1
Issue: 1 Ref No: QUALITY SYSTEMS RECORD Issued by: Approved by: Issue date: Approval date: Logo Temperature Log (CCP) Page: 1 of 1 Date: Warehouse Chill Room 1 Chill Room 2 Chill Room 3 Freezer 1 Freezer 2 Freezer 3 Dry store 1 Dry Store 2 Target +10°C -5°C -5°C -5°C -25°C -25°C -25°C +5°C +5°C Time: 06:00 am 07:00 am 08:00 am 09:00 am 10:00 am 11:00 am 12:00 am 01:00 pm 02:00 pm 03:00 pm 04:00 pm 05:00 pm 06:00 pm First check in the morning to be conducted by Manager. Any queries or readings +/-2C difference (unless defrosting) inform Manager tel.: Refer to Storage Temperature Control Procedure. Comments:

Temperature Log

  • Upload
    houss

  • View
    212

  • Download
    0

Embed Size (px)

DESCRIPTION

cal

Citation preview

  • Issue: 1 Ref No:

    QUALITY SYSTEMS RECORD Issued by:

    Approved by:

    Issue date:Approval date:

    Logo

    Temperature Log (CCP)Page: 1 of 1

    Date: Warehouse Chill Room 1

    Chill Room 2

    Chill Room 3

    Freezer 1 Freezer 2 Freezer 3 Dry store 1 Dry Store 2

    Target +10C -5C -5C -5C -25C -25C -25C +5C +5CTime:06:00 am07:00 am08:00 am09:00 am10:00 am11:00 am12:00 am01:00 pm02:00 pm03:00 pm04:00 pm05:00 pm06:00 pmFirst check in the morning to be conducted by Manager. Any queries or readings +/-2C difference (unless defrosting) informManager tel.: Refer to Storage Temperature Control Procedure.

    Comments: