7/25/2019 Tecnical Submittal -
1/8
Technical Proposal for the Level Difference of Steel Structure in 4th
and
Roof Floor Level
1.
Necessity
As per the structural steel drawings (IFC and Shop drawings) from in fourth level and in roof
Level, RHS 250x150x12.5 Box members which are outside in 3 cases are 150mm above other
members. Following are the Locations
a.
Along Grid : D1 to Grid A3 outside Grid 0.9
b.
Along Grid: E to B1 outside Grid 13
c.
Along Grid: 13 to 10 outside Grid C
2. Analysis
Upon detailed analysis it can be concluded that there are curtain wall in this locations inmajority area and in once case near Abattoir Room in fourth Floor, this area in inside the
building with block work around. These cases are classified as Case 1 and 2 respectively and the
details are enclosed. We have enclosed layout of Fourth floor with Architectural drawings and
Structural steel drawings super imposed and section of Case 1 and 2 are highlighted.
For the sake of identification, quick review and understanding of the section drawings, existing
steel members are colored blue and new steel members are colored red.
3. Basis of Proposal
This proposal is made with due respects to the design intent and no changes to the flooring
level, ceiling level and faade is required. Only structural modifications for the decking system
are made and the details are enclosed. In principle a 6 mm thick MS sheet (either Plain or
chequered) is proposed between the outer ring member HEB 240 and the inside member HEB
500 between the RHS members. Where the curtain wall is coming in order to fix the bottom
bracket for the mullion we have added another UPN 100 member to which the bracket will be
fixed with Bolts & Separation membrane
4. Related changes
The curtain wall in these locations is proposed at a distance of 100 mm outside the specified
alignment so as to ensure that the top transom is not hindered by the connection members of
steel structure.
In the 3rd
floor and 4th
floor, curtain wall W 21a and W22a respectively will not be continuous
unlike shown in the South Elevation side which can be a discrepancy in the drawing
7/25/2019 Tecnical Submittal -
2/8
5.
Connections
The UPN channel section is proposed to be connected to the RHS 250x150 members with cleat
angle of 200x200 welded to Box and channel from either side. The top level of the channel is
proposed flush against the Box members and MS Sheet will be above this.
6. Supporting Drawings
a)
Super imposed drawings Structural Steel and Architectural - Locations highlighted
b)
Proposal Plan ( 2 Sheets)
c)
Proposal Section Case 1
d)
Proposal Section Case 2
e)
Proposal Blown up section
7/25/2019 Tecnical Submittal -
3/8
7/25/2019 Tecnical Submittal -
4/8
Section
WithCu
Section A. Case 1
With Curtain wall
7/25/2019 Tecnical Submittal -
5/8
SectionA.Case1
WithCurtainwall
SectionB.Case2
WithoutCurtainwall
7/25/2019 Tecnical Submittal -
6/8
HEB500
R
HS250*150*12.5
HEB240
Screed
TOS:+18.95
TOC:+19.10
UPN
100belowcurtainwall
06m
mthk-MSSheet
4thfloor:FFL+19.20
TOS:+19.10
150
Varies.1350Maximum
ScreedTopp
ingwith
Rebar-10m
m@150c/c
Cu
rtainWallSystem
Case
:1
WithCurtainWall
O
utsidetheBuilding
Insid
etheBuilding
SECTIO
N-A
StoneCladding
asperdetails
L65x65x6
L65x65x6
Refer
toBlownupdrawing
7/25/2019 Tecnical Submittal -
7/8
Blo
ckworkwith
Cla
ddinginF
acade
HEB
500
R
HS2
50*1
50*12.5
HEB24
0
Scre
ed
TOS:+1
8.9
5
TOC:+1
9.1
0
06mm
thk-M
SSh
eet
4thflo
or:FFL+1
9.2
0
1350Maximum
Scre
edT
oppingwith
reB
ar-1
0m
m@1
50c/c
Case
:2
With
outCurtainW
all
Insid
etheB
uildin
g
SECTIO
N-B
150
L65x
65x
6
7/25/2019 Tecnical Submittal -
8/8
UPN
100below
curtainwallBetweentheRHSme
mbers,
top
FlushwithcleatAngles:Gr:S270
EPDMTermination
AluminumBracketInstalled
overChannelwithH
SBolts(8.8gr)
CoverCap
S
toneCopping
OutsidetheBuilding
InsidetheB
uilding
BottomTransom:10mmaboveFFL
6mmthkMSPlate
Gr:S270
Blownupdra
wingfor
Curtainwall
interface
4thfloor:FFL
+19.20
D
GU
asperSpecs