2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Relocate playground in Washington Square Village above garage (Estimated construction time, 9 months) Create temporary play area and plaza on LaGuardia Place (9 months) Relocate dog run to University Village (9 months) Create new seating area along Bleecker Street south (9 months) Construct temporary gym facility at location of former Washington Square Village Playground (9 months) Create new plazas at the north and south end of block and renovate Mercer Playground (9 months) Temporary Gym 4 5 6 3 2 1 WSV 1 WSV 2 WSV 3 WSV 4 WSV Retail Adrienne’s Garden Coles Athletic Center Silver Tower 2 Silver Tower 1 505 LaGuardia Morton Williams West 3rd Street Bleecker Street West Houston Street LaGuardia Place Mercer Street Temporary Gym & Open Space Phase 1 Private Spaces Existing Buildings New Public Space (Previous Phase) New Buildings (Current Phase) New Public Space (Current Phase) Entry Points New Building (Previous Phase) 1 6 5 2 3 4

Temporary Gym & Open Space · 2020-08-06 · Construct temporary gym facility at location of former Washington Square Village Playground (9 months) Create new plazas at the north

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Temporary Gym & Open Space · 2020-08-06 · Construct temporary gym facility at location of former Washington Square Village Playground (9 months) Create new plazas at the north

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

Relocate playground in Washington Square Village above garage (Estimated construction time, 9 months)

Create temporary play area and plaza on LaGuardia Place (9 months)

Relocate dog run to University Village (9 months)

Create new seating area along Bleecker Street south (9 months)

Construct temporary gym facility at location of former Washington Square Village Playground (9 months)

Create new plazas at the north and south end of block and renovate Mercer Playground (9 months)

TemporaryGym

456

321

WSV 1 WSV 2

WSV 3 WSV 4

WSVRetail

Adrienne’sGarden

ColesAthletic Center

SilverTower 2

SilverTower 1

505LaGuardia

MortonWilliams

West 3rd Street

Bleecker Street

West Houston Street

LaG

uard

ia P

lace

Mer

cer

Stre

et

Temporary Gym & Open SpacePhase 1

Private SpacesExisting Buildings

New Public Space(Previous Phase)

New Buildings(Current Phase)

New Public Space(Current Phase)

Entry Points

New Building (Previous Phase)

1

65

2

3

4

Page 2: Temporary Gym & Open Space · 2020-08-06 · Construct temporary gym facility at location of former Washington Square Village Playground (9 months) Create new plazas at the north

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

ZipperBuilding

1

23

TemporaryGym

WSV 1 WSV 2

WSV 3 WSV 4

WSVRetail

SilverTower 2

SilverTower 1

505LaGuardia

MortonWilliams

West 3rd Street

Bleecker Street

West Houston Street

LaG

uard

ia P

lace

Mer

cer

Stre

et

Adrienne’sGarden

Zipper Building & Open SpacePhase 2

Construct Zipper Building (gym, academic, retail, dorm, faculty housing, hotel, and supermarket relocation) (Estimated construction time, 54 months)

Create new 11,000 sf publicly accessible playground in University Village (9 months)

Create a new esplanade along former Greene Street to access new playground, dog run, and zipper building (9 months)

Private SpacesExisting Buildings

New Public Space(Previous Phase)

New Buildings(Current Phase)

New Public Space(Current Phase)

Entry Points

New Building (Previous Phase)

1

2

3

Page 3: Temporary Gym & Open Space · 2020-08-06 · Construct temporary gym facility at location of former Washington Square Village Playground (9 months) Create new plazas at the north

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

ZipperBuilding

BleeckerSchool

1

2

TemporaryGymSite

Construction of Bleecker Building with Public School and NYU academic and dormitory space (timing of building dependent on DOE and SCA time table) (Estimated construction time, 36 Months)

Temporary interim open space to be provided if Phase 4 project delayed (9 months)

2 VSW1 VSW

4 VSW3 VSW

WSVRetail

SilverTower 2

SilverTower 1

505LaGuardia

West 3rd Street

Bleecker Street

West Houston Street

LaG

uard

ia P

lace

Mer

cer

Stre

et

Adrienne’sGarden

Bleecker SchoolPhase 3

Private SpacesExisting Buildings

New Public Space(Previous Phase)

New Buildings(Current Phase)

New Public Space(Current Phase)

Entry Points

New Building (Previous Phase)

1

2

Page 4: Temporary Gym & Open Space · 2020-08-06 · Construct temporary gym facility at location of former Washington Square Village Playground (9 months) Create new plazas at the north

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

Mercer Building

345

12

ZipperBuilding

BleeckerSchool

WSV Playground

PhilosophyGarden

Public LawnTricycle Garden

Mercer PlazaWSV 3 WSV 4

Create new seating and landscape areas along West 3rd and Bleecker streets (Estimated construction time, 9 months)

Construct new parking garage on Washington Square Village in northeast portion of the block (21 months)

Construct new Mercer Building and below grade space on middle and eastern portion of the block (63 months)

Create new plazas and play areas along Mercer Street (9 months)

Create new publicly accessible open space and playground in Washington Square Village (12 months)

WSV 1 WSV 2

WSV 3 WSV 4

WSVRetail

SilverTower 2

SilverTower 1

505LaGuardia

West 3rd Street

Bleecker Street

West Houston Street

LaG

uard

ia P

lace

Mer

cer

Stre

et

Adrienne’sGarden

Mercer Building & Open SpacePhase 4

Private SpacesExisting Buildings

New Public Space(Previous Phase)

New Buildings(Current Phase)

New Public Space(Current Phase)

Entry Points

New Building (Previous Phase)

1

1

2

354

Page 5: Temporary Gym & Open Space · 2020-08-06 · Construct temporary gym facility at location of former Washington Square Village Playground (9 months) Create new plazas at the north

Construct new LaGuardia Building and below grade space (Estimated construction time, 39 months)

Rebuild LaGuardia and Adrienne’s gardens and public plazas along LaGuardia Place and around building, statue of Fiorella LaGuardia retains prominence in the newly designed site (12 months)

1

2

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

LaGuardia Building

12

Mercer Building

ZipperBuilding

BleeckerSchool

WSV 3 WSV 4

LaGuardia Building & Open Space

Phase 5

Private SpacesExisting Buildings

New Public Space(Previous Phase)

New Buildings(Current Phase)

New Public Space(Current Phase)