule Table V : Cost of Out location ERP-HRMS Training
111 Page. 7
Point l
Page. 7 Point l There is no Application support time window specified. Kindly provide the same. Refer Clause 2.2 Performance standard and Service Level parameters sub clause 2.2.1 ERP-HRMS Software and Related Components of the
tender document
112 Page. 86,
Point 7
Page. 86, Point 7 Will a part of the Application be exposed to the internet via a DMZ setup? Is there a requirement
for a DMZ Hardware and Environment setup ?
Refer Sl No. 27 of the clarifications above.
DMZ h/w is out of scope of this tender
113 Page. 97,
Point 13
Page. 97, Point 13 Incentive Calculation: from which system will the input data be captured for Incentive
Calculation? Will the Output of this Calculation be required to integrate with the existing Payroll
system (in case it is to be continued)? In that case, why should the Incentive be calculated in the
HR ERP at all.
Incentive calculation to be done combinedly by HRMS & Payroll. The blueprint will be designed during AS-IS & TO-BE study as per best practices &
processes
114 Page. 7,
Point h
Page. 7, Point h Will there be any specific duration of training or RECL would go by what Vendor recommends To be mutually decided
115 Page 7,
Point e
Page 7, Point e We have observed the current Db is the latest 11gR2 but the Application is not. We understand
that the Upgrade of the existing ERP and its Customizations will be out of scope. Hence, Vendor
will not be responsible for the SLAs in case any issues arise in the HR ERP due to a problem in
the existing ERP or its Customizations before or after Upgrade.
This will be taken care off by OLA.
116 Page No
85, Item
No 7
Capability to link employees with
the various Committees
(permanent or temporary)
What Committee is it referring to and how would the linkage be used in downstream processes Various commitees of employees are formed from time to time in REC. These may have a fixed tenure. This feature will help us track re-formation
due date of committees, positions that have fallen vacant / expected to fall vacant due to separation of employee(s) etc.
117 Page No
92, Item
No 2
Capability to track the physical
location of the service file by
recording the file number and
place where it is kept so that after
HRMS, no physical file movement
may be required
Require more clarification of this point HR maintains service file for Each employee in REC; this point pertains to a database of number & location of these files
118 Page No
99, Item
No 51
Raise alerts to the pre-defined
users in the event that payment of
payroll related statutory obligation
are being delayed
Needs more clarification Alerts such as data/ papers required for Income Tax etc by stipulated dates.
119 Page No
100, Item
No 71
Automatic calculation of PRP on
financial year basis based on
certain parameter, for eligibility
like MOU rating, % of Annual
Basic pay, % of PBT, and
executive performance rating.
Needs more clarification Functionality should enable calculation of PRP (variable) payout to all employees on basis of employer & employee related variables in a year/
Rates of eligibilty vary from with grades and also company/ Individual performance.
120 General General Pls specify whether Backup device such as Tape Library is also a part of this tender for both PR
& DR site. If yes, pls specify the total no. of tape drives & slots required / total amount of data to
be backed up & backup window along with backup policy
No. Bidder to utilize, configure & Implement the solution with existing solutions
121 General General Pls specify the backup software specifications also IBM Tivoli, backup licenses will be provided by RECL
122 General General Pls mention the RPO & RTO required for Disaster Recovery. Refer sl no. 70 of the clarifications above
123 Page 13
Clause 9
Helpdesk Activities Who will provide Service Desk Tool Refer sl no. 53 of the clarifications above
124 Page 14
Clause 10
Access Control Activities Will it be on the Application bidder deploys or will it be on RECL's existing Directory System? Refer sl. No. 85 of the clarifications above
125 Page 14
Clause 10
Access Control Activities Report format to be provided by RECL Formats to be mutually finalized
126 Page 14
Clause
13.6
Server Admin (Virus Cleaning) Details of AV server Refer sl. No. 66 of the clarifications above
127 Page 19
Clause
B.3
Functional Scope (point 6.1)
Performance Monitoring & Report
Will it be through tools or manual basis? Bidder to supply the software tools (Inbuild tools) to REC
128 Page 19
Clause
B.3
Functional Scope (point 6.2)
Performance Monitoring & Report
Manual log analysis will be difficult. Bidder to supply the software tools to REC, if required
129 Page 19
Clause
B.3
Functional Scope (point 8.i)
Backup & Restore
Backup platform is owned by RECL. OK
130 Page 19
Clause
B.3
Functional Scope (point 8.i)
Backup & Restore
Restoration will be a joint ownership with the existing Backup Team of the Customer Restoration will be the responsibility of the bidder during the currency of the agreement/ contract with the bidder.
131 Page 22
Section
2.2.2.4
...SLA Computation & report
Preparation with tool...
If tool is to be provided by bidder, will the Customer provide Hardware to host the same? Bidder to provide hardware.
132 Page 84
Manpower
Database
Maintain employee information
including:Employee number
Headcount by category and division on the basis of employee headount Yes, should also include multi location/ office wise data any many other criteria such as DOB, joining, retirement, qualifi, gender, caste, religion etc.
133 Page 87
Training
Capability of undertaking training
need analysis for various units for
creating a training plan using
multiple tools e.g. performance
management, competency
management, training needs /
employee development part of
appraisal forms in PMS module,
succession planning, self
nomination (with approval through
proper channel) etc.
Are all employees trainees or is there specific categoy of employees who undergo training. Alos
are there any addiotnal resources outside RECL who will be getting trained
Refer Sl No. 2 of the clarifications above
134 Page 90
Employee
Self
Service
Capability to empower employees
to enter / view/ edit predefined
data regarding self e.g. updating
of personal records like Bank
details, marital status, salary
details with last employer, leave
balance, leave approval status ,
Salary details, loan etc. taken
from REC, declare investments
for tax calculation purpose,
Property returns, Leased
accommodation data, Medical
information etc. With capability of
classifying information on basis of
whether these can be not viewed
or only viewed or both viewed and
edited / entered by employees.
The console shall be in English
and Hindi.
Should manager be able to see basic details and information of employee reporting into him/her. Refer Sl No. 3 of the clarifications above
135 Page 91
Leave
Managem
ent and
Time
managem
ent
Capability to mark attendance on-
line though the HRMS .
System to be linked to Time
management system of REC.
Summary of the exisitng time management system available at different locations Biometric Attendance system currently exists in only one or two location ; manual attendance system used in other locations
136 General General we recommend the proposed ERP HRMS product should have been interfaced with oracle 11i
or 12i at atleast in two plant organization to ensure that there is no risk to RECL
No Change proposed.
137 Page no On-site One year comprehensive
warranty maintenance and
support of supplied software
solution (ERP-HRMS & Payroll
with Integration) by certified/
qualified and trained
engineers/personnel only both at
ERP-DC & ERP-DR.
Please clearity weather hardware enginners are also required or only software/application
enginneer only
The FMS people mentioned here is for software/ application support.
138 Page no 7 Undertake cabling necessary for
system integration and overall
solution as per international
networking standards.
clearity required about the Power/UPS/LAN cabling availbility Refer sl no. 62 of the clarifications above
139 page no 7 Provide training to IT/ ERP
Technical and support team and
other IT professionals as required
by RECL for the installation,
configuration, commissioning,
monitoring, troubleshooting of
various equipments/ products,
ERP application and system &
database administration & other
aspects of the supplied
equipments and products at New
Delhi at bidder’s facilities.In
addition the following certification
training with OEM official
curriculum and OEM official
training material for each
participant along with one attempt
to appear for examination leading
to independent industry standard
and globally recognized
certification shall also be carried
out
Please specify the no of training participants for each training course Refer sl. No. 64 of the clarifications above
140 Page 111 The implementation and on-site
support services for the duration
of the contract shall be provided
by the principle OEM responsible
for the solution
Since SI has capabilities to install/Support the products, So please remove class or add
OEM/SI
No Change proposed.
141 page 114 Site failure In such a fail over
scenario, no committed
transactions in database should
be lost. Once the failed system
comes up, there should be a
scope of reverting back to the
original configuration manually
and automatically (both options)
Please specify weather site failback is required automaticallyor not? Yes
142 Pageno
36
Backup duration achievable from
the solution for each database.
Please specify the backup software and free licenses availble IBM Tivoli, backup licenses will be provided by RECL
143 Page no
116
Bidder should carry out Integration
with existing backup solution
Please specify the existing backup software. Also is bidder is required to factor the backup
licenses?
Same as point 142 of the clarifications above
144 Page no
36
RTO and RPO achievable from
the solution
Please specify the RPO value? Refer sl. No. 53 of the clarifications above
145 Page no
114
Clustering is required for all the
Database instances of the
Production Systems.
is DR Production system also needs to be configured in clustered DR system will be a single node
146 Pageno
114
Generic Please specify the compute required for DR site w.r.t to Production. The specified specification are minimum to be supported
147 21 of 122;
Clause #
2.2.1 viii)
Liquidated Damages The upper ceiling of the penalty
on the on-site comprehensive
warranty maintenance services
shall be the total amount to be
paid to the vendor for providing on-
site warranty maintenance/annual
warranty maintenance services in
a year under the contract. In case
the total penalty in a year is more
than the balance payment to be
made to the vendor during the
year REC may request the vendor
to deposit the amount with REC
with in a stipulated time period or
may revoke the performance
guarantee either in part or full to
realize the outstanding dues for
non-performance as per the
contract
The upper ceiling of the penalty on the on-site comprehensive warranty maintenance services
shall be the 5% of total amount to be paid to the vendor for providing on-site warranty
maintenance/annual warranty maintenance services in a year under the contract. In case the
total penalty in a year is more than the balance payment to be made to the vendor during the
year REC may request the vendor to deposit the amount with REC with in a stipulated time
period or may revoke the performance guarantee either in part or full to realize the outstanding
dues for non-performance as per the contract
No Change proposed.
148 22 of 122;
Clause #
2.2.2.3
Liquidated damages on
SLA
The uptime will be calculated on
monthly basis both for total uptime
as well as maximum response
time. The penalty for non-
performance by every 0.1 % of the
requirement given above or part
thereof will be 1.0 % of the total
sub-component cost
The uptime will be calculated on monthly basis both for total uptime as well as maximum
response time. The penalty for non-performance by every 0.1 % of the requirement given above
or part thereof will be 1.0 % of the total sub-component cost. The aggregate penalty for both
uptime and response time, should not exceed 5% of AMC value for the period.
No Change proposed.
149 27 of 122;
Clause # 1
f
Acceptance Criteria The acceptance plan will be drawn
up by RECL and bidder within 4
weeks of signing of the contract
Suggest to include this clause in the acceptance plan
"Services and/or deliverables shall be deemed to be fully and finally accepted by Buyer in the
event when Buyer has not submitted its acceptance or rejection response in writing to the bidder
within 15 days from the date of installation/commissioning or when Buyer uses the Deliverable
in its business, whichever occurs earlier. Parties agree that the bidder shall have 15 days time
to correct in case of any rejection by Buyer."
Not Accepted.
Modification as follows:
The acceptance plan/ use deliverable in business will be drawn up by RECL and bidder within 10 weeks of signing of the contract
150 38 of 122;
Clause #
XI.
Financial Bid Notwithstanding clause (vi) above,
RECL may solicit the bidder’s
consent to an extension of the
period of bid validity. The request
and the response thereto shall be
made in writing by fax, e-mail,
cable or telex etc. A bidder
granting the request will neither be
required nor permitted to modify
its bid, while confirming extension
of bid validity. A bidder may
refuse the request in writing to
RECL without forfeiture of its bid
security (EMD), In such a case the
bid shall be considered as
withdrawn and RECL shall
return/refund the bid security
(EMD) at the earliest to such
bidder(s). On expiry of the bid
validity period the bid shall be
deemed valid till such time the
bidder does not withdraw its bid
formally by a written
communication to RECL. The bid
shall be deemed to be valid for a
period of seven working days on
receipt of such written
communication by RECL.
Notwithstanding clause (vi) above, RECL may solicit the bidder’s consent to an extension of the
period of bid validity. The request and the response thereto shall be made in writing by fax, e-
mail, cable or telex etc. A bidder granting the request will neither be required nor permitted to
modify its bid, while confirming extension of bid validity. A bidder may refuse the request in
writing to RECL without forfeiture of its bid security (EMD), In such a case the bid shall be
considered as withdrawn and RECL shall return/refund the bid security (EMD) at the earliest to
such bidder(s). On expiry of the bid validity period the bid shall be deemed valid till such time
the bidder does not withdraw its bid formally by a written communication to RECL. The bid shall
be deemed to be valid for a period of seven working days on receipt of such written
communication by RECL.
No Change proposed.
151 46 of 122;
Clause #
4.16.12
Right of Replacement Bidder should replacea team
member only with prior approval
of RECL for whatsoever reasons.
Bidder should replace the KEY employee only with prior approval of RECL for whatsoever
reasons.
No Change proposed.
152 53 of 122;
Clause #
5.5 IX.
Pre-delivery Inspection
& Delivery
Any unjustified and unacceptable
delay in the delivery beyond the
delivery schedule as per purchase
order will render the bidder liable
for liquidated damages at the rate
of 1% (One percent) of total order
value per week or part thereof
subject to a maximum of ten
weeks and thereafter RECL holds
the option to cancel the purchase
order and forfeit the entire EMD
and/or the Security Deposit and/or
Performance Guarantee of the
defaulting bidder which may
include the deposit made against
other deliveries and/or purchase
orders, if any.
Any unjustified and unacceptable delay in the delivery beyond the delivery schedule as per
purchase order will render the bidder liable for liquidated damages at the rate of 1% (One
percent) of total order value 0.5% of value of undelivere products per week or part thereof
subject to a maximum of ten weeks and thereafter RECL holds the option to cancel the
purchase order and forfeit the entire EMD and/or the Security Deposit and/or Performance
Guarantee of the defaulting bidder which may include the deposit made against other deliveries
and/or purchase orders, if any.
No Change proposed.
153 53 of 122;
Clause #
5.5 X.
Pre-delivery Inspection
& Delivery
In addition the bidder shall also be
liable to pay RECL a cancellation
charge of 8.5% (Eight and a Half
percent) of the value of
unsupplied items. In case of non-
payment of cancellation charges
RECL reserves the right to realize
the same from the security
deposits or pending payments of
the bidder, if any, already
available with them. In such a
situation, RECL will complete the
execution of incomplete orders
through alternate sources at the
risk and cost of the defaulting
bidder. In case of RECL not
deciding on cancellation of
purchase order and/or forfeit of
EMD and/or Security deposits
and/or Performance Bank
Guarantee than RECL may levy
lost opportunity cost as a
percentage of the total purchase
order value over and above the
default late delivery penalty as
decided by RECL. The same shall
be binding on the bidder
Request for deletion of this clause for the below reasons.
1. LD is covered for delay in deliverables
2. Risk purchase will be exercised for breach
No Change proposed.
154 53 of 122;
Clause #
5.6 II.
Installation and
Commissioning
Installation and system integration
of the delivered items should be
completed within the time frame
specified in Chapter 2, failing
which Liquidated damages at the
rate of 0.2% (zero point two
percent) of purchase order value
per day subject to maximum of
10% will be imposed. Thereafter,
RECL holds the option to
complete the installation work
through alternate sources at the
risk and cost of the defaulting
bidder. Penalty for both delivery
and commissioning will be
charged simultaneously for their
respective delays.
Installation and system integration of the delivered items should be completed within the time
frame specified in Chapter 2, failing which Liquidated damages at the rate of 0.2% (zero point
two percent) of purchase order value per day week subject to maximum of 10% 5% will be
imposed. Thereafter, RECL holds the option to complete the installation work through alternate
sources at the risk and cost of the defaulting bidder. Penalty for both delivery and
commissioning will be charged simultaneously for their respective delays.
The aggregate penalty mentioned in clause 5.5 IX & 5.6. II shall not exceed 5% of order value.
No Change proposed.
155 56 of 122;
Clause #
5.9 IV
Payment Schedule 10% (Five percent) payment of
the cost of total items (excluding
Warranty Maintenance, FMS &
certification training(s) &
corresponding examination(s)
cost(s)) supplied will be made
after stabilization of the ERP
solution at site by RECL on
production of jointly signed and
sealed installation and
acceptance report
Typo error between percentage mentioned in figure & words. Clarity required. Clause 5.9 sub clause IV To be Read as:
10% (Ten percent) payment of the cost of total items (excluding Warranty Maintenance, FMS & certification training(s) & corresponding
examination(s) cost(s)) supplied will be made after stabilization of the ERP solution at site by RECL on production of jointly signed and
sealed installation and acceptance report.
156 56 of 122;
Clause #
5.9 V
Payment Schedule 2.5% (Seven and a half percent)
payment of the cost of items
(excluding Warranty Maintenance,
FMS & certification training(s) &
corresponding examination(s)
cost(s)) supplied will be made
after successful completion of
training and producing a training
completion certificate duly signed
by RECL site-in-charge/project
coordinator
Typo error between percentage mentioned in figure & words. Clarity required. Clause 5.9 sub clause V To be Read as:
2.5% (Two and a half percent) payment of the cost of items (excluding Warranty Maintenance, FMS & certification training(s) &
corresponding examination(s) cost(s)) supplied will be made after successful completion of training and producing a training completion
certificate duly signed by RECL site-in-charge/project coordinator.
157 57 of 122;
Clause #
5.10
Arbitration If any dispute (s) or differences (s)
of any kind whatsoever arise
between the Parties, the Parties
hereto shall negotiate with a view
to its amicable resolution and
settlement through a committee
appointed by CMD, REC. In the
event no amicable resolution or
settlement is reached between the
parties within 30 days after receipt
of notice by one party, then the
disputes or differences as detailed
above shall be referred to and
settled by the Sole Arbitrator to be
appointed by CMD, RECL.
If any dispute (s) or differences (s) of any kind whatsoever arise between the Parties, the Parties
hereto shall negotiate with a view to its amicable resolution and settlement through a committee
appointed by CMD, REC. In the event no amicable resolution or settlement is reached between
the parties within 30 days after receipt of notice by one party, then the disputes or differences as
detailed above shall be referred to and settled by the Sole Arbitrator to be appointed by mutual
consent of both the parties.
No Change proposed
158 62; Clause
# 5.18
TERMINATION
CLAUSE
As per RFP We cant agree to the clause. We propose alternate clause:-
Either Party shall have the right to terminate this Agreement at any time:
With Cause – in the event that the other party commits a material breach of the Agreement and
fails to cure such default to the non-defaulting party’s reasonable satisfaction within thirty (30)
days.
In the event of termination by owner, the Bidder shall be paid for the:
1. goods delivered
2. services rendered
3. work in progress
4. unpaid AMCs
5. third party orders in pipeline which cannot be cancelled despite Bidder's best efforts
6. unrecovered investments shall be paid by customer as per termination schedule
till the date of termination.
No Change proposed
159 65 of 122;
Clause #
5.19
No suspension of Work The obligations of the RECL and
the Supplier shall not be altered
by reasons of conciliation/
arbitration being conducted during
the progress of works. Neither
party shall be entitled to suspend
the work on account of
conciliation/arbitration and
payments to the Supplier shall
continue to be made in terms of
the contract. Subject to the above
including the sub-clauses that is
pending conciliation or arbitration
on any issue between the RECL
and the Supplier, it shall be
agreed that the RECL shall be
entitled to claim any amount as
reimbursement as per the claim in
writing for any works done by the
RECL from the outside agency for
the default of the Supplier in
respect of any item for which such
conciliation or arbitration as stated
above is pending and the Supplier
shall jointly and severally be liable
to pay such amount or amounts
immediately on receipt of such
demand from the RECL without
demur, and in case of the award
in such arbitration is given by the
arbitrators in favour of the
Supplier, then the amount/s under
the award shall be refunded to the
supplier , as the case may be by
the REC, immediately on receipt
of such award, if not challenged in
a court of law.
a. Risk Purchase Clause
Notwithstanding what is stated
above, it shall be agreed that the
The obligations of the RECL and the Supplier shall not be altered by reasons of conciliation/
arbitration being conducted during the progress of works. Neither party shall be entitled to
suspend the work on account of conciliation/arbitration and payments to the Supplier shall
continue to be made in terms of the contract. Subject to the above including the sub-clauses
that is pending conciliation or arbitration on any issue between the RECL and the Supplier, it
shall be agreed that the RECL shall be entitled to claim any amount as reimbursement as per
the claim in writing for any works done by the RECL from the outside agency for the default of
the Supplier in respect of any item for which such conciliation or arbitration as stated above is
pending and the Supplier shall jointly and severally be liable to pay such amount or amounts
immediately on receipt of such demand from the RECL without demur, and in case of the award
in such arbitration is given by the arbitrators in favour of the Supplier, then the amount/s under
the award shall be refunded to the supplier , as the case may be by the REC, immediately on
receipt of such award, if not challenged in a court of law.
a. Risk Purchase Clause
Notwithstanding what is stated above, it shall be agreed that the supplier (for the purpose of this
clause who shall include the implementation partner) shall be responsible to RECL for
implementation of the project and the supplier and implementation partner shall be jointly and
severally liable for all claims of RECL not more than the contract value in respect of the work
done or to be done by RECL from outside agencies for the default of the supplier or
implementation partner as the case may be, till the termination of the contract by RECL under
clause 5.18). This clause may be invoked during the period of project implementation and
maintenance period with effect from the date of signing of the contract
No Change proposed
160 Clause To
be Added
Limitation of Liability Notwithstanding anything to the contrary elsewhere contained in this or any other contract
between the parties, neither party shall, in any event, be liable for (1) any indirect, special,
punitive, exemplary, speculative or consequential damages, including, but not limited to, any
loss of use, loss of data, business interruption, and loss of income or profits, irrespective of
whether it had an advance notice of the possibility of any such damages; or (2) damages
relating to any claim that arose more than one year before institution of adversarial proceedings
thereon.
Subject to the above and notwithstanding anything to the contrary elsewhere contained herein,
the maximum aggregate liability of the bidder for all claims under or in relation to this
Agreement, shall be, regardless of the form of claim(s), shall be at actual and limited to the
twenty five percent of value of the contract.
Not Accepted.
161 Clause To
be Added
Taxes & Duties The rates stated in the Schedule of Rates shall not be subject to escalation or increase on any
account whatsoever, other than new taxes, duties, levies or new rates etc.imposed by Central or
State Government subsequent to submission of the bid.
Not Accepted.
162 Clause To
be Added
Title & Ownership CONTRACTOR assumes that the title & ownership of the goods supplied under this Contract is
passed onto Customer on delivery of the material at the Customer location.
Not Accepted.
163 Clause To
be Added
Deemed Acceptance Services and/or deliverables shall be deemed to be fully and finally accepted by Customer in
the event when Customer has not submitted its acceptance or rejection response in writing to
Bidder within 15 days from the date of installation/commissioning or when Customer uses the
Deliverable in its business, whichever occurs earlier. Parties agree that Bidder shall have 15
days time to correct in case of any rejection by Client.
Not Accepted.
164 g) Qualifcation criteria The bidder must have
successfully executed the
following ERP-HRMS software
projects for Government/ Semi
Government/ Autonomous
Organizations/ Public Sector
Utilities/ Private Sector in India as
main contractor during the last
Seven financial years ending last
day of previous month of bid
submission(Attach copy of
purchase/ work order and
successful completion certificate
from the client/ customer):
1. at least One Project of a value
of Rs 300 Lac during the last
seven financial years; OR
2. at least Two Projects of a value
of Rs 190 Lac each during the last
seven financial years;
3. at least Three Projects of a
value of Rs 150 Lac each during
the last seven financial years.
Does this criteria include only ERP purely for HRMS or it specifies ERP for which one of the
modules provided should be HRMS? An "OR" seems to be missing between points 2.
and 3.
Refer sl no. 44
165 Page 86,
6
Organisation Structure Capability to generate tree
structure giving details of all role
holders and reporting employees
(defining reporting and reviewing
relationship) at different levels like
CO , PO , ZO , department ,
organizational level etc.
What is the current organisation structure of RECL? Available on REC Website.
166 Page 86,
7
Recruitment Facility to attach documents/
credentials in soft form as a part
of the application or at any other
time as decided by the institution.
The system must generate online
application number and the
acknowledgement of receipt of
application, with a condition that
the application is subject to be
rejected if the fee has not been
paid (in case fee is applicable).
Facility for manual intervention
and subsequent responses after
verification process must be
there.
How is the fees payment done? Is it online or manually paid? Online fee payment facility is not available as on date; However HRMS should allow for both manual and online fee payment
167 Page 87,
12
Recruitment Ability to capture details of the
policy for recruitment to various
cadres in the company
What is the current recrutiment process flow? Is there any application that is currently in use? No electronic system is being used for recruitment as on date;
168 Page 88,
4
Training Capability to design selection
criteria (for employees) for various
in house/ external trainings
especially higher studies. Send
timely reminders to nominated
employees.
What is the total number of in house and external training conducted in an year? Will the
trainings be centralized or decentralized?
This varies from year to year eg. In FY '11-12 about 100 trg. programmes were conducted; in FY '12-13 about 100 trg. programmes have been
conducted till date; As on date trainings are organised in centralised manner
169 Page 88,
1
Promotion Capture and manage performance
targets in goal setting forms as
well as actual performance at
various levels - Corporate,
Departments, Regional Office,
Divisions, organizational etc.
Currently at what level is the performace targets set? Is this currently linked to the appraisal
related bonus/incentive?
Performance targets can be in terms of quality, quantity, cost / revenue, time and such other measures; Performance ratings of employees are used
for calculation of Performance related Pay and other variable pay elements
170 NA Transfer / Manpower
Allocation
General How many levels of approval is required in transfer process? Number of levels may vary over time depending on the organisational heirachy which itself varies with time. Broadly could range between 5-6 or
more some times.
171 NA Transfer / Manpower
Allocation
General Is transfer allowed to/from other government entities? What is the application requirement to
capture such records?
Yes ; records required to be maintained for these employees will be similar to those required for regualr employees in addition to other additional
records like date of absorption / repatriation, details of parent entity etc.
172 Page 91,
18
Employee Self Servide Capability to conduct on-line
employee satisfaction surveys
and generate analysis results.
How many times is the employee satisfaction survey conducted? Number of surveys / year may vary from year to year. About 3-4 or more.
173 Page 91,
1
Leave Management and
Time management
Capability to mark attendance on-
line though the HRMS .
System to be linked to Time
management system of REC.
What is the time management system used in REC? Is this common across all offices and
locations? If not, how many different system exists?
Biometric Attendance system currently exists in only one or two location ; manual attendance system used in other locations
174 Page 91,
2
Leave Management and
Time management
Capability to maintain & configure
multiple types of leave like casual,
earned, study, medical, extra-
ordinary, maternity, paternity, Half
pay leave, commuted, special
disability leave, special casual
leave, child care leave,
compensatory leave etc with
provision to define maximum and
minimum cap etc and enforce
applicable REC rules. Provision
should be there to adjust applied
leave days and actual utilized
leave days.
Please provide the list of leave types currently in use. Various leave types are as indicated in clause; However more leave types may be added to this list in future for which provision must be build into
the system
175 Page 92,
18
Leave Management and
Time management
Capability to obtain total
attendance data for any date.
What are the various Time Calendars followed? Query needs eloboration. Daily & Monthly generally. List of holidays vary from location to location.
176 Page 92,
18
Leave Management and
Time management
Capability to obtain total
attendance data for any date.
What are the various workshifts followed? there is a single workshift for all employees; However overtime is allowed
177 NA Maintenance of service
files
General What would be the volume of record uploaded and required to stored in the system? Records of all present and past employees will have to be stored
178 NA Discipline / Vigilance /
Legal Cases
General How many Discipline / Vigilance / Legal Cases are processed each year? 30 to 40 per year during recent years; However the number may vary from year to year
179 NA Benefits Module General Please provide the list of benefits currently in use. Broad benefit types have been indicated on Pg. No. 93, Clause 1; However, more benefits are added to this list each year , so a current list may be
outdated by the time work order is awarded
180 NA Performance and
Competency
Management
General Is the data available for all the tasks outlined. System will need data loaded to support this
functionality.
The data is dynamic and variable and will be provided by users.
181 Page 96,
6
Payroll Administration The system may provide for
interface to interact with / migrate
data available in the existing
system to the proposed ERP.
Currently the salary processing of
employees is taken care of by an
oracle based system. The
attendance records are
maintained through a software at
Corporate Office and also
manually. In future, there should
be a provision to interface the
attendance capturing machines
and leave management module
(of HRMS) with the ERP.
How many years of payroll data has to be migrated? Data from existing ERP will be migrated to the new system. Earlier data, if any will be provided by REC
182 NA Payroll Administration General How many payrolls exist today? As of now there is only one Payroll at REC
183 NA Payroll Administration General How many payrolls in a month? As per requirement
184 NA Payroll Administration General How many pay elements per payroll ? As per requirement
185 NA Payroll Administration General Are there any union or site specific payments? If so, can you indicate how many? As per requirement
186 NA Payroll Administration General How many offcycle payrolls are processed annually? Or monthly? As per requirement
187 NA Payroll Administration General How big is the payroll team today? Not relevant
188 NA Payroll Administration General How many people are involved in the payroll process today? Not relevant
189 NA Payroll Administration General How many days does it take to complete a paycycle processing? Not relevant
190 NA Payroll Administration General Please specify the current number of HR Users and Payroll Users Please refer sl. No. 105 of the clarifications above.
191 NA Server Specifications of Server Type 1,
Server Type 2
Can we provide the specification that is optimal for application running which could be less or
more than the configuration specified?
The specified specification are minimum to be supported
192 NA General General Should all the points in RFP be complied in full or the vendor can mention that some of the
points are not supported?
RFP Scope of work, deliverables etc and terms and conditions are to be complied in full.
193 Pg 7 Bidder Responsibilities On-site One year comprehensive
warranty maintenance and
support of supplied software
solution (ERP-HRMS & Payroll
with Integration) by certified/
qualified and trained
engineers/personnel only both at
ERP-DC & ERP-DR.
1. Do we need to have 2 persons onsite - 1 at Date center - Delhi and 1 at Disaster Recovery
site - Hyderabad? for hardware maintenance?
Do you also need person for application support onsite? What is the duration of on
site support 1 year or 3 years (point g - talks of 3 year support where as point d talks of 1 year
support).
1. The number of FMS support engineers will be decided by REC as per the quoted Price and requirements
2. The support should consist of Support Services for application, database, hardware, OS etc
3. For application support during One year onsite comprehensive warranty maintainence 2 personnel are to be deployed
4. Point d is for application software whereas Point g is for Hardware
194 Pg 7 Bidder Responsibilities Why we need to conduct this training? Training to be imparted as per clauses of tender document (Clause 1.3)
195 Pg 12 Scope of Work To provide Bilingual (English/
Hindi) End User Interfaces,
Screens & Reports as specified
and required by RECL.
Which all screens and reports need to be Bilingual? Please specifiy details . Yes. End user Input and Out put should be available bilingual.
196 Pg 13 Scope of Work Helpdesk Call Management
Activities
Is this requirement only for hardware support? Both Software and Hardware are covered
197 Pg 56 General Terms &
Conditions
Payment Schedule The payment schedule for 60% - can it be made by vendor. The schedule is one sided and
unfavourable for any vendor. Request you to modify the same.
Refer Sl No. 38 of the clarifications above
198 8 Eligibility Criteria page 8
Clause 1.4 (G)
g)The bidder must have
successfully executed the
following ERP-HRMS software
projects for Government/ Semi
Government/ Autonomous
Organizations/ Public Sector
Utilities/ Private Sector in India as
main contractor during the last
Seven financial years ending last
day of previous month of bid
submission(Attach copy of
purchase/ work order and
successful completion certificate
from the client/ customer):
g) The bidder must have successfully executed the following ERP-HRMS software projects for
Government/ Semi Government/ Autonomous Organizations/ Public Sector Utilities/ Private
Sector in India as main contractor during the last Seven financial years ending last day of
previous month of bid submission(Attach copy of purchase/ work order and successful
completion certificate from the client/ customer):
Refer Sl No. 44 of the clarifications above
199 Total Liability Clause
missing in the RFP .
Please introduce a clause limiting/capping the total liability, direct ,indirect or consequential
damages to a defined figure ,preferably equal to the value of the purchase order or maximum
Twice the Order Value.
Refer Clause 5.8 : Warranty Maintainence sub clause IX Viz: "IX. The total penalty will not exceed total value of the order….."
200 1 1.3 -O Provide training to IT/ ERP
Technical and support team and
other IT professionals as required
by RECL for……..
Is RECL looking at product OEM training to be provided by OEM or by bidder Refer Sl No. 12 of the clarifications above.
201 2 Table – II (B) : Broad
Components of Work -
A2
Insurance: The equipments are to
covered under transit insurance till
transfer of ownership to RECL
When tranfer of ownership will happen ?? On Acceptance of Solution by RECL
202 3 ANNEXURE – E: Price
Schedule
Database Requirement RECL is currently using Oracle database. Its always advisable to have same technology
platform for smooth integration at database level and better technological leverage for future.
Hence we request you to make 'Full Use Oracle database' as part of bid.
Annexure-E : Price Schedule Table - I HRMS Software & Related Components, item no 9 & 10:
RDBMS Enterprise Edition should be read as RDBMS Enterprise Edition Full Use
203 4 TABLE – II: Cost of
Hardware
Type -2 Server (data base
servers)
1) How many Database server (out of 3) will be deployed in Primary and DR Site respectively.
Does the primary site deployment will have oracle RAC deployment?
Refer Sl No. 14 of the clarifications above.
204 5 TABLE – II: Cost of
Hardware
Type -2 Server (data base
servers)
How many server (out of 3-servers) will be ne used to host database for Test/Dev/Training
environments?
Refer Sl No: 15 of the clarifications above.
205 6 C. Specifications of
Server Type 2
CPU Speed
Intel® Xeon® E5-4640 2.4GHz,
20MB cache, 8.0 GT/s QPI,
Turbo, HT, 8Core 95W or Better
We would like to provide Intel Xeon E-2690 ; 2.9 GHz, 20 MB catche, , 8.0 GT/s QIP, Turbo, , 8
core, 135W or better. This will offer following benefits over E5-4640…..a) Better clock speed of
2.9GHz for better payroll processing ; b) TDP of 135 will provide more protection while running ;
c) E-2690 is less costlier than E-4640; Further we would like to propose following specs...... 2 x
Eight-Core Intel® Xeon® E5-2690 Processors (2.9 GHz)
• 128 GB Memory (expandable to 256GB)
• Disk Controller HBA with 512MB Battery Backed Write Cache
• 4 x 300 GB 10,000 RPM Disks
• 2 x QDR (40Gb/s) Ports
• 4 x 1/10 Gb Ethernet Ports (copper)
• 2 x 10 Gb Ethernet Ports (optical)
• 1 x ILOM Ethernet Port
• 2 x Redundant Hot-Swappable Power Supplies
No Change proposed.
206 7 C. Specifications of
Server Type 2
HDD Required - The System
Should be Supplied with 5 Nos of
SAS 6G 15K RPM 300GB HDD to
be configured in RAID-5
4 x 300 GB 10,000 RPM Disks No Change proposed.
207 8 C. Specifications of
Server Type 2
22. OS Certification We would like to propose Oracle Linux 5.0, Solaris OS also. No Change proposed.
208 9 F. Specifications of
Storage System
22. OEM vendor must meet the
following -
The implementation and on-site
support services for the duration
of the contract shall be provided
by the principle OEM responsible
for the solution
We would like to understand following …. A) Is implementation & on site support to be provided
by OEM of storage or by bidder?? B) If support is required by OEM ; is it required to be 24X7
support during entire duration of implementation or RECL would like to suggest fixed man day
OEM support (eg - 50 man day OEM support for entire duration of project.
Refer Sl. No. 20 of the clarifications above.
209 10 F. Specifications of
Storage System
19
OS/Host support -
Industry leading Operating
System platforms including:
Windows Server® 2003, Windows
Server® 2008, RHEL-6®,
VMware®, Hyper-V®.
Should include Solaris OS also No Change proposed.
210 11 F Specifications of Storage System We would like to propose following server specs to be added as part of RFP............3 x Exadata
Storage Servers
X3-2:
• 36 CPU cores for SQL
processing (18 cores
enabled)
• 12 PCI flash cards (6 cards
enabled) with 2.4 TB
Exadata Smart Flash
Cache
• 18 x 600 GB 15,000 RPM
High Performance disks or
18 x 3 TB 7,200 RPM
High Capacity disks (6
disks per storage server
enabled)
No Change proposed.
211 56 Payment Schedule Clause5.9
clause II
I. No Advance Will be given
II. 60% (Seventy percent) payment of the cost of total items (excluding Warranty Maintenance,
FMS & certification training(s) & corresponding examination(s) cost(s)) will be made after ERP-
HRMS & Payroll POC testing ends and on successful delivery and inspection of all hardware,
software, network items at site & satisfactory ERP-HRMS & Payroll POC testing and successful
delivery and inspection certification by RECL site-in-charge and furnishing of required Bank
Guarantee towards performance and support services for an amount of 10% of the total order
value valid up to 60 days after warranty maintenance period. RECL at its discretion can release
part payment of items delivered to REC.
III. 25% (Twenty Five percent) payment of the cost of total items (excluding Warranty
Maintenance, FMS & certification training(s) & corresponding examination(s) cost(s)) supplied
will be made after ERP-GoLive, successful installation, configuration, commissioning,
integration and acceptance at site by RECL on production of jointly signed and sealed
installation and acceptance report.
IV. 10% (Five percent) payment of the cost of total items (excluding Warranty Maintenance,
FMS & certification training(s) & corresponding examination(s) cost(s)) supplied will be made
after stabilization of the ERP solution at site by RECL on production of jointly signed and sealed
installation and acceptance report.
V. 2.5% (Seven and a half percent) payment of the cost of items (excluding Warranty
Maintenance, FMS & certification training(s) & corresponding examination(s) cost(s)) supplied
will be made after successful completion of training and producing a training completion
certificate duly signed by RECL site-in-charge/project coordinator.
VI. 2.5% (Two and a half percent) payment of the cost of items (excluding Warranty
Maintenance, FMS & certification training(s) & corresponding examination(s) cost(s)) supplied
will be made after successful signing of Operational Level Agreement (OLA) with the other
existing ERP vendors. This will only be made after delivery and acceptance of equipments.
VII. The payment for certification training(s) & corresponding examination(s) cost(s) shall be
made on pro-rata basis on successful completion against the respective purchase orders on
submission of the required documents in order.
VIII. The payment for on-site Facilities Management Services (FMS) & Warranty Maintenance/
AMC will be made on quarterly basis on deduction of liquidated damages if any, after
completion of each quarter and submission of invoice(s) to RECL after successful completion of
services as per scope of work considering various SLAs and terms and conditions of the tender
document and certification by RECL site-in-charge/ project co-ordinator. Deductions towards
non-compliance of the SLAs, if any, will be adjusted from the respective quarterly invoice.
Payment will be released within 30 days of submission of invoice(s) and clarification of all
doubts.
IX. In case the site is not ready for installation after 60 days of delivery of full consignment,
payments shall be made on submission of site not ready certificates and submission of Security
Deposit in the form of Bank Guarantee of the amount equal to 10% of the amount of total order
values.
X. Payments shall be subject to deductions of any amount for which the Bidder is liable under
the agreement against this contract. Late delivery charges will be deducted from the first
payment itself. Similarly late installation charges will deducted from the payment due after
installation and commissioning etc. Further, all payments shall be made subjects to deduction of
TDS (Tax deduction at Source ) as per the income-Tax Act, 1961 including addendums from
time to time and any other taxes.
XI. All Payment shall be made in Indian Rupees only.
XII. No Advance Payment will be made by RECL on any account.
XIII. ED(HR), RECL or his representative would be the Engineer-In-Charge for the work and all
bills should be forwarded through him before submitting to payment. The decision of ED(HR),
RECL shall be final and binding on the Contractor.
Clause 5.9 To be Read as:
I. No Advance Will be given
II. 60% (Sixty percent) payment of the cost of total items (excluding Warranty Maintenance, FMS & certification training(s) & corresponding
examination(s) cost(s)) will be made after ERP-HRMS & Payroll POC testing ends and on successful delivery and inspection of all
hardware, software, network items at site & satisfactory ERP-HRMS & Payroll POC testing and successful delivery and inspection
certification by RECL site-in-charge and furnishing of required Bank Guarantee towards performance and support services for an amount
of 10% of the total order value valid up to 60 days after warranty maintenance period. RECL at its discretion can release part payment of
items delivered to REC.
III. 25% (Twenty Five percent) payment of the cost of total items (excluding Warranty Maintenance, FMS & certification training(s) &
corresponding examination(s) cost(s)) supplied will be made after ERP-GoLive, successful installation, configuration, commissioning,
integration and acceptance at site by RECL on production of jointly signed and sealed installation and acceptance report.
IV. 10% (Ten percent) payment of the cost of total items (excluding Warranty Maintenance, FMS & certification training(s) & corresponding
examination(s) cost(s)) supplied will be made after stabilization of the ERP solution at site by RECL on production of jointly signed and
sealed installation and acceptance report.
V. 2.5% (Two and a half percent) payment of the cost of items (excluding Warranty Maintenance, FMS & certification training(s) &
corresponding examination(s) cost(s)) supplied will be made after successful completion of training and producing a training completion
certificate duly signed by RECL site-in-charge/project coordinator.
VI. 2.5% (Two and a half percent) payment of the cost of items (excluding Warranty Maintenance, FMS & certification training(s) &
corresponding examination(s) cost(s)) supplied will be made after successful signing of Operational Level Agreement (OLA) with the other
existing ERP vendors. This will only be made after delivery and acceptance of equipments.
VII. The payment for certification training(s) & corresponding examination(s) cost(s) shall be made on pro-rata basis on successful
completion against the respective purchase orders on submission of the required documents in order.
VIII. The payment for on-site Facilities Management Services (FMS) & Warranty Maintenance/ AMC will be made on quarterly basis on
deduction of liquidated damages if any, after completion of each quarter and submission of invoice(s) to RECL after successful completion
of services as per scope of work considering various SLAs and terms and conditions of the tender document and certification by RECL
site-in-charge/ project co-ordinator. Deductions towards non-compliance of the SLAs, if any, will be adjusted from the respective quarterly
invoice. Payment will be released within 30 days of submission of invoice(s) and clarification of all doubts.
IX. In case the site is not ready for installation after 60 days of delivery of full consignment, payments shall be made on submission of site
not ready certificates and submission of Security Deposit in the form of Bank Guarantee of the amount equal to 10% of the amount of total
order values.
X. Payments shall be subject to deductions of any amount for which the Bidder is liable under the agreement against this contract. Late
delivery charges will be deducted from the first payment itself. Similarly late installation charges will deducted from the payment due after
installation and commissioning etc. Further, all payments shall be made subjects to deduction of TDS (Tax deduction at Source ) as per the
income-Tax Act, 1961 including addendums from time to time and any other taxes.
XI. All Payment shall be made in Indian Rupees only.
XII. No Advance Payment will be made by RECL on any account.
XIII. ED(HR), RECL or his representative would be the Engineer-In-Charge for the work and all bills should be forwarded through him
before submitting to payment. The decision of ED(HR), RECL shall be final and binding on the Contractor.
212 114 Annexure F H. Miscellaneous Compliance Item no. 3 : Cluster and Cluster Server LAN Stands Deleted
213 115 Annexure F H. Miscellaneous Compliance Item no. 9 : Inserted as detailed here The following stands added in Annexure F:
H. Miscellenous Compliance at sl. No. 9 :
The Quality Review services shall be provided by the bidder for integration of solution with existing ERP. It shall essentially be provided
by:
1) Existing ERP OEM viz. M/s Oracle India Pvt. Ltd. and ;
2) Proposed ERP-HRMS OEM.
The details of review to be carried out are:
a) Review of Application Design & Business Process Parameters.
b) Review of business analysis and validate the same after business analysis conducted by System Integrator(SI).
c) Review & Validate 'Gaps' that has been identified: Review / Suggest workaround solutions.
d) Review the interface requirements & Plan for Testing Phase.
e) In addition to above following needs to be carried out:
a. By existing ERP vendor viz. M/s Oracle India Pvt. Ltd at least at two stages i.e. after Design Stage (at least for 2 days) and before Go-Live
Stage (at least for 1 day) by at least One consultant with product specialization with Oracle E-Business Suite 11i Implementation
experience
i. Review Integration requirement vis-à-vis the design parameters
ii. Review the testing Plan
iii. Review & Validate Gaps that has been identified & solution provided (Application/ Workaround)
iv. etc
b. By OEM of proposed HR-ERP at least at two stages i.e. after Design Stage (at least for 2 days) and before Go-Live Stage (at least for 5
days) by at least One consultant with product specialization with Implementation experience
i. Design Review: Quality Review – devise revised gap fit and testing plan
ii. Development Review: Design & Implementation to adhere to standards.
iii. Technical Review: Analysis of Technical Implementation compliance & operation procedures e.g. security, backup, performance
management. Also do Go-Live health check
iv. Deliverables
1. Technical Quality Management
2. Technical Integration Check
3. Technical Feasibility Check
4. Information Management
5. Risk Management & Mitigation etc
214 Annexure E Price Schedule TABLE – I: ERP-HRMS Software & Related Components & TABLE – II: Cost of Hardware To be read as per the enclosed PDF file named: Revised_Table_I_and_Table_II_Annexure_E_Price_Schedule.pdf
215 Dates Extension of Date of for
Collecting tender, Submission
of bids and Opening of
technical bids
Notice for Time Extension
The extension in the last dates for collecting tender, submission of bids and opening of technical bids may be noted as below:
1) Last Date of Collecting Tender : 12.02.2013
2) Last Date of Submission of Bids : 13.02.2013, Time: Up to 1500 hours
3) Date of Opening of Technical Bids : 13.02.2013, Time: 1600 hours
Note:
1) Except for modifications, if any, as mentioned above, all other scope of work, terms & conditions, Technical & functional specifications of the tender document remain the same and shall be ipso facto applicable