    Technical Proposal for the Level Difference of Steel Structure in 4th

    and

    Roof Floor Level

    1.

    Necessity

    As per the structural steel drawings (IFC and Shop drawings) from in fourth level and in roof

    Level, RHS 250x150x12.5 Box members which are outside in 3 cases are 150mm above other

    members. Following are the Locations

    a.

    Along Grid : D1 to Grid A3 outside Grid 0.9

    b.

    Along Grid: E to B1 outside Grid 13

    c.

    Along Grid: 13 to 10 outside Grid C

    2. Analysis

    Upon detailed analysis it can be concluded that there are curtain wall in this locations inmajority area and in once case near Abattoir Room in fourth Floor, this area in inside the

    building with block work around. These cases are classified as Case 1 and 2 respectively and the

    details are enclosed. We have enclosed layout of Fourth floor with Architectural drawings and

    Structural steel drawings super imposed and section of Case 1 and 2 are highlighted.

    For the sake of identification, quick review and understanding of the section drawings, existing

    steel members are colored blue and new steel members are colored red.

    3. Basis of Proposal

    This proposal is made with due respects to the design intent and no changes to the flooring

    level, ceiling level and faade is required. Only structural modifications for the decking system

    are made and the details are enclosed. In principle a 6 mm thick MS sheet (either Plain or

    chequered) is proposed between the outer ring member HEB 240 and the inside member HEB

    500 between the RHS members. Where the curtain wall is coming in order to fix the bottom

    bracket for the mullion we have added another UPN 100 member to which the bracket will be

    fixed with Bolts & Separation membrane

    4. Related changes

    The curtain wall in these locations is proposed at a distance of 100 mm outside the specified

    alignment so as to ensure that the top transom is not hindered by the connection members of

    steel structure.

    In the 3rd

    floor and 4th

    floor, curtain wall W 21a and W22a respectively will not be continuous

    unlike shown in the South Elevation side which can be a discrepancy in the drawing

  • 7/25/2019 Tecnical Submittal -

    2/8

    5.

    Connections

    The UPN channel section is proposed to be connected to the RHS 250x150 members with cleat

    angle of 200x200 welded to Box and channel from either side. The top level of the channel is

    proposed flush against the Box members and MS Sheet will be above this.

    6. Supporting Drawings

    a)

    Super imposed drawings Structural Steel and Architectural - Locations highlighted

    b)

    Proposal Plan ( 2 Sheets)

    c)

    Proposal Section Case 1

    d)

    Proposal Section Case 2

    e)

    Proposal Blown up section

  • 7/25/2019 Tecnical Submittal -

    3/8

  • 7/25/2019 Tecnical Submittal -

    4/8

    Section

    WithCu

    Section A. Case 1

    With Curtain wall

  • 7/25/2019 Tecnical Submittal -

    5/8

    SectionA.Case1

    WithCurtainwall

    SectionB.Case2

    WithoutCurtainwall

  • 7/25/2019 Tecnical Submittal -

    6/8

    HEB500

    R

    HS250*150*12.5

    HEB240

    Screed

    TOS:+18.95

    TOC:+19.10

    UPN

    100belowcurtainwall

    06m

    mthk-MSSheet

    4thfloor:FFL+19.20

    TOS:+19.10

    150

    Varies.1350Maximum

    ScreedTopp

    ingwith

    Rebar-10m

    m@150c/c

    Cu

    rtainWallSystem

    Case

    :1

    WithCurtainWall

    O

    utsidetheBuilding

    Insid

    etheBuilding

    SECTIO

    N-A

    StoneCladding

    asperdetails

    L65x65x6

    L65x65x6

    Refer

    toBlownupdrawing

  • 7/25/2019 Tecnical Submittal -

    7/8

    Blo

    ckworkwith

    Cla

    ddinginF

    acade

    HEB

    500

    R

    HS2

    50*1

    50*12.5

    HEB24

    0

    Scre

    ed

    TOS:+1

    8.9

    5

    TOC:+1

    9.1

    0

    06mm

    thk-M

    SSh

    eet

    4thflo

    or:FFL+1

    9.2

    0

    1350Maximum

    Scre

    edT

    oppingwith

    reB

    ar-1

    0m

    m@1

    50c/c

    Case

    :2

    With

    outCurtainW

    all

    Insid

    etheB

    uildin

    g

    SECTIO

    N-B

    150

    L65x

    65x

    6

  • 7/25/2019 Tecnical Submittal -

    8/8

    UPN

    100below

    curtainwallBetweentheRHSme

    mbers,

    top

    FlushwithcleatAngles:Gr:S270

    EPDMTermination

    AluminumBracketInstalled

    overChannelwithH

    SBolts(8.8gr)

    CoverCap

    S

    toneCopping

    OutsidetheBuilding

    InsidetheB

    uilding

    BottomTransom:10mmaboveFFL

    6mmthkMSPlate

    Gr:S270

    Blownupdra

    wingfor

    Curtainwall

    interface

    4thfloor:FFL

    +19.20

    D

    GU

    asperSpecs