BOQ Name of Work :-Construction of CC Road from H/o sh. Rajiv Babele to (DP) double pole at Magar Pur Village SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone 927.50 sqm 19.98 2 E/W in excavation in fdn. In ordinary soil etc. 12.19 cum 42.40 3 P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc. 12.19 cum 3058.40 79.50 cum 3058.40 4 1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc. 36.57 cum 4546.50 5 making subgrade in cutting or filling etc. 79.50 cum 42.40 6 S/L of 125 micron thk. Polythene sheet including labour cost etc. 795.00 sqm 16.00 7 P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc. 79.50 cum 4872.80 8 12 mm thk. Plasterin 1:4 cement F- sand mortar 159.00 sqm 148.50 9 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each. 267.00 Rm 5.00 10 S/F of angle iron sign board including painting and writing etc. 1.00 each 3000.00

Tender Dated 04/03/2013

  • Upload
    hathuan

  • View
    226

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC Road from H/o sh. Rajiv Babele to (DP) double pole at Magar Pur Village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

927.50 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

12.19 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

12.19 cum 3058.40

79.50 cum 3058.40

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

36.57 cum 4546.50

5 making subgrade in cutting or filling etc.

79.50 cum 42.40

6 S/L of 125 micron thk. Polythene sheet including labour cost etc.

795.00 sqm 16.00

7

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

79.50 cum 4872.80

8 12 mm thk. Plasterin 1:4 cement F- sand mortar

159.00 sqm 148.50

9 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

267.00 Rm 5.00

10 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 2: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC Road from H/o sh. Ramle Jamadar via. H/O Mehtab to the H/O Gyan Singh at Patha Village SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

11.73 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

11.73 cum 3143.90

76.50 cum 3143.90

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

35.19 cum 4331.00

5 making subgrade in cutting or filling etc.

76.50 cum 42.40

6 S/L of moorum in blanket coat etc.

76.50 cum 663.60

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

765.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

76.50 cum 4872.80

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

153.00 sqm 148.40

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

267.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 3: Tender Dated 04/03/2013

BOQ Name of work:-Construction of CC road from H/o sh.Durga Rajpoot via H/O Neelu Tiwari towards H/O Harish chandra rawat at Patha village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

450.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

6.9 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

6.9 cum 3358.40

45.00 cum 3358.40

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

20.7 cum 4535.75

5 making subgrade in cutting or filling etc.

45.00 cum 42.40

6 S/L of moorum in blanket coat etc.

45.00 cum 568.70

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

450.00 sqm 16.00

8 P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

45.00 cum 5128.90

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

90.00 sqm 148.90

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

150.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 4: Tender Dated 04/03/2013

BOQ Name of work :-Construction of CC road from H/o Sh. Harnarayan Yadav towards Karasdev Mandir at Sitaura village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

270.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

4.14 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

4.14 cum 3270.75

27.00 cum 3270.75

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

12.42 cum 4476.90

5 making subgrade in cutting or filling etc.

27.00 cum 42.40

6 S/L of moorum in blanket coat etc.

27.00 cum 663.90

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

270.00 sqm 16.00

8 P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

27.00 cum 5041.40

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

54.00 sqm 148.90

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

99.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 5: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from H/o Sh. Bhagirath Kushwaha via H/o Suresh parihar to the H/O Jaihari Shashtri at Khalilpura village SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

300.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

6.164 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

6.164 cum 3339.70

40.20 cum 3339.70

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

18.492 cum 4433.40

5 making subgrade in cutting or filling etc.

40.20 cum 42.40

6 S/L of moorum in blanket coat etc.

40.20 cum 695.40

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

402.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

40.20 cum 5113.00

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

80.40 sqm 149.15

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

132.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 6: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from main road towards H/O Sh. Dulichandra at Dhimarpura of Devra Khurd village SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

60.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

4.876 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

4.876 cum 3358.55

31.80 cum 3358.55

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

14.628 cum 4437.50

5 making subgrade in cutting or filling etc.

31.80 cum 42.40

6 S/L of moorum in blanket coat etc.

31.80 cum 710.45

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

318.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

31.80 cum 5123.15

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

63.60 sqm 149.40

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

120.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 7: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from H/o Bajnath Tiwari towards H/O Nand Ram Sharma at Aksev Village SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

30.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

4.6 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

9.2 cum 3243.40

30.00 cum 3243.40

4 1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

27.6 cum 4460.00

5 making subgrade in cutting or filling etc.

30.00 cum 42.40

6 S/L of moorum in blanket coat etc.

30.00 cum 605.10

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

300.00 sqm 16.00

8 P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

30.00 cum 5039.55

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

100.00 sqm 147.50

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

99.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 8: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from H/o Rai Towards H/o Ram Prasad Adhyapak at Berwai Village SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

30.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

4.6 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

9.2 cum 3317.00

30.00 cum 3317.00

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

27.6 cum 4465.30

5 making subgrade in cutting or filling etc.

30.00 cum 42.40

6 S/L of moorum in blanket coat etc.

30.00 cum 679.90

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

300.00 sqm 16.00

8 P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

30.00 cum 5089.00

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

100.00 sqm 149.60

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

99.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 9: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from H/o Ajuddi to H/o Ayodhaya and from H/o Lalaram via. Door of Ram Prasad towards H/o Khachore at grampanchayat Bhata, Block Bangra SN Item of work No. Qty unit Rate Amount

1 Dismantling of old flag stone

30.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

11.27 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

11.27 cum 3253.10

73.50 cum 3253.10

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

33.81 cum 4567.50

5 making subgrade in cutting or filling etc.

73.50 cum 42.40

6 S/L of moorum in blanket coat etc.

73.50 cum 766.20

7

S/L of 125 micron thk. Polythene sheet including labour cost etc.

735.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

73.50 cum 5036.70

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

122.50 sqm 149.60

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

240.00 Rm 5.00

11

S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 10: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from main Road to the H/o Pappu Patel at Tendua village of Gramsabha Pasrai SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

300.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

11.5 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

11.5 cum 3142.05

75.00 cum 3142.05

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

34.5 cum 4534.60

5 making subgrade in cutting or filling etc.

75.00 cum 42.40

6 S/L of moorum in blanket coat etc.

75.00 cum 672.05

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

750.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

75.00 cum 4904.50

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

125.00 sqm 149.60

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

249.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 11: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from the H/o Kalidas Pal towards 2nd H/o chhakki Pal at village Heeranagar,Block Bamore SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

30.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

4.37 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

4.37 cum 3251.85

28.50 cum 3251.85

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

13.11 cum 4354.85

5 making subgrade in cutting or filling etc.

28.50 cum 42.40

6 S/L of moorum in blanket coat etc.

28.50 cum 801.80

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

285.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

28.50 cum 5021.50

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

57.00 sqm 149.45

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

99.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 12: Tender Dated 04/03/2013

BOQ

Name of work:-Construction of CC road from the H/o Ramswarup Pal towards H/O Chaturbhuj Kori at Village Kuratha,Block Bamore SN Item of work No. Qty unit Rate Amount

1 Dismantling of old flag stone

60.00 sqm 19.98

2 E/W in excavation in fdn. In ordinary soil etc.

6.808 cum 42.40

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

6.808 cum 3290.45

44.40 cum 3290.45

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

20.424 cum 4418.05

5 making subgrade in cutting or filling etc.

44.40 cum 42.40

6 S/L of moorum in blanket coat etc.

44.40 cum 801.80

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

444.00 sqm 16.00

8 P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

44.40 cum 5060.20

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

88.80 sqm 150.60

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

150.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 13: Tender Dated 04/03/2013

BOQ

Name of work - Necessary repair ,Construction of toilet,construction of rack in the laboratory at shee Jawahar Lal Nehru Inter College Uldan SN Item of work Qty unit Rate Amount 1 Dismantling of B/W in cement mortar 0.483 cum 83.91 40.53 2 E/W in excavation in foundation in ordinary soil. 28.55 cum 42.00 1198.99 3 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge

GSB in fdn. etc.

2.22 cum 2996.70 6665.26 4 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement

sand mortar

25.38 cum 3356.29 85179.49 5 providing RCC 1:2:4 cement sand and approved GSG

4.17 cum 4794.71 20005.62 same as above but for columns 1:1.5:3 2.19 cum 6552.77 14350.96 15.40 cum 5374.07 82747.78 6 Mild steel as [email protected]% of RCC work

21.87cum 17.00 qtl 5593.82 95094.94

7 12 mm thk. Plaster 1:4 cement sand mortar 322.75 sqm 91.90 29660.73 8 P/F angle iron chaukhats 9.60 rm 1.414 qtl 6393.44 9040.32 9 Fixing of couragated iron sheet in door frames 7.2 sqm 899.00 6472.80

10 P/F door and window shutters of CP Teak woosd 1.5 inch. Thk.

fully panneled 3.6 sqm 4195.37 15103.33 fully glazed 1.8 sqm 3596.03 6472.85 11 2.5 cm thk. 1:2:4 plain cement conc. Floor with cement

approved coarse sand laid in pannels including 8 cm thk. Base conc including 3 mm thk floating coat complete for toilets

13.75 sqm 407.55 5603.81 12 Approximate cost of oxidized brass fittings with scr

ews for doors and windows etc. 5.4 sqm 799.12 4315.25

13 painting over doors and window surfaces two coats over one coat of priming paint coat 72.90x2.25

20.95 sqm 75.95 1591.15

14 Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

100.00 sqm 55.94 5594.00

15 White washing threecoats 200.00 sqm 5.19 1038.00 16 P/F water tank of capacity of 2000 L of sintax make

heavy duty.with lid and locking arrangement 1000.00 Ltr. 11.20 22400.00

17 P/F first quality white glazed orissa pattern WC pan with all required fittings including pvc cistern of capacity 10 ltrs.etc hindustan or cera or equivalent make complete item.

5 4676.00 23380.00

Page 14: Tender Dated 04/03/2013

18 P/F flat back 465 mmx355mm x265 mm size liped front urinal basin of white glazed earthen ware first quality hindustan or equivalent make isi marked with automatik flushing cistern of pvc of capacity of 5 ltr. including all fittings etc. complete item.

1 Nos. 2604.00 2604.00

19 P/F white glazed ladies urinal pot 1 Nos. 800.00 800.00 20 P/F 550mmxx400mm wash basin of white glazed

earthen ware 1st quality ISI marked hindustan,cera or equivalent make with RS or CI brackets painted white 15 mm dia. CP brass pillar cock with CP metal handle and 32 mm dia.CP brass chain with rubber plug 32 mm dia. CP brass waste standard pattern complete item.

3 Nos. 2100.00 6300.00

21 P/F 120 mm dia PVP float valve with brass rod and union complete ISI marked

1 Nos. 187.6 187.60

22 P/F CP brass Bib cocks heavy quality 15 mm dia. ISI marked complete item of work.

15 Nos. 229.60 3444.00

23 P/F 600x450 mm bevelled looking mirrir of Atul,Kiran 6.50 mm thk. Including all fittings etc . Complete item of work

2 each 560.00 1120.00

24 P/F GI pipe B class jindal,JTC make ISI marked incluting GI specials such as bends.tee , sockets , clamps etc. The rates also includes concealed GI fittings where required cutting and making dood the walls etc. complete item of work.

25 mm dia. 50.00 Rm 212.80 10640.00 20 mm dia. 60.00 Rm 168.00 10080.00 15 mm dia 100.00 Rm 142.80 14280.00 25 P/F full way brass gate valve heavy quality ISI marked

complete item of work.

25 mm dia. 1.00 Nos. 420.00 420.00 20 mm dia. 4.00 Nos. 254.80 1019.20 26 P/F GI grating 100 mm dia including cutting of floor

stone ,making surface good complete item 4 Nos. 100.00 400.00

27 P/F PVC pipe 100 mm dia. Heavy duty including all fittings adhesives T&P etc. required for proper complition of work

25 Rm 200.00 5000.00

28 P/F submersible pump 1 HP and delivery pipe of approved make,in bore hole already existing including all fittings ets required for proper complition of work.

1 each 20000.00 20000.00

Page 15: Tender Dated 04/03/2013

Construction of Mauranipur vivahghar BOQ S.N Item of work qty unit Rate Amount 1 Base concrete in 1:4:8 cement sand and 22.4-53 mm gauge

granite stone ballast 21.58 cum 2996.62 2 P/l 2.5 cm thk.1:2:4 plain CC floor over 8 cm thk base CC in

1:4:8 for plinth protection making surface good complete item as directed by engineer in charge 68.40 sqm 407.55

3 providing and laying 25mm thk. Kota stone flooring over 20 mm thk.cement mortar

285.91 sqm 855.40 4 P/F kota stone skirting 150 mm height 202.690 Rm 59.99 P/F dado of china white glazed wall tiles 147.44 sqm 1198.68 5 P/F door and window shutters of CP Teak woosd 1.5 inch.

Thk. Fully panalled 50.40 4195.37 fully glazed 25.74 sqm 3596.03 6 Approximate cost of oxidized brass fittings with scr ews for

doors and windows etc. total area of doors and windows 76.14 sqm 799.12 7 P/F 12 mm thk. And 100 mm wide pelmets with curtain rod 34.90 Rm 359.60 8 P/F galvanized mosquitos proof heavy gauge iron wire

guage with CP teak wood battens 80 mmx 10 mm complete.

22.500 sqm 799.11 9 painting over doors and window surfaces two coats over

one coat of priming paintc coat 72.90x2.25 164.03 sqm 75.95 10 P/A OBD 2 coats on interior surface of building over one

coat of cement paint 1392.611 sqm 75.95 11 P/A weather resistant /water proof paint 2 or more coats

required for proper finishing of surface over one coat of cement paint 900.85 sqm 79.91

12 P/F water tank of capacity of 2000 L of sintax make heavy duty.with lid and locking arrangement 2000.00 Ltr. 11.20

13 P/F first quality white glazed orissa pattern WC pan with all required fittings including pvc cistern of capacity 10 ltrs.etc hindustan or cera or equivalent make complete item. 7 4676.00

14 same as in item 12 but of european type 2 Nos. 5219.00

Page 16: Tender Dated 04/03/2013

15 P/F flat back 465 mmx355mm x265 mm size liped front urinal basin of white glazed earthen ware first quality hindustan or equivalent make isi marked with automatik flushing cistern of pvc of capacity of 5 ltr. including all fittings etc. complete item. 4 Nos. 2604.00

16 P/F 550mmxx400mm wash basin of white glazed earthen ware 1st quality ISI marked hindustan,cera or equivalent make with RS or CI brackets painted white 15 mm dia. CP brass pillar cock with CP metal handle and 32 mm dia.CP brass chain with rubber plug 32 mm dia. CP brass waste standard pattern complete item. 7 Nos. 2100.00

17 P/F GI pipe B class jindal,JTC make ISI marked incluting GI specials such as bends.tee , sockets , clamps etc. The rates also includes concealed GI fittings where required cutting and making dood the walls etc. complete item of work.

25 mm dia. 50.00 Rm 212.80 20 mm dia. 60.00 Rm 168.00 15 mm dia 100.00 Rm 142.80 18 P/F full way brass gate valve heavy quality ISI marked

complete item of work. 25 mm dia. 1 Nos. 420.00 20 mm dia. 4 Nos. 254.80 CP fittings. 19 P/F CP brass Bib cocks heavy quality 15 mm dia. ISI marked

complete item of work. 15 Nos. 229.60 20 P/F CP brass shower heavy quality 10 mm dia. Capted

including CP brass stop cock ISI marked complete item. 6 Nos. 344.40 21 gysers 25 ltr capacity each 2 Nos. 22 P/F 600x450 mm bevelled looking mirrir of Atul,Kiran 6.50

mm thk. Including all fittings etc . Complete item of work 6 each 560.00 23 P/F PVC pipe 150 mm dia. Heavy duty including all

necessaryfittings,adhesive,excavation ,backfiffing etc. required for proper complition of work. 70.00 Rm 300.00

24 P/F PVC pipe 100 mm dia. Heavy duty 25.00 Rm 200.00 25 P/F P trap 150 mm dia. 2.00 Nos. 150.00 26 P/F P trap 100 mm dia. 10.00 Nos. 100.00 27 P/F GI grating 100 mm dia including cutting of floor stone

,making surface good complete item 20.00 Nos. 100.00 28 P/F 120 mm dia PVP float valve with brass rod and union

complete ISI marked 1.00 Nos. 187.6 29 P/F 750mm x 20 mm size CP brass towel rail of approved

quality 6.00 each 378 30 P/F railing for stair case of MS including one coat of primer

etc. required for proper complition of work. 250 kg. 67.92 31 painting of staircase railing etc 20 sqm 75.95

Page 17: Tender Dated 04/03/2013

BOQ Name of work : Construction of shops in the gramsabha of Uldan on the vacent land owned by Zila Panchayat near bus stand

SN Item of work NO. Qty. Unit Rate Amount 1 E/W in excavation in foundation in B.C.Soil

132.03 Cum 43.95 2 PCC in 1:4:8 in foundation with cement sand and22.4-

53 mm gauge stone ballast

39.61 Cum 2996.62 3 C R Stone masonaryin 1:6 cement sand mortar

82.59 Cum 2197.57 4 RCC in 1:2:4 in plinth beam Cum 4.72 Cum 5553.87 5 1st classB/W in 1:4cement sand mortar in super

structure.

63.16 Cum 3444.12 6 RCC work in 1:2:4 in lintel beam and slab

28.89 Cum 5374.02 7 Mild steel as reinforcement Total qty. of RCC work in plinth beam,lintel beam and

slab (28.89+4.72=33.61)@1.34% 35.00 Qntl. 5593.82

8 S/F of MS fan hooks 20.00 Nos. 61.00 9 S/F of rolling shutters of approved make made of

80x1.25mmcold rolled MS: Lath interlocked throughout their entire length and joined together,having inside and outside locking arrangement complete but excluding the cost of top cover and spring.

57.60 sqm 1837.97

10 P/F of 27.5mm long wire spring grade 2 for rolling shutters

20.00 Nos. 1318.54

11 Providing and fixing top cover for rolling shutters 24.00 Rm 679.25 12 Providing and fixing ball bearing for rolling shutters 20.00 Nos. 839.07 13 12 mm thk. Plaster in 1:4 cement and sand 1017.01 sqm 91.89 14 E/W in filling in plinth including leveling dressing

,ramming etc. complete . Shops

verandah 89.24 cum 43.95 15 2.5 cm thk. Cc in 1:2:4 in flooring on8 cm thk base

concrete in 1:4:8

148.73 sqm 407.55

Page 18: Tender Dated 04/03/2013

16 as in item no 15 but without base concrete

29.76 sqm 159.82 17 s/f of 3.15 mm thk.& 22.5 mm deep glass strip

306.00 11.98 18 White washing 3 coats inside

648.60 sqm 5.19 19 finishing exterior walls,chhaja and columns witt cement

paint

201.48 sqm 79.91 20 Raised pointing 1:2 cement sand mortar below plinth 46.200 sqm 91.89

21 two coats of painting of rolling shutters(10x2.25) 202.50 sqm 75.91

21 S/F of sign board 1 Nos. 3500

Page 19: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Ghatkotra Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7 Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 20: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Dhawakar Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7

Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 21: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Saunakpura Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7 Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 22: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Nipana Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7 Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 23: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Simardha Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7 Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 24: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Sijari Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3

P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4

P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5

Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7

Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8

P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 25: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Itayal Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7

Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 26: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat Devri Singh Pura Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7 Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 27: Tender Dated 04/03/2013

BOQ Name of work: construction of RCC shade at shamshan ghat of Swyawni Vill.

SN Item of work No. Qty unit Rate Amount

1 E/W in excavation in foundation in foundation in ordinary soil.

7.84 cum 42.00

2 P/L PCC 1:4:8 cement sand and 22.40-53 mm gauge GSB in fdn. Etc.

2.35 cum

3.14 cum 2996.70

3 P/L 1st class B/W in fdn. /plinth /super str.in1:4 cement sand mortar

5.90 3356.29

4 P/L RCC 1:2:4 cement sand and16- 22.40 mm gauge GSB in footing etc.

3.84 cum 4794.71

same as above but for columns 1:1.5:3

3.89 cum 6552.77

6.18 cum 5553.87

9.55 cum 5374.07

5 Mild steel as [email protected]% of RCC work 23.46 cum

21.00 Qtl 5593.82

6 12 mm thk. Plaster 1:4 cement sand mortar

48.75 sqm 91.90

7 Finishing walls /surfaces two coats with water proof cement paint of approved make and quality

250.00 sqm 55.94

8 P/L PCC 1:3:6 cement sand and 40 mm gauge approved stone ballast

7.28 Cum 3396.25

9 providing and fixing sign board including paintin and writing etc

1 each 3000.00

Page 28: Tender Dated 04/03/2013

BOQ Name of work : Construction of boundary wall on the land of zila panchayat at Uldan Bus stand S.N. Item of work Qty. Unit Rate Amount

1 E/W in excavation in foundation in B.C.Soil 62.40 Cum 43.95

2 PCC in 1:4:8 in foundation with cement sand and22.4-53 mm gauge stone ballast

18.72 Cum 3076.60

3 C R Stone masonaryin 1:6 cement sand mortar 33.28 Cum 2197.57

4 1st classB/W in 1:4 cement sand mortar in super structure.

54.44 Cum 3356.22

5 12mm thk.plaster 1:4 cement sand mortar

894.63 sqm 91.89 7 white washing 3 coats 890.95 sqm 5.19

8 P/F of mild steel gate of approximate weight of 160 kg of size 2.00 m x2.00m 1.50 qtl 6792.50

9 painting of gate with approved quality and shade etc.two coats over one coat of primer 12.00 67.92

10 P/F of angle iron sign board including painting and writing etc. 1.00 No. 3000.00

Page 29: Tender Dated 04/03/2013

BOQ Name of work : Remaining work of Construction of Vivah ghar at Mouranipur ,(Electrification )

S.N. Item of work Qty. Unit Rate Amount

1

Wring points for light 1.0mm2 FR PVC pipe multi strand copper wire etc.

a. Light points one way b. Light point two way c. Ceiling fan points d. Plug points

74.00 02.00 14.00 16.00

Each Each Each Each

432.00 546.00 495.00 231.00

2 S/F of power plug 15A/240V with flush type switch etc. 07 Each 232.00 1624.00

3

S/F of following size sub main PVC pipe etc. a. 2.5 mm2 2 wire copper sub main b. 6.0 mm2------- c. 10.0 mm2 4 wire -----

120 45 10

RM RM RM

102.00 178.00 480.00

4 S/F of 32 A 450V TPN Cat B 1.00 Each 1626.00

5 S/F of 32A 32 Pole C/O Switch 1.00 Each 1768.00 6 S/F of 32A wall bracaket Cat A 18.00 Each 597.00

7 S/F of HPF Ex- type feting with tube Cat A 4A 25.00 Each 760.00

8 S/F of bulk head fixing etc. 8.00 Each 7140.00

9 S/F earthling for 440V 1.00 Each 4055.00

10

S/F 2 Nos 8WC GI wire for earthling complete 20 RM 144.00

11

S/F of 1X85 W CFL Street fiting with 85 CFL Complete 6.00 Each 2650.00

12 S/F fancy type round sieling feting with 1X18W CFL comp. 6.00 Each 836.00

13 S/F of 12 ways PNDB with 10 Nos 6 A to 30 A SPMCB Etc. 3.00 Each 2930.00

14 S/F GI Shutter with making hole and fixing of MS drum etc. 3.00 Each 1094.00

Page 30: Tender Dated 04/03/2013

BOQ Name of work : Repair of road for Bhitora Uldan Link Road Km 1&2 (0.283-1.800)

S.N. Item of work Qty. Unit Rate Amount

1

P/L 7.5 cm compacted layer of WBM grade-2 with 40-63 mm gauge GSB etc. 10 cm loose

8.07 Cum 1663.50

2

P/L 7.5 cm compacted layer of WBM grade-2 with 24. 40-53 mm gauge GSB etc. 10 cm loose 20.29 Cum 1714.20

3 1St coat bitumen painting P1 with road roller etc. 4551.00 sqm 123.40

4 2nd coat bitumen painting P2 with road roller etc. 4551.00 sqm 71.05

5 S/F of angle iron sign board including painting and writing etc. 1 NO. 3000.00

Page 31: Tender Dated 04/03/2013

BOQ Name of work : Repair/Renewal of road for Bhitora Uldan Road Km 2&3 (1.80-3.00)

S.N. Item of work Qty. Unit Rate Amount

1

P/L 7.5 cm compacted layer of WBM grade-2 with 24. 40-53 mm gauge GSB etc. 10 cm loose 27.15 Cum 1725.00

2 1St coat bitumen painting P1 with road roller etc. 3600.00 sqm 123.50

3 2nd coat bitumen painting P2 with road roller etc. 3600.00 sqm 71.10

4 E/W in embankments in BC soil including ramming. 360.00 cum 42.00

5 S/F of angle iron sign board including painting and writing etc. 1 NO. 3000.00

Page 32: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC Road in abadi portion from Ber ka khirak toHanuman Khirak road

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

6.12 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

4.59 cum 2913.13

30.60 cum 2913.13

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

14.07 cum 4489.94

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

cum

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

280.50 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

44.51 cum 4706.67

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

10.20 sqm 148.98

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

93.50 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 33: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road F/h plool singh yadav to H/o surendra munshi at chirgaon Dehat

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

6.90 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

5.29 cum 2811.96

34.50 cum 2811.96

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

14.548 cum 4201.60

5 making subgrade in cutting or filling etc.

34.50 cum 42.00

6 S/L of moorum in blanket coat

34.50 cum 482.60

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

345.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

37.15 cum 4593.83

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

57.50 sqm 144.90

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

108.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 34: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o bhabar pahelvan to jalnigam road

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

20.00 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

15.00 cum 2935.03

30.50 cum 2935.03

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

41.40 cum 4499.10

5 making subgrade in cutting or filling etc.

70.00 cum 42.00

6 S/L of moorum in blanket coat

cum

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

305.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

33.95 cum 4746.29

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

166.00 sqm 150.94

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

102 00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

12 e/w in filling

55.00 cum 112.16

Page 35: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o mahipal singh yadav to H/o mangal singh yadav at simrabari subhashnagar

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

14.42 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

10.81 cum 2853.16

21.63 cum 2853.16

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

28.43 cum 4326.59

5 making subgrade in cutting or filling etc.

21.63 cum 42.00

6 S/L of moorum in blanket coat

cum

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

216.30 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

22.81 cum 4664.75

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

47.38 sqm 150.02

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

69.99 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 36: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o Badam singh to H/o Hukum singh singh at coat village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

22.83 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

17.12 cum 2984.29

48.54 cum 2984.29

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

40.53 cum 4422.50

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

48.54 cum 650.70

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

485.40 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

50.93 cum 4879.80

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

sqm

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

155.90 Rm 5.00

11

S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 37: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o sitaram parihar to H/o malkhan singh kushwaha at Palar village bada gaon

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

4.20 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

3.15 cum 2959.84

21.00 cum 2959.84

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

9.66 cum 4344.05

5 making subgrade in cutting or filling etc.

24.50 cum 42.00

6 S/L of moorum in blanket coat

21.00 cum 619.10

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

175.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

20.85 cum 4743.18

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

14.00 sqm 148.31

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

58.33 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 38: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from rqjapur road towards H/o lakhan kushwaha at raksa village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

495.00 sqm 19.97

2 E/W in excavation in fdn. In ordinary soil etc.

30.80 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

23.10 cum 2997.21

57.20 cum 2997.21

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

60.72 cum 4449.85

5 making subgrade in cutting or filling etc.

88.00 cum 42.00

6 S/L of moorum in blanket coat

cum

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

572.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

59.73 cum 4794.81

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

365.20 sqm 149.99

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

190.66 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 39: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from khailar main road to H/o kashiram ahirwar moh. Isai chauki village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

sqm

2 E/W in excavation in fdn. In ordinary soil etc.

22.68 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

17.01 cum 2856.75

cum

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

44.71 cum 4445.85

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

cum

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

sqm

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

62.04 cum 4667.27

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

268.92 sqm 150.14

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

194.40 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 40: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o dharendra yadav to H/o narendra yadav at khailar village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

sqm

2 E/W in excavation in fdn. In ordinary soil etc.

cum

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

cum

cum

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

9.20 cum 4445.85

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

cum

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

468.75 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

50.01 cum 4667.27

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

100.00 sqm 150.14

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

160.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 41: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o pankaj to H/o abdul ,hat pad at pipra village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

sqm

2 E/W in excavation in fdn. In ordinary soil etc.

20.00 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

14.55 cum 2893.90

30.00 cum 2893.90

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

40.02 cum 4238.79

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

30.00 cum 376.40

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

300.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

33.22 cum 4701.00

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

166.00 sqm 145.79

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

99.99 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

12 E/W in filling

43.20 cum 112.16

Page 42: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/omunna savita towards the temple of shankarji at chirgaon

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

sqm

2 E/W in excavation in fdn. In ordinary soil etc.

cum

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

7.50 cum 2811.96

cum

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

7.73 cum 4201.60

5 making subgrade in cutting or filling etc.

0.30 cum 42.00

6 S/L of moorum in blanket coat

28.80 cum 482.60

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

75.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

8.33 cum 4593.83

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

18.00 sqm 144.90

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

150.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 43: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from khairapat mandir towards H/O lakhu ahirwar sat gram panchayat varoda moth

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

sqm

2 E/W in excavation in fdn. In ordinary soil etc.

2.40 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

1.80 cum 374.17

10.00 cum 374.17

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

4.60 cum 449.25

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

10.00 cum 672.30

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

100.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

10.92 cum 4667.79

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

8.00 sqm 145.91

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

20.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 44: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o balwan kushwaho toH/o dhakurdas ahirwar to H/o Jagdish verma at ara village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

sqm

2 E/W in excavation in fdn. In ordinary soil etc.

cum

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

53.73 cum 3312.70

cum

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

19.47 cum 4253.64

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

cum

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

908.58 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

91.71 cum 4953.74

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

123.88 sqm 148.07

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

186.62 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 45: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC road from H/o Raghuvir Rajpoot to H/o Ramsanehi barar to old cc road at chitguan village

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

sqm

2 E/W in excavation in fdn. In ordinary soil etc.

17.40 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

9.45 cum 3066.30

58.20 cum 3066.30

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

37.26 cum 4085.95

5 making subgrade in cutting or filling etc.

45.00 cum 42.00

6 S/L of moorum in blanket coat

58.20 cum 705.03

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

582.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

59.58 cum 4836.00

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

99.60 sqm 145.05

10 making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

194.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 46: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC Road from main road toH/o sh. Deep Chand yadav at barai village SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

5.60 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

4.20 cum 3049.55

27.75 cum 3049.55

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

15.87 cum 4417.95

5 making subgrade in cutting or filling etc.

12.00 cum 42.00

6 S/L of moorum in blanket coat

12.00 cum 740.20

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

330.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

34.09 cum 4842.77

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

66.40 sqm 149.19

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

110.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 47: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of CC Road from H/o babu Baretha to H/o sh. Nathu Ram yadav at Berisalpura

SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

7.00 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

5.25 cum 3057.80

12.00 cum 3057.80

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

13.80 cum 4408.17

5 making subgrade in cutting or filling etc.

cum

6 S/L of moorum in blanket coat

12.00 cum 727.10

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

120.00 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

13.15 cum 4851.42

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

41.50 sqm 149.05

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

36.00 Rm 5.00

11 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 48: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of Jhansi Mou Road to Atcchru Nigona Khera link road panting label work SN Item of work No. Qty unit Rate Amount 1 E/w on cutting of filling etc.

61.38 sqm 58.00

2 P/L 9.24 cm compacted layer of of WBM 45 – 90 mm etc.

56.71

1478.60

3 P/L 7.50 Cm Comp. layer of WBM G-2 45-63 GSB Etc.

41.85.00 cum 1523.00

4 P/L 7.5 Cm comp. layer of WBM 22.4-53 GSB 10 Cm loose

41.85 cum 1554.00

5

Panting work 1. P/L prime coat WBM

surface @ .85Kg / Sqm 2. P/L Tack coad rpime

surface @ 0.25 kg / Sqm 3. P/L PC 20.00 mm thik 4. P/L seal coat type A etc.

558.00 558.00 558.00 558.00

sqm Sqm Sqm Sqm

38.00 21.00 128.00 45.60.00

6 E/W in embank ment etc.

139.00 Cum 58.00

Page 49: Tender Dated 04/03/2013

46

BOQ Name of Work :-Construction work of soiling coat /repier and inter coat of link road from ber ka khiran to Hanuman khirak (L= 0.845KM) SN Item of work No. Qty unit Rate Amount

1 E/W in cutting in filling , making sub grate etc.

443.43 cum 42.00

2 P/L of 0.924 em comp. layer of WBM G-1 with 45-90GSB

96.05 cum 1429.60

3 P/L morum in blanket coat 0.15 cm compt. Layer

155.92 cum 1040.10

4 P/L 7.5 cm compt. Layer of WBM G-2 with 45-63 mm GSB etc

190.12 cum 1483.50

5 E/W of filing wideling of road

2618.77 cum 42.00

6

S/F iron Angle board including printing letter writing fixing at site

1 Nos. 3000

Page 50: Tender Dated 04/03/2013

BOQ Name of Work :-Construction work of Earth/mourum/soiling coat from vill. Tern to Mata mandir at Dabra village

SN Item of work No. Qty unit Rate Amount

1 E/W in cutting or filling , making sub grate etc.

1618.50 cum 42.00

2 P/L of 0.924 em comp. layer of WBM G-1 with 45-90GSB

253.08 cum 1306.58

3 P/L morum in blanket coat 0.23 cm loose Layer (0.15cm)

410.85 cum 845.00

4 E/W of filing road edg.

690.56 cum 42.00

5 S/F iron Angle board including printing letter writing fixing at site

1 Nos. 3000

Page 51: Tender Dated 04/03/2013

BOQ

BARBED WIRE FENCING WORK AT SHAHJAHAPUR AT ZILAPANCHAYAT AGRICULTURE LAND

S.NO. Item of work qty. unit rate amount

1

S/F of precast RCC pillar 1:2:4 cement ,sand and 20mm gauge granite stone ballast including excavation of pit ,grouting of RCC pillarin 1:6:12 Pcc with cement ,sand and 22.4-53 mm gauge granite stone ballast curing T&P etc. required for complition of work 16 1268.40

2

S/F of angle iron 40x40x6 mm, including excavation of pit ,grouting ofangle iron polesp in 1:6:12 Pcc with cement ,sand and 22.4-53 mm gauge granite stone ballast curing T&P etc. required for complition of work

760.00

NOS.

558.88

3

Providin barbed iron wire fencing including fixing it to pos after strenghening it including labour and T&P etc.required for proper complition of work but excluding supply of posts and wire. 10881.00 Rm 1.00

4 Supply of 14x14 A-6 barbed GI wire@7Rm/Kg 1514.42 Kg 63.00

Total

Page 52: Tender Dated 04/03/2013

BOQ

BARBED WIRE FENCING WORK AT DAK BANGLA BEDORA VILLAGE AT ZILAPANCHAYAT AGRICULTURE LAND

S.NO. Item of work qty. unit rate amount

1

S/F of precast RCC pillar 1:2:4 cement ,sand and 20mm gauge granite stone ballast including excavation of pit ,grouting of RCC pillarin 1:6:12 Pcc with cement ,sand and 22.4-53 mm gauge granite stone ballast curing T&P etc. required for complition of work 6

Nos 1268.40

2

S/F of angle iron 40x40x6 mm, including excavation of pit ,grouting ofangle iron polesp in 1:6:12 Pcc with cement ,sand and 22.4-53 mm gauge granite stone ballast curing T&P etc. required for complition of work

197.00

NOS.

558.88

3

Providin barbed iron wire fencing including fixing it to pos after strenghening it including labour and T&P etc.required for proper complition of work but excluding supply of posts and wire. 3152.68.00 Rm 1.00

4 Supply of 14x14 A-6 barbed GI wire@7Rm/Kg 448.00 Kg 63.00

Total

Page 53: Tender Dated 04/03/2013

BOQ

Name of work : Construction of 14 shops at Baruasagar Zila Panchayat pond bhawan land. SN Item of work NO. Qty. Unit Rate Amount 1 E/W in excavation in foundation in B.C.Soil

174.02 Cum 43.95 2 PCC in 1:4:8 in foundation with cement sand

and22.4-53 mm gauge stone ballast

85.22 Cum 3076.60 3 C R Stone masonaryin 1:6 cement sand mortar

114.73 Cum 2197.57 4 RCC in 1:2:4 in plinth beam 5.90 Cum 5054.42 5 1st classB/W in 1:4cement sand mortar in super

structure.

69.81 Cum 3204.46 6 RCC work in 1:2:4 in lintel beam and slab

38.74 Cum 5773.62 7 Mild steel as reinforcement Total qty. of RCC work in plinth beam,lintel

beam and slab (28.89+4.72=33.61)@1.34% 52.56 Qntl. 6113.25

8 S/F of MS fan hooks 16.00 Nos. 61.00 9 S/F of rolling shutters of approved make made

of 80x1.25mmcold rolled MS: Lath interlocked throughout their entire length and joined together,having inside and outside locking arrangement complete but excluding the cost of top cover and spring.

124.20 sqm 1837.97

10 P/F of 27.5mm long wire spring grade 2 for rolling shutters

36.00 Nos. 1318.54

11 Providing and fixing top cover for rolling shutters

41.40 Rm 679.25

12 Providing and fixing ball bearing for rolling shutters

36 Nos. 839.07

13 12 mm thk. Plaster in 1:4 cement and sand 1385.16 sqm 91.89

Page 54: Tender Dated 04/03/2013

14 E/W in filling in plinth including leveling

dressing ,ramming etc. complete . Shops

verandah 149.08 cum 43.95 15 2.5 cm thk. Cc in 1:2:4 in flooring on8 cm thk

base concrete in 1:4:8

175.15 sqm 407.55 16 as in item no 15 but without base concrete

22.25 sqm 159.82 17 s/f of 3.15 mm thk.& 22.5 mm deep glass strip

204.18 11.98 18 White washing 3 coats inside

939.03 sqm 5.19 19 finishing exterior walls,chhaja and columns witt

cement paint

208.83 sqm 79.91 20 Raised pointing 1:2 cement sand mortar below

plinth 41.37 sqm 91.89

21 two coats of painting of rolling shutters(10x2.25)

202.50 sqm 75.91

21 S/F of sign board 1 Nos. 3000 22 Dismanting of old damaged brick work in mud

mortar 49.27 Cum 67.92

23 Dismanting of old damaged RCC work 5.56 Cum 279.79 24 Clearing in site for excavation of fdn. 292.11 Sqm 10.00

Page 55: Tender Dated 04/03/2013

BOQ Name of Work :-Construction of Nala & CC Road behind Rameshwar Das Inter college at Amara Vill. SN Item of work No. Qty unit Rate Amount 1 Dismantling of old flag stone

0.00 sqm 0.00

2 E/W in excavation in fdn. In ordinary soil etc.

6.60 cum 42.00

3

P/L CC 1:6:12 cement sand and 22.40-53 mm gauge GSB in foundation/base coat including all supply of material T&P etc.

4.99 cum 2995.90

33.30 cum 2995.90

4

1st class B/W in 1:4 cement F-sand mortar in fdn.and plinth including all supply of materials T&P etc.

15.31 cum 4180.17

5

making subgrade in cutting or filling etc.

38.85 cum 42.00

6 S/L of moorum in blanket coat

33.30 cum 563.30

7 S/L of 125 micron thk. Polythene sheet including labour cost etc.

333 sqm 16.00

8

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

34.58 cum 4775.10

9 12 mm thk. Plasterin 1:4 cement F- sand mortar

22.20 sqm 146.96

10

making expansion joint in CC road slab at an interval of 2.5- 3.0 m each.

66.60 Rm 5.00

Construction of Nala 11 E/W ex in fd

150.40 cum 42.00

12

P/L CC 1:4:8 cement f- sand and 22.4-53mm gauge GSG including all supply of material T&P etc.

23.40 cum 3076.40

13

CR stone masonary 1:4 cement sand morter etc.

93.60 cum 2197.57

14

P/L CC 1:2:4 cement c- sand and 16- 22.40mm gauge GSG including all supply of material T&P etc.

6.66 cum 9794.71

15 RCC Slab

15.84 cum 5553.87 16 Mild Steel

12.43 qtl 6193.00

17 Raised pointing 1:2 cement sand

144.00 sqm 91.89

18 S/F of angle iron sign board including painting and writing etc.

1.00 each 3000.00

Page 56: Tender Dated 04/03/2013

BOQ Name of work - Necessary repairing in type 4-quarter in zp compound SN Item of work Qty unit Rate 1 Scraping of old surface 960.00 sqm 2.39 2 P/A OBD of approved make & shade etc. 460.79 sqm 47.94 3 P/A DOBD of approved make & shade on ext. surface etc. 441.77 sqm 25.17 4 Dismantling of RCC work etc. 0.62 cum 279.69 5 S/f of flagstone etc. 0.72 cum 776.00 6 Edging of door & window etc. 24 No. 50.00

7 12 mm thk. Plaster 1:4 cement sand mortar 10 sqm 91.89 8 S/f of window panel glass etc. 2.17 sqm 519.42

9 painting of door & window two coats etc. 132.39 sqm 63.92 10 S/f of galvanized mosquito iron wire jaly etc. 19.73 sqm 679.25 11 S/f of ceiling fan etc. 2 No. 2000.00 12 s/f of exshast fan etc. 1 no 1000.00 13 Approx. cost of oxidised iron fittings 1 job job 800.00

14 S/F of vitrified tiles in flooring etc. 22.09 sqm 1249.00 15 s/f of 6mm thk china glazed tiles 63.63 sqm 1198.70 16 P/F of sink including all fittings etc. 1.0 no 2300.00 17 P/F of wash basin including all fittings etc. 2.00 no 2100.00 18 P/F of PVC pipe 15 mm ID 13.50 rm 60.00

GI pipe 15 mm dia 25.50 rm 142.80 GI pipe 25 mm dia 2.00 rm 212.00 19 S/F of brass bib cock / angle valve 16.00 rm 173.60 20 Wiring for electrification Light point 13.00 each 432.00 Ceiling fan point 3.00 each 495.00 Plug point 4.00 each 231.00 Power plug point 3.00 each 232.00 21 Sintex water tank 2 nos 500 ltr each 1000.00 Ltr. 11.20 22 P/F water tank of capacity of 2000 L of sintax make heavy

duty.with lid and locking arrangement 1000.00 Ltr. 11.20

23 P/F first quality white glazed orissa pattern WC pan with all required fittings including pvc cistern of capacity 10 ltrs.etc hindustan or cera or equivalent make complete item.

1 Nos 4676.00

P/F first quality white glazed European pattern WC pan with all required fittings including pvc cistern of capacity 10 ltrs.etc hindustan or cera or equivalent make complete item.

1 Nos. 5219.00

24 P/F MCB box 1 Nos. 1953.33 25 P/F of aluminium curtain rod 20 mm dia etc. 27.40 rm 50.00 P/F brackets for curtain rod etc. 32.00 Nos. 55.00

Page 57: Tender Dated 04/03/2013

BOQ Name of work - Necessary repair work & W/C washing of zila panchayat office & JE residence SN Item of work Qty unit Rate 1 E/W in excavation in fdn. etc. 1.22 cum 42.00 2 P/A OBD of approved make & shade etc. 1003.87 sqm 55.90 3 CC in 1:4:8 in fdn. 22.5-53 GSB 0.31 cum 2996.70 4 CR stone masonary 1:6 cement sand in F &P 0.82 cum 2197.60 5 2.5cm thk. DPC in 1:1.5:3 with waterproof compound 1.36 sqm 195.80 6 First class b/w in 1:4 cement sand mortar 5.24 cum 3520.00 7 12 mm thk. Plaster 1:4 cement sand mortar 91.00 sqm 91.90 8 RCC 1:2:4 in slab 0.91 cum 5370.10 9 Mild steel reinforcement 0.15 qtl 5593.80 10 s/f of 6mm thk china glazed tiles 1:3 cement sand 11.73 sqm 1198.70 11 30mm thk. Kota stone flooring on Base concrete etc. 13.04 sqm 1798.00 12 S/f of angle iron chaukhat etc. 0.80 qtl 6392.90 13 s/f of 15mm dia GI pipe 20 rm 142.80 14 S/F of brass bib cock 2 no. 229.60 15 S/F of shower 1 no. 400.00 16 S/F of galvanized mosquito net 10.80 sqm 799.10 17 Whitewashing to two coats 378.29 sqm 3.60 18 Painting to coats 258.07 sqm 63.90 19 S/f of 4mm thk. Glass panel etc. 1.50 Sqm 659.30 20 Finishing wall with cement paint two coats 1077.56 sqm 63.90 21 Repairing electrical wiring with replacing switch board

etc. 1 job 5000

22 S/f of ceiling fan 3 No. 2000 23 Repairing door & window including all fitting 6 No. 800 24 Sprit polish two coats 1 Job 10000

Page 58: Tender Dated 04/03/2013

BOQ Name of work : repair of zp building at Sanaura Baruasagar

SN Item of work NO. Qty. Unit Rate Amount 1 E/W in excavation in foundation in B.C.Soil

18.17 Cum 42.00 2 PCC in 1:4:8 in foundation with cement sand

and22.4-53 mm gauge stone ballast

3.90 Cum 2996.20 3 C R Stone masonaryin 1:6 cement sand mortar

2.79 Cum 2197.60 4 2.5cm Phk dpc 1:1.5:3

4.65 Sqm 195.80

5 1st classB/W in 1:4cement sand mortar 4.86 Cum 3356.30

6 1st classB/W in 1:6cement sand mortar in super structure.

17.21 Cum 32706.50

7 RCC in 1:2:4 with cement sand and16-22.4mm gauge stone ballast

0.23 Cum 4656.90

8 RCC in 1:2:4 in lintels with cement sand and16-22.4mm gauge stone ballast

0.18 Cum 4894.60

9 RCC in 1:2:4 in septic tank cover with cement sand and16-22.4mm gauge stone ballast

0.56 Cum 4894.60

10 Mild steel as reinforcement 0.58 Qtl 5593.80 11 S/F of angle iron Chaukhat 5.82 Qtl 6392.90 12 S/F of angle iron frame 6.08 Qtl 6392.90 13 S/F of GI shutters 123.30 Sqm 899.00 14 12 mm thk. Plaster in 1:4 cement and sand 530.45 Sqm 91.90 15 P/f of 6mm thk. China tiles 47.76 sqm 1198.70 16 S/F of orrisa type WC with all necessary

fittings. 4.00 Nos. 4676.00

17 S/F of hand wash basin 2.00 Nos. 2100.00 18 S/F of 100 mm dia. SW pipe

10.00 Rm.. 120.00

19 Providing and fixing of 4cm sheesham wood pannel shutters

171.00 sqm 3036.60

20 Approx. cost of iron fittings 1.71 sqm 279.70

21 Painting 2 coats over previous painted surface 138.32 sqm 63.90

22 White wash 2 coats 2000.00 sqm 3.60

Page 59: Tender Dated 04/03/2013

23 S/F of low density polythene water tank 2 nos each 500 lrt.

1000.00 ltr 11.20

24 P/F 25 mm dia. GI pipe 30.00 rm 212.80 25 P/F 15 mm dia. GI pipe 50.00 rm 142.80 26 P/F 1 HP jet pump with approved make

withfittings 1 .00 no 20000.00

27 S/F of 15 mm dia brass bib cock 12 nos 173.60 28 S/F of 25 mm dia brass gate valve 1.00 nos 140.00

29 Dismantling of old brick work in mud mortar 13.24 cum 67.90 30 Repair of door and windows 10 no 500.00

31 Site cleaning 1 job 2000.00

Page 60: Tender Dated 04/03/2013

Bill of Quantity Name of Work - xzke vEcjx<+ esa okMZ ua0 1 ds dq'kokgk eqgYyk esa jkefd'kqu dq'kokgk ds

edku ls txnh'k iq= Xokys dq'kokgk ds edku rd lh0lh0 jksM fuekZ.k

Sl No. Item of Work Quantity Unit Rate Tender Rate 1 Earth work in excavation in

foundation in B.C. soil lead 30m and lift upto 1.5m etc. 20.70 Cum 42.00

2 C.C. in in foundation with

1:6:12 cement, fine sand, 22.4-53mm gauge stone ballast etc. 15.53 Cum 2455.10

3 M-150 class brick work with

1:4 cement and sand morter. 31.74 Cum 3133.60 4 12mm thick plaster with 1:4

cement and sand morter. 115.00 Sqm 78.30 5 Supply & laying of mooram in

blanket coat 55.20 Cum 535.30 6 C.C. in base coat with 1:6:12

cement, fine sand, 22.4-53mm gauge stone ballast etc. 55.20 Cum 2455.10

7 Supply & laying of 125 micron

thick polythene shaat including labour cost etc. 552.00 Sqm 12.00

8 C.C. in top coat with 1:2:4

cement, coarse sand, 16-22.4mm gauge stone grit etc. 63.14 Cum 3972.90

9 Making expansion joint each

5.00 m in c.c. road slab 110.40 Rmt 5.00

10 S/F of iron angle sign board including painting & letter writing etc. complete 1.00 Nos. 3000.00

Page 61: Tender Dated 04/03/2013

Bill of Quantity Name of work: xzke Hkkstyk esa “elku?kkV dh ckmMªhcky dk fuekZ.kA S.

No. Item of work Qty Unit Rate Tender Rate

1 E/W in excavation in foundation in ordinary soil etc.

90.03 cum 42.00

2 Cement concrete in 1:4:8 with cement F-sand and 22.4-53mm gauge granite stone ballast in foundation including all supply of material T&P etc.

30.12 cum 2515.40

3 CR stone masonary in 1:4 with cement sand marker etc.

50.81 cum 2236.00

4 2.5 cm thick DPC in 1:1.5:3 cement sand and 16-22.4 mm gauge granite stone grite etc.

112.95 Sqm 168.50

5 1st class brick work in 1:4 cement F-sand mortar in super structure with one brickwall etc.

9.68 cum 3280.00

6 1st class brick work in 1:4 cement F-sand mortar in super structure with half brickwall etc.

44.81 cum 32.80

7 12mm thick cement plaster in 1:4 with cement sand morter etc.

753.00 sqm 74.80

8 Finishing of wall with cement paint two coat etc.

753.00 sqm 3484.00

9 S/F of iron gate as for direction by engineer encharge etc.

3.00 qtl 5544.00

10 Painting to coat on one coat of primer etc.

2.25 sqm 4731.00

11 S/F of iron angle sign board including painting and writing etc.

01 No. 3000.00

Page 62: Tender Dated 04/03/2013

Ekk=kvksa dk vuqeku i=

dk;Z dk uke& xzke yksgkx< es a ohjsUnz xqtZj ds edku ls /kdsyh JhokLro ds edku rd lh0lh0 jksM fuekZ.k fo0[k0 eks aB y0 0-150 fdeh0

dz0 dk;Z dk fooj.k Ekk=k bdkbZ njsa VsaMj nj “kCnksa vkSj vadksa esa

1 2 3 4 5 6 1 Excavtion in foundation with

B.C. soil etc. 13.80 m3 42.00

2 C.C. in 1:6:12 with cement f-sand & 22.4-53mm GSB in foundation etc.

8.10 m3 2435.00

3 1st class brick work in cement fine sand mortar in foundation and plinth etc.

26.25 m3 3151.20

4 Making sub-grade with cutting or filling etc.

- m3 -

5 S/L of moorum in blanket coat including labour cost etc.

45.55 m3 627.40

6 C.C. in 1:6:12 with cement sand & 22.4-53mm GSB etc. in base coat.

45.55 m3 2435.00

7 S/F of 125 Micron polythene sheet including labour cost etc.

455.50 m2 12.00

8 P.C.C. in 1:2:4 with cement sand & 20mm gauge granite stone grit

46.82 m3 3961.60

9 Making expansion joint in 3.0M length in C.C. road slab including labour etc. complete.

114.00 Rmt 5.00

10 12mm thick cement plaster in 1:4 Cement sand mortar etc. complete

165.00 m2 78.70

11 S/F of Iron angle signboard including painting & writing etc.

1.00 job 3000.00

Page 63: Tender Dated 04/03/2013

Ekk=kvksa dk vuqeku i=

dk;Z dk uke& xzke befy;k LVsV es a esujksM ls d`ikjke ds edku rd lh0lh0 jksM fuekZ.kA yEokbZ 200eh0

dz0 dk;Z dk fooj.k Ekk=k bdkbZ njsa VsaMj nj “kCnksa vkSj vadksa esa

1 2 3 4 5 6 1 Excavtion in foundation with

B.C. soil etc. 9.06 m3 42.00

2 C.C. in 1:6:12 with cement f-sand & 22.4-53mm GSB in foundation & base coat etc.

75.75 m3 2498.90

3 1st class brick work in cement fine sand mortar in foundation and plinth etc.

27.19 m3 3266.10

4 Making sub-grade with cutting or filling etc.

- m3 -

5 S/L of moorum in blanket coat including labour cost etc.

59.10 m3 589.10

6 C.C. in 1:6:12 with cement sand & 22.4-53mm GSB etc. in base coat.

- m3 -

7 S/F of 125 Micron polythene sheet including labour cost etc.

591.00 m2 12.00

8 P.C.C. in 1:2:4 with cement sand & 20mm gauge granite stone grit

66.28 m3 4011.60

9 Making expansion joint in 3.0M length in C.C. road slab including labour etc. complete.

0.00 Rmt 5.00

10 12mm thick cement plaster in 1:4 Cement sand mortar etc. complete

98.50 m2 78.80

11 S/F of Iron angle signboard including painting & writing etc.

1.00 job 3000.00

Page 64: Tender Dated 04/03/2013

dk;kZy; ftyk iapk;r] >kWlhA

fufonk lwpuk

ftyk iapk;r] >kWlh ds iathdr Bsdsnkjksa ls fuEukfdar dk;ksZ gsrq fnukad 18-03-2013 dks vijkUg 2-00 ots rd dk;kZy; ftyk iapk;r >kWlh ds lkFk lkFk dk;kZy; ftykf/kdkjh >kWlh o fodkl Hkou lHkkxkj >kWlh esa eqgjoan fufonk;sa vkeaf=r dh tkrh gSA tks mlh fnu dk;kZy; ftyk iapk;r >kWlh vijkUg 3%00 mifLFkr Bsdsnkjks ds le{k “kklukns”k la[;k 2998@33&2&11&197th@2011 fnukad 29 tqykbZ 2011 esa of.kZr O;oLFkk ds vUrxZr Vs.Mj lfefr }kjk [kksyh tkosxhA fufonk izi= ftyk ipak;r dk;kZy;] ds lkFk lkFk dk;kZy; ftykf/kdkjh >kWlh o fodkl Hkou lHkkxkj >kWlh ls fnukad 16-03-2013 rd dk;Zfnolksa esa fu/kkZfjr “kqYd nsdj izkIr fd;s tk ldrs gSA izR;sd fufonk ds lkFk vusZLVeuh dh /kujkf”k dk jk’Vhª; opr i=@jk’Vªh;dr cSdksa ds ,Q0Mh0vkj0@lhMhvkj@VhMhvkj lyXu djuk vfuok;Z gSA tks vij eq[; vf/kdkjh ftyk iapk;r >kWlh ds inuke ls oa/kd gksxh fufonk njs vadks o “kCnksa esa vfdar dh tk;sxhA izR;sd dk;Z fy;s vusZLVeuh dh /kujkf”k i`Fkd&iFkd :i ls fufonk ds lkFk layXu dj izLrqr djuk vfuok;Z gksxkA dksbZ Hkh l”krZ fufonk Lohdkj ugha dh tk,xh rFkk fcuk dkj.k ork;s fdlh ;k lHkh fufonkvksa dks vLohdr djus dk vf/kdkj l{ke vf/kdkjh esa

fufgr gksxkA mDr fufonk lwpuk tuin dh osolkbV http: // Jhansi. nic. in ij Hkh miyC/k gSA

d0 la0

dk;Z dk uke vuqekfur ykxr

¼yk[k :0 es a½

vus ZLVeuh dh /kujkf’k

fufonk ewY; dk;Z iw.kZ djus dh vof/k

1 2 3 4 5 6 1 ¼jkT; foRr vk;ksx½

xzke ?kkVdksVjk] /kokdj ,oa lkSudiqjk ds ‘ke’kku?kkV eas vkj0lh0lh0 lsM dk fuekZ.k dk;ZA fo0[k0eÅjkuhiqj

9-99 99900 1000 nks ekg

2 xzke fuiku] flej/kk] fltkjh [kqnZ esa ‘ke’kku?kkV ea s vkj0lh0lh0 lsM dk fuekZ.k dk;ZA fo0[k0 xqjljka;

9-99 99900 1000 nks ekg

3 xzke fprxoka es a j?kqohj jktiwr ds edku ls jkelusgh ojkj ds edku rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-195 fdeh0 fo0[k0eks aB

7-40 74000 750 ,d ekg

4 xzke ,sjk esa oyoku dq’kokgk ds edku ls Bkdqjnkl vfgjokj ds edku ls txnh’k oekZ ds edku rd lh0lh0 jksM fuekZ.kA ya0 0-306 fdeh0 fo0[k0eks aB

7-81 78100 800 ,d ekg

5 xzke iapk;r cjksnk eksB es a [kSjkifr eafnj ls y[kq vfgjokj ds edku dh vksj lh0lh0 jksM fuekZ.k dk;ZA ya0 0-04 fdeh0 fo0[k0eks aB

1-20 12000 200-00 ,d ekg

6 xzke vejk esa egkUr jkes’ojnkl bVj dkyst ds ihMs ukys dk fuekZ.k 80eh0 doZM iqfy;k lfgr rFkk 100eh0 lh0lh0 jksM fuekZ.k dk;ZA fo0[k0 eks aB

8-96 89700 900-00 nks ekg

7 fpjxkao eqUuk lfork ds edku ls ‘kadj th ds eafnj rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-03 fdeh0 fo0[k0fpjxkao

1-15 11500 200 ,d ekg

8 xzke ncjk es a xkao dh eksM ls ekrk eafnj rd feV~ ~Vh ,oa eksje]lksfyax dksM rd fuekZ.k dk;ZA ya0 1-000 fdeh0 fo0[k0fpjxkao

7-86 78600 800 nks ekg

9 xzke fiijk es a iadt ds edku ls gkV iSV rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-100 fdeh0 fo0[k0fpjxkao

3-59 35900 400 ,d ekg

10 xzke okjbZ es a esu jksM ls xako dh vksj lh0lh0 jksM fuekZ.k dk;ZA ya0 0-100 fdeh0 fo0[k0fpjxkao

3-65 36500 400 ,d ekg

11 osjh lkyiqjk xkao es a jksM ls ¼okow ojsBk ds edku ls ukFkwjke ;kno ds edku rd½ lh0lh0 jksM fuekZ.k dk;ZA ya0 0-050 fdeh0 fo0[k0fpjxkao

2-00 20000 200 ,d ekg

Page 65: Tender Dated 04/03/2013

12 osj ds f[kjd ls guqeku f[kjd laEidZ ekxZ ij feVVh lksfyax ejEer ,oa baVjdksV Lrj rd dk dk;ZA fo0[k0 oMkxkao

7-33 73300 800 ,d ekg

13 xzke dksV es a Jh cknke flag ds ?kj ls gqdqe flag ds ?kj rd lh0lh0jksM fuekZ.k ukyh lfgr A ya0 0-840 fdeh0 fo0[k0oMkxkao

6-88 68800 700 ,d ekg

14 xzke ikyj Cykd cMkxkao es a lhrkjke ifjgkj ds ?kj ls jke flag dq’kokgk ds ?kj dh vksj lh0lh0 jksM fuekZ.k dk;ZA ya0 0-060 fdeh0 fo0[k0oMkxkao

2-38 23800 300 ,d ekg

15 xzke jDlk es jktkiqj jksM ls y[ku dq’kokgk ds edku dh vksj lh0lh jksM fuekZ.k dk;ZA ya0 0-225 fdeh0 fo0[k0cchuk

9-00 90000 1000 nks ekg

16 [kSykj esu jksM ls dk’khjke vfgjokj ds edku rd eqgYyk bZlkbZ pkSdh rd lh0lh0 jksM fuekZ.k dk;ZA ya00-165 fdeh0 fo0[k0cchuk

5-88 58900 600 ,d ekg

17 [kSykj es a ujsUnz ;kno ds edku ls /kes ZUnz ;kno ds edku rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-100 fdeh0 fo0[k0cchuk

3-10 31000 300 ,d ekg

18 cchuk :yj eq0 ‘kkL=h uxj esa Hkaoj igyoku ds edku ls ty fuxe jksM rd lh0lh0 jksM fuekZ.kA ya0 0-100 fdeh0 fo0[k0cchuk

5-40 54100 600 ,d ekg

19 xzke flejkokjh lqHkk”k uxj es a Jh eghiky flg ds edku ls eaxy flag ;kno ds edku rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-103 fdeh0 fo0[k0cchuk

3-47 34700 400 ,d ekg

20 xzke iapk;r exjiqj es a jktho ccsys ds edku ls ¼Mh0 ih0½ Moy iksy rd lh0lh0 jksM fuekZ.k dk;ZA fo0[k0oxajk

9-00 90000 1000 nks ekg

21 xzke iapk;r HkVk fodkl [k.M oaxjk es a vTtqnnh ds edku ls v;ks/;k ds edku rd ,oa ykykjke ds edku ls jkeizlkn d njokts ls gksrs gq;s [kpksj s ds edku dh vksj lh0lh0 jksM fuekZ.kA ya00-270 fdeh0 fo0[k0oxajk

9-00 90000 1000 nks ekg

22 xzke bVk;y] nsojh flagiqjk ,oa L;kouh [kqnZ ds ‘ke’kku?kkV eas vkj0lh0lh0 lsM dk fuekZ.k dk;ZA fo0[k0eÅjkuhiqj

9-99 99900 1000 nks ekg

23 xzke flrkSjk es a Jh gjukjk;u ;kno ds edku ls dkjl nso eafnj dh vksj lh0lh0 jksM fuekZ.k dk;ZA ya00-100 fdeh0 fo0[k0eÅjkuhiqj

3-40 34000 400 ,d ekg

24 xzke iBk es a nqxkZ jktiwr ds edku ls uhyw frokjh ds edku gksrs gq;s gfj’kpUnz jkor ds ekdu dh vksj lh0lh0 jksM fuekZ.k dk;ZA ya0 0-170 fdeh0 fo0[k0eÅjkuhiqj

5-60 56000 600 ,d ekg

25 xzke vDlso es cStukFk frokjh ds edku ls uUnjke ‘kekZ ds edku dh vksj lh0lh0 jksM fuekZ.k dk;Z ukyh lfgrA ya0 0-120 fdeh0 fo0[k0xqjljka;

4-50 45000 500 ,d ekg

26 xzke csjobZ es a jk; ds edku ls jkeizlkn v/;kid ds edku dh vksj lh0lh0 jksM fuekZ.k dk;Z ukyh lfgrA ya0 0-120 fdeh0 fo0[k0xqjljka;

4-53 45300 500 ,d ekg

27 xzke [kyhyiqjk esa HkkxhjFk dq’kokgk ds edku ls lqjs’k ifjgkj ds edku gksrs gq;s t;gfj ‘kkL=h ds edku rd rFkk pkSjkgs dk lkSUnjhdj.k dk;ZA ya0 0-150 fdeh0 fo0[k0xqjljka;

5-00 50000 500 ,d ekg

28 xzke nsojk [kqnZ ds <hejiqjk eksgYys es a eSujksM ls nqyhpUnz ds edku dh vksj lh0lh0jksM fuekZ.k dk;ZA ya0 0-120 fdeh0 fo0[k0xqjljka;

4-00 40000 400 ,d ekg

Page 66: Tender Dated 04/03/2013

29 xzke rSnqvk es esu jksM ls iIiw iVsy ds edku rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-250 fdeh0 fo0[k0xqjljka;

9-00 90000 1000 nks ekg

30 xzke ghjk uxj Oykd okekSj es a dkyhnkl iky ds edku ls NDdh iky ds nwljs ?kj dh vksj lh0lh0 jksM fuekZ.k dk;ZA ya00-100 fdeh0 fo0[k0okekSj

3-50 35000 400 ,d ekg

31 xzke dqjSBk Cykd okekSj es a jke Lo:i iky ds edku ls prq ZHk qt dksjh ds edku dh vksj lh0lh0 jksM fuekZ.k dk;ZA ya00-150 fdeh0 fo0[k0okekSj

5-50 55000 600 ,d ekg

32 xzke iBk es a jeys teknkj ds edku ls esgrkc ds edku gksrs gq;s Kku flag ds edku rd lh0lh0jksM fuekZ.k ukyh lfgrA ya00-270 fdeh0 fo0[k0okekSj

9-00 90000 900 nks ekg

33 eÅjkuhiqj fLFkr ftyk iapk;r dh Hkwfe ij fookg ?kj dk vo’ks”k dk;ZA

13-37 134000 1500 rhu ekg

34 eÅjkuhiqj fLFkr ftyk iapk;r dh Hkwfe ij fookg ?kj es a fo|qr fQfVax dk dk;ZA

1-79 18000 200 ,d ekg

35 o:vklkxj ikS.M Hkou dh Hkwfe ij 14 nqdkuks a dk fuekZ.k dk;ZA fo0[k0oMkxkao

19-10 191000 2000 rhu ekg

36 mYnu ol LVSUM ij ftyk iapk;r dh Hkwfe ij 10 nqdkuks a dk fuekZ.k dk;ZA fo0[k0oa axjk

13-07 130700 1500 rhu ekg

37 mYnu ol LVS.M ij ftyk iapk;r dh [kkyh Hkwfe dh okmUMªhoky dk fuekZ.k dk;ZA fo0[k0oa axjk

4-25 42500 500 ,d ekg

38 Vkbi 4 DokVlZ esa vko’;d ejEer ,oa jaxkbZ iqrkbZ dk dk;ZA>kWlh eq[;ky;

2-26 22600 300 ,d ekg

39 ftyk iapk;r dk;kZy; ,oa vkoklh; ifjlj dh vko’;d ejEer ,oa jxkbZ iqrkbZ dk dk;ZA >kWlh eq[;ky;

2-64 26400 300 ,d ekg

40 xzke oSnksjk es a ftyk iapk;r dh Hkwfe ij rkj QSfUlx dk dk;ZA Cykd cchukA

1-52 15200 200 ,d ekg

41 xzke ‘kkgtgkiqj esa ftyk iapk;r dh Hkwfe ij rkj QSfUlx dk dk;ZA Cykd eks aBA

5-62 56200 600 ,d ekg

42 fHkVksjk mYnu lMd ds [email protected] dk dk;Z fdeh0 2 o 3 ¼1-800 ls 3-00 fdeh0½Cykd oaxjk fdeh0 2o 3 es aA

7-88 78800 800 ,d ekg

43 Jh tokgjyky usg: baVj dkyst mYnu esa vko’;d ejEer] Vk;ysV] iz;ksx’kkykvksa esa jSd fuekZ.k vkfn dk;ZA Cykd oaxjk

5-28 52800 600 nks ekg

44 >kWlh eÅjkuhiqj jksM ls vN: f[kjd gksrs gq;s fuxkSjk [ksjk lMd dk vo’ks”k dk;ZA fo0[k0 oMkxkao ya00 -186 fdeh0

3-65 36500 400 ,d ekg

45 fpjxkao nsgkr es a Qwy flag ;kno ds edku ls lqjsUnz eq’kha ds edku rd ukyh lfgr lh0lh0 jksM fuekZ. k dk;ZA ya0 0-125fdeh0

3-90 39000 400 ,d ekg

46 osj ds f[kjd ls guqeku f[kjd jksM ij vkoknh es a lh0lh0 jksM fuekZ.k dk;ZAya0 0-105 fdeh0

3-90 39000 400 ,d ekg

47 eqgYyk lukSjk dLok o:vklkxj fLFkr ftyk iapk;r ds iqjkus dU;k fo|ky; Hkou dh ejEer dk dk;ZA

5-00 50000 500 nks ekg

48 eÅ fHkVksjk mYnu lEidZ ekxZ dh ejEer dk dk;Z ¼pSust 0-283 ls 1-800rd½ ya01-517 fdeh0 1 o 2 es aA

9-64 96400 1000 nks ekg

49 xzke Hkkstyk esa ‘ke’kku ?kkV ij okmMªhoky dk fuekZ.k dk;Z ya0 0-251fdeh0A

4-91 49100 500 ,d ekg

50 xzke befy;k LVsV es a esu jksM ls d`ikjke ds edku rd lh0lh0 jksM fuekZ.k ya0 0-200eh0

6-00 60000 600 ,d ekg

51 xzke vEojx< esa okMZ ua0 1 ds dq’kokgk eqgYyk esa jkefd’ku dq’kokgk ds edku ls txnh’k iq= Xokys dq’kokgk ds edku rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-230fdeh0

5-91 59100 600 ,d ekg

Page 67: Tender Dated 04/03/2013

52 ¼13os a foRr v;ksx½ xzke yksgkx< es a ohjsUnz xqtZj ds edku ls /kdsyh JhokLro ds edku rd lh0lh0 jksM fuekZ.k dk;ZA ya0 0-150fdeh0

4-50 45000 500 ,d ekg

uksV %& 1& fufonk ewY; ds lkFk 12-5٪ oSV ,oa 1٪ ljpktZ nsuk gksxkA 2& fufonk lwpuk esa vafdr 10yk[k ls vf/kd ds dk;ksZ dh rduhdh Lohdfr “kklu ls izkIr gksus ds mijkUr gh

dk;Zvkns”k tkjh fd;k tkosxkA 3& fufonk ds lkFk iathdr Bsdsnkjksa dks gSfl;r izek.k i= ,oa pfj= izek.k i= ¼ftykf/kdkjh }kjk fuxZr½ layXu

djuk vfuok;Z gksxkA gSfl;r ,oa pfj= izek.k i= oS/k u ik;s tkus ij fufonk fujLr dj nh tkosxhA 4& http: // Jhansi. nic. In ls Hkh fufonk QkeZ MkmuyksM fd;s tk ldxsa bl osolkbM ij ls MkmuyksM fd;s

x;s fufonk QkeZ ds lkFk fufonk ewY; rFkk12-5izfr”kr oSV ,oa 1izfr”kr ljpkPkZ dk cSd Mª¶V vij eq[; vf/kdkjh ftyk iapk;r >kWlh ds inuke oukdj layXu djkuk vfuok;Z gksxkA

¼,e0,y0 fo”odekZ½ ¼ds0,u0 “kqDy½ ¼ehjk jk;½ vfHk;Urk vij eq[; vf/kdkjh v/;{k

ftyk iapk;r >kWlhA ftyk iapk;r] >kWlhA ftyk iapk;r]>kWlhA dk;kZy; ftyk ipak;r] >kWlhA

i=kad @ft0ia0@fufonk lwpuk ¼2011&12½ fnukad Qjojh 2013 izfrfyfi%& fuEu dh lsok esa lwpukFkZ ,oa uksfVl oksMZ ij pLik gsrq izsf’krA 1& vk;qDr egksn; >kWlh]e.My >kWlh dks lknj voyksdukFkZ izsf’krA 2& ftykf/kdkjh egksn;]>kWlh dks lknj voyksdukFkZ iszf’krA 3& ftyk ,oa l= U;k;/kh”k egksn; >kWlh dks lknj voyksdukFkZ iszf’krA 4& ek0 v/;{k egksn;k ftyk iapk;r] >kWlh dks lknj voyksdukFkZ iszf’krA 5& eq[; fodkl vf/kdkjh@eq[; vf/kdkjh egksn; ftyk iapk;r]>kWlh dks lknj voyksdukFkZ iszf’krA 6& vij ftykf/kdkjh ¼foRr ,oa jktLo½ egksn; >kWlh dks lknj voyksdukFkZ iszf’krA 7& vf/k”kklh vfHk;ark izk0[k0yks0fu0fo0>kWlhA 8& vf/k”kklh vfHk;ark xzkeh.k vfHk;a=.k lsok >kWlhA 9& vf/k”kklh vfHk;ark fu0[k0 yks0fu0fo0>kWlhA 10& ifj;kstuk funs”kd ftyk xzkE; fodkl vfHkdj.k >kWlhA 11& leLr miftykf/kdkjh >kWlh 12& leLr rglhynkj >kWlhA 13& lEiknd nSfud vej mtkyk >kWlh ,ao nSfud tu&tu tkxj.k >kWlh dks bl vuqjks/k ds lkFk fd mi;qZDr

fufonk lwpuk dks vius lekpkj i= ds vkxkeh vad esa de ls de LFkku esa izdk”ku dj “kkldh; njksa dk foy nks vfrfjDr izfr;ksa lfgr Hkqxrku gsrq v/kksgLrk{kjh ds dk;kZy; esa fHktok;s tkus dk d’V djsA

14& ftyk lwpuk foKku vf/kdkjh >kWlh dks bl vuqjks/k ds lkFk fd mijksDr fufonk lwpuk tuin dh osolkbM

http://jhansi.nic,in ij izlkfjr djus dk d’V djsA 15& foRrh; ijke”kZnkrk ftyk iapk;r >kWlh dks bl vk”k; ds lkFk izsf’kr fd mijksDrkuqlkj fu;r frfFk dks

le; ls fufonk [kksys tkus gsrq mifLFkr jgus dk d’V djsaA 16& ftyk iapk;r ds leLr iathdr Bsdsnkjksa dks lwpukFkZA 17& ukftj ftyk iapk;r >kWlh dks vko”;d dk;Zokgh ,oa uksfVl cksMZ ij pLik gsrqA

vij eq[; vf/kdkjh ftyk ipak;r] >kWlhA